Dallas County R-1 School District 309 W. Commercial Buffalo, MO 65622



Similar documents
Request for Proposal: Network Switches

Request for Proposals E-Rate Wireless Project Bolivar High School Bolivar R-1 School District

Request for Proposal: Network Switches

2015 Piqua City Schools RFP for Network Equipment under E-Rate Category 2

Request for Quote E-Rate Eligible Services Scope of Work - Internal Connections: Network Infrastructure Equipment and Cabling

E- Rate RFP Entity # Funding Year 14 With Multi-Year Option 470 # RFP: Data and Cell Service

Request for Proposal: Network Switches

Request for Proposal

Request for Proposal Internet Bandwidth

Request for Proposals Erate Category 1 Hosted VoIP Service Hinds County School District

REQUEST FOR PROPOSALS FOR INTERNAL CONNECTIONS. INCLUDING EQUIPMENT and. VoIP TELEPHONE SYSTEM FOR THE ALTERNATE HIGH SCHOOL BUILDING

NOTICE: CALLING FOR PROPOSALS VOICE-OVER IP (VOIP) EQUIPMENT AND INSTALLATION ERATE ELIGIBLE SERVICES

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

TECHNICAL SPECIFICATIONS FOR SIP TRUNK AND LONG DISTANCE PROJECT

Hosted VoIP RFP. Throughout this document, the word District refers to Wayne County School District

Monrovia Unified School District RFP# M Managed Internal Broadband Services PROVIDER PRE-QUALIFICATION GUIDELINES

Request for Proposal: Network Switches

MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL

Buford City Schools. Request for Proposal (RFP) UPS devices

How To Bid For A Major Network Connection At Midland City Elementary

Coosa County School System Request for Proposal Hosted VOIP Solution

Hosted VoIP RFP. Throughout this document, the word District refers to Rankin County School District

Request for Quote. Inland Lakes School Indian River, Michigan. For. Phone System BID PACKAGE

REQUEST FOR PROPOSAL E-RATE Funding Year 2015 HOSTED VOICE OVER IP (VOIP) for Tunica County School District

Hosted VoIP RFP. Throughout this document, the word District refers to Smith County School District

Request for Proposal Internet Service. Central Administration Offices. Cape Girardeau Public School District #63

Wired and Wireless Network Request for Proposal New Washington County High School Facility

Request for Proposal: Network Switches

Hosted VoIP RFP. Throughout this document, the word District refers to BRUNEAU GRAND VIEW JOINT SCHOOL DISTRICT #365

Request for Proposal- Network Switches and Professional Services

Hosted VoIP RFP. Subject

LAWRENCE COUNTY SCHOOL DISTRICT E-RATE Request for Quotations for Internet Service

E-RATE Year 18 ( ) Scalable Internet Access RFP Enterprise Elementary School District

Hosted VoIP RFP. Throughout this document, the word District refers to ANDERSON UNION HIGH SCHOOL DISTRICT.

Request for Proposal IP Phone System Upgrade

Request for Proposals. St Charles CUSD 303 ERATE PROGRAM INTERNET SERVICES

Robla School District

Additional specific restrictions are laid out in the following bid packet. As a courtesy, we have provided the following summary of this bid.

Hosted VoIP RFP. Throughout this document, the word System refers to The Jackson Hinds Library System

How To Provide A Hosted Phone Service To A School District In Mississippi

Request for Proposal: Network Switches

Request for Proposal: Network Switches

SERVICE PROVIDER CRITERIA AND CONTRACT REQUIREMENTS

INTERNET SERVICE FOR OAKLAND UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSALS (RFP) FOR E-RATE 17 ( )

REQUEST FOR PROPOSALS FOR. IP Phone System. Issue Date: April 1, Submittal Date: May 1, 2015 at 12:00 P.M. Contact: Tricia A.

SERVICE PROVIDER CRITERIA AND CONTRACT REQUIREMENTS

REQUEST FOR PROPOSALS (RFP) Web Hosting Services. for. Rescue Union Elementary School District Entity Number

Request for Proposal: Network Switches

REQUEST FOR PROPOSAL WAN AND INTERNET AND HOSTED VOIP

DALLAS INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT ADDENDUM No. 2 NETWORK ELECTRONICS

EDUCATION ACHIEVEMENT AUTHORITY OF MICHIGAN SCHOOLS 3022 West Grand Blvd., Suite Detroit, MI 48202

Request for Proposal Cellular Service

City of Fulton, Missouri REQUEST FOR PROPOSAL

Lauderdale County School District Telecommunications Service (Hosted VOIP Solution) E-Rate Request for Proposal

Illinois Century Network Illinois State Library An E-rate Information Session

Request for Proposal: Network Switches

Center Unified School District

ARCHITECTURAL PARTNERS, P.C. 10 Ninth Street, Lynchburg, Va / Fax 434/

Request for Proposal Hosted Voice Over IP Telephony Service Bid Due: February 26, 2012 at 3pm

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Voice over IP System

i. Each building s network connections are routed through Cisco Small Business Switch SG or 36.

STAMFORD PUBLIC SCHOOLS PURCHASING DEPARTMENT P.O. BOX 9310 STAMFORD, CT (203) E-RATE CONSULTING SERVICES FOR STAMFORD PUBLIC SCHOOLS

Request for Quote E- Rate Eligible Services Scope of Work - Hosted Voice over IP. Background: General Specifications:

PIERCE COUNTY LIBRARY SYSTEM. REQUEST FOR PROPOSAL (RFP) for. Telephone Service (Analog Phone Service)

Request for Proposal (RFP) IP Cameras/Door Access Control

REQUEST FOR PROPOSAL

Internet & VoIP Services Eligible and ineligible E-rate services RFP #

REQUEST FOR PROPOSALS: Internet Access Service. For: Peach County School District (BEN: )

REQUEST FOR PROPOSAL. Webbased Student with Student Safe Features

INTERNET SERVICE

Upper Perkiomen School District

The following services in any combination of options are sought:

REQUEST FOR PROPOSALS FOR DISASTER RECOVERY ADMINISTRATIVE SERVICES

Project Scope Statement

REQUEST FOR PROPOSAL For NETWORK SWITCHES AND FIREWALL EQUIPMENT USAC/E- Rate 470 # Proposal Due: March 26th, 2015

Transcription:

Dallas County R-1 School District 309 W. Commercial Buffalo, MO 65622 Network Infrastructure Upgrade RFP Erate Category Two February 5, 2015

Dallas County R-1 School District is seeking bids to upgrade their network infrastructure. Specifications for this are contained in this document. The information in this Request for Proposals (RFP) is provided in conjunction with the Universal Service Administrative Company (USAC) Schools and Libraries Division (SLD) Forms 470 and 471, in partial fulfillment of the requirements for the Federal Communications Commission (FCC) Universal Service Fund discounts. Vendors must be an E-Rate eligible service provider and must supply a valid Service Provider Identification Number (SPIN). Vendors must also provide contact information for the individual who is responsible for the filing of vendor E- Rate forms. Bids Should be Labeled: Network Infrastructure Upgrade All bids shall be delivered in duplicate in a sealed envelope clearly marked. Network Infrastructure Upgrade to the address listed below: Dallas County R-1 Schools Office of the Superintendent 309 W Commercial Buffalo, MO 65622 (417)345-2222 Technical questions regarding this proposal should be addressed by e-mail to cay.sergent@bisonpride.org. Each bidder must submit the following with a bid proposal: 1) Listing of subcontractors (if any) 2) 3 School District References 3) Verification of Liability Insurance with a minimum amount of $1,000,000 per occurrence 4) Service Provider Identification Number All the above information will be evaluated by the district. All bids must be received by March 6, 2015

Bidding Period: The bidding contract period is February 5, 2015 through March 6th, 2015. Dallas County R-1 School District reserves the right to extend the contract term to coincide with an E-Rate program year or an extended service end date for an E-Rate program year pursuant to a service delivery deadline extension, as defined by the FCC and/or the USAC. In submitting a bid, the bidder agrees to the following terms: 1) Any and all bids must be valid thru completion of work. 2) The Bidder has examined the specification document and has inspected in detail the site of the proposed work, and has familiarized himself/herself with all of the detailed requirements of installation, and understands that in making this proposal he/she waives all right to plead any misunderstanding regarding same. 3) The Bidder understands that the district reserves the right to reject any or all bids, to accept or reject portions of the bid, and to waive any informality in the bidding. 4) The Bidder further agrees that not less than the prevailing hourly rate of wages as determined by the State of Missouri Division of Labor or determined by the Court of Appeals shall be paid to all workers performing work under this Proposal. 5) The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. 6) Mandatory vendor meeting and walk-through February 19 th beginning at 9:00 A.M. at 500 W. Main, Buffalo, MO 65622.

E-Rate Contingency: All awards are contingent upon receiving E-Rate funding to supplement local funding for support of the project. Evaluation of Proposals: An evaluation committee will review submitted, complete proposals and make a recommendation for contract awards. School District will evaluate proposals from qualified vendors using the following criteria: Price for Eligible Equipment and Services (one-time as well as recurring): 30% Compatibility with Existing Network and Infrastructure: 25% Technical Capabilities and Background/Personnel Qualifications: 10% Prior Experience and Vendor Track Record and References: 20% Cost of Ineligible Equipment and Services (one-time as well as recurring): 15%

Bid Scope Network Infrastructure Upgrade 2015 1) Include the quote for labor and installation charges that may or may not be accepted for the engineering and design, installation, start-up, operational performance testing, and operation requested in the RFP. 2) The cost of labor should be line itemed separately from the cost of equipment and materials. 3) In addition, the vendor shall provide materials and a schedule for all training for the tech staff needed for the optimal utilization of these technologies across schools. 4) A final walk thru will be required to finalize installation performed. 5) Pricing should be clearly delineated as recurring or non-recurring, and inclusive of any and all fees necessary to turn-up service, including but not limited to sub-contractor s fees, installation and special construction fees. 6) Bids should be itemized with E-Rate eligible portion ($150 per student per school) identified and everything over $150 per student should be identified as additional bids for each school. 7) Bids must be submitted in a form compatible with the new USAC Form 471. 8) All products mentioned below are products compatible with those currently used at this district. Other products or models can be used but need to be equivalent and compatible with the mentioned items.

Dallas County R-1 School District Network Infrastructure Upgrade Other products or models can be used but need to be equivalent and compatible with the mentioned items. All cabling should meet accepted industry standards (i.e. plenum; raceway when on walls). High School Located at 500 W Main, Buffalo, Missouri 478 students Erate Eligible Amount - $71,7000 CORE: Objective: Remove transceivers and replace with GBICS o Module for HP Switch o GBICs to connect fiber runs Tech Office: o 1 HP 2920-48g or equivalent o 2 port 10GB SFP+ module o 10GB GBIC to connect to core o Install fiber uplink to core Room 112: Objective: Have 10GB to core o 2 port 10GB SFP+ module o 10GB GBIC to connect to core Room 91: Objective: Remove switch and cables to centralize wiring closets o Install cable runs to Room 112 Room 115: Objective: Remove switch and cables to centralize wiring closets o Install cable runs to Room 111 Room 111: Objective: Increase capacity to centralize wiring closets o One rack with cable management o 10GB GBIC to connect to core o HP Switch o Install fiber uplink to core ITV Room: Objective: Remove switch and cables to centralize wiring closets o Install cable runs to teacher workroom Teacher Workroom: Objective: Increase capacity to centralize wiring closets o 1 - HP 2920-48g or equivalent o 1-2 port 10GB SFP+ module o 1-10GB GBIC to connect to core

HS Office and Principal s Office: Objective: Consolidate switches to 1 switch location o 1 -rack o 1 - HP 2920-48g Switch o 1 - port 10GB SFP+ module o 1-10GB GBIC to connect to core o Cable network runs to new location Field House: Objective: Remove transceivers and replace with GBIC s o 1 - HP2920-24g o 1 - GBIC to connect fiber to core o 1 - Battery backup AG: Objective: Consolidate wiring closets and achieve 10GB to core o Install or move current rack in lab o 1 HP 2920-24g Switch o 1-2 port 10GB SFP+ module o 1-10GB GBIC to connect to core o 1 - GBIC to connect fiber to weight room o Install new cable runs Weight Room: Objective: Connect to AG via Fiber o 1 HP Switch 2530-8g o 1 - GBIC to connect fiber to AG building o Install fiber to AG building Shewmaker Building: Objective: Centralize wiring closet in building o 1 - rack and cable management o 1 battery backup o Install cable runs to remove switches in Room 301 and 303 FEMA: Objective: Connect to core via fiber o 1 HP Switch 2920-24g o 1 - GBIC

Mallory Elementary Located at 315 South Hickory, Buffalo, MO 65622-604 students - Erate Eligible Amount - $90,600 Core: Objective: Increase capacity in rack and improve connectivity o 1 - rack o HP Switch 5406 with modules o 1 GBICs to connect fiber to HS and edge switching Office : Objective: Centralize Wiring Closets o Install cable runs to core 200 Hall: Objective: Increase capacity in rack and achieve 10 GB to core o 1 - rack o 1-2920-48g or 5406 chassis if will be expanding the number of cable runs o 1 battery backup o 1-10 GB GBIC 300 Hall: Objective: Increase capacity in rack and improve connectivity o 1 - new rack out of the way of roof access and re-cable network drops o 1-5406 chassis with modules o 1-10GB GBIC to connect fiber to core o 1 battery backup Annex: Objective: Centralize wiring in building o 1 - additional switch o 1 Battery backup o Re-cable to remove switch in ceiling Trailers: Objective: Improve wiring o 1 HP 2530-12g o 1 battery backup o Install either new exterior CAT 6 o Install new cable runs

Middle School Located at 926 W. Truman, Buffalo, Missouri 65622-529 students Erate Eligible Amount - $79,350 Core: Objective: Achieve 10GB to Core o 1 - UPS o I - GBIC s o 1 rack o Clean up cabling Office: Objective: Connect wiring closet via fiber and achieve 10GB to Core o 1- rack o 1 - HP 5406 Switch with applicable modules o 1 - GBIC to connect fiber to core Custodial Closet: Objective: Connect wiring closet via fiber and achieve 10GB to Core o 1 - rack o 1 HP 2920-48g Switch o 1 - GBIC to connect fiber to core o 1 -battery backup

Long Lane: Locate at 25 State Road, Long Lane, MO 65590-96 students Erate Eligible Amount - $14,400 Objective: Improve connectivity to core for building and correct wiring issues in office 1 HP 2920-48g Switch 1 battery backup New cable runs in office area

Career Center: Located at Vo-Tech Road, Louisburg, MO 65685-205 students Erate Eligible Amount - $30,750 South Building: Objective: Improve connectivity to core and achieve 10GB to core o 1 rack o 1 GBIC to connect fiber to core o 1 battery backup Nursing Room: Objective: Improve connectivity to core and correct wiring issues o New cable runs to lab area o Remove switch and cable drops to central location Lab: Objective: Improve connectivity to core and correct wiring issues o 1 rack o 1 HP 2920-48g Switch o 1 fiber to core o 1 GBIC to connect fiber to core o 1 battery backup o Install cabling to move drops to central location Core: Objective: Improve connectivity to core and achieve 10GB network speed o 1 rack and cable management o 4 GBICs to connect fiber to lab, graphic arts, north building, and south building o 1 battery backup o Install fiber from breakout box in Nursing Room and Computer Room to connect North and South buildings to core Graphic Arts: Objective: Improve connectivity to core and achieve 10GB network speed o 1 rack o 1 HP 2920-48g Switch o 1 GBIC o 1 battery backup North Building: Objective: Improve connectivity to core and achieve 10GB network speed o 1 rack o 1 HP 2920-48g Switch

o 1 GBIC to connect fiber to core o 1 battery backup o Install cable to remove switch in Auto tech room