New York University. NYU Core Project Financial Planning Information. Martin S. Dorph Executive Vice President, Finance and Information Technology



Similar documents
Financial Plan. Operating and Capital. May 2009

Breakdown of the MITFL FY12 Financial Statement Summary

Kirsten Volpi Senior Vice President for Finance and Administration

M E M O R A N D U M. University Space Priorities Working Group. Date: January 16, University Space Priorities - Decision Making Process

Debt Management. Policy/Procedure. I. Purpose

FINANCE 1O1 1 FINANCE OR, HOW THE UNIVERSITY OF NEW HAMPSHIRE EARNS, SPENDS, MANAGES, ACCOUNTS FOR, AND STEWARDS ITS FINANCIAL RESOURCES

PROPOSED BUDGET

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

Office of the President Phone: South Street, Suite 400 Fax:

BUDGET ADVISORY COMMITTEE FINAL BUDGET

83. Standard 9. Financial Resources. 1. Description Financial stability

The University of Financial Plan - A Summary

I. BACKGROUND INFORMATION

MINNESOTA STATE COLLEGES AND UNIVERSITIES BOARD OF TRUSTEES Agenda Item Summary Sheet

How To Read A University Or College'S Financial Statement

Financial Report to the Board of Trustees

ANNUAL BUDGET. A Presentation to the Board of Governors February 2013

Cool Spring Analytics

Responses from The College of New Jersey

Each year, millions of Californians pursue degrees and certificates or enroll in courses

THE WILLIAM PATERSON UNIVERSITY OF NEW JERSEY (A Component Unit of the State of New Jersey)

SCHOOL OF NURSING FINANCIAL MODEL

CALIFORNIA STATE UNIVERSITY, SAN MARCOS. Financial Statements. June 30, 2005 and (With Independent Auditors Report Thereon)

Analysis of the Financial Condition of the University of Illinois System

Budgeting and Planning Process

Current Ratio - General Fund

A. To strategically utilize debt to fund mission critical projects;

Minnesota State Colleges & Universities St. Cloud Tech College - Allied Health Building Renovation Design

STRATEGIC FINANCIAL PLANNING SANTA CLARA UNIVERSITY GUIDELINES FOR BUDGETING AND FINANCIAL MANAGEMENT OF CURRENT OPERATIONS

Each year, millions of Californians pursue degrees and certificates or enroll in courses

The College of New Jersey. Key Financial Performance Indicators As of June 30, 2012

Report to the Financial Planning and Investment Committee

University Space Priorities Working Group Final Report

Fleming College Financial Plan

The Colleges of the Seneca Financial Statements May 31, 2007 and 2006

Capital Budget Summary

TO MEMBERS OF THE COMMITTEE ON LONG RANGE PLANNING: DISCUSSION ITEM EXECUTIVE SUMMARY

STATE OF INDIANA SCHOOL CONSTRUCTION ANNUAL REPORT

Policies, Procedures and Guidelines

FY Compensation and Tuition & Fee Proposals April 9, Office of the Vice President for Budget and Finance 1

Boston College Financial Statements May 31, 2007 and 2006

Earnings Conference Call

Asset Liability Management Semi-Annual Borrower Reports (SABRe)

Annual Debt Management Report. Board of Trustees Finance & Audit Workgroup August 15, 2013

Executive Summary. Model Structure. General Economic Environment and Assumptions

Financial Health Analysis. Sample Choir. Overview 1. Dashboard 2

The Ontario University Agreements

Budget Update 4/29/13

NEW YORK PUBLIC RADIO. Financial Statements and Supplemental Schedule. June 30, 2014 and (With Independent Auditors Report Thereon)

ABA Budget Discussion

BUDGET APPROVED ON JULY 17, 2014 PROPOSED BUDGET

BEREA COLLEGE DEBT POLICY

Understanding College and University Endowments

STATE OF NORTH CAROLINA

Financial Statements. Saint Joseph s College. June 30, 2014 and 2013

2015 CAMPUS STATEMENT

FINANCIAL STATEMENTS. APRIL 30, 2012 and 2011 INDEPENDENT AUDITORS' REPORT

New Jersey Institute of Technology

JAMES A. MICHENER ART MUSEUM

HUDSON COUNTY COMMUNITY COLLEGE AUDITED FINANCIAL STATEMENTS AND SCHEDULES OF EXPENDITURES OF FEDERAL AND STATE OF NEW JERSEY AWARDS JUNE 30, 2008

NEW YORK PUBLIC RADIO. Financial Statements and Supplemental Schedule. June 30, 2015 and 2014

Multi Year Financial Plan Academic Division FY through FY

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

DCAS Efficiency Initiatives. June 6, 2012

School of Oriental and African Studies Financial Strategy

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM

THE CALIFORNIA STATE UNIVERSITY Office of the Chancellor 401 Golden Shore Long Beach, California (562)

The University of Texas at San Antonio 2014 Summary of Financial Condition. Financial Condition: Satisfactory

United Cerebral Palsy, Inc. Financial Report September 30, 2013

XIV. Accounting for Gifts, Endowment Earnings and Other Projects

Budget Plan Fiscal 2014

FINANCIAL FACT BOOK. for the June 30, 2012 Fiscal Year

PACIFIC SCIENCE CENTER FOUNDATION

Date 1/2/2014. Prepared for. Virginia Land Investments Patterson Ave., Suite 200 Richmond, VA Cleveland, Ohio. Richmond, Virginia

Financial Statement Analysis Paper

California Educational Facilities Authority Pomona College; Private Coll/Univ - General Obligation

Summary of Restructuring Issues At Non-Profit and For-Profit Colleges. Joe D Angelo

Financial Statements of RED RIVER COLLEGE. Year ended June 30, 2009

This glossary provides explanations of financial terms used throughout UDW+ reports and

STATE OF NORTH CAROLINA

CAMBRIAN COLLEGE BUSINESS PLAN

West Virginia Council for Community and Technical College Education

How To Understand The Chart Of Accounts Class For The Org Chart Of Account Class For Dartmouth College

TULANE UNIVERSITY financial statements

The Economic Impact of Texas State University

How To Relocate To Greenville One

OHIO CHRISTIAN UNIVERSITY FINANCIAL STATEMENTS. JUNE 30, 2012 (With Summarized Financial Information For the Year Ended June 30, 2011)

Determination of Annual Increase in Educational and Related Course Enrollment Fees

Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret

CONTENTS. Independent Auditors Report Consolidated Statements of Financial Position Consolidated Statements of Activities...

Report to the Financial Planning, Investment and Human Resources Committee

Burke Annual Report. iscal Year and Accomplishments

Kent State University (a component unit of the State of Ohio)

CONSOLIDATED FINANCIAL STATEMENTS. APRIL 30, 2015 and 2014 INDEPENDENT AUDITOR'S REPORT

NEW JERSEY INSTITUTE OF TECHNOLOGY. June 30, 2012 and 2011

THE CITADEL THE MILITARY COLLEGE OF SOUTH CAROLINA

An Update Analysis of the Financial Statements. The University of Delaware Academic Years Prepared for AAUP

University of California, Berkeley MANAGEMENT S DISCUSSION AND ANALYSIS (UNAUDITED)

University of Cincinnati. Office of Management and Budget Circular A-133 Reports for the Year Ended June 30, 2011

Account Groups. Table of Contents. VII. 32 accounts - Loan Funds Purpose, Source of Funds, Typical Expenditures, Transfers, Restrictions

Transcription:

New York University NYU Core Project Financial Planning Information Martin S. Dorph Executive Vice President, Finance and Information Technology November, 2012

Contents Background 3 Description of Analysis 4 Development of Financial Capacity: 2002-2011 5 Space Envelope and Financial Projection 2012-2021 14 Core Project Plan Development Options 22 2

Background The University s Board of Trustees, based on the 2008 Strategic Framework and dialogue with senior management established the following fiduciary mandates Ensure that there is adequate and adequately maintained infrastructure for academics Address the historic lack of sufficient space Currently too compressed Currently too vertical for classroom uses Prefer owning versus leasing Leases often more expensive due to landlord s profit, real estate taxes, etc. Never stop paying on leases When owned, debt is eventually paid off and resources are freed up for other purposes Move beyond the catch up on deferred maintenance that has dominated the past ten years University leadership was charged with delivering a space plan to meet the mandate within our financial capacity which was set by the Board at debt service of approximately 7% of budget University leadership developed University space planning projections consistent with the Board s mandate University leadership also considered South Block development plan options as part of the space planning projections consistent with that charge 3

Description of Analysis The analysis looks at the budget and financial metrics for the University excluding the School of Medicine and NYU Hospitals Center which operate separately ( except as defined below). In order to measure the capacity of the University to meet the mandate of the Trustees, we analyzed the following metrics over the historic period 2002-2011 Operating Margin: Excess of annual operating revenues over annual operating expenses (WSQ only). This is the annual cash flow generated from University operations before use for capital projects, or deposits to reserve accounts. Cash and Unrestricted Investments: Working Capital plus unrestricted long term investments as of August 31 of each year. Long- term investments do not include donor-designated endowment but do include quasi-endowment, i.e., funds invested long term but not restricted. (WSQ only). Capital Expenditures: (WSQ only) Debt: Long-Term Debt Outstanding (WSQ + SOM)* Leverage: Ratio of Expendable Financial Resources to Debt (with expendable financial resources defined as unrestricted and temporarily restricted net assets less plant) (WSQ + SOM)* Debt Service: Annual Principal and Interest Payments (WSQ only) Debt Service as a % of Annual Operating Budget (WSQ only) *The University s debt includes debt of both WSQ and the School of Medicine (SOM debt is less than 20% of total). 4

Development of Financial Capacity: 2002-2011 The following events had an impact on the University s operating budget and expendable resources over the past ten years. Significant Operating Budget Events during 2002 2011: Correction of University Structural Deficit (2002 2004) Partners Plan Hiring and Ancillary Costs (2007 2011) Administrative Reengineering (2008-2010) Generated Annual Savings of $66 million Created necessary budget gap closer during financial crunch Now, as planned, available for investments in academic programs Establishment of Strategic Contingency Reserve (2009) At request of Board, established emergency cushion for unforeseen budget shocks of the University (not Medical Center) Annual deposit equal to 1% of Gross Tuition Revenue At present, market value is $102 million When equal to 5% of operating budget, annual contributions will be reallocated for academic investments Establishment of Momentum Fund (2011) Equal to 1% of Gross Tuition Revenue, used to fund annual academic initiatives Significant Events Affecting Cash and Unrestricted Investments 2002 2001: Successful execution and completion (2008) of $3 billion NYU fundraising campaign largest ever in U.S. (at that time) Strategic Contingency Reserve established (2009) Financial market decline (2009) 5

Development of Financial Capacity: 2002-2011 The following projects were the significant capital projects during the past ten years. The vast majority were either renovations of existing space or newly acquired space that replaced leased space. Academic Investments: Dentistry FAS Schwartz Hall (2005-2007): $54 million: Renovations / Upgrade Partners Plan (2007-2011): Renovations / Upgrade Science: $111 million Non-Science: $151 million Faculty Housing: $37 million Genomics Building (2008): $92 million: Renovations / Upgrade King Juan Carlos Center (2008): $15 million: Renovations / Upgrade Science Phase 2 (2010-2011): $26 million: Renovations / Upgrade Gallatin Law 715 Broadway (2007-2008): $24 million: Renovations / Upgrade Furman Hall (2002-2004): $112 million: New Space Vanderbilt Hall (2004-2005): $29 million: Renovations / Upgrade 135 MacDougal Building (2009-2010): $37 million: New Space 22 Washington Square North (2009-2010): $15 million: New Space 6

Development of Financial Capacity: 2002-2011 Academic Investments: Steinhardt Stern SCPS TSOA Kimball Hall (2007-2008): $19 million: Renovations / Upgrade Pless Hall and East Building (2011): $9 million: Renovations / Upgrade Shimkin Hall (2007-2008): $23 million: Renovations / Upgrade Concourse Project (2009-2010): $47 million: Renovations / Upgrade Fairchild Building (2010): $90 million: Renovations / Upgrade Undergraduate drama studios on Broadway (2010-2011): $19 million: New (Leased) Space Wagner Puck Building Renovations (2004): $10 million: New (Leased) Space Miscellaneous Purchase of 20 Cooper Square (2004): $37 million: New Space 7

Development of Financial Capacity: 2002-2011 Significant Capital Expenditures during 2002 2011 (continued): Student Housing and Student Services Design and Build of Kimmel Student Center (2002-2003): $79 million: New Space University Hall and Palladium (2002-2003): $21 million : Renovations / Upgrade Gramercy Green Dorm (2008): $295 million*: New Owned Replacing Leased 12 th Street Dorm (2010): $138 million*: New Owned Replacing Leased Global Center for Academic and Spiritual Life (2009-2011): $95 million: New Space Faculty Housing Purchase of Faculty Housing at 120 West 15 th Street (Armory Apartments) (2002): $38 million: New Space Apartments (2006-2010): $30 million: Renovations / Upgrade Campus Infrastructure, Administration, and Other Cogeneration Plant (2007-2011): $137 million: Renovations / Upgrade Purchase of 730 Broadway (2009): $212 million**: Owned Replacing Leased * Two leased dorms replaced with owned facilities, creating cumulative cash flow surplus of $275 million over 30 years ** Conversion of 140,000 square feet of leased space to 200,000 square feet of owned space 8

Dollars in Millions Dollars in Millions Development of Financial Capacity : 2002-2011 250 Average annual operating margin of $129mm ($151mm in Last 8 years). (Note: this is before transfers for capital projects). Operating margin has grown due to prudent budget management by Schools and University administrative units (including administrative re-engineering) Cash and unrestricted investments increased 146%. Operating Margin (WSQ Only) 200 150 100 50 0 196 141 133 136 119 103 187 190 53 30 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Cash and Unrestricted Investments (WSQ Only) 1,800 1,600 1,400 1,246 1,502 1,482 1,273 1,369 1,720 1,200 1,033 1,000 800 699 718 829 600 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 9

Dollars in Millions Dollars in Millions Development of Financial Capacity : 2002-2011 700 600 500 400 300 200 100 Capital investments of $2.95 billion ($295 million per year) 0 Debt (including SoM) increased 117% - less than growth in cash and investments Two-thirds of capital expenditures were funded with sources other than debt: fundraising, operating funds, etc. 213 169 184 Capital Expenditures (WSQ Only) 116 130 143 487 580 575 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 352 2,500 Outstanding Long-Term Debt (WSQ + SOM) 2,000 2,128 2,161 1,500 1,640 1,636 1,000 500 996 998 983 1,105 1,063 1,156 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 10

Expendable Financial Resources/Direct Debt Development of Financial Capacity: 2002-2011 10 Year Financial History: Increase in fiscal 2007 due to one-time sale of Remicade revenue stream by SOM Expendable Financial Resources to Direct Debt (WSQ + SOM) 1.80x 1.60x 1.40x 1.20x 1.00x 0.80x 0.60x 0.40x 0.20x 0.00x 1.54x 0.93x 0.85x 0.72x 0.70x 0.70x 0.64x 0.65x 0.51x 0.56x 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 11

Dollars in Millions Definition of Historic Baseline: 2002-2011 Debt Service increases to $148 million per year Approximately $645 million of debt incurred in 2008 to 2010 (approx. $42 million per year debt service) was due to conversion of leased to owned real estate with little net impact on operating budget Annual Debt Service (WSQ Only) 250 200 150 100 56 51 59 60 68 62 69 93 110 148 50 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Annual Debt Service as % of Operating Expense Budget (WSQ Only) 20.0% 15.0% 10.0% 5.0% 4.5% 3.8% 4.4% 4.1% 4.4% 3.6% 3.8% 4.9% 5.5% 6.9% 0.0% 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 12

Development of Financial Capacity: 2002-2011 Board of Trustees considered University s financial capacity and space needs. If allowed annual debt service at WSQ to stay at about 7.0% of annual budget, this would be equivalent to an additional $100 million of debt service per year by 2021 (due to growth in operating budget) $100 million per year of additional debt service would allow up to $1.4 billion in borrowing (assuming 30 years @ 6%). If continue to fund projects from other sources as well, there could be a total funding envelope of up to $3 billion in total capital expenditures Board also advised that NYU should look to options that can assist in funding and financial capacity: own versus lease, revenue producing projects such as student residence halls, and higher levels of fundraising The Board authorized the University to define the total space development envelope within that financial capacity, including a Core Project focused on the south block, with an evaluation of the financial impact over a ten year period 13

Space Envelope and Financial Projection 2012-2021 In order to meet the Board s mandate, University leadership developed a ten year projection of space development options, and financial impact In developing the financial projection, the following operating goals were reflected in the projection: UG Enrollment Growth at Washington Square: average of 0.5% per year Graduate and Professional Enrollment Growth: essentially flat UG Tuition: Moderation of rate of increase compared to recent history UG Room and Board: Rate of increase consistent with recent history UG Financial Aid: Rate of increase equal to the rate of tuition increase Graduate Tuition: Rate of increase consistent with recent history Philanthropy: Consistent with recent history Annual Merit Increases (Salaries): Maintain competitive market position (with faculty salaries in top ten); consistent with past practice rate of increase expected to be slightly less than rate of tuition growth. Energy: Rate of increase higher than recent history General Inflation in Other Non-personnel Costs: 2.5% per year 14

Revised Baseline to Address Strategic Priorities: Campus Space Plan Space Envelope and Financial Projection 2012-2021 In developing the space envelope, the following factors were taken into account: Enrollment impact (both at WSQ and on campuses abroad); Square footage of University space utilized or gained; Resulting surplus or unmet demand of square footage based on University needs; Resulting surplus or unmet demand for student housing; Faculty headcount (e.g., would increasing faculty count require additional space for offices, faculty housing, and other related costs?); Research funding and indirect cost recovery (e.g., would increased research funding require increased lab space, etc?); Domino impacts of space moves (e.g., would a renovation of a classroom into lab space require a replacement classroom, where would a relocated administrative office go and would there be related lease or renovation costs?); Lease expirations (e.g., where will Wagner and Sociology go after the expiration of the Puck Lease?) Added externalities (e.g., what are the nature and amount of miscellaneous costs associated with enrollment growth?); Fundraising opportunities (e.g., does the initiative give rise to additional fundraising opportunities?) 15

Space Envelope and Financial Projection 2012-2021 The resulting projection provided the following space envelope and cost within the financial capacity Total Additional Square Footage of approximately 1.6 million square feet Academic Space (including IPA): 0.8 million square feet Student Housing and Student Services: 0.4 million square feet Campus Infrastructure, Administration and Other: 0.4 million square feet of which 0.3 million is lease replacement Total Capital Expenditures of approximately $3.0 billion Academic: $1.6 billion Student Housing and Student Services: $0.8 billion Faculty Housing: $0.2 billion Campus Infrastructure, Administration and Other: $0.4 billion Not all $3 billion spent on the additional square footage: $0.7 billion is capital maintenance, and also included amounts for renovations of existing space and equipment needs (e.g. IT) Total Increase in Debt Service not to exceed $100 million; Debt Service equal to 7% of Operating Budget after ten years Total Increase in Debt not to exceed $1.4 billion For purposes of this analysis, we incorporated the Zipper full build option of 670,000 square feet at a cost of $725 million. This option was the most costly option considered. All operating expenses associated with the incremental space are included in the projection 16

Dollars in Millions Dollars in Millions Space Envelope and Financial Projection 2012-2021 250 200 150 100 50 0 (50) Operating Margin (WSQ Only) <=HISTORY PROJECTION=> 207 196 187 190 159 141 133 136 131 119 103 108 101 105 85 84 70 77 73 53 53 59 30 36 47 29 2002 2003 2004 2005 2006 2007 2008 2009 2010 (3) 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 (14) (24) June 2012 Financial Plan (Baseline) Original Budgets 2,000 1,800 1,600 1,400 1,200 1,000 800 600 Cash and Unrestricted Investments (WSQ Only) <=HISTORY PROJECTION=> 1,909 1,889 1,777 1,790 1,720 1,691 1,716 1,770 1,655 1,627 1,615 1,502 1,482 1,369 1,246 1,273 1,033 829 699 718 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 June 2012 Financial Plan (Baseline) 17

Dollars in Millions Dollars in Millions Space Envelope and Financial Projection 2012-2021 700 600 500 400 300 200 100 0 Capital Expenditures (WSQ Only) <=HISTORY PROJECTION => 580 575 487 467 517 445 402 352 327 322 213 225 169 184 116 130 143 102 107 111 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Outstanding Long-Term Debt (WSQ + SOM) 3,500 3,000 2,500 <=HISTORY PROJECTION=> 2,449 2,486 2,128 2,161 2,195 2,861 2,826 3,305 3,255 3,247 3,193 3,137 2,000 1,640 1,636 1,500 1,000 996 998 983 1,105 1,063 1,156 500 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 June 2012 Financial Plan (Baseline) 18

Expendable Financial Resources/Direct Debt Space Envelope and Financial Projection 2012-2021 1.80x 1.60x 1.40x 1.20x 1.00x 0.80x 0.60x 0.40x 0.20x 0.00x Expendable Financial Resources to Direct Debt (WSQ + SOM) <=HISTORY PROJECTION=> 1.54x 0.96x 0.93x 0.85x 0.72x 0.70x 0.70x 0.64x 0.65x 0.51x 0.56x 0.52x 0.47x 0.48x 0.46x 0.38x 0.40x 0.31x 0.35x 0.38x 0.41x 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 19

Dollars in Millions Space Envelope and Financial Projection 2012-2021 Annual debt service remains at approximately 7% over ten years Interest rates assumed to be 6.0% - current 30 year borrowing rate is 4.0% 250 Annual Debt Service (WSQ Only) <=HISTORY PROJECTION=> 235 235 240 240 243 200 150 100 56 51 59 60 68 62 69 93 110 148 114 141 161 183 177 50 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20.0% 18.0% Annual Debt Service as % of Operating Expense Budget (WSQ Only) <=HISTORY PROJECTION=> 16.0% 14.0% 12.0% 10.0% 8.0% 6.0% 4.0% 4.5% 3.8% 4.4% 4.1% 4.4% 3.6% 3.8% 4.9% 5.5% 6.9% 5.0% 5.8% 6.2% 6.6% 6.1% 7.7% 7.4% 7.3% 7.0% 7.0% 2.0% 0.0% 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20

Revised Baseline to Address Strategic Priorities: Campus Space Plan Space Envelope and Financial Projection 2012-2021 Findings Can continue to convert leased space to owned space close to 300,000 square feet Can continue to invest in capital maintenance $700 million Can create revenue opportunity in dorm Ability to withstand stresses: Assumed only $175 million of fundraising for capital over next ten years (6% of total projected cost) Assumed no increases to unrestricted investments from fundraising (only from operations) Assumed 6% borrowing rate on debt with current rates at 4% (this could be worth approximately $20 million per year savings on projected new debt) Operating Margin projections were conservative (in every year over past ten years University has had substantial positive budget performance) Core Project on South Block represents less than 25% of total capital cost of overall space plan projection Can cut back on the $3 billion plan in the event of unforeseen future budget shocks If assume University achieves fundraising equal to 20% of project costs: Additional $430 million in fundraising would bring total to $605 million Savings of $31.2 million in debt service per year becomes only 6% of budget Improvement to expendable resources to debt ratio from approximately 0.46x to approximately 0.7x 21

Core Project Plan Development Options The ULURP process created an envelope of permitted development. The University s plan was to first develop the south block, and undertake either the Zipper building (east) or the west building on the site of Morton Williams supermarket. This plan was confirmed by City Council, and no development on the northern block (Washington Square Village) will occur before 2022. For purposes of the Board mandated projection, we incorporated the Zipper full build option at a cost of $725 million. This option was the most costly option considered and therefore it was determined that if this could be accommodated within the financial envelope, then smaller less costly options could be chosen without detrimental impact to the University. This space plan projection was undertaken before final action by the City Planning Commission and City Council. Therefore the components of the Zipper building and their size differ from the final zoning envelope. The southernmost Tower was not included in the space plan projection because it was planned for a hotel, and the Zipper building was modeled at 670,000 square feet instead of the 754,400 square feet approved in the ULURP process. Therefore, we have revised Core Project Plan options consistent with these changes 22

Revised Baseline to Address Strategic Priorities: Campus Space Plan Core Project Plan Development Options There are two primary development options for consideration: East Side (Zipper Building): 754,000 square feet plus 46,000 square feet for tower prep = 800,000 square feet: TSOA Institute for the Performing Arts (IPA) (90,000 GSF) Academic Space in addition to IPA (185,000 GSF) Athletic Space (150,000 GSF) Student Residence Hall (295,000 GSF) Retail, Community and Next Phase Prep Space (80,000 GSF) West Side (Morton Williams site): If New York School Construction Authority vests: TSOA IPA = 70,000 square feet If SCA does not exercise option (NYU full build) = 155,000 square feet TSOA IPA (90,000 GSF) Academic Space in addition to IPA (40,000 GSF) Community Facility Space (25,000 GSF) 23

Revised Baseline to Address Strategic Priorities: Campus Space Plan Core Project Plan Development Options Finance and Build on South Block 1. East Side without additional fundraising 2. East Side with additional fundraising 3. West Side NYU full build 4. West Side SCA Vests Acquire New Site and Build: Possible Space not identified; however, if a site could be acquired, the acquisition would add approximately $300 per square foot to the cost( which would be higher if inflated to 2016 $) 1. Comparable to East Side Project with new gym 2. Comparable to East Side Project without new gym 3. Comparable to West Side NYU full build 4. Comparable to West Side SCA Vests Lease Space and Renovate: Possible Space not identified; lease options for Lower Manhattan would begin at $50 to $60 per square foot per year, would escalate approximately 3% per year, and would also require renovation costs of $200 to $500 per square foot, depending on use (higher if inflated to 2016 $) 1. Comparable to East Side Project with new gym 2. Comparable to East Side Project without new gym 3. Comparable to West Side NYU full build 4. Comparable to West Side SCA Vests 24

Revised Baseline to Address Strategic Priorities: Campus Space Plan Core Project Plan Development Options East Side Options: Sources and Uses of Funds East Side Full Build (no tower) (dollars in millions) Sources Fundraising 50 Long-Term Debt 784 Total Sources 834 East Side Full Build (no tower), plus $250M fundraising (dollars in millions) Sources Fundraising 300 Long-Term Debt 534 Total Sources 834 Uses Public Improvements and City Fees 16 Faculty Housing Mitigation at Silver Towers and WSV Demolition and Cogen Connection Academic Space (185,000 GSF) 26 22 193 TSOA IPA (90,000 GSF) 130 Athletic Space (150,000 GSF) 130 Dormitory (295,000 GSF) 266 Retail, Community and Next Phase Prep Space (80,000 GSF) 51 Total Uses (800,000 GSF) 834 Uses Public Improvements and City Fees 16 Faculty Housing Mitigation at Silver Towers and WSV Demolition and Cogen Connection Academic Space (185,000 GSF) 26 22 193 TSOA IPA (90,000 GSF) 130 Athletic Space (150,000 GSF) 130 Dormitory (295,000 GSF) 266 Retail, Community and Next Phase Prep Space (80,000 GSF) 51 Total Uses (800,000 GSF) 834 Debt Service = $56.9 million per year Debt Service = $38.8 million per year 25

Revised Baseline to Address Strategic Priorities: Campus Space Plan Core Project Plan Development Options West Side Options: Sources and Uses of Funds West Side Option 1 (SCA Vests, NYU takes 70,000 GSF) (dollars in millions) Sources Fundraising 50 Long-Term Debt 83 Total Sources 133 West Side Option 2 (NYU Full Build 155,000 GSF) (dollars in millions) Sources Fundraising 50 Long-Term Debt 193 Total Sources 243 Uses Public Improvements and City Fees 16 Faculty Housing Mitigation at Silver Towers and WSV 26 Demolition and Supermarket Relocation 11 TSOA IPA Space (70,000 GSF) 81 Total Uses (70,000 GSF) 133 Debt Service = $6.0 million per year Uses Public Improvements and City Fees 16 Faculty Housing Mitigation at Silver Towers and WSV Demolition and Supermarket Relocation Academic Space (40,000 GSF) 26 11 41 TSOA IPA (90,000 GSF) 130 Community Facility Space (25,000 GSF) 20 Total Uses (155,000 GSF) 243 Debt Service = $14.0 million per year 26

Revised Baseline to Address Strategic Priorities: Campus Space Plan Core Project Plan Development Options Alternative Strategies to SouthBlock Development - Estimates as of Fiscal Year 2020 (dollars in thousands) Construct on South Block Construction on Acquired Site 1 Leased and Renovated Site 2 East Side East Side with Fundraising West Side with SCA West Side All NYU East Side East Side w/o Gym West Side with SCA West Side All NYU East Side East Side w/o Gym West Side with SCA West Side All NYU Square Feet 800,000 800,000 70,000 155,000 800,000 650,000 70,000 155,000 800,000 650,000 70,000 155,000 Annual Debt Service (and Lease Costs where applicable) $ 56,900 $ 38,800 $ 6,000 $ 14,000 $ 71,500 $ 58,800 $ 6,300 $ 16,100 $ 75,800 $ 61,600 $ 6,600 $ 14,700 Revenue Offsets 3 $ 19,700 $ 19,700 $ - $ 1,600 $ 17,600 $ 17,600 $ - $ - $ 17,600 $ 17,600 $ - $ - Net Cost per Year $ 37,200 $ 19,100 $ 6,000 $ 12,400 $ 53,900 $ 41,200 $ 6,300 $ 16,100 $ 58,200 $ 44,000 $ 6,600 $ 14,700 1. Construction on acquired site option includes additional $300/GSF for site acquisition, but excludes costs for Cogen connection and faculty housing noise and air mitigations at Southblock. 2. Leased and renovated site option assumes $55/RSF, with 25% increase in GSF to calculate RSF; plus, $350/GSF for renovation costs. Excludes Cogen connection and faculty housing noise and air mitigations at Southblock. 3. Revenue offsets based on housing revenue and commercial lease opportunities. 27

Revised Baseline to Address Strategic Priorities: Campus Space Plan Core Project Plan Development Options Findings: Construction on South Block is far more economical than acquire/build or lease/renovate options (construction of full Zipper is less expensive than other options even without new gym). Zipper (East Side) options fit well within Board s funding envelope, leaving capacity for other initiatives and needs as they arise Fundraising would provide substantial benefit; with $250 million fundraising, East Side could be built for $6 million more per year than West Side option, but would provide 5 times more space (net additional 650,000 square feet) 28