DCAA SERVICES. DCAA Financial Liaison Advisor
|
|
|
- Austen Day
- 10 years ago
- Views:
Transcription
1 DCAA SERVICES DCAA Financial Liaison Advisor
2 Objectives DCAA Organization Type of Audits When to Request How to Request Financial Liaison Advisor (FLA) activities Summary
3 History of DCAA DCAA Was Formed by Transferring Existing Resources From Each of the Military Services Into the Newly Formed: Resulted in: Defense Contract Audit Agency A single organization that contractors deal with on contract audit matters One set of audit guidance -- the DCAA Contract Audit Manual
4 Agency Mission DCAA shall: Perform all necessary contract audits for the Department of Defense and provide accounting and financial advisory services regarding contracts and subcontracts to all Department of Defense components responsible for procurement and contract administration. These services will be provided in connection with negotiation, administration and settlement of contracts and subcontracts. Provide contract audit service to other Government agencies as appropriate.
5 Defense Contract Audit Agency Executive Officer Director Deputy Director General Counsel Defense Legal Service Assistant Director Operations Assistant Director Policy & Plans Assistant Director Resources Regional Offices (5) Director Deputy Director Regional Offices (5) Central, Eastern, Mid-Atlantic, Northeastern, and Western Five Regions Supervise Following Offices: Total Resident Offices 18 Branch Offices 51 Suboffices (Off-site)
6 DCAA Staffing in 2007 STAFF Auditors 3,464 Administrative & Clerical 587 Total 4,051 PROFESSIONAL QUALIFICATIONS CPAs 1,236 College Graduates 3,431 Advanced Degrees 873
7 Summary of DCAA Audit Results Item FY 05 FY 06 FY 07 $'s Audited (Billions) $319.7 $303.4 $358 Net Savings (Billions) $2.7 $2.3 $2.4 Return on Investment $6.2 to 1 $5.2 to 1 $5.3 to 1
8 Products and Services Pre-award Contract Audit Services Post-award Contract Audit Services Internal Control System Audits Other DCAA Support Service
9 When to Request Audit Services FAR : Proposal Analysis Techniques When buyer or CO cannot determine if a price is fair and reasonable If information is needed on: Acceptability of Accounting System Financial Capabilities Many more
10 Why DCAA Reviews Costs ALLOWABILITY FAR The cost is allowable when it is reasonable, allocable and complies with FAR , CAS (Cost Accounting Standards), laws and regulations, and terms of the contract. REASONABLENESS FAR A cost is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business. ALLOCABILITY FAR A cost is allocable if it is assignable or chargeable to one or more cost objectives on the basis of relative benefits received or other equitable relationship... If it is incurred specifically for one contract; benefits both the contract and other work; or is necessary to the overall operation of the business.
11 Pre-award Price Proposals Typically: Direct Labor Labor Overhead Material Material Overhead G&A
12 Pre-award Audit Services Type of Service Specific Cost Information Agreed- Upon Procedures Cost Realism Analysis Scope of Service Provide existing data in FAO files, or additional services that can be provided in 4 hours or less. Performance of specific procedures agreed-upon in advance with the customer Evaluation to ascertain potential cost understatement Type of Report Statement Generally oral with written confirmation memo Disclaimer Disclaimer Audit of Part of a Proposal Examination of one or more cost elements or parts of a cost element, e.g., rates or the bases, but not the entire proposal Opinion only on parts examined
13 Pre-award Audit Services Type of Service Scope of Service Type of Report Statement Complete Proposal Audit Examination of an entire proposal Opinion on proposal as a whole Audit of Forward Pricing Rates Examination of a contractor s direct and indirect rates Opinion on rates examined
14 Pre-award Audit Services Preaward Surveys Accounting System Survey Financial Condition Financial Condition Assessment
15 Post-award Audit Services Incurred Costs/Annual Overhead Rates Truth In Negotiation Act Compliance CAS (Cost Accounting Standards) Compliance & Adequacy Claims/Terminations Financial Capability Voucher/Progress Payment Reviews Floorchecks Material Existence Contract Closing
16 Contractor Internal Control System Audits Accounting Estimating EDP (Electronic Data Processing) Compensation Billing Budgeting Material Management Labor Purchasing Indirect and Other Direct Cost
17 Other DCAA Support Commercial Items Verify sales history Verify discounts Review terms and conditions Negotiation Support
18 How You Can Help Us Better Serve You Teaming & early involvement encouraged Whenever practical, use to communicate your needs to DCAA Request electronic submissions from contractors Tailor your request to what you need - General requests imply look at everything
19 Requesting an Audit Be specific Ask for what you need Type of audit System information Call an FLA for help
20 FLA Services To support commands by serving as onsite interface between DCAA and Procurement Officials Mission: to provide financial advisory service support at command sites to assist PCOs in determining fair and reasonable contract prices.
21 FLA LOCATIONS NAVFAC-NW OGDEN-ALC EDWARDS AFFTC VANDENBERG AFB NAVFAC Pt Hueneme SMC CHINA LAKE * ARSTRAT TRICARE UF SPACE COM TACOM-AFSC USTRANSCOM AF-AMC USACE-OM * USACE-KC NAVFAC-SW TINKER-ALC Camp Pendleton MC SUPSHIP-SD FT HOOD-ACA SPAWAR - SD/HQ KIRTLAND AFRL/NNSA SPAWAR SYS CTR Army Navy AETC Air Force Non-DoD AFCEE Other-DoD * Part Time # SSEB Assistance SMDC AMCOM NASA -MSFC MEDCOM DFAS-CSD DFAS-CPS WP-ASC &AFMC USACE-MOBILE USACE-SAV USACE-HSVL EGLIN AFB TYNDALL AFB TRICARE-HQ MDA TACOM-JSC USSOCOM DSCC WR-ALC DCMA DCC-W DESC # DSCA DTRA ACA-NRCC NTSD-ORLANDO TSA DOE ESC NUWC-RI* DSCP NAVICP * CECOM RMAC PENREN SDDC & ACA ITEC 4 AMC USAMRAA DSCR NAVFAC-NO NAVFAC-HQ NAVFAC-CHES SSP * NAVSEA ONR NAVAIR NAVFAC-ATL FISC-Norfolk MARMC SPAWAR-CH NAVFAC-SO
22 FLA Services Facilitate communication Coordinate audit requests Interpret audit reports Explain changes in audit policies & procedures Elevate procurement officials concerns Arrange attendance of DCAA personnel at negotiations and meetings Participate in training sessions
23 FLA Services Cost Analysis Analysis of Other than Cost or Pricing Data Commercial Pricing Market Research SSEB (Limited) Parametrics Other Areas
24 DCAA Website Contains: DCAA Publications DCAA Points of Contacts Audit Office Locator Products and Services Organization
25 DCAA Website Contains: DCAA Publications DCAA Points of Contacts Audit Office Locator Products and Services Organization
26 Summary DCAA can help before, during, and after contract award FLAs are available to answer questions and/or help draft requests DCAA is here to help!
NCMA MEETING PREPARING FOR A DCAA PRICE PROPOSAL AUDIT JUNE 8, 2011
NCMA MEETING 1 PREPARING FOR A DCAA PRICE PROPOSAL AUDIT JUNE 8, 2011 Denise M. Hunt DCAA LM Mt. Laurel Resident Office Forward Pricing Technical Specialist DCAA OVERVIEW AND PRICE PROPOSAL AUDIT PROCESS
DCAA and the Small Business Innovative Research (SBIR) Program
Defense Contract Audit Agency (DCAA) DCAA and the Small Business Innovative Research (SBIR) Program Judice Smith and Chang Ford DCAA/Financial Liaison Advisors NAVAIR 2010 Small Business Aviation Technology
Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference
Defense Contract Audit Agency NAVAIR Small Business Aviation Technology Conference November 29-30, 2006 t Defense Contract Audit Agency Established in 1965 Separate Agency of the Department of Defense
DCAA Guidelines. How the SBIR firm can work effectively with the Defense Contract Audit Agency
DCAA Guidelines How the SBIR firm can work effectively with the Defense Contract Audit Agency Today s Presenters OUTLINE Presenter Introduction DCAA & DCMA DCAA Overview Types of DCAA Audits What it takes
Introduction and DCAA Overview
Introduction and DCAA Overview Industry Engagement Session 10/29/2015 The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations DCAA 1965-2015:
You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List.
Page 1 of 5 You've successfully subscribed to this feed! Updated content can be viewed in Internet Explorer and other programs that use the Common Feed List. View my feeds DCAA News Thursday, May 28, 2009,
DCAA Overview and Resources Available for Small Businesses
DCAA Overview and Resources Available for Small Businesses The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Page 1 Department of Defense
Audit Expectations for Small Businesses
Audit Expectations for Small Businesses DEFENSE CONTRACT CONSULTING Joseph A. Dalton, CGFM/CFE/CAP Over 31 Years -Supervisory/Auditor Service- DCAA Retired Captain, U. S. Naval Reserve 1996 BUSINESS NO.
Basic Financial Requirements for Government Contracting
Basic Financial Requirements for Government Contracting 2014 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
Defense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63)
Defense Contract Audit Agency: What Do They Do and How Does It Affect ME as a Resource Manager? (Breakout #63) Pat Fitzgerald Director Defense Contract Audit Agency The views expressed in this presentation
Pre-Award Accounting Systems
Pre-Award Accounting Systems 2013 National SBIR Conference Christopher Andrezze, CPA Special Assistant to the Deputy Director May 16, 2013 The views expressed in this presentation are DCAA's views and
DCAA Our Role. Laura Cloyd-Hall, CPA, MBA John D. Mollohan II, CPA, CFE. Page 1. DCAA 1965-2015: Celebrating 50 Years of Excellence
DCAA Our Role Laura Cloyd-Hall, CPA, MBA John D. Mollohan II, CPA, CFE DCAA 1965-2015: Celebrating 50 Years of Excellence Page 1 Topics About DCAA Typical DCAA Audits for Small Businesses Basic Roles of
Contracting Officers Representative Tracking Tool
Contracting Officers Representative Tracking Tool April 2012 Slide #1 CORT Tool Background PROBLEM: Section 813, Panel on Contracting Integrity, mandated by Congress in the NDAA 2007, required DoD to examine
Fiscal Year 2016 Budget Estimates
Fiscal Year 2016 Budget Estimates Defense Contract Audit Agency (DCAA) February 2015 (This page intentionally left blank) Summary ($ in thousands) Budget Activity (BA) 4: Administrative and Service-wide
Hotline Complaint Regarding the Defense Contract Audit Agency Examination of a Contractor s Subcontract Costs
Inspector General U.S. Department of Defense Report No. DODIG-2015-061 DECEMBER 23, 2014 Hotline Complaint Regarding the Defense Contract Audit Agency Examination of a Contractor s Subcontract Costs INTEGRITY
FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013)
FAR UPDATE 52.216-7, Allowable Cost and Payment (Jun 2013) "It's never too early to prepare for your incurred cost submission (A webinar sponsored by Pleasant Valley Business Solutions) 1 Objective Know
DCAA Contract Audit Manual
May 20, 2015 TI1 TI-001 TI-000 TOPICAL INDEX TO THE CONTRACT AUDIT MANUAL TI-001 Topical Index This section is an internal index to the Contract Audit Manual (CAM). alphabetical listing of subjects captioned
DCAA Audit R 4 Rights to Records, Requirements & Remedies
San Diego Chapters Present DCAA Audit R 4 Rights to Records, Requirements & Remedies A Seminar with Panel Discussion and Audience Participation February 18, 2009 This Morning s Agenda 8:30 Introduction
Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers
Curtis Matthews, Managing Partner Government Accounting, Estimating, and Billing Systems: Pitfalls and Answers Findley Gillespie, Senior Manager May 18, 2011 1 The material appearing in this presentation
Department of Defense Inspector General OAIG-Audit Policy and Oversight ATTN: APO, Suite 11D28 4800 Mark Center Drive Alexandria, VA 22350-1500
Additional Copies To obtain additional copies of the final report, visit www.dodig.mil/audit/reports or contact the Office of the Assistant Inspector General for Audit Policy and Oversight at (703) 604-8760
Strategies for Achieving Successful Audit Outcomes. Presented by: Noah Leiden, CPA Partner Patrick J. Fitzgerald, CPA Director
Strategies for Achieving Successful Audit Outcomes Presented by: Noah Leiden, CPA Partner Patrick J. Fitzgerald, CPA Director Agenda What is Success? Understanding and Impacting the Audit Process Strategies
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5105.36 February 28, 2002 Certified Current as of November 21, 2003 SUBJECT: Defense Contract Audit Agency (DCAA) DA&M References: (a) Title 10, United States Code
Review of Audits Issued by the Defense Contract Audit Agency in FY 2012 and FY 2013
Report No. DODIG-2014-109 Inspector General U.S. Department of Defense SEPTEMBER 8, 2014 Review of Audits Issued by the Defense Contract Audit Agency in FY 2012 and FY 2013 INTEGRITY EFFICIENCY ACCOUNTABILITY
Accounting System Requirements
Accounting System Requirements Further information is available in the Information for Contractors Manual under Enclosure 2 The views expressed in this presentation are DCAA's views and not necessarily
Department of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 7640.02 April 15, 2015 IG DoD SUBJECT: Policy for Follow-Up on Contract Audit Reports References: See Enclosure 1 1. PURPOSE. This instruction reissues DoD Instruction
October 20, 2015 9(1)
October 20, 2015 9(1) CHAPTER 9 Paragraph Table of Contents Page 9-000 Audit of Cost Estimates and Price Proposals 9-001 Scope of Chapter... 901 9-002 Related Audit Guidance... 901 9-003 The Total Audit
Defense Contract Management Agency Overview Briefing
Defense Contract Management Agency Overview Briefing Presented By: Deb Gable Customer Liaison to AAC Date: 14 Apr 09 Revision 1, 26 Mar 09 Topics to Discuss Introduction Mission and Vision Organizational
The Changing Government Contractor Environment
The Changing Government Contractor Environment 1 Federal Government Contracting DCAA FY 2014 Report to Congress DCAA Audit Guidance Business systems Federal regulatory rule changes State Contracting (Dept.
DEFENSE CONTRACT AUDIT AGENCY
DEFENSE CONTRACT AUDIT AGENCY Fundamental Building Blocks for an Acceptable Accounting System Presented by Sue Reynaga DCAA Branch Manager San Diego Branch Office August 24, 2011 Report Documentation Page
DEFENSE CONTRACT AUDIT AGENCY GUIDE FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include verification for completeness
Statement of Mr. William H. Reed Director, Defense Contract Audit Agency Senate Armed Services Committee April 19, 2007
1 Statement of Mr. William H. Reed Director, Defense Contract Audit Agency Senate Armed Services Committee April 19, 2007 Mr. Chairman, members of the Committee, my statement will summarize the Defense
Are you in Compliance with the Financial Rules for 8(a) Companies?
Are you in Compliance with the Financial Rules for 8(a) Companies? Sales Less than $1M Withdrawals exceeding $250,000 are considered excessive. Compiled financial statements are required within 90 days
Presenting the Numbers: Accounting Systems for Government Contractors
Presenting the Numbers: Accounting Systems for Government Contractors William D. Craven, CPA Senior Cost/Price Analyst CH2M HILL Plateau Remediation Company William D. Craven, CPA, CMA, CIA Cost/Price
INSTRUCTION NUMBER 7640.02 August 22, 2008
Department of Defense INSTRUCTION NUMBER 7640.02 August 22, 2008 IG DoD SUBJECT: Policy for Follow-up on Contract Audit Reports References: See Enclosure 1 1. PURPOSE. This Instruction: a. Reissues DoD
Government Contract Cost Accounting Workshop
The Alabama Procurement Technical Assistance Center Program & Alabama Small Business Development Center Network Present: Government Contract Cost Accounting Workshop $75 Includes Lunch & Materials Thursday,
Accounting System Requirements
Basic Financial Requirements for Government Contracting The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations Accounting System Requirements
October 1, 2015 4(1)
October 1, 2015 4(1) Paragraph CHAPTER 4 Table of Contents 4-000 General Audit Requirements Page 4-001 Scope of Chapter... 401 4-100 Section 1 --- FAO Coordination with Procurement and Contract Administration
TOPIC 12 CONTRACT COST AND PRICE ANALYSIS
CONTRACT AUDIT GUIDE FRAMEWORK TOPIC 12 CONTRACT COST AND PRICE ANALYSIS Objective To determine whether the agency effectively conducts cost or price analysis to arrive at fair and reasonable prices for
July 6, 2015 11(1) CHAPTER 11
July 6, 2015 11(1) CHAPTER 11 Table of Contents Paragraph Page 11-000 Audit of Contractor Compliance with Contract Financial Management Requirements 11-001 Scope of Chapter... 1101 11-100 Section 1 ---
PAS 730.3.B.2.4 April 24, 2012 12-PAS-012(R)
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO April 24, 2012 MEMORANDUM FOR REGIONAL DIRECTORS, DCAA DIRECTOR,
DCAA Initiatives/Current Issues
Defense Contract Audit Agency DCAA Initiatives/Current Issues Maryland Association of CPAs 2010 Government Contractors' Conference September 21, 2010 Kenneth J. Saccoccia Assistant Director Policy and
Department of Homeland Security. U.S. Coast Guard s Maritime Patrol Aircraft
Department of Homeland Security OIG-12-73 (Revised) August 2012 August 31, 2012 Office of Inspector General U.S. Department of Homeland Security Washington, DC 20528 August 31, 2012 Preface The Department
GAO DCAA AUDITS. Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated
GAO United States Government Accountability Office Report to Congressional Addressees July 2008 DCAA AUDITS Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated
DCAA Contract Audit Manual
D(1) APPENDIX D Table of Contents Paragraph Page D-000 Technical Specialist Assistance D-001 Scope... D1 D-100 Section 1 --- Deciding Whether Technical Specialist Assistance is Needed D-101 General...
October 15, 2015 1(1) CHAPTER 1. Table of Contents
October 15, 2015 1(1) CHAPTER 1 Table of Contents Paragraph Page 1-000 Introduction To Contract Audit 1-001 Scope of Chapter... 101 1-100 Section 1 --- Establishment and Responsibilities of DCAA 1-101
CHAPTER 8. Table of Contents
July 29, 2015 8(1) Paragraph CHAPTER 8 Table of Contents 8-000 Cost Accounting Standards Page 8-001 Scope of Chapter... 801 8-100 Section 1 --- Overview - Cost Accounting Standards Board (CASB) Rules and
DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219. PPS June 26, 2012 INFORMATION FOR CONTRACTORS
DEFENSE CONTRACT AUDIT AGENCY 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 PPS June 26, 2012 DCAA MANUAL NO. 7641.90 INFORMATION FOR CONTRACTORS 1. PURPOSE. This manual supersedes
Click to edit Master title style
Click to edit Master title style Click The to Business edit Master title style Operations Center and CPSRs Breakout Third Session level # D08 Andrew C. Obermeyer, Director, DCMA Business Operations Center
SUBCHAPTER G CONTRACT MANAGEMENT PART 842 CONTRACT ADMINISTRATION AND AUDIT SERVICES
SUBCHAPTER G CONTRACT MANAGEMENT PART 842 CONTRACT ADMINISTRATION AND AUDIT SERVICES Sec. 842.000 Scope of part. 842.070 Definitions. Subpart 842.1 Contract Audit Services 842.101 Contract audit responsibilities.
U.S. Army Corps of Engineers, New York District Monitoring of a Hurricane Sandy Contract Needs Improvement
Inspector General U.S. Department of Defense Report No. DODIG-2016-028 DECEMBER 3, 2015 U.S. Army Corps of Engineers, New York District Monitoring of a Hurricane Sandy Contract Needs Improvement INTEGRITY
Testimony. Patrick J. Fitzgerald Director, Defense Contract Audit Agency. before the. Commission on Wartime Contracting In Iraq and Afghanistan
Testimony of Patrick J. Fitzgerald Director, Defense Contract Audit Agency before the Commission on Wartime Contracting In Iraq and Afghanistan July 26, 2010 Chairman Thibault, Chairman Shays, and members
Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies
Inspector General U.S. Department of Defense Report No. DODIG-2016-001 OCTOBER 1, 2015 Evaluation of Defense Contract Management Agency Actions on Reported DoD Contractor Business System Deficiencies INTEGRITY
How to Survive a DCAA Audit
How to Survive a DCAA Audit www.paulgunn.com 1 How to Survive a DCAA Audit - Overview Areas of interest and expectations of a typical audit: 1. Introduction o 2. The DCAA and Types of audits 3. Preparing
REAL-TIME LABOR EVALUATIONS. The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations
REAL-TIME LABOR EVALUATIONS The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations 1 Real-Time Labor Evaluation What is a Real-Time Labor Evaluation?
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security 1. PURPOSE This memorandum sets forth an understanding of contract audit coverage and related audit
DCAA Contract Audits: Current Trends and Issues
DCAA Contract Audits: Current Trends and Issues Presented to: NCMA Huntsille, AL Chapter August 25, 2011 Darryl L. Walker, CPA Technical Director Beason & Nalley, Inc. Copyright 2011 Beason & Nalley, Inc.
Defending the Contractor: Ensuring DCAA Compliance with Time and Expense Software
Defending the Contractor: Ensuring DCAA Compliance with Time and Expense Software The Premier Sage Software Business Solutions Provider National Presence, Local Touch 1.800.425.9843 www.blytheco.com TABLE
Government Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update
Government Contracting in 2015: Balancing Risks to Reap Rewards - Compliance Update Baker Tilly Beers & Cutler, PLLC, is a wholly-owned subsidiary of Baker Tilly Virchow Krause, LLP. 2015 Baker Tilly Beers
February 3, 2016 12(1) CHAPTER 12
February 3, 2016 12(1) CHAPTER 12 Table of Contents Paragraph Page 12-000 Auditing Contract Termination, Delay/Disruption, and Other Price Adjustment Proposals or Claims 12-001 Contract Terminations and
Incurred Cost Submissions - It's Not Too Early!
Incurred Cost Submissions - It's Not Too Early! March 28, 2013 David Eck and Todd W. Bishop Dixon Hughes Goodman LLP Agenda Treat Incurred Cost Submissions like a Project Why an Incurred Cost Submission?
DCAA / DCMA: Progress or Status Quo? Presented By: Christine Williamson, CPA, Member Kristen Soles, CPA, Member
DCAA / DCMA: Progress or Status Quo? Presented By: Christine Williamson, CPA, Member Kristen Soles, CPA, Member Agenda State of the Agencies DCAA/DCMA What does GAO have to say? What does DOD IG have to
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION The Internal Revenue Service September 14, 2010 Reference Number: 2010-10-115 This report has cleared the Treasury Inspector General for Tax Administration
QUALITY CONTROL REVIEW REPORT
IG-02-007 QUALITY CONTROL REVIEW REPORT ERNST & YOUNG LLP AND DEFENSE CONTRACT AUDIT AGENCY AUDIT OF SOUTHWEST RESEARCH INSTITUTE, FISCAL YEAR ENDED SEPTEMBER 24, 1999 January 23, 2002 OFFICE OF INSPECTOR
DEFENSE CONTRACT AUDIT AGENCY CHECKLIST FOR DETERMINING ADEQUACY OF CONTRACTOR INCURRED COST PROPOSAL
Instructions: This form should be completed for each proposal submission and maintained in the permanent file. Adequacy reviews of contractor incurred cost proposals include an assessment for completeness
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security
MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security 1. PURPOSE This memorandum sets forth an understanding of contract audit coverage and related audit
Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012
Strategic Implications of the New DFARS Business System Rule Co-presented by Venable LLP and Argy, Wiltse & Robinson June 12, 2012 1 Panelists Robert A. ( Rob ) Burton, Partner, Venable LLP A 30-year veteran
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219
DEFENSE CONTRACT AUDIT AGENCY DEPARTMENT OF DEFENSE 8725 JOHN J. KINGMAN ROAD, SUITE 2135 FORT BELVOIR, VA 22060-6219 IN REPLY REFER TO PSP 730.8.B.1/2010-003 February 18, 2011 11-PSP-003(R) MEMORANDUM
Sage TimeSheet. Defending the Contractor Ensuring DCAA Compliance With Time and Expense Software
Sage TimeSheet Defending the Contractor Ensuring DCAA Compliance With Time and Expense Software Contents Introduction: Executive Summary.............................. 3 History and Mission of the DCAA..............................
Office of the Inspector General Department of Defense
CONTRACT MANAGEMENT FOR THE NATIONAL DEFENSE CENTER FOR ENVIRONMENTAL EXCELLENCE Report No. D-2000-188 September 14, 2000 This special version of the report has been revised to omit contractor sensitive
Rules on Job Hunting And Post-Government Employment
Rules on Job Hunting And Post-Government Employment Prepared By: The Fort Knox Office of the Staff Judge Advocate Administrative Law Division 50 Third Ave Fort Knox, KY 40121 (502) 624-7414 * Special acknowledgment
DCAA New Tactics in Obtaining Contractor Internal audit reports
DCAA New Tactics in Obtaining Contractor Internal audit reports By Todd Bishop and David Eck, CPA In August 2012, the Defense Contract Audit Agency (DCAA) issued updates to its policy guidance and the
1 1 1 2 2 2 2 3 3 3 3 3 4 4 4 4 5 back
Introduction Bid Protest Business Systems Design, Evalution and Validation Contractor Accounting & Compliance Risk Assessments Contractor Purchasing System Review (CPSR) Cost Accounting Standards (CAS)
If you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure to
How do I survive an audit of an incurred cost submission? If you require a copy of this presentation, please provide your contact information to either Christopher Weir or Bob Eyer and we will be sure
What Exactly is an Acceptable Accounting System?
What Exactly is an Acceptable Accounting System? Kristen Soles, CPA Member Stephanie Widzinski, CPA Senior Manager September 27, 2012 Agenda Review DFARS Business System Rule What Agency is Responsible
DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System
DCAA Perspective: Key Subcontracting Practices for Maintaining Approved Business Systems Accounting System and Estimating System Breakout Session A Alfred J. Massey, Western Region, Special Programs Manager,
Post Award Accounting System Audit at Nonmajor Contractors
Activity Code 17741 Version 3.1, dated November 2015 B-01 Planning Considerations Post Award Accounting System Audit at Nonmajor Contractors Audit Specific Independence Determination Members of the audit
Navy s Contract/Vendor Pay Process Was Not Auditable
Inspector General U.S. Department of Defense Report No. DODIG-2015-142 JULY 1, 2015 Navy s Contract/Vendor Pay Process Was Not Auditable INTEGRITY EFFICIENCY ACCOUNTABILITY EXCELLENCE INTEGRITY EFFICIENCY
How DCMA Helps To Ensure Good Measurements
How DCMA Helps To Ensure Good Measurements Speaker/Author: Robert Field Defense Contract Management Agency 605 Stewart Avenue Garden City, New York 11530 Email: [email protected] Phone: (516) 228-5886;
Small Business Contracting at Marine Corps Systems Command Needs Improvement
Inspector General U.S. Department of Defense Report No. DODIG-2016-019 NOVEMBER 10, 2015 Small Business Contracting at Marine Corps Systems Command Needs Improvement INTEGRITY EFFICIENCY ACCOUNTABILITY
How to Develop a FAR-Compliant Cost or Price Proposal
How to Develop a FAR-Compliant Cost or Price Proposal May 21, 2014 Presenter: Paul H. Calabrese Rubino & Company, CPAs & Consultants Senior Manager Tel: 301-214-4137 [email protected] www.linkedin.com/in/pcalabrese
Allegations of the Defense Contract Management Agency s Performance in Administrating Selected Weapon Systems Contracts (D-2004-054)
February 23, 2004 Acquisition Allegations of the Defense Contract Management Agency s Performance in Administrating Selected Weapon Systems Contracts (D-2004-054) This special version of the report has