Employing a Data Acquisition Handling System (DAHS) for New Source Performance Standards (NSPS) Ja Rule Reporting of Petroleum Refinery Emissions

Size: px
Start display at page:

Download "Employing a Data Acquisition Handling System (DAHS) for New Source Performance Standards (NSPS) Ja Rule Reporting of Petroleum Refinery Emissions"

Transcription

1 Technical Paper BR-1923 Employing a Data Acquisition Handling System (DAHS) for New Source Performance Standards (NSPS) Ja Rule Reporting of Petroleum Refinery Emissions Authors: D.C. Pretty Babcock & Wilcox Power Generation Group, Inc. Hatfield, Pennsylvania, U.S.A. Presented to: American Fuel & Petrochemical Manufacturers Date: October 19-21, 2014 Location: San Antonio, Texas, U.S.A.

2 Employing a Data Acquisition Handling System (DAHS) for New Source Performance Standards (NSPS) Ja Rule Reporting of Petroleum Refinery Emissions BR-1923 D.C. Pretty Babcock & Wilcox Power Generation Group, Inc., Hatfield, Pennsylvania, USA Presented to American Fuel & Petrochemical Manufacturers October 19-21, 2014 San Antonio, Texas, USA Abstract New environmental regulations have been promulgated in the Environmental Protection Agency (EPA) Federal Register that amend the existing new source performance standards (NSPS) of refinery sources including process heaters and flares. One of the many implications of the amended Ja rule include new Continuous Emissions Monitoring System (CEMS) installations for all affected sources, including (but not limited to) NO x CEMS, O 2 CEMS, H 2 S CEMS, and total reduced sulfur (TRS) CEMS. Owners will be subject to various performance specification (PS) standards in conjunction with operating the new CEMS. With each of the PS requirements, a data collection mechanism is specified to track the measurements, quality assurance (QA) activities, and overall CEMS operating time, to be reported on a quarterly basis at minimum (as needed). There are various data collection devices in the industry including, but not limited to, programmable logic controllers, data loggers, and various distributive control systems. Using a process control system for environmental reporting creates a challenge with the increase in QA and reporting activities needed to support monitoring for the new sources at the refinery. Data Acquisition and Handling System (DAHS) technology utilizes built-in logic engines to determine data validity, in both data collection and CEMS QA. With the amount of affected emissions sources growing and environmental staff not growing at the same rate, a DAHS streamlines the efforts of environmental staff by automating the human effort required for reporting. 1

3 The Rule NSPS Ja With the inception of the Clean Air Act in 1963, the federal government has taken an active and documented approach to monitoring and controlling air quality with regards to emissions from industrial sources. Refineries are among the industries with emissions sources affected by this legislation and continue to be affected with new regulations. The New Source Performance Standards (NSPS) Ja rule for petroleum refineries is documented in the Code of Federal Regulations, Title 40 (40CFR) Parts 9 and 60. The rule was initially proposed in May 2007 in the Environmental Protection Agency (EPA) Federal Register as an amendment to the existing NSPS of refinery sources including process heaters and flares, NSPS J rule. Through revisions during the following year, the rule became finalized in December 2008, but with an extension of the stay date for the rule. In September 2012, the final amendments were promulgated in the Federal Register. The final rule became effective in November 2012, effectually establishing a compliance deadline of November The Ja rule amendment applies to all process heaters newly constructed, reconstructed or modified after May 14, 2007, and flares newly constructed, reconstructed or modified after June 24, A flare is defined as a combustion device that uses an uncontrolled volume of air to burn gas. The rule further defines flares as a flare gas header system, hence creating it as a separate affected facility rather than a type of fuel gas combustion device, delineating it from other processes in a refinery (i.e., heater). In the case of multiple flares tying into the same header, each flare is considered an individual source to the header. Modifications to a flare as defined in Section a that trigger applicability to the rule are: Any new piping from a refinery process unit, including ancillary equipment A fuel gas system is physically connected to a flare Any alterations to the flare to increase flow capacity of the flare The Ja rule breaks down process heaters into different categories: natural draft process heaters, forced draft process heaters, co-fired natural draft process heaters, and co-fired forced draft process heaters. Natural draft process heaters are those that include induced draft systems and forced draft process heaters include balanced draft systems. The Ja rule is designed to achieve a reduction in emissions by stipulating new concentration-based limits for nitrogen oxides (NO x ), hydrogen sulfide (H 2 S) and total reduced sulfur (TRS) and volumetric flow - based limits for flow through a flare. The rule increases the amount of affected sources at a refinery for monitoring and applies additional limits to the monitoring sources to effectually reduce the NO x, sulfur dioxide (SO 2 ), and volatile organic compound (VOC) emissions emitted from these sources. The EPA estimates a reduction in SO 2 by 3,200 tons/year, NO x by 1,100 tons/year, and VOCs by 3,400 tons/year, with a co-benefit of CO 2 emission reductions by almost 2,000,000 metric tonnes a year. This emissions reduction will manifest with the EPA estimated 400 affected flares nationwide that will be subject to the final rule, an amount ten (10) times the estimates of 2008 with the original NSPS J rule. 2

4 CEMS Implications NSPS Ja Of the many implications of the amended Ja rule, new Continuous Emissions Monitoring System (CEMS) installations are required for all affected sources, with certain exceptions. For flare gas header systems subject to the rule, each flare of the system must be equipped with a continuous sulfur CEMS. Certain exemptions are allowed for flares that have inherently low SO 2 concentration gas flowing through them, are used very infrequently, are equipped with recovery gas systems or are secondary flares. Emergency flares are those defined by use (i.e. no flow through them) less than 4 times a year. Those flares equipped with a flare recovery gas system must be designed and sized to capture all flows while secondary flares must have accurate measurement through its primary source. For process heaters subject to the rule, each must be equipped with a continuous NO x CEMS along with an O 2 CEMS to measure as the diluents. Certain exemptions apply for process heaters that are equipped with low or ultra-low NO x burners, that have a rated capacity <100 MBtu/hr and that choose to use a heat inputbased NO x emission reporting mechanism. In those instances, a CEMS is not required for compliance, but fuel consumption and compliance testing are required to demonstrate emissions limits. TRS emissions compliance requires owners to maintain and operate a TRS CEMS, with quality assurance (QA) activities as specified in 40CFR Part60, Appendix B, Performance Specification (PS) 5. Popular technologies for monitoring TRS are ultraviolet (UV) fluorescence measurements through various means of sample delivery. This technology provides a quick response (typically <5 sec) and reliable measurement of multiple sulfur species. For H 2 S emissions compliance, owners are required to maintain and operate an H 2 S CEMS, with QA activities specified in PS-7. Gas chromatography is the industry preferred technique, which employs separating sample gas in a column and using the retention of each gas in the column for detection. This method has a lengthy response time due to the measurement complexity, but it is the most accurate method for tracking H 2 S in the flare. For NO x emissions compliance, source owners are required to maintain and operate a NO x and O 2 CEMS, with QA activities specified in PS-2 and PS-3 respectively. A popular technology for NO x measurement is by chemiluminescence, as it provides a more accurate response when measured at lower levels (<50ppm) of NO x. The paramagnetic cell technology employed for O 2 measurement uses a strong magnetic field to separate oxygen molecules for analysis. Each type of CEMS has its own set of operation, maintenance and certification testing procedures, each of which represents material cost and personnel staffing requirement for the refineries. Material costs include the CEMS peripherals (enclosure, HVAC system, etc.), replacement/spare CEMS parts, and Relative Accuracy Test Audit (RATA) testers, while Instrument and Controls (I&C) technicians and environmental staff are part of the CEMS maintenance and reporting team. 3

5 With each of the PS requirements, a data collection mechanism is specified to track the operations of the CEMS system. PS-2, 3, 5 and 7 specify that a CEMS data recorder shall have an established high and low-level value which must be between 1.5 times the span and the span provided in the applicable regulation. Along with CEMS concentration data, the CEMS data recorder must also track QA activities and overall CEMS operating time to be reported on a quarterly basis at minimum, or as frequently as the particular state/air district requests. To track measurements, data collection devices must have the capability of collecting analog and digital signals over copper (hard-wired), through a communication protocol interface (i.e., Modbus), or a combination of both. The signal, either hard-wired or digital, will originate from the CEMS monitor (or analyzer). For reporting data to the agency, the CEMS data recorder must collect and retain certain peripheral information, outside of the CEMS measurements. When logging a calibration drift test or a certification drift test (7-day), the CEMS recorder must have the capability to track the CEMS readings along with the gas standard readings so that the percent (%) drift error can be calculated. With instrument diagnostics coming from the CEMS monitors/analyzers, the health of the CEMS can also be documented by a CEMS recorder. The maintenance, calibration, and malfunction inputs can be connected directly to the CEMS recorder, which is the preferred method, but it is not imperative that it be done in this manner. Whether manually entered by a responsible party for the CEMS (I&C technician or an environmental engineer) or logged directly from the CEMS system, the data recorder needs to recognize those periods of time to document overall CEMS downtime. With the rule asking for CEMS data to comply with emissions limits on a multi-hour or multi-day basis, an hour average recording is acceptable; however, during a RATA, the data collection system must be able to produce minute level readings for comparison with an external CEMS. CEMS Data Recorders NSPS Ja There is a myriad of devices which can collect data from a CEMS and peripheral process data. Programmable logic controllers (PLCs) are miniature digital computers that are used widely for process control throughout various industries. Like a computer, PLCs include a controller (central processing unit, CPU, with integrated memory) and input/output (I/O) receivers attached to the controller. The logic programming of a PLC allows the controller to collect inputs (analog or digital) and manipulate outputs (analog or digital) based on the particular logic written. Modern PLC s are designed for rugged installation, with a high tolerance for vibration, abrasion and temperature, withstanding temperatures generally over 100 F, 2g or better vibration rating, and 20g or better impact force. I/O blocks are a functionless version of the I/O used with a PLC, but carry all the same durable properties of a PLC. The I/O block needs a CPU (PLC controller, logger, or computer) to act as the storage device, since the I/O blocks do not come with memory. A data logger refers to any electronic device that collects and records data over time. Devices as primitive as a chart recorder or as sophisticated as a computer server are considered data loggers, as they all can record and maintain data over a continuous period of time. What separates a data logger from other devices with integrated memory (computer, PLC, etc.) is that loggers 4

6 traditionally do not handle logic, much like an I/O block; they simply record data. Distributed control systems (DCS) are a network of CPUs that handle functions across a plant or facility. The processes are physically spread out over a large physical area, usually covering several square miles (e.g., a refinery); hence it does not make sense for the CPU s to be centralized in one zone. These industrial systems are tied to a long-term recording device, typically a computer server. The storage mechanism is a database which houses the information and logs it in a logical format, recording the parameter (in this case emissions measurement), date and time, and measurement diagnostic. Information in the database, depending on its capabilities, can be aggregated, manipulated and reprocessed into a physical hard-copy report. For NSPS Ja compliance, the CEMS data must be collected to produce multi-hour and multi-day averages. Environmental staff and I&C technicians are both involved in managing emissions data at different stages of the process. When I&C technicians perform service on the CEMS for preventative or corrective maintenance, or calibrate the instrument, they log the periods of time in the data recorder and must keep a reason for the periods of CEMS downtime and a corrective action for getting the CEMS back online. Environmental staff then average the data, excluding the periods of CEMS downtime, per 40CFR60.13 and produce the appropriate calculations based on that particular emission limit. As dictates, each hour of emissions data becomes valid pending the CEMS downtime does not exceed 30 minutes, as logged in maximum 15 minute averages. If data is recorded on a minute-by-minute basis, the hour becomes valid if there are two quadrants of data with at least one minute of normal CEMS operation separated by 15 minutes. The valid hour data blocks are then averaged in 3-hour, 24-hour, and 30-day averages for H 2 S, SO 2 and NO x respectively. Those hours that are considered CEMS downtime must be collected and reported out each quarter to demonstrate CEMS operation at 90% or greater during source operation. Figure 1 shows an example report which denotes the information required for reporting for each emission parameter from each source at the refinery. It is the responsibility of the environmental staff to properly aggregate the CEMS operating data, categorize it into the proper performance summary category, and finally create a ratio (percentage) of CEMS downtime to total source operating time. At the end of each quarter 2,160 hours are reconciled, for each source in the plant, and with an estimated 400 newly affected flares across the country this means over 800,000 hours quarterly to properly track and manage for new sulfur CEMS nationwide. Technicians and environmental staff at refineries are burdened with this requirement, in addition to the CEMS currently being managed. 5

7 Figure 1 Summary Report Gaseous and Opacity Excess Emission and Monitoring System Performance Source: 40 CFR 60.7 Subpart A, General Provisions; Electronic Code of Federal Regulation, 2014; Web. CEMS Data Management NSPS Ja Virtually all operating refineries use a DCS system for process control, regardless of the particular process or product manufactured. A DCS infrastructure includes, but is not limited to, controllers, located at the plant level, a series of human-machine interface (HMI) terminals, including operator, engineering and management stations, and an overall plant data system, which collects data from all the controllers. Figure 2 is a sample DCS block diagram of the various functional levels. 6

8 Figure 2 DCS Functional Level Block Diagram The DCS controllers have I/O blocks for collecting digital and analog signals, similar to a PLC, and instrumentation used in the plant is tied into the DCS system to monitor the specific process. The communication protocols between DCS controller, HMI terminals and plant data system can vary based on the manufacturer, and can be configured through a hard-wired interface, an open protocol like Modbus, or a proprietary protocol. A CEMS is logical to integrate into a DCS system as the CEMS components are instruments which can be tied into an individual controller. A DCS also has infrastructure to provide long-term storage required for CEMS data and can reprocess minute level information through residual calculations (e.g., NO x corrected to O 2 ) or by outputting data into a spreadsheet (Microsoft Excel) or as a hard-copy printout. Many refineries chose to go this route by implementing their DCS as their CEMS data recorder and continue to use a DCS as their data management tool. The main drawback of using a DCS as a CEMS recorder is that while it fits the purpose as specified by PS-2, it does not do much beyond that. DCS controllers can collect data from the instruments through various means (hard-wired interface, electronic protocol, etc.), and serve it up to a plant data historian where calculations can then be performed. Most DCS historians even have the means of producing up to 7

9 a 24-hour average, in any specified increment inclusive. They lack, however, the ability to handle the data validation algorithms as specified in 40CFR As specified to calculate an hourly average: At least four valid data points are required to calculate the hourly average, i.e., one data point in each of the 15-minute quadrants of the hour For a partial operating hour (any clock hour with less than 60 minutes of unit operation), at least one valid data point in each 15-minute quadrant of the hour in which the unit operates is required to calculate the hourly average For any operating hour in which required maintenance or quality assurance activities are performed o o If the unit operates in two or more quadrants of the hour, a minimum of two valid data points, separated by at least 15 minutes, is required to calculate the hourly average If the unit operates in only one quadrant of the hour, at least one valid data point is required to calculate the hourly average If a daily calibration error check is failed during any operating hour, all data for that hour shall be invalidated, unless a subsequent calibration error test is passed in the same hour Except as provided under paragraph (h)(2)(vii) of this section, data recorded during periods of continuous monitoring system breakdown, repair, calibration checks, and zero and span adjustments shall not be included in the data averages The above standards spell out five logic scenarios to be carried out for hourly average processing. This means that the CEMS data reporting tool must be able to collect source operation to handle partial operating hours, reconcile preventative maintenance, corrective maintenance, calibration checks, calibration failures and equipment failures, and finally validate them throughout the minutes of an hour to produce valid 15-minute averages (and hourly averages subsequently). To simply collect the CEMS operational data, a DCS would need to have input from CEMS equipment to indicate failure, user/operator inputs to determine preventative/corrective maintenance activities, and knowledge of a gas standard being introduced while performing a calibration and whether it has passed or failed based on the specific pollutant performance specification. Once this information is collected, it then takes a powerful algorithm to create the hourly averages as specified by 40CFR DCS systems are sophisticated machines, but this level of calculation is outside the purpose of a DCS, as it is by design a process control system. Logging process parameters is part of the DCS design since it needs to use them for process control (e.g., using process temperature as a feedback for controlling fuel firing rate), but collecting and averaging data as specified by NSPS Ja is not its intended purpose. This now becomes the duty of environmental staff to use external programs and their own time and energy to finish the task of producing the final emissions averages, along with the emission exceedence reporting, CEMS downtime reporting, and quarterly/annual QA activities reporting. Based on the practices of the refinery, the data required to include in quarterly reports may be stored in multiple systems, requiring human intervention to extrapolate the appropriate information for reporting. Environmental staff may have to pull records from 8

10 CEMS maintenance logs, instrument diagnostic logs, and a DCS to complete the compliance reports. The additional sources NSPS Ja estimates will add to the hundreds of sources already spread out across the country, thus increasing the already demanding workload of environmental staff. Employing a DAHS NSPS Ja A Data Acquisition and Handling System (DAHS) is a computer-based system which is a tool for CEMS data storage and processing. A DAHS is a combination of a data collection device, a historian, and a logic/reporting engine that performs data handling, validation and reporting. DAHS technology captures the data reporting requirements denoted in 40CFR60.13, in addition to tracking CEMS downtime and source operating time. Figure 3 Typical DAHS Architecture Diagram Figure 3 shows a typical DAHS architecture, where each component serves a purpose in the overall tracking of CEMS data and QA activities. The data collection device is the source level of the DAHS architecture, connecting to the instrumentation associated with the CEMS. The data collection device takes in information like raw emissions data, the analyzer performance and various process signals to send to the historian. Depending on the design, a user input can be entered into the data collection device to be collected and aggregated (i.e., a CEMS analyzer maintenance toggle switch) as an I/O point. A data collection device could be the aforementioned PLC, I/O block, data logger, or a DCS since they each collect I/O. Some DAHS manufacturers have historians and logic/reporting engines that are compatible with multiple data collection devices, and each DAHS manufacturer specifies the type, quantity and variety to be used with their particular application. The historian and logic/reporting engine are codependent and usually reside as one portion of the application, but each serve a different purpose in the data handling process. Information collected by the data collection device gets sent to the historian, which is in the form of a database or other proprietary storage format. Due to the compact and rugged nature of data collection devices, they are limited with storage memory for information, so historians become the long-term storage mechanism for the DAHS. User inputs such as calibration gas standard information, periods of corrective maintenance, or reasons for corrective action after an equipment failure 9

11 are all examples of information that will be logged in the historian, along with the date and time of each occurrence. In addition to continuous CEMS data, the historian will also collect QA activities (Quarterly CGA, annual RATA) and initial certification data. DAHS applications vary, but some QA and certification activities can be automated while others require user data entry. Once data is collected in the historian, the logic engine takes over to perform data calculations and validations. The creation of hourly averages is only part of what the logic engine does; in total, a logic engine would: Perform arithmetic calculations to produce proper reporting units for an emission parameter and calculating hourly averages from the data based on CEMS performance for that particular emission as outlined in 40CFR60.13 Validate a calibration drift check (daily or CGA) passed or failed by applying user input on calibration gas standards and calculating the drift between the analyzer reading and the standard (following 40CFR60 Appendix F) Determine if an emission from a source (expressed as a 3-hr, 24-hr or 30-day rolling average) exceeds the limits of NSPS Ja, accumulate periods of excess, categorize them per Figure 1, and create a ratio of excess periods to total source operating time Sum up the periods of CEMS downtime, categorize them per Figure 1, and create a ratio of CEMS downtime to total source operating time Validate QA activity for completion, assess if it passed or failed, apply data validation (or invalidation) as necessary The reporting engine will pull from a combination of the historian and logic engine of a DAHS to handle compliance reports. Compliance reports output from a CEMS will include at minimum those specified in 40CFR60.7 Subpart A, which handle excess emissions and downtime reporting. Certification and QA activity reports are an output from the DAHS, as they are required for quarters where those activities were performed to demonstrate compliance. The format for reports can vary as necessary, but generally are a Microsoft Excel file format for easy viewing. A DAHS simplifies compliance for environmental staff with the logic/reporting engine inherent to the product. With a DAHS, the information which potentially was held in multiple systems is stored in one database, running one application for data access and report generation. In addition to streamlined compliance, other benefits of a DAHS include functional data and monitoring for process operations staff and I&C technicians who work on CEMS. For I&C technicians, a DAHS can monitor CEMS analyzer and sample system function through monitoring the instrumentation associated with the CEMS and create alerts for malfunction, hence decreasing CEMS downtime with proactive notifications. Also, I&C technicians can access the historian through a front-end application to manually categorize and provide corrective actions for a period of CEMS downtime immediately after it happens (e.g., after they 10

12 finish a maintenance activity). For operations staff, a DAHS can calculate predictive emissions exceedence alarms based on source performance to track emissions concentrations and rates and alert users prior to exceeding a compliance limit. Like I&C technicians, operations staff can access the historian to manually categorize and provide corrective actions for periods of CEMS emissions limit exceedence. While there have been no formal studies done on the effects of using a DAHS to decrease CEMS downtime or decrease CEMS emissions exceedence, the reduction of man hours and staffing requirements for CEMS compliance are real and tangible. The US Bureau of Labor Statistics reports the average annual salary for an environmental engineer is just above $80,000, while the average DAHS cost lies between $25,000 and $50, From a business management view, owners typically want to limit expenses that do not increase revenue or provide a return on their investments (i.e., environmental regulations compliance). However, a one-time equipment cost can be justified easier than a recurring personnel cost, whether for internal or external contract staffing. Owners will staff as they see fit for NSPS Ja compliance, but this sudden and large increase of emissions data collection and reporting requirements will not be met in proportion with the same staffing. While all DAHS products provide streamlined compliance, the product s flexibility to create an efficient and user-friendly experience is what differentiates one from another. 1 Data taken from top 5 DAHS vendors in the United States as of

13 Copyright 2014 by Babcock & Wilcox Power Generation Group, Inc. All rights reserved. No part of this work may be published, translated or reproduced in any form or by any means, or incorporated into any information retrieval system, without the written permission of the copyright holder. Permission requests should be addressed to: Marketing Communications, Babcock & Wilcox Power Generation Group, Inc., P.O. Box 351, Barberton, Ohio, U.S.A Or, contact us from our website at Disclaimer Although the information presented in this work is believed to be reliable, this work is published with the understanding that Babcock & Wilcox Power Generation Group, Inc. (B&W PGG) and the authors and contributors to this work are supplying general information and are not attempting to render or provide engineering or professional services. Neither B&W PGG nor any of its employees make any warranty, guarantee or representation, whether expressed or implied, with respect to the accuracy, completeness or usefulness of any information, product, process, method or apparatus discussed in this work, including warranties of merchantability and fitness for a particular or intended purpose. Neither B&W PGG nor any of its officers, directors or employees shall be liable for any losses or damages with respect to or resulting from the use of, or the inability to use, any information, product, process, method or apparatus discussed in this work. 12

Natural Gas Conversions of Existing Coal-Fired Boilers

Natural Gas Conversions of Existing Coal-Fired Boilers White Paper MS-14 Natural Gas Conversions of Existing Coal-Fired s Authors: F.J. Binkiewicz Jr., P.E. R.J. Kleisley B.E. McMahon J.E. Monacelli D.A. Roth D.K. Wong Babcock & Wilcox Power Generation Group,

More information

Quality Assurance Program Quality Assurance Plan Periodic Audits Standard Operating Procedures Preventive Maintenance Outline Quality Assurance Plan (QAP) What is a QAP Why is a QAP required? What does

More information

Assessing the Changes Required by the Industrial Boiler MACT Regulations

Assessing the Changes Required by the Industrial Boiler MACT Regulations Technical Paper MS-17 Assessing the Changes Required by the Industrial Boiler MACT Regulations Authors: A.L. LeClair L.M. McDermitt Babcock & Wilcox Power Generation Group, Inc. Barberton, Ohio, U.S.A

More information

Application Note 12: TrendView Recorders Continuous Emissions Monitoring

Application Note 12: TrendView Recorders Continuous Emissions Monitoring Application Note 12: TrendView Recorders Continuous Emissions Monitoring Continuous Emissions Monitoring (often abbreviated to CEM) is the term commonly used to describe instantaneous or real-time environmental

More information

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,

More information

NetDAHS Edge Software A proactive and centralized control hub for air compliance reporting

NetDAHS Edge Software A proactive and centralized control hub for air compliance reporting NetDAHS Edge Software A proactive and centralized control hub for air compliance reporting Babcock & Wilcox Power Generation Group, Inc. (B&W PGG), the exclusive provider of KVB-Enertec emissions products

More information

Keywords: PEMS, CEMS, turbine

Keywords: PEMS, CEMS, turbine SYMPOSIUM OF THE INDUSTRIAL APPLICATION OF GAS TURBINES COMMITTEE BANFF, ALBERTA, CANADA OCTOBER 2015 CERTIFICATION OF A STATISTICAL HYBRID PREDICTIVE EMISSION MONITORING SYSTEM IN THE U.S.A. AND DEVELOPMENT

More information

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting The monitoring provisions for the WEB trading program balance the need for accurate monitoring to provide certainty for

More information

NSPS Subpart OOOO: Applicability and Compliance Basics

NSPS Subpart OOOO: Applicability and Compliance Basics NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com

More information

Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents. Applicability... 1.0

Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents. Applicability... 1.0 Chapter 2 Compliance Branch CEMS Guidance Manual Table of Contents Page No. Applicability... 1.0 1.0 Continuous Emissions Monitor Operating Principles... 3.0 1.1 Introduction... 3.0 1.2 Definitions...

More information

Continuous Monitoring Manual

Continuous Monitoring Manual January, 1992 Revisions: April, 2015 Operations Division 811 SW 6 th Avenue Portland, OR 97204 Phone: 503-229-5696 800-452-4011 Fax: 503-229-5850 Contact: Jill Inahara www.oregon.gov/deq DEQ is a leader

More information

MEMORY RESISTORS EMISSIONS MONITORING

MEMORY RESISTORS EMISSIONS MONITORING MEMORY RESISTORS EMISSIONS MONITORING FEBRUARY / MARCH 2009 $9.50 (incl GST) NANOTUBE BUILDING BLOCKS THE FUTURE OF CONSTRUCTION This article was supplied by Mustang Engineering. Brian Funke and Allen

More information

Data Validation Clarification Document (DRAFT) Continuous Source Monitoring Manual Revision No. 8 (Manual)

Data Validation Clarification Document (DRAFT) Continuous Source Monitoring Manual Revision No. 8 (Manual) Data Validation Clarification Document (DRAFT) Continuous Source Monitoring Manual Revision No. 8 (Manual) Disclaimer: The Continuous Source Monitoring Manual Revision No. 8 (Manual) - Data Validation

More information

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds

Texas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June

More information

PROCEDURE 1. QUALITY ASSURANCE REQUIREMENTS FOR GAS CONTINUOUS EMISSION MONITORING SYSTEMS USED FOR COMPLIANCE DETERMINATION

PROCEDURE 1. QUALITY ASSURANCE REQUIREMENTS FOR GAS CONTINUOUS EMISSION MONITORING SYSTEMS USED FOR COMPLIANCE DETERMINATION While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the

More information

1.0 What Are the Purpose and Applicability of Performance Specification 11?

1.0 What Are the Purpose and Applicability of Performance Specification 11? While we have taken steps to ensure the accuracy of this Internet version of the document, it is not the official version. Please refer to the official version in the FR publication, which appears on the

More information

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit. Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 153-11686 First Significant Permit Modification to Part 70 No.: T153-5975-00006 Dear Ms. Frosch: Midwestern

More information

NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER

NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER NEW GENERATION PROGRAMMABLE AUTOMATION CONTROLLER Understanding what a PAC is starts from the understanding of PLC. A PLC is a Programmable Logic while

More information

Process gas chromatographs. Measurement made easy. Compliance Solutions for 40CFR60 Subpart Ja

Process gas chromatographs. Measurement made easy. Compliance Solutions for 40CFR60 Subpart Ja Process gas chromatographs. Measurement made easy Compliance Solutions for 40CFR60 Subpart Ja Introduction ABB offers a proven analytical solution to completely meet your Refinery Flare Monitoring requirements

More information

State of the Art (SOTA) Manual for Boilers and Process Heaters

State of the Art (SOTA) Manual for Boilers and Process Heaters State of the Art (SOTA) Manual for Boilers and Process Heaters Original Date: July 1997 Revision Date: February 22, 2004 State of New Jersey Department of Environmental Protection Air Quality Permitting

More information

ABSTRACT. Paper #13178. David T. Suess DSG Solutions, LLC, 8315 5 th Ave NE, Seattle, WA 98115 Rex S. Thompson

ABSTRACT. Paper #13178. David T. Suess DSG Solutions, LLC, 8315 5 th Ave NE, Seattle, WA 98115 Rex S. Thompson Data Acquisition and Handling System (DAHS) Emissions Compliance and Regulatory Audit Recipe for Large Combustion Units Equipped with Continuous Emission Monitoring Systems (CEMS) and Continuous Opacity

More information

Combined Cycle Control Overview

Combined Cycle Control Overview Combined Cycle Control Overview Introduction The Combined Cycle (CC) solution provides for the control and monitoring of a typical CC power plant in a cost effective, preengineered package. Basic Architecture

More information

Using Advanced Process Controls to Drive Regulatory Emissions Compliance

Using Advanced Process Controls to Drive Regulatory Emissions Compliance Q&A and Technology Forum Plant Automation & Decision Support Sessions October 9-12, 2007 PD-07-109 Using Advanced Process Controls to Drive Regulatory Emissions Compliance Presented By: Dennis L. Cima,

More information

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit. Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 125-11685 First Significant Permit Modification to Part 70 No.: T 125-5976-00004 Dear Ms. Frosch: Midwestern

More information

What Now? More Standards for Safety and Regulatory Compliance

What Now? More Standards for Safety and Regulatory Compliance What Now? More Standards for Safety and Regulatory Compliance Mike Schmidt, P.E., CFSE Bluefield Process Safety Chuck Miller, CFSP Emerson Process Management Presenters Mike Schmidt, P.E., CFSE Bluefield

More information

INDEX 9-7-100 GENERAL

INDEX 9-7-100 GENERAL REGULATION 9 INORGANIC GASEOUS POLLUTANTS RULE 7 NITROGEN OXIDES AND CARBON MONOXIDE FROM INDUSTRIAL, INSTITUTIONAL AND COMMERCIAL BOILERS, STEAM GENERATORS AND PROCESS HEATERS INDEX 9-7-100 GENERAL 9-7-101

More information

Testing Automated Manufacturing Processes

Testing Automated Manufacturing Processes Testing Automated Manufacturing Processes (PLC based architecture) 1 ❶ Introduction. ❷ Regulations. ❸ CSV Automated Manufacturing Systems. ❹ PLCs Validation Methodology / Approach. ❺ Testing. ❻ Controls

More information

MHRA GMP Data Integrity Definitions and Guidance for Industry January 2015

MHRA GMP Data Integrity Definitions and Guidance for Industry January 2015 MHRA GMP Data Integrity Definitions and Guidance for Industry Introduction: Data integrity is fundamental in a pharmaceutical quality system which ensures that medicines are of the required quality. This

More information

Tank Gauging & Inventory Management Solutions

Tank Gauging & Inventory Management Solutions & Inventory Management Solutions Automation solutions for oil & gas, defense and aviation applications FuelsManager, Varec s industry-leading software is available in four editions: Standard, Professional,

More information

HC900 for Boiler Control Applications

HC900 for Boiler Control Applications HC900 for Boiler Control Applications Background Until recent years, only the largest boilers could justify sophisticated boiler controls. Now high fuel costs make it necessary to improve boiler efficiency

More information

PROPOSED ADDENDA TO EPA/AUTO PROTOCOL FOR COMPLIANCE ASSURANCE MONITORING

PROPOSED ADDENDA TO EPA/AUTO PROTOCOL FOR COMPLIANCE ASSURANCE MONITORING This document presents procedures that satisfy EPA Compliance Assurance Monitoring (CAM) rule requirements applicable to VOC (Volatile Organic Compound) emission control devices for coating processes for

More information

Rosemount Analytical s X-STREAM XE Web-Browser Interface Takes Process Analysis to the Next Level

Rosemount Analytical s X-STREAM XE Web-Browser Interface Takes Process Analysis to the Next Level Solutions for the Process Industries Rosemount Analytical s -STREAM E Web-Browser Interface Takes Process Analysis to the Next Level The -Stream E takes process gas analysis to the level of ease of use

More information

INDUSTRIAL BOILER MACT FACTSHEET

INDUSTRIAL BOILER MACT FACTSHEET INDUSTRIAL BOILER MACT FACTSHEET The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Industrial/Commercial/Institutional Boilers and Process Heaters (40 CFR Part 63, Subpart DDDDD),

More information

Rob Barton RMB Consulting & Research, Inc. EPRI CEM User Group Conference May 8, 2013

Rob Barton RMB Consulting & Research, Inc. EPRI CEM User Group Conference May 8, 2013 Rob Barton EPRI CEM User Group Conference May 8, 2013 Unique Reporting Challenges Compilation of various reporting requirements Electronic submittal of most data/records Adapting existing tools to new

More information

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR] State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit For This General Permit allows for the construction, installation, reconstruction and operation of single

More information

Semaphore T BOX Applications in Data Center Facilities

Semaphore T BOX Applications in Data Center Facilities Semaphore T BOX Applications in Data Center Facilities Introduction Data centers must reliably provide 24/7/365 operation. For automation and monitoring of the facility, use of a rugged, reliable RTU is

More information

Maximizing return on plant assets

Maximizing return on plant assets Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth

More information

MHRA GMP Data Integrity Definitions and Guidance for Industry March 2015

MHRA GMP Data Integrity Definitions and Guidance for Industry March 2015 MHRA GMP Data Integrity Definitions and Guidance for Industry Introduction: Data integrity is fundamental in a pharmaceutical quality system which ensures that medicines are of the required quality. This

More information

KPI, OEE AND DOWNTIME ANALYTICS. An ICONICS Whitepaper

KPI, OEE AND DOWNTIME ANALYTICS. An ICONICS Whitepaper 2010 KPI, OEE AND DOWNTIME ANALYTICS An ICONICS Whitepaper CONTENTS 1 ABOUT THIS DOCUMENT 1 1.1 SCOPE OF THE DOCUMENT... 1 2 INTRODUCTION 2 2.1 ICONICS TOOLS PROVIDE DOWNTIME ANALYTICS... 2 3 DETERMINING

More information

Implementation of a Real-Time Environmental Data Management System to Ensure HRVOC Program Compliance

Implementation of a Real-Time Environmental Data Management System to Ensure HRVOC Program Compliance Implementation of a Real-Time Environmental Data Management System to Ensure HRVOC Program Compliance By Kelly Coppola BP Texas City Site, BP Products North America, Inc. Texas City, Texas and Jane Buchanan

More information

MATHESON STACK EMISSION CALIBRATION PROGRAM. Experience the MATHESON Commitment to Supply Chain Excellence

MATHESON STACK EMISSION CALIBRATION PROGRAM. Experience the MATHESON Commitment to Supply Chain Excellence MATHESON STACK EMISSION CALIBRATION PROGRAM MATHESON STACK EMISSION CALIBRATION PROGRAM MATHESON is a single source for industrial, medical, specialty, and electronics gases as well as gas handling equipment,

More information

ARTICLE 3. MONITORING REQUIREMENTS

ARTICLE 3. MONITORING REQUIREMENTS ARTICLE 3. MONITORING REQUIREMENTS Rule 1. Continuous Monitoring of Emissions (Repealed) (Repealed by Air Pollution Control Division; filed Aug 28, 1990, 4:50 p.m.: 14 IR 81) Rule 1.1. Continuous Monitoring

More information

SHORT TRAINING COURSES

SHORT TRAINING COURSES Post Office Box SR 95, Spintex Road, Ghana Tel: +233 302 812680, Fax: +233 302 814709 E mail: contact@automationghana.com Website: www.automationghana.com SHORT TRAINING COURSES Equipping industries with

More information

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule

More information

Title V Compliance Verification Process

Title V Compliance Verification Process em case study by Sara King and Jeffrey Meyers Development and Implementation of a Title V Compliance Verification Process Sara L. King is the environmental director at the ConocoPhillips Ponca City Refinery,

More information

Server Consolidation with SQL Server 2008

Server Consolidation with SQL Server 2008 Server Consolidation with SQL Server 2008 White Paper Published: August 2007 Updated: July 2008 Summary: Microsoft SQL Server 2008 supports multiple options for server consolidation, providing organizations

More information

Mass Flow Meter Product Guide

Mass Flow Meter Product Guide Mass Flow Meter Product Guide 2 thermal Mass technology Kurz Instruments manufactures thermal mass flow meters designed to accurately monitor and measure dry air, dry gas, and wet gas environments. Thermal

More information

NSW Air Quality Monitoring Network: Quality Assurance Procedures

NSW Air Quality Monitoring Network: Quality Assurance Procedures NSW Air Quality Monitoring Network: Quality Assurance Procedures Copyright State of NSW and Office of Environment and Heritage With the exception of photographs, the State of NSW and Office of Environment

More information

sierra monitor corporation Fire and Gas Detection Systems

sierra monitor corporation Fire and Gas Detection Systems sierra monitor corporation Fire and Gas Detection Systems Sierra Monitor Corporation Inspired by technology, driven by safety, designed with passion Information Technology protecting life and property

More information

ORACLE HYPERION DATA RELATIONSHIP MANAGEMENT

ORACLE HYPERION DATA RELATIONSHIP MANAGEMENT Oracle Fusion editions of Oracle's Hyperion performance management products are currently available only on Microsoft Windows server platforms. The following is intended to outline our general product

More information

MATHESON REFINERY PROGRAM for Specialty Gas Supply. Experience the MATHESON Commitment to Supply Chain Excellence

MATHESON REFINERY PROGRAM for Specialty Gas Supply. Experience the MATHESON Commitment to Supply Chain Excellence MATHESON REFINERY PROGRAM for Specialty Gas Supply MATHESON REFINERY PROGRAM for Specialty Gas Supply MATHESON is a single source for industrial, medical, specialty, and electronics gases as well as gas

More information

Thermal Mass Flow Meters

Thermal Mass Flow Meters Thermal Mass Flow Meters for Greenhouse Gas Emissions Monitoring Natural Gas Measurement for Emissions Calculations Flare Gas Monitoring Vent Gas Monitoring Biogas and Digester Gas Monitoring Landfill

More information

Rule 1146.2 - EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS

Rule 1146.2 - EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS Rule 1146.2 - EMISSIONS OF OXIDES OF NITROGEN FROM LARGE WATER HEATERS AND SMALL BOILERS (a) Purpose and Applicability The purpose of this rule is to reduce NOx emissions from natural gas-fired large (commercial)

More information

FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION

FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION EPA s Air Rules for the Oil & Natural Gas Industry FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION Storage tanks are used to temporarily hold liquids

More information

Wolverine Clean Energy Venture

Wolverine Clean Energy Venture Prepared for: Wolverine Power Supply Cooperative Cadillac, Michigan Supplement to CAA Section 112(g) MACT Auxiliary Boiler Amended Application No. 317-07 Wolverine Clean Energy Venture Rogers City, MI

More information

COLORADO REGULATION 7

COLORADO REGULATION 7 COLORADO REGULATION 7 Author: Jay Christopher, Business Unit Manager, Air & Process Services, Trihydro Corporation Jane Steere, QAQC Coordinator, Air & Process Services, Trihydro Corporation ABSTRACT The

More information

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment

More information

Site Identification No.: 197809AAO Application No.: 15030051

Site Identification No.: 197809AAO Application No.: 15030051 Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO

More information

Empowering intelligent utility networks with visibility and control

Empowering intelligent utility networks with visibility and control IBM Software Energy and Utilities Thought Leadership White Paper Empowering intelligent utility networks with visibility and control IBM Intelligent Metering Network Management software solution 2 Empowering

More information

Implementation of a Large Real-time Environmental Data Management System

Implementation of a Large Real-time Environmental Data Management System Environmental Conference September 18-20, 2005 The Fairmont Hotel Dallas, Texas Implementation of a Large Real-time Environmental Data Management System Presented By: Paul Glaves Mustang Engineering, Inc./

More information

Real-time Video Monitoring Increases the Efficiency of SCADA Process Management

Real-time Video Monitoring Increases the Efficiency of SCADA Process Management Harry Hsiao, Moxa Product Manager (harry.hsiao@moxa.com) Traditional SCADA (Supervisory Control and Data Acquisition) systems have been an important part of automation control systems for many years, and

More information

Process Instrumentation

Process Instrumentation Process Instrumentation Analysis by Gas Chromatography Engineered Solutions, Guaranteed Results. WASSON - ECE INSTRUMENTATION Process Gas Chromatography Features of Process Chromatographs Agilent 7890A

More information

How to Choose the Right Industrial Firewall: The Top 7 Considerations. Li Peng Product Manager

How to Choose the Right Industrial Firewall: The Top 7 Considerations. Li Peng Product Manager How to Choose the Right Industrial Firewall: The Top 7 Considerations Li Peng Product Manager The right industrial firewall can strengthen the safety and reliability of control systems Central to industrial

More information

Small Business Economic Impact Statement Chapter 173-441 WAC Reporting of Emission of Greenhouse Gases

Small Business Economic Impact Statement Chapter 173-441 WAC Reporting of Emission of Greenhouse Gases Small Business Economic Impact Statement Chapter 173-441 WAC Reporting of Emission of Greenhouse Gases September 2010 Publication no. 10-02-024 Publication and Contact Information This report is available

More information

F ox W hi t e Paper. Reduce Energy Costs and Enhance Emissions Monitoring Systems

F ox W hi t e Paper. Reduce Energy Costs and Enhance Emissions Monitoring Systems F ox W hi t e Paper Reduce Energy Costs and Enhance Emissions Monitoring Systems A Technical White Paper from Fox Thermal Instruments Rich Cada, VP Sales & Marketing, Fox Thermal Instruments, Inc. 399

More information

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013 Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013 Overview O Background (pollutants) O Federal permitting regulations O Colorado permitting regulations O Colorado

More information

WIRELESS REMOTE MONITORING OF CATHODIC PROTECTION SYSTEMS. John Hawkyard MICorr Deputy General Manager Rawabi Corrosion Technology Co Ltd Al-Khobar

WIRELESS REMOTE MONITORING OF CATHODIC PROTECTION SYSTEMS. John Hawkyard MICorr Deputy General Manager Rawabi Corrosion Technology Co Ltd Al-Khobar WIRELESS REMOTE MONITORING OF CATHODIC PROTECTION SYSTEMS John Hawkyard MICorr Deputy General Manager Rawabi Corrosion Technology Co Ltd Al-Khobar INTRODUCTION Cathodic Protection is an electrochemical

More information

IndustrialIT System 800xA Engineering

IndustrialIT System 800xA Engineering IndustrialIT System 800xA Engineering Overview Features and Benefits Integrated Engineering Environment: Supports the engineering of the entire extended automation system from field devices to plant management

More information

The Advantages of Enterprise Historians vs. Relational Databases

The Advantages of Enterprise Historians vs. Relational Databases GE Intelligent Platforms The Advantages of Enterprise Historians vs. Relational Databases Comparing Two Approaches for Data Collection and Optimized Process Operations The Advantages of Enterprise Historians

More information

A ChemoMetec A/S White Paper September 2013

A ChemoMetec A/S White Paper September 2013 NucleoCounter NC-3000, NucleoView NC-3000 Software and Code of Federal Regulation 21 Part 11; Electronic Records, Electronic Signatures (21 CFR Part 11) A ChemoMetec A/S White Paper September 2013 ChemoMetec

More information

of The New England Water Works Association

of The New England Water Works Association Journal Our 132nd Year of The New England Water Works Association Volume 127 No. 2 June 2013 PUTNAM WATER TREATMENT PLANT AQUARION WATER COMPANY OF CONNECTICUT GREENWICH, CONNECTICUT New England Water

More information

U.S. EPA Part 75 Emissions Monitoring Policy Manual and Updates Copy can be downloaded at: http://www.epa.gov/airmarkets/emissions/monitoring.

U.S. EPA Part 75 Emissions Monitoring Policy Manual and Updates Copy can be downloaded at: http://www.epa.gov/airmarkets/emissions/monitoring. ECMPS Emissions Collection and Monitoring Plan System CEMTEK Environmental 2012 ECMPS is the electronic reporting system through which Part 75 affected facilities report monitoring plan records, QA/Certification

More information

Exhibit to Data Center Services Service Component Provider Master Services Agreement

Exhibit to Data Center Services Service Component Provider Master Services Agreement Exhibit to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-002 Between The State of Texas, acting by and through the Texas Department of Information

More information

Product Catalog. Trane eview Energy Reporting Software BAS-PRC054-EN. November 2010

Product Catalog. Trane eview Energy Reporting Software BAS-PRC054-EN. November 2010 Product Catalog Trane eview Energy Reporting Software November 2010 BAS-PRC054-EN Copyright 2010 Trane This document and the information in it are the property of Trane and may not be used or reproduced

More information

Station Automation Series COM600 Protection and control from ABB Future-proof Concept: Extensive Substation System Integration and Interoperability The Station Automation Series COM600 is a dedicated system

More information

Automation Technology Helps Precast Producer Reduce Energy Consumption and Lower Costs

Automation Technology Helps Precast Producer Reduce Energy Consumption and Lower Costs Automation Technology Helps Precast Producer Reduce Energy Consumption and Lower Costs Gregg Jacobson, Gary Jacobs, Tom Holmes and Tony Bryant, Wells Concrete Don Pankowski, Wally Metzen, Gretchen Hughes

More information

Introduction. Background

Introduction. Background Predictive Operational Analytics (POA): Customized Solutions for Improving Efficiency and Productivity for Manufacturers using a Predictive Analytics Approach Introduction Preserving assets and improving

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD IN RE: Proposed revisions to Air Pollution Control Regulation

More information

Using Predictive Maintenance to Approach Zero Downtime

Using Predictive Maintenance to Approach Zero Downtime SAP Thought Leadership Paper Predictive Maintenance Using Predictive Maintenance to Approach Zero Downtime How Predictive Analytics Makes This Possible Table of Contents 4 Optimizing Machine Maintenance

More information

Proactive Performance Management for Enterprise Databases

Proactive Performance Management for Enterprise Databases Proactive Performance Management for Enterprise Databases Abstract DBAs today need to do more than react to performance issues; they must be proactive in their database management activities. Proactive

More information

Antelope Enterprise. Electronic Documents Management System and Workflow Engine

Antelope Enterprise. Electronic Documents Management System and Workflow Engine Antelope Enterprise Electronic Documents Management System and Workflow Engine Antelope Enterprise v4 High Availability Edition Information in this document applies to the Antelope Enterprise v4 High Availability.

More information

ORACLE PLANNING AND BUDGETING CLOUD SERVICE

ORACLE PLANNING AND BUDGETING CLOUD SERVICE ORACLE PLANNING AND BUDGETING CLOUD SERVICE ENTERPRISE WIDE PLANNING, BUDGETING AND FORECASTING KEY FEATURES Multi-dimensional / multi user planning with a powerful business rules engine Flexible workflow

More information

Reliability Modeling Software Defined

Reliability Modeling Software Defined Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights

More information

WHITE PAPER. Improving Operational Readiness for P25 Systems through Advanced Network Monitoring

WHITE PAPER. Improving Operational Readiness for P25 Systems through Advanced Network Monitoring WHITE PAPER Improving Operational Readiness for P25 Systems through Advanced Network Monitoring With the introduction of trunked radios systems over 20 years ago, public safety communications technology

More information

AMBIENT AIR QUALITY MONITORING SYSTEM. Air Quality Monitoring... Easier. Faster. Better. www.chemtrols.com

AMBIENT AIR QUALITY MONITORING SYSTEM. Air Quality Monitoring... Easier. Faster. Better. www.chemtrols.com AMBIENT AIR QUALITY MONITORING SYSTEM Air Quality Monitoring... Easier. Faster. Better. www.chemtrols.com AMBIENT AIR QUALITY MONITORING FROM CHEMTROLS Chemtrols is a leading solution provider in the field

More information

Oracle Planning and Budgeting Cloud Service

Oracle Planning and Budgeting Cloud Service Oracle Planning and Budgeting Cloud Service Oracle Planning and Budgeting Cloud Service enables organizations of all sizes to quickly adopt world-class planning and budgeting applications with no CAPEX

More information

Microsoft Dynamics NAV 2013 R2 Sizing Guidelines for Multitenant Deployments

Microsoft Dynamics NAV 2013 R2 Sizing Guidelines for Multitenant Deployments Microsoft Dynamics NAV 2013 R2 Sizing Guidelines for Multitenant Deployments February 2014 Contents Microsoft Dynamics NAV 2013 R2 3 Test deployment configurations 3 Test results 5 Microsoft Dynamics NAV

More information

Part 75 Emissions Monitoring Policy Manual. U.S. Environmental Protection Agency Clean Air Markets Division Washington, D.C.

Part 75 Emissions Monitoring Policy Manual. U.S. Environmental Protection Agency Clean Air Markets Division Washington, D.C. Part 75 Emissions Monitoring Policy Manual U.S. Environmental Protection Agency Clean Air Markets Division Washington, D.C. 2013 TABLE OF CONTENTS Page Introduction... iii Section 1 -- General... 1-i Section

More information

Rockwell Automation s Business Intelligence Solutions for Manufacturers

Rockwell Automation s Business Intelligence Solutions for Manufacturers ARC VIEW DECEMBER 3, 2009 Rockwell Automation s Business Intelligence Solutions for Manufacturers By Craig Resnick Summary Rockwell Automation recently briefed ARC regarding its latest business intelligence

More information

Product Overview. Dream Report. OCEAN DATA SYSTEMS The Art of Industrial Intelligence. User Friendly & Programming Free Reporting.

Product Overview. Dream Report. OCEAN DATA SYSTEMS The Art of Industrial Intelligence. User Friendly & Programming Free Reporting. Dream Report OCEAN DATA SYSTEMS The Art of Industrial Intelligence User Friendly & Programming Free Reporting. Dream Report for Trihedral s VTScada Dream Report Product Overview Applications Compliance

More information

OECD SERIES ON PRINCIPLES OF GOOD LABORATORY PRACTICE AND COMPLIANCE MONITORING NUMBER 10 GLP CONSENSUS DOCUMENT

OECD SERIES ON PRINCIPLES OF GOOD LABORATORY PRACTICE AND COMPLIANCE MONITORING NUMBER 10 GLP CONSENSUS DOCUMENT GENERAL DISTRIBUTION OCDE/GD(95)115 OECD SERIES ON PRINCIPLES OF GOOD LABORATORY PRACTICE AND COMPLIANCE MONITORING NUMBER 10 GLP CONSENSUS DOCUMENT THE APPLICATION OF THE PRINCIPLES OF GLP TO COMPUTERISED

More information

Emulated Digital Control System Validation in Nuclear Power Plant Training Simulators

Emulated Digital Control System Validation in Nuclear Power Plant Training Simulators Digital Control System Validation in Nuclear Power Training s Gregory W. Silvaggio Westinghouse Electric Company LLC silvaggw@westinghouse.com Keywords: Validation, nuclear, digital control systems Abstract

More information

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in

More information

ORACLE HYPERION PLANNING

ORACLE HYPERION PLANNING ORACLE HYPERION PLANNING ENTERPRISE WIDE PLANNING, BUDGETING, AND FORECASTING KEY FEATURES Hybrid data model facilitates planning, analysis and commentary Flexible workflow capabilities Reliability with

More information

(Adopted December 1, 1978)(Amended July 8, 1983)(Amended November 6, 2009) (Amended September 5, 2014)

(Adopted December 1, 1978)(Amended July 8, 1983)(Amended November 6, 2009) (Amended September 5, 2014) (Adopted December 1, 1978)(Amended July 8, 1983)(Amended November 6, 2009) (Amended September 5, 2014) RULE 1111. REDUCTION OF NO x EMISSIONS FROM NATURAL-GAS- FIRED, FAN-TYPE CENTRAL FURNACES (a) (b)

More information

NortechCommander Software Operating Manual MAN-00004 R6

NortechCommander Software Operating Manual MAN-00004 R6 NortechCommander Software Operating Manual MAN-00004 R6 If the equipment described herein bears the symbol, the said equipment complies with the applicable European Union Directive and Standards mentioned

More information

New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion

New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion New RCSA section 22a-174-22 Subcommittee Definitions, Applicability, Tune ups, Record keeping 4/29/15 Summary of Discussion Before the meeting Bob Silvestri (PSEG) shared diluent cap description and definition.

More information

Control of Boiler Operation using PLC SCADA

Control of Boiler Operation using PLC SCADA Control of Boiler Operation using PLC SCADA K. Gowri Shankar Abstract This paper outlines the various stages of operation involved in the conversion of a manually operated boiler towards a fully automated

More information

Artificial Intelligence Advancements Applied in Off-The-Shelf Controllers

Artificial Intelligence Advancements Applied in Off-The-Shelf Controllers Artificial Intelligence Advancements Applied in Off-The-Shelf Controllers Abstract: By: Edward M. Marszal, P.E. President, Kenexis Ph: 614-451-7031 Fax: 614-451-2643 3366 Riverside Drive Columbus, OH 43221

More information

TR 07-03 SUPPLEMENTARY REQUIREMENTS FOR THE ACCREDITATION OF CONTINUOUS AMBIENT AIR QUALITY MONITORING STATIONS

TR 07-03 SUPPLEMENTARY REQUIREMENTS FOR THE ACCREDITATION OF CONTINUOUS AMBIENT AIR QUALITY MONITORING STATIONS SUPPLEMENTARY REQUIREMENTS FOR THE ACCREDITATION OF CONTINUOUS AMBIENT AIR QUALITY MONITORING STATIONS Approved By: Chief Executive Officer: Ron Josias Senior Manager: Christinah Leballo Reviewed By: Testing

More information