1 Internal Audit Milton Keynes Council ATTENDANCE MANAGEMENT Internal Audit Final Report JULY 2012

2 EXECUTIVE SUMMARY 1 AUDIT AREA An audit of Attendance Management has been carried out in accordance with the annual audit plan, with a particular focus on the reporting of sickness. 2 AUDIT OPINION Limited Assurance Some controls exist but inconsistency in application by managers undermines the value of these controls. However, the implementation of MK Council s Employee and Management Self Service (ESS/MSS) should address many of the weaknesses identified and in turn raise the opinion to Satisfactory. The Management culture around Attendance Management must also improve which may result in a Good rating being achievable in future audits. 3 AUDIT CONCLUSIONS 3.1 Although there are Policies and Procedures in place these are not fully complied with throughout the council by management resulting in failure to record and monitor sickness absence. The result is: under reporting of actual sickness on payroll poor management of staff sickness contributing to further unnecessary absence potential financial losses There is no evidence to suggest that Managers are currently held accountable for non-compliance with the Attendance Management policies. 3.2 There are no standard processes used to record employee attendance including flexi-time working. As a result the flex-time/toil policies have been breached in some areas. Furthermore, there is a potential risk that staff do not work the hours for which they are paid. 3.3 Human Resources (HR) have been working closely on a sickness absence/attendance management pilot with Neighbourhood Services and this has improved the reporting of sickness absence. 3.4 Training has highlighted the importance of Attendance Management to Managers and attendees report they feel more empowered as a result to take appropriate action when dealing with attendance issues. AUDIT REPORT E620/12 1 JULY 2012

3 4 THE FUTURE 4.1 All actions are in the Management Action Plan (Page 7). Detailed findings from the audit are reported within the Main Report in Section The introduction of ESS/MSS should address many of the control weaknesses identified in this report. The roll out of ESS/MSS is due to start in August 2012, subject to satisfactory pilot outcomes. 4.3 There need to be cultural improvements across the council that ensure all managers comply with the Management Attendance Policies and use of ESS/MSS. Some further improvements could be achieved by HR Advisory working closely with the Service Groups as it has done with Neighbourhood Services and once the learning from the pilot programme has been reviewed. Furthermore, management at all levels must be made accountable for noncompliance with Attendance Management Policies. 4.4 As systems of recording improve, reported sickness levels may increase. As the culture improves and sickness is better managed sickness absence levels may then reduce. AUDIT REPORT E620/12 2 JULY 2012

4 MAIN REPORT 5 BACKGROUND INFORMATION 5.1 Employees are the Council s biggest asset. The Attendance Management Policy states that The Council recognises that employee absences have an adverse impact on colleagues, workloads and service delivery. The purpose of the policy is to ensure a consistent and fair approach to managing issues of non-attendance and to minimise employee absence through positive attendance management. Along with the supporting Toolkit the policy specifies the responsibilities of line managers, employees and human resources in promoting good attendance. 5.2 Line managers are responsible for managing their employees attendance in respect of the adherence to contracted hours, flexi-time regulations (where applicable), annual leave entitlement and authorising other absence types. 5.3 HR oversees the collation and reporting of absence data for the whole council and supports line managers in dealing with absences within their teams. HR advisory currently spend approximately 45% of their time on managing attendance and case work has increased following recent pilots to address employee absences when sickness reaches the 4+ trigger (4 periods of sickness in a rolling 6 month period). Over a period of time this work has resulted in improvements in reducing sickness absence within the pilot areas and improved workforce information. 5.4 The Council s new Employee and Manager Self-Service (piloted since May 2012), aims to reduce the number of routine information requests and transactions made directly to HR personnel and allow employees to have direct access to view and modify their own information. It will provide a centralised record for access to management data including attendance and nonattendance management. However, HR will continue to monitor sickness absence at a high level and provide line managers with monthly sickness absence reports and support in dealing with long term sickness absence. 5.5 Statistics The statistics shown below are based on reported data. However, as highlighted the data does not reflect actual sickness because not all sickness is reported. SUM of FTE absence days lost to sickness 2011/12 ** Total number of employees More than zero less than or more, less than or more less than or more 188 Grand Total 2061 ** The above report was produced by HR on request from Audit. This information currently is not readily available from the HR system but instead required a detailed manipulation of data by HR staff to provide this information. AUDIT REPORT E620/12 3 JULY 2012

5 Year Annual Corporate Sickness per FTE (Incl Schools) Corporate Benchmark Actual CIPFA Benchmarking (all unitary average) 2011/ * / / Year Annual Corporate Sickness per FTE (Excl Schools) Corporate Benchmark Actual CIPFA Benchmarking (all unitary average) 2011/ Not available 2010/ Not available 2009/ Not available *awaiting figures from Strictly Ed Illness Type Total FTE days lost 2011/12 Stress Infection Other Musculo Stomach etc Back, Neck Neurological Eye, Ear Mouth Genito, Menst Heart, Circula Other Types Chest, Resp Pregnancy Dermatological Grand Total % Total available FTE days AUDIT SCOPE & AREAS/SCORES 6.1 To establish the degree of adherence to current policies and procedures, Audit reviewed the current Attendance Management processes in place to record and monitor attendance, sickness absence, annual leave and flexi-time/toil, with 22 managers. A sample of employees attendance records were also reviewed and where applicable checked back to payroll s records. To ensure that managers follow due process with regards to attendance management. (Management responsibilities) Key: 1 = Poor, 3 = Good ** Whilst some departments comply with Attendance Management Policy the weaknesses that exist across the council and the lack of enforcement of Policy results in a score of 1. ** AUDIT REPORT E620/12 4 JULY 2012

6 7 DETAILED FINDINGS 7.1 Sickness Absence Internal Audit identified sickness absences that had gone unreported on payroll. For instance, in one service area, that maintains good records, 5% of sickness absence was not reported to payroll. For those departments that do not maintain good records it is not possible for Internal Audit to quantify the level on non-reported sickness. See Management Action Plan reference 1a out of 22 departments have no system to centrally record sick leave. This makes it difficult for managers to readily monitor sickness absence. See Management Action Plan reference 1b Further to a conversation with the payroll manager, it is noted that ESS/MSS will help to ensure that sickness is recorded for those employees on flexi-time working because managers will have to record sickness absence in order for flexi-time balances to be correct. However, this will not ensure that the formal return to work process with staff is carried out out of 22 managers do not consistently complete Return to Work forms and formal interviews. Instead for shorter periods of absence an informal discussion takes place. See Management Action Plan reference 2a Copies of Sickness Notification Forms and Return to Work Interview forms are not always retained by 8 out of 22 managers. See Management Action Plan reference 2b. 7.2 General Attendance Records Most departments do use a flex-time recording system although currently there are a variety of different systems used, even sometimes within the same department. However in some departments there is no checking of timesheets to ensure accuracy of time recorded. See Management Action Plan reference 1c The following types of variances from the flexi-time policy were noted: Start time recorded before 8am however, often this was due to a legitimate business need or in agreement with the manager 5+ hours worked without a 30 minute break being taken Carried forward credit within 4 week period over the 15 hour allowance, however sometimes this was in agreement with the manager See Management Action Plan reference 1d The current Annual Leave/Flexi card system works well. No problems to report. AUDIT REPORT E620/12 5 JULY 2012

7 7.3 Training Managers reported the Attendance Management Training has helped them to enforce the sickness absence policies. However, out of the 22 managers interviewed, 7 had not attended either the full Attendance Management Training or the Bite Size Training. See Management Action Plan Management Information HR Advisory s recent pilot on the 4+ trigger issue resulted in an increase in case work for HR advisory. However, over a period of time, sickness absence decreased demonstrating the benefits of improved management The statistics shown in the background of the report were provided by HR. However, it is noted that for some statistics HR have to do a lot of manipulation of the data in order to obtain statistics that could be of value in strategically managing sickness and to provide further support to managers in their operational management of absence. See Management Action Plan 4. AUDIT REPORT E620/12 6 JULY 2012

8 ATTENDANCE MANAGEMENT MANAGEMENT ACTION PLAN The Agreed Actions are categorised on the following basis: Essential - Implementation is required to address a risk that fundamentally undermines the control or objective of that system. Important - Implementation is required to address a risk that seriously undermines the control or objective of that system. Standard - Implementation is required to address a risk that undermines the control or objective of that system. Ref. Findings Risk/ Implication Agreed Action Management Comments Manager Responsible & (Target Date) 1a 1b Sickness Absence Sickness absence is not always reported to payroll. A central record of sick leave absence is not currently maintained by all managers Under reporting of sickness Poor staff management Potential financial loss. Essential Following the ESS/MSS pilot and review of lessons learned, subject to Project Board approval, ESS/MSS to be rolled out across the council at the earliest appropriate opportunity. Agreed. AD HR Strategy/ 31 December c 1d General Attendance Management Various time recording systems are used across the council and in some departments there is no independent check of timesheets. Flexi-time working There are breaches of the flexi-time policy Potential for inaccurate recording of actual hours worked Potential impact on individuals well-being and/or service delivery AUDIT REPORT E620/13 7 JULY 2012

9 ATTENDANCE MANAGEMENT 2a 2b Sickness Absence Formal and documented Return to Work Interviews are not undertaken for short periods of absence. Managers are not currently retaining a local copy of Sickness Notifications Forms and/or Return to Work Interview forms. Poor staff management Unnecessary absenteeism Essential Following a review and evaluation of the work that HR Advisory has done with Neighbourhood Services to consider rolling this out across all Service Groups. Once it is believed that Managers are following procedures effectively then to avoid further constraints on resources, HR s involvement will need to adjust accordingly with Management Information being used to manage future compliance. Agreed, subject to full consideration of the costs and benefits. AD HR Strategy/ 31 December 2012 (for the review and evaluation) 2c General Attendance Management Section 1a-d above highlights that ESS/MSS will help achieve improved sickness reporting, time recording and compliance with the flexi-time policy. However, if managers are not accountable for personal failure and failure of their staff to use ESS then ESS/MSS will not provide the benefits expected. Failure to use ESS/MSS or inaccurate/ fraudulent reporting of time All levels of staff, across the council, must use ESS/MSS, especially for recorded sickness absence. Managers must check staff timesheets, where applicable, on a regular basis to ensure that timesheets are being completed correctly. Whilst ESS/MSS should allow variances to flexitime policy, at management discretion and in line with service needs (the exception rather than the rule) the independent check of timesheets should ensure that this allowance is not abused. Regular review of records and Management Information should be undertaken to ensure all staff are using ESS/MSS as expected. Council policy should reflect that failure to record information accurately through self service ie time recording as expected, is potentially a disciplinary offence. Agreed AD HR Strategy/ 31 December 2012 AUDIT REPORT E620/13 8 JULY 2012

10 ATTENDANCE MANAGEMENT 3 Attendance Management (AM)Training Despite the mandatory requirement to attend AM training not all managers have attended the training course. Poor staff management. Important HR to provide further information about AM training opportunities to managers. Participation should be monitored and reported to senior managers. Agreed AD HR Strategy/ 31 October Management Information Within the current systems used, there is no facility to easily extract data to accurately breakdown short term and long term sickness per employee. Additionally the same applies to breaking down the reasons for long term absence. Long term absence not managed effectively. Important Existing plans to improve MI reporting on sickness absence with the implementation of ESS/MSS to be activated as soon as feasible post implementation Consideration needs to be given to the reports required to allow strategic management of sickness absence and ensure that these can be easily obtained from ESS/MSS. There is no intention to change to the MI reporting (unless we agree further investment in configuration of a more sophisticated report) but data accuracy would be an outcome which the team (MI&BP) would be analysing closely with line managers AD HR Strategy/ 31 December 2012 AUDIT REPORT E620/13 9 JULY 2012

11 E620/13 - ATTENDANCE MANAGEMENT Final Report Distribution List Corporate Director - Resources Assistant Director HR Strategy Assistant Director Financial Management Member with Portfolio for Finance Audit Commission Lynda Baker Head of Internal Audit Karen Hall Auditor Available in audio, large print, Braille and other languages Tel Milton Keynes Council Civic Offices 1Saxon Gate East Central Milton Keynes MK9 3EJ T F E internal.audit@milton-keynes.gov.uk W audit

Milton Keynes Council

Milton Keynes Council Internal Audit Milton Keynes Council www.milton-keynes.gov.uk/internal-audit Internal Audit Final Report JULY 2013 EXECUTIVE SUMMARY 1 AUDIT AREA 1.1 An audit of (FAST) has been carried out in accordance

More information

Attendance Management City of York Council Internal Audit Report 2013/14

Attendance Management City of York Council Internal Audit Report 2013/14 Attendance Management City of York Council Internal Audit Report 2013/14 Business Unit: Corporate and Cross Cutting : Assistant Director - Customers & Employees Service Manager: P3 P2 P1 Date Issued: 09/07/2014

More information

Briefing Paper for the Management of Sickness Absence Cardiff Council. Audit year: 2013-14 Issued: May 2014 Document reference: 275A2014

Briefing Paper for the Management of Sickness Absence Cardiff Council. Audit year: 2013-14 Issued: May 2014 Document reference: 275A2014 Briefing Paper for the Management of Sickness Absence Cardiff Council Audit year: 2013-14 Issued: May 2014 Document reference: 275A2014 Status of briefing paper This document has been prepared for the

More information

Health & Wellbeing Framework. Absence Management Policy

Health & Wellbeing Framework. Absence Management Policy Health & Wellbeing Framework Absence Management Policy 1 Introduction This Policy is part of the Health & Wellbeing Framework which is made up of a number of elements which together encompass all formal

More information

Sickness Absence Rates In DASH - An Overview

Sickness Absence Rates In DASH - An Overview SICKNESS RATES: ADULT SERVICES AND HEALTH DIRECTORATE 1. Sickness absence rates 213/14 As reported and noted, DASH recorded a higher average number of days' sickness absence amongst its employees for 213/14

More information

Report of Kim Jobson Head of Human Resources and Organisational Development

Report of Kim Jobson Head of Human Resources and Organisational Development Item No. 5 Corporate Issues Overview & Scrutiny 27 January 2011 Managing Sickness Absence Report of Kim Jobson Head of Human Resources and Organisational Development Purpose of the Report 1 To provide

More information

Title: Sickness Absence Management Policy and Procedure. CONTENT SECTION DESCRIPTION PAGE. 1 Introduction 2. 2 Policy statement 2.

Title: Sickness Absence Management Policy and Procedure. CONTENT SECTION DESCRIPTION PAGE. 1 Introduction 2. 2 Policy statement 2. Title: Sickness Absence Management Policy and Procedure. Date Approved: 17 June 2014 Approved by: JSPF Date of review: June 2016 Policy Ref: Issue: 1 Division/Department: Human Resources Author (post-holder):

More information

Attendance Management Procedure and Policy

Attendance Management Procedure and Policy ATTENDANCE MANAGEMENT PROCEDURE Attendance Management Procedure and Policy Attendance management procedure Date of Issue: 02 September 2015 To: All Headteachers, Chairs of Governors and Management Committees

More information

MANAGING ATTENDANCE POLICY

MANAGING ATTENDANCE POLICY MANAGING ATTENDANCE POLICY POLICY Purpose 3 Responsibilities 3 Sickness Schemes 3 PROCEDURE Sickness Notification Procedure 4 4.1 General Principals 4 4.2 Reporting of Sickness Absence 4 4.3 Sickness Absence

More information

STRESS POLICY. Stress Policy. Head of Valuation Services. Review History

STRESS POLICY. Stress Policy. Head of Valuation Services. Review History STRESS POLICY Title Who should use this Author Stress Policy All Staff SAC Approved by Management Team Approved by Joint Board Reviewer Head of Valuation Services Review Date 2018 REVIEW NO. DETAILS Review

More information

POLICY FOR MANAGING SICKNESS ABSENCE

POLICY FOR MANAGING SICKNESS ABSENCE Summary POLICY FOR MANAGING SICKNESS ABSENCE This policy sets out the standards for dealing with sickness absence in a fair, sensitive and supportive way, whilst at the same time recognising the needs

More information

Sickness absence policy

Sickness absence policy Sickness absence policy This policy forms part of your contract of employment. The councils are entitled to introduce minor and non-fundamental changes to this policy by notifying you of these changes

More information

2.1 notes the statistics and information contained within this report;

2.1 notes the statistics and information contained within this report; DUNDEE CITY COUNCIL REPORT TO: Personnel Committee - 15 August 2005 REPORT ON: REPORT BY: Sickness Absence Management Assistant Chief Executive (Management) REPORT NO: 485-2005 1 PURPOSE OF REPORT 1.1

More information

Insert CCG Logo. Flexi Time Scheme

Insert CCG Logo. Flexi Time Scheme 1 Insert CCG Logo Flexi Time Scheme Review Circulation Application Ratification Author Minor Amendments Supersedes Title 1 DOCUMENT CONTROL PAGE Flexi Time Scheme All previous CCG Flexi Time Policies

More information

Attendance Management Policy 1

Attendance Management Policy 1 Scope: All Staff Effective Date: Aug 2009 Responsible Dept: Human Resources Equality Impact Assessment: Completed April 2012 Last updated by/date: May 2012 Next review date: May 2015 Associated links &

More information

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service Agenda Item 8 Page 1 of 9 MEETING Audit, Governance & Review Committee AGENDA ITEM 8 MEETING DATE 11 December 2013 REPORT NUMBER SUBJECT REPORT BY

More information

DRAFT MANAGEMENT OF EMPLOYEE CAPABILITY: ATTENDANCE MANAGEMENT POLICY

DRAFT MANAGEMENT OF EMPLOYEE CAPABILITY: ATTENDANCE MANAGEMENT POLICY DRAFT MANAGEMENT OF EMPLOYEE CAPABILITY: ATTENDANCE MANAGEMENT POLICY CONTENTS Section Page 1 Introduction 2 2 Scope 2 3 Key Responsibilities 3 4 Definitions used Within the Policy 3 5 Recording & Monitoring

More information

SICKNESS ABSENCE MANAGEMENT POLICY & SICK LEAVE POLICY (Revised July 2014)

SICKNESS ABSENCE MANAGEMENT POLICY & SICK LEAVE POLICY (Revised July 2014) SICKNESS ABSENCE MANAGEMENT POLICY & SICK LEAVE POLICY (Revised July 2014) 1. INTRODUCTION Dundalk Institute of Technology (hereinafter called the Institute ) recognises that regular attendance is an essential

More information

SICKNESS ABSENCE REPORT

SICKNESS ABSENCE REPORT AGENDA ITEM No. 12 MEETING : TRUST BOARD DATE : 28 APRIL 2010 REPORT OF : WORKFORCE & OD DIRECTORATE Contact : Jo Davies, Director of HR & Development Officer Tel: 01792 562940 Email: jo.davies@ambulance.wales.nhs.uk

More information

MERTHYR TYDFIL COUNTY BOROUGH COUNCIL

MERTHYR TYDFIL COUNTY BOROUGH COUNCIL MERTHYR TYDFIL COUNTY BOROUGH COUNCIL TIME AND ATTENDANCE POLICY Date approved by Council: Date of implementation: Date of review: 1 Contents 1. Overview.. 3 2. Responsibilities. 3 3. Recording Time.....

More information

Review of the Management of Sickness Absence Conwy County Borough Council

Review of the Management of Sickness Absence Conwy County Borough Council Audit 2004/2005 Date: December 2005 Authors: Ros Adams and George Jones Ref: 1072A2005 Review of the Management of Sickness Absence Conwy County Borough Council Contents Summary Report Introduction 3 Background

More information

Comhairle nan Eilean Siar Internal Audit Review MANAGEMENT OF SICKNESS ABSENCES. Final Report 2013/14-18

Comhairle nan Eilean Siar Internal Audit Review MANAGEMENT OF SICKNESS ABSENCES. Final Report 2013/14-18 Comhairle nan Eilean Siar Internal Audit Review Final Report 2013/14-18 01 st July 2013 CONTENTS Page SECTION 1 - EXECUTIVE SUMMARY 1-8 SECTION 2 - DETAILED FINDINGS AND RECOMMENDATIONS 9-27 SECTION 3

More information

Attendance management Policy

Attendance management Policy Attendance management Policy Policy summary West Yorkshire Police supports police officers and police staff, absent from work due to sickness and will treat them with compassion and respect. This policy

More information

THE MANAGEMENT OF SICKNESS ABSENCE BY NHS TRUSTS IN WALES

THE MANAGEMENT OF SICKNESS ABSENCE BY NHS TRUSTS IN WALES THE MANAGEMENT OF SICKNESS ABSENCE BY NHS TRUSTS IN WALES Report by Auditor General for Wales, presented to the National Assembly on 30 January 2004 Executive Summary 1 The health and well being of the

More information

Adult Social Care Select Committee 17 January 2012. Managing staff absence in Adult Social Care

Adult Social Care Select Committee 17 January 2012. Managing staff absence in Adult Social Care S Adult Social Care Select Committee 17 January 2012 Managing staff absence in Adult Social Care Purpose of the report: Scrutiny of Services/Performance Management This report sets out for information

More information

SICKNESS ABSENCE MANAGEMENT PROCEDURE. With effect from xxxxxx

SICKNESS ABSENCE MANAGEMENT PROCEDURE. With effect from xxxxxx SICKNESS ABSENCE MANAGEMENT PROCEDURE With effect from xxxxxx Purpose The purpose of this policy is to provide guidelines on how to manage and support staff through absence due to ill health. When is this

More information

Managing Absence Procedure

Managing Absence Procedure Managing Absence Procedure Human Resources 1 Introduction 1.1 The University is committed to maintaining the health, safety and wellbeing of its most important asset its workforce, and will seek to adopt

More information

Cardiff and Vale University Health Board. Sickness Absence Policy

Cardiff and Vale University Health Board. Sickness Absence Policy Cardiff and Vale University Health Board Sickness Absence Policy Approved by: Welsh Partnership Forum Business Committee Issue Date: September 2015 Review Date: October 2016 Document Title: Sickness Absence

More information

Attendance Management Policy

Attendance Management Policy Attendance Management Policy Document Reference: Version: Ratified by: Date ratified: Name of originator/author: Name of responsible committee/individual: Date issued: Review date: Target audience: Document

More information

Attendance Management Guidance

Attendance Management Guidance Attendance Management Guidance As at 15 September 2009-1 - Contents Page 1. Policy statement 3 2. Purpose 3 3. Scope 4 4. Confidentiality 4 5. Preventing sickness absence 5 6. Roles 5 7. Occupational health

More information

SICKNESS ABSENCE MANAGEMENT POLICY (HR06)

SICKNESS ABSENCE MANAGEMENT POLICY (HR06) SICKNESS ABSENCE MANAGEMENT POLICY (HR06) General Overview To be used in conjunction with: Section 1 Short Term Sickness Absence Management Procedure Section 2 Long Term Sickness Absence Management procedure

More information

NHS North Somerset Clinical Commissioning Group

NHS North Somerset Clinical Commissioning Group NHS North Somerset Clinical Commissioning Group HR Policies Managing Sickness Absence Approved by: Quality and Assurance Group Ratification date: September 2013 Review date: September 2016 Elaine Edwards

More information

Attendance Management Policy and Procedures

Attendance Management Policy and Procedures Attendance Management Policy and Procedures Attendance Management Policy..2 The Short Term Attendance Management Procedure...10 Explanation of Terms Used.13 The Stages of the Short Term Procedure.16 Introduction

More information

(HR Policy Committee 9 March 2015)

(HR Policy Committee 9 March 2015) Somerset County Council HR Policy Committee 9 March 2015 Paper B Item No. 6 Annual Report on Sickness Cabinet Member: Cllr Anna Groskop, Cabinet Member for HR & Transformation Lead Officer: Richard Williams,

More information

Director of Organisational Development & Workforce DISCIPLINARY POLICY

Director of Organisational Development & Workforce DISCIPLINARY POLICY Directorate of Organisational Development & Workforce DISCIPLINARY POLICY Reference: OWP017 Version: 3.0 This version issued: 15/05/13 Result of last review: Major changes Date approved by owner (if applicable):

More information

ATTENDANCE MANAGEMENT POLICY

ATTENDANCE MANAGEMENT POLICY ATTENDANCE MANAGEMENT POLICY Recommending Committee: Approving Committee: Signature: Human Resources Directorate Human Resources Council Carole Whewell Designation: Vice Chair Date: September 2008 October

More information

Chapter 3 Office of Human Resources Absenteeism Management

Chapter 3 Office of Human Resources Absenteeism Management Office of Human Resources Absenteeism Management Contents Section A - Background, Objective and Scope............................ 24 Section B - Criterion 1 - Communicating Expectations.......................

More information

Psychological Wellbeing and the Avoidance and Management of Stress Policy; Alcohol and drugs policy; Dignity within the University policy.

Psychological Wellbeing and the Avoidance and Management of Stress Policy; Alcohol and drugs policy; Dignity within the University policy. Sickness Absence Management Policy Version 1.0 Last amended: August 2014 SICKNESS ABSENCE MANAGEMENT POLICY 1. INTRODUCTION The University recognises and accepts its obligations in respect of employees

More information

How to manage employee. absence. bsenc

How to manage employee. absence. bsenc How to manage employee absence ploye bsenc The cost of sickness absence The DWP s (Department of Work and Pensions) Health and Wellbeing at Work Report found large employers reported a higher incidence

More information

Sickness Absence Report 2011-2012. The Big Life Group. Sickness Absence Report - April 2011 to March 2012

Sickness Absence Report 2011-2012. The Big Life Group. Sickness Absence Report - April 2011 to March 2012 The Big Life Group Sickness Absence Report - April 2011 to March 2012 1. INTRODUCTION From April 2009, managers have been recording sickness on the HR Database in place of the paper based attendance records.

More information

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY INFORMATION GOVERNANCE TOOLKIT REPORT

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY INFORMATION GOVERNANCE TOOLKIT REPORT NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY INFORMATION GOVERNANCE TOOLKIT REPORT 9.7 Date of the meeting 15/07/2015 Author Sponsoring Clinician Purpose of Report Recommendation J Green - Head

More information

LEASEHOLD MANAGEMENT & SHARED OWNERSHIP; INCLUDING SERVICE CHARGES

LEASEHOLD MANAGEMENT & SHARED OWNERSHIP; INCLUDING SERVICE CHARGES LEASEHOLD MANAGEMENT & SHARED OWNERSHIP; INCLUDING SERVICE CHARGES Final Distribution Director of Housing Services Home Ownership Manager Insurance Risk Manager Head of Finance Audit Manager, Audit Commission

More information

MANAGING ATTENDANCE POLICY

MANAGING ATTENDANCE POLICY 1 The Royal Liberty School Where boys are ambitious, where boys succeed MANAGING ATTENDANCE POLICY Reviewed by: Finance and Personnel Committee Review Date: June 2015 Next Review: June 2016 2 CONTENTS

More information

Cumbria Constabulary. Audit of Budget Management (Payroll)

Cumbria Constabulary. Audit of Budget Management (Payroll) Cumbria Constabulary Audit of Budget Management (Payroll) 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens), www.sjstudios.co.uk, Monument

More information

Managing Ill Health & Sickness Absence Procedure

Managing Ill Health & Sickness Absence Procedure Chelmsford City Council Human Resources Managing Ill Health & Sickness Absence Procedure Version 2.7 1 Version 2.7 2 Table of contents 1. Introduction... 5 1.1 Application & Discretion... 5 1.2 Employee

More information

Human Resources ATTENDANCE MANAGEMENT POLICY AND PROCEDURE. Agreed June 2013

Human Resources ATTENDANCE MANAGEMENT POLICY AND PROCEDURE. Agreed June 2013 Human Resources ATTENDANCE MANAGEMENT POLICY AND PROCEDURE Agreed June 2013 To be reviewed 2015 Contents Page 1. Scope and Policy 3 2. Accountability 3 3. Learner Involvement 3 4. Process 4.1 Rules for

More information

SICKNESS ABSENCE POLICY

SICKNESS ABSENCE POLICY SICKNESS ABSENCE POLICY 1 POLICY STATEMENT This sickness absence policy sets out procedures for reporting sickness absence and for managing sickness absence in a fair and consistent way. The Company recognises

More information

SHORT TERM SICKNESS ABSENCE MANAGEMENT GUIDANCE NOTES (MGN32) Final

SHORT TERM SICKNESS ABSENCE MANAGEMENT GUIDANCE NOTES (MGN32) Final SHORT TERM SICKNESS ABSENCE MANAGEMENT GUIDANCE NOTES (MGN32) Final Created By Amended by PCH HR Advisors 10.01.2012 Further amendments made at maximising attendance working group Jan & Feb 2012 Approved

More information

Staff Attendance at Work Policy

Staff Attendance at Work Policy Staff Attendance at Work Policy 1. Introduction 1.1. This Policy strives to ensure the wellbeing of employees at work, through support, advice and help where underlying health issue are contributing to

More information

PS 147 Attendance Management Policy

PS 147 Attendance Management Policy PS 147 Attendance Management Policy October 2012 Version 1.0 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

Little Firs Day Nursery. STAFF ATTENDANCE MANAGEMENT POLICY AND PROCEDURE

Little Firs Day Nursery. STAFF ATTENDANCE MANAGEMENT POLICY AND PROCEDURE Little Firs Day Nursery. STAFF ATTENDANCE MANAGEMENT POLICY AND PROCEDURE Little Firs is committed to promoting and encouraging the highest levels of attendance in order to maximise the use of both human

More information

Horniman Museum and Gardens

Horniman Museum and Gardens Horniman Museum and Gardens Statement of requirements for a human resources management system Tender submissions due by 2pm on Thursday 31 January 2013 January 2013 final version Page 1 of 15 1 Table of

More information

Work Life Balance (WLB)

Work Life Balance (WLB) Flexible Working Hours Policy Work Life Balance (WLB) Title Reference Flexible Working Hours Policy Work Life Balance (WLB) HRP001 Version 4.0 Date August 2008 Author Approved by Impact assessment date

More information

HSE HR Circular 007/2010 26 th April, 2010.

HSE HR Circular 007/2010 26 th April, 2010. Office of the National Director of Human Resources Health Service Executive Dr. Steevens Hospital Dublin 8 All Queries to: frank.oleary@hse.ie; Tel: 045 880454 des.williams@hse.ie; Tel: 045 882561 / 01

More information

Business Plan for Strategic Human Resources - March 2012 to 30 September 2013

Business Plan for Strategic Human Resources - March 2012 to 30 September 2013 Business Plan for Strategic Human Resources - March 2012 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are to: 1.2 Context Design & deliver people and organisational development

More information

JOB DESCRIPTION. HRPTS Payroll Implementation Manager (Temporary/Secondment Opportunity until 31 August 2014)

JOB DESCRIPTION. HRPTS Payroll Implementation Manager (Temporary/Secondment Opportunity until 31 August 2014) Ref No: 73214007 JOB DESCRIPTION JOB TITLE BAND DIRECTORATE INITIAL LOCATION REPORTS TO ACCOUNTABLE TO HRPTS Payroll Implementation Manager (Temporary/Secondment Opportunity until 31 August 2014) 8a Finance

More information

South Cave Bears Day Nursery Staff Absence Management Procedure

South Cave Bears Day Nursery Staff Absence Management Procedure South Cave Bears Day Nursery Staff Absence Management Procedure South Cave Bears Day Nursery encourages all its employees to maximise their attendance at work while recognising that employees will, from

More information

Self Assessment STANDARDS

Self Assessment STANDARDS Self Assessment STANDARDS www.wellbeingcharter.org.uk This pack contains an overview of the Workplace Wellbeing Charter, including the Charter Framework, the Assessment Standards and other useful information.

More information

Thurrock Council. Managing Sickness Absence Policy

Thurrock Council. Managing Sickness Absence Policy Thurrock Council Managing Sickness Absence Policy Contents Page 1. Introduction 5 2 Purpose 5 3. Scope 6 4. Key Responsibilities 6 Employees Managers Human Resources 5. Reporting Sickness Absence 7 Reporting

More information

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST HEALTHCARE GOVERNANCE COMMITTEE

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST HEALTHCARE GOVERNANCE COMMITTEE SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST HEALTHCARE GOVERNANCE COMMITTEE I TO BE HELD ON MONDAY 26 NOVEMBER 2012 Subject: Supporting Director: Author: Status

More information

Report by Director Workforce, Organisational Development and Delivery Support

Report by Director Workforce, Organisational Development and Delivery Support Agenda Item No. 8 Performance and Finance Select Committee 3 October 2014 Sickness Absence and Employee Health and Wellbeing Report by Director Workforce, Organisational Development and Delivery Support

More information

Annualised hours policy

Annualised hours policy Annualised hours policy This policy may form part of your contract of employment (depending on the wording in your written statement of terms and conditions). The councils are entitled to introduce minor

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

MANAGING ATTENDANCE POLICY AND PROCEDURE

MANAGING ATTENDANCE POLICY AND PROCEDURE MANAGING ATTENDANCE POLICY AND PROCEDURE Policy Number HR 029 Date Ratified October 2010 Next Review Date October 2013 Policy Statement/Key Objectives To ensure that Lancashire Care NHS Foundation Trust

More information

Managing Attendance Protocol & Procedure

Managing Attendance Protocol & Procedure This is an official Northern Trust policy and should not be edited in any way Managing Attendance Protocol & Procedure Reference Number: NHSCT/11/419 Target audience: This protocol is directed to all Trust

More information

Council Tax and Housing Benefit Overpayments Vale of Glamorgan Council

Council Tax and Housing Benefit Overpayments Vale of Glamorgan Council September 2010 Authors: Margaret Griffiths and Jayne Power Ref: 426A2010 Council Tax and Housing Benefit Overpayments Vale of Glamorgan Council Good arrangements helped the Vale of Glamorgan Council overpay

More information

Vale of Glamorgan. Overview Report: Review of HR and Workforce Planning. November 2011

Vale of Glamorgan. Overview Report: Review of HR and Workforce Planning. November 2011 Vale of Glamorgan Overview Report: Review of HR and Workforce Planning November 2011 Content 1 Introduction 1 2. Review Findings 3 3. The Way Forward 17 2012 Grant Thornton UK LLP. All rights reserved.

More information

Management of Sickness Absence Policy and Critical Illness Guidance

Management of Sickness Absence Policy and Critical Illness Guidance Management of Sickness Absence Policy and Critical Illness Guidance Management of Sickness Absence Policy and Critical Illness Guidance Policy ref no: HR038-14 Author (inc job Judith Champion, Senior HR

More information

SICKNESS ABSENCE MANAGEMENT POLICY & PROCEDURES

SICKNESS ABSENCE MANAGEMENT POLICY & PROCEDURES SICKNESS ABSENCE MANAGEMENT POLICY & PROCEDURES 1. INTRODUCTION 11. The Dublin Institute of Technology (hereinafter called the Institute ) recognises that regular attendance is an essential part of the

More information

Procedure for Managing Sickness Absence and Promoting Attendance for Teachers and Associated Professionals

Procedure for Managing Sickness Absence and Promoting Attendance for Teachers and Associated Professionals 1 Procedure for Managing Sickness Absence and Promoting Attendance for Teachers and Associated Professionals December 2013 2 Contents Pages Introduction and Dundee City Council Corporate Policy 3-4 Absence

More information

Managing Sickness Absence Procedure. Management Guidance

Managing Sickness Absence Procedure. Management Guidance Managing Sickness Absence Procedure. Management Guidance Related Documents: Absence Policy 1. Purpose 1.1. The aim of this procedure is to ensure Tees Valley YMCA adopts a fair and effective approach to

More information

Officers have taken action on this and created a detailed action plan to improve sickness absence performance attached as Appendix 1.

Officers have taken action on this and created a detailed action plan to improve sickness absence performance attached as Appendix 1. BACKGROUND Measuring and monitoring sickness absence is a requirement of the Audit Commission and is calculated across all local authorities (BVPPI 12 the number of working days/shifts lost due to sickness

More information

Stratford on Avon District Council. The Human Resources Strategy

Stratford on Avon District Council. The Human Resources Strategy Stratford on Avon District Council The Human Resources Strategy Page 1 1 Purpose of The Human Resources (HR) Strategy The purpose of this document is to review the role and effectiveness of human resource

More information

Attendance Management Procedural Changes. Equality Impact Assessment Employee Policy Centre of Expertise May 2011

Attendance Management Procedural Changes. Equality Impact Assessment Employee Policy Centre of Expertise May 2011 Attendance Management Procedural Changes Equality Impact Assessment Employee Policy Centre of Expertise May 2011 Equality impact assessment for insert name of policy process or service Introduction and

More information

The NHS Knowledge and Skills Framework (NHS KSF) and the Development Review Process

The NHS Knowledge and Skills Framework (NHS KSF) and the Development Review Process The NHS Knowledge and Skills Framework (NHS KSF) and the Development Review Process [This is the final draft of the NHS KSF Handbook that will be used for national roll-out if implementation of Agenda

More information

Employee Alcohol and Substance Abuse Policy. Effective from January 2014

Employee Alcohol and Substance Abuse Policy. Effective from January 2014 Employee Alcohol and Substance Abuse Policy Effective from January 2014 Contents 1.0 Introduction... 4 2.0 Aims... 4 3.0 Legal issues in relation to employment... 4 3.1 Health and Safety at Work Act 1974...

More information

Aberdeen City Council

Aberdeen City Council Aberdeen City Council Internal Audit Report Final Contract management arrangements within Social Care & Wellbeing 2013/2014 for Aberdeen City Council January 2014 Internal Audit KPI Targets Target Dates

More information

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW HR & PAYROLL EXECUTIVE SUMMARY- 2 NOVEMBER 2011

ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW HR & PAYROLL EXECUTIVE SUMMARY- 2 NOVEMBER 2011 ARGYLL AND BUTE COUNCIL SUPPORT SERVICES REVIEW HR & PAYROLL EXECUTIVE SUMMARY- 2 NOVEMBER 2011 1 Introduction 1.1 The Heads of Customer & Support Services, Improvement & HR and the workstream leads for

More information

ATTENDANCE MANAGEMENT POLICY

ATTENDANCE MANAGEMENT POLICY ATTENDANCE MANAGEMENT POLICY CONTENTS 1. GENERAL PRINCIPLES 2. ROLES & RESPONSIBILITIES 1.1 EMPLOYEE 1.2 MANAGER 1.3 HUMAN RESOURCES 1.4 HEALTH & SAFETY SERVICES OCCUPATIONAL HEALTH 1.5 TRADE UNION RESPRESENTATIVES

More information

Caedmon College Whitby

Caedmon College Whitby Caedmon College Whitby Data Protection and Information Security Policy College Governance Status This policy was re-issued in June 2014 and was adopted by the Governing Body on 26 June 2014. It will be

More information

International Students House Health and Absence Management Policy

International Students House Health and Absence Management Policy International Students House Health and Absence Management Policy PURPOSE International Students House accepts that employees will, on occasions, find themselves unable to attend work due to sickness.

More information

WEEK SIX Performance Management

WEEK SIX Performance Management WEEK SIX Performance Management Performance Management: objective-setting and systematic performance review Monitoring Performance: control/monitoring systems, absence control and the design of disciplinary

More information

Sickness Absence Policy

Sickness Absence Policy Sickness Absence Policy Version: 2.4 Status: Title of originator/author: Name of responsible director: Developed/revised by group/committee and Date: Approved by group/committee and Date: Approved Deputy

More information

POLICY FOR THE MANAGEMENT OF ABSENCE DUE TO SICKNESS

POLICY FOR THE MANAGEMENT OF ABSENCE DUE TO SICKNESS Directorate of Organisational Development & Workforce POLICY FOR THE MANAGEMENT OF ABSENCE DUE TO SICKNESS Reference: OWP007 Version: 1.0 This version issued: 31/05/12 Result of last review: N/A Date approved

More information

Managing Sickness Absence Policy HR022

Managing Sickness Absence Policy HR022 Managing Sickness Absence Policy HR022 To be read in conjunction with section 14 of the NHS Terms and Conditions of Service Handbook Date Drafted: Oct 2008 Review Date: Oct 2010 Version: V1.0 Author of

More information

Coleg Gwent Internal Audit Report 2012/13 Payroll and HR. Assurance Rating: Payroll

Coleg Gwent Internal Audit Report 2012/13 Payroll and HR. Assurance Rating: Payroll Coleg Gwent Internal Audit Report 2012/13 Payroll and HR Assurance Rating: Payroll HR Distribution List: Final Report Audit Committee Principal Vice Principal, (Finance, Estates and Information Services)

More information

SICKNESS ABSENCE POLICY

SICKNESS ABSENCE POLICY chapter _v 1/10/2004 12:18 pm Page SICKNESS ABSENCE POLICY. SICKNESS ABSENCE POLICY.1 Introduction.2 Aims.3 Definition of Sickness Absence.4 Entitlements. Entitlement to Statutory Sick Pay (SSP).6 Notification

More information

Chelmsford City Council. Human Resources. Drugs and Alcohol at Work

Chelmsford City Council. Human Resources. Drugs and Alcohol at Work Chelmsford City Council Human Resources Drugs and Alcohol at Work Table of contents 1. Introduction... 1 2. Scope... 1 3. Advice... 1 4. Assistance... 2 5. Further Support and Information... 3 1. Introduction

More information

HR/Employment Law Consultancy Services. Your Service, Your Way

HR/Employment Law Consultancy Services. Your Service, Your Way HR/Employment Law Consultancy Services Your Service, Your Way About Abbey Abbey HR Consultancy Services is a trading division of LHS Solicitors LLP. LHS Solicitors LLP is regulated by the Solicitors Regulation

More information

Information Security Incident Management Policy

Information Security Incident Management Policy Information Security Incident Management Policy Version: 1.1 Date: September 2012 Unclassified Version Control Date Version Comments November 2011 1.0 First draft for comments to IT Policy & Regulation

More information

This is continuing evidence of the effectiveness of our managing attendance procedures.

This is continuing evidence of the effectiveness of our managing attendance procedures. ITEM NO RESOURCES SCRUTINY COMMITTEE DATE 25 th March 2014 PORTFOLIO Resources and Performance Management REPORT AUTHOR Heather Brennan TEL NO 01282 477120 EMAIL hbrennan@burnley.gov.uk Sickness Absence

More information

POLICE AND CRIME COMMISSIONER FOR ESSEX. Staff Capability (Sickness & Attendance) Procedure

POLICE AND CRIME COMMISSIONER FOR ESSEX. Staff Capability (Sickness & Attendance) Procedure MARKED POLICE AND CRIME COMMISSIONER FOR ESSEX Staff Capability (Sickness & Attendance) Procedure Version Control Version 1. November 212 Written By J. Drewett November 212 Authorised By C. Garbett November

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

Human Resources Policy No. HR46

Human Resources Policy No. HR46 Human Resources Policy No. HR46 Maintaining Personal Files and ESR Records Additionally refer to HR04 Verification of Professional Registration HR33 Recruitment and Selection HR34 Policy for Carrying Out

More information

WASTE DISPOSAL SITES & RECYCLING INTERNAL AUDIT REPORT. Duncan Wilkinson Head of Audit and Risk Management

WASTE DISPOSAL SITES & RECYCLING INTERNAL AUDIT REPORT. Duncan Wilkinson Head of Audit and Risk Management INTERNAL AUDIT REPORT WASTE DISPOSAL SITES & RECYCLING Duncan Wilkinson Head of Audit and Risk Management AUDIT REPORT - E271/06 FEBRUARY 2006 SECTION INTERACTIVE INDEX PAGE EXECUTIVE SUMMARY 1 INTRODUCTION

More information

AGENDA ITEM: 10 SUMMARY

AGENDA ITEM: 10 SUMMARY Page 1 of 5 AGENDA ITEM: 10 SUMMARY Report for: Cabinet Date of meeting: 26 th July 2011 PART: 1 If Part II, reason: Title of report: Contact: Review of Sickness Absence Management Policy and Procedure

More information

MANAGING SICKNESS ABSENCE POLICY

MANAGING SICKNESS ABSENCE POLICY MANAGING SICKNESS ABSENCE POLICY Policy Devised: March 2013 Adopted on: 5 th December 2013 Review date: December 2014 1. BACKGROUND 1.1 From time to time employees may suffer ill health and it is essential

More information

AUDIT COMMITTEE 25 JUNE 2015

AUDIT COMMITTEE 25 JUNE 2015 AUDIT COMMITTEE 25 JUNE 2015 AGENDA ITEM 13 Subject: ANNUAL INTERNAL AUDIT REPORT 2014/15 Report by: AUDIT AND INVESTIGATIONS MANAGER Enquiries contact: Ray Joy (01245 606424) Email ray.joy@chelmsford.gov.uk

More information

London Borough of Hammersmith & Fulham

London Borough of Hammersmith & Fulham London Borough of Hammersmith & Fulham OVERVIEW & SCRUTINY BOARD 28 JANUARY 2014 UPDATE ON SICKNESS ABSENCE MANAGEMENT IN LBHF Report of the Corporate Director Open Report Classification: For Scrutiny

More information

Benefits Service. Students. Claiming Housing Benefit and Council Tax Benefit. www.milton-keynes.gov.uk/benefits

Benefits Service. Students. Claiming Housing Benefit and Council Tax Benefit. www.milton-keynes.gov.uk/benefits Benefits Service Students Claiming Housing Benefit and Council Tax Benefit www.milton-keynes.gov.uk/benefits Benefits Service This leaflet gives you information about claiming Housing Benefit and Council

More information