Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013



Similar documents
Oil and Gas Air Quality Regulations and Permitting

Implementation Question and Answer Document. for

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS

Statement of Basis SCA Tissue North America, LLC

REGULATORY ANALYSIS. February 11, Colorado Department of Public Health and Environment

Methane Emissions and Colorado Coal Mines

EPA s Air Quality Regulations for Stationary Engines

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations

Site Identification No.: AAO Application No.:

Tesoro Savage Vancouver Energy Distribution Terminal August 2013 Application No Page 2-162

Class II General Permit G35-C Registration to (Construct, Modify, etc.)

Prevention of Significant Deterioration Air Construction Permit Application

State of the Art (SOTA) Manual for Boilers and Process Heaters

TECHNICAL SUPPORT DOCUMENT FOR. AIR EMISSION GENERAL PERMIT: PART 70 LOW-EMITTING FACILITY GENERAL PERMIT April 30, 2015

GREENHOUSE GAS PREVENTION OF SIGNIFICANT DETERIORATION PERMIT APPLICATION. Red Gate Power Plant South Texas Electric Cooperative, Inc.

The proposed Project would be constructed in portions of Montana, South Dakota, Nebraska, Kansas, Oklahoma, and Texas.

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency

Regulation No. 34. Emission Banking and Trading Program

Air Pollution s, 1950s. Air Pollution Laws 1950s

MEMORANDUM March 7, Phillip Fielder, P.E., Permits and Engineering Group Manager

ADEM Form /10 m5

Wolverine Clean Energy Venture

HB , Clean Air/Clean Jobs Act

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

New Hampshire Code of Administrative Rules Env-A 3100

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Assessment of Air Emissions Martin Marietta Materials Facilities on Highway 34, Weld County, Colorado Project No.:

Notice of Construction Application for Landfill Gas to Pipeline Gas Treatment Facility

TECHNICAL SUPPORT DOCUMENT. San Diego Gas & Electric Company. Desert Star Energy Center

Subpart I Delaware. 40 CFR Ch. I ( Edition) (10) Amendments to Section V (Surveillance)

Garry Kaufman Colorado Air Pollution Control Division May 14, 2014

Asphalt Roofing A Guide to Air Quality Regulations

Rule Overview Regulation No.3, 6 and 7

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD

PRE-PERMIT CONSTRUCTION APPROVAL GUIDANCE DOCUMENT

Clean Up Your Fleet. Introducing a practical approach to cleaner, more efficient fleet operation

Approval Order: New Approval Order for a Produced Water Treatment Facility Project Number: N

How to Achieve improvements in GHG Regulation

Air Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond. Garry Kaufman Holland & Hart LLP

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R06-OAR ; FRL Region 6]

Connecticut Department of Energy and Environmental Protection

DRAFT AIR QUALITY MANAGEMENT IN GARFIELD COUNTY: COLORADO S MOST ACTIVE ENERGY DEVELOPMENT REGION

Air Quality in San Diego 2013 Annual Report

Air Permit Application Volume II Warren County Combined-Cycle Project

3.0 THE 2002 BASE-YEAR INVENTORY. 3.1 Background and requirements

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections

Texas Commission on Environmental Quality Emissions Banking and Trading Programs. Office of Air Air Quality Division

NSPS Subpart OOOO: Applicability and Compliance Basics

EPA emission regulations: What they mean for diesel powered generating systems

STATE OF NEW HAMPSHIRE STATE IMPLEMENTATION PLAN REVISION

AGREEMENT FOR IMPLEMENTATION OF THE PHILADELPHIA COUNTY AIR POLLUTION CONTROL PROGRAM

DRAFT White Paper Asphalt (non-permitted) Strategy Evaluation Portland Air Toxics Solutions

Potential to Emit A Guide for Small Businesses

RESIDENTIAL AND COMMERCIAL/INSTITUTIONAL NATURAL GAS AND LIQUEFIED PETROLEUM GAS (LPG) COMBUSTION

THE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 -

Expansion Pitfalls, Permitting and Compliance A Case Study

INDUSTRIAL BOILER MACT FACTSHEET

West Virginia Department of Environmental Protection Division of Air Quality. Fact Sheet

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Parts 52 and 81. [EPA-R04-OAR ; FRL Region 4]

PERMIT Under the Environmental Conservation Law (ECL) IDENTIFICATION INFORMATION

Addressing Air Emissions from Marcellus Shale Natural Gas Production. Joe Osborne Lauren Burge Group Against Smog & Pollution Pittsburgh, PA

EPA Clean Power Plan and Impact on Texas and the Country. Scott D. Deatherage

PART 70 PERMIT TO OPERATE

(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour;

Understanding Tier 4 Interim and Tier 4 Final EPA regulations for generator set applications

Part 4: How to Avoid Being a Title V Major Source

4. The role of fleets and fleet managers Role of REC?

Colorado PUC E-Filings System

Overview of the Heavy-Duty National Program. Need to Reduce Fuel Consumption and Greenhouse Gases from Vehicles

of Upstream Oil and Gas Activities in the Rocky Mountain States

4. The role of fleets and fleet managers

Summary: Apollo Group Greenhouse Gas Inventory (Worldwide)

Ozone Precursor and GHG Emissions from Light Duty Vehicles Comparing Electricity and Natural Gas as Transportation Fuels

Green Fleet Policy PURPOSE

Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements

ClimatE leaders GrEENHOUsE Gas inventory PrOtOCOl COrE module GUidaNCE

TECHNICAL BRIEFING SHEET NRG Texas Power LLC Permit No.: HAP-14

State of Colorado Comments Docket ID No. EPA-HQ-OAR and Docket ID No. EPA-HQ-OAR

Environmental Laws: Summaries of Major Statutes Administered by the Environmental Protection Agency

PART 70 PERMIT TO OPERATE

By: Kim Heroy-Rogalski, P.E. California Air Resources Board. Delhi, India April 29, 2015

Environmental Management EU 304

NEW YORK STATE IMPLEMENTATION PLAN FOR THE INFRASTRUCTURE ASSESSMENT FOR NITROGEN DIOXIDE UNDER SECTIONS 110(a)(1) AND (2) OF THE CLEAN AIR ACT

NATIONAL AIR QUALITY TRAINING PROJECT PROFESSIONAL DEVELOPMENT TRAINING GUIDE

Summary Fact Sheet for WEB Trading Program: Monitoring, Recordkeeping and Reporting

RULE 1002 FLEET INVENTORY Adopted INDEX

Latham & Watkins Environment, Land & Resources

Emission report Honda accord/cu1

1GI IMissouri Department of Natural Resources ~ ~. Air Pollution Control Program

Large Spark Ignited Engine Certification

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

Calculating Greenhouse Gas Emissions

Regulatory Impact Analysis

Point Source Emission Inventory For Non-Electric Companies in Georgia

State of the Art (SOTA) Manual for Commercial Sterilizers and Fumigators using Ethylene Oxide

Environmental Defense Fund NAFA Fleet Management Association

Chicago Area Clean Cities

Meet Clean Diesel. Improving Energy Security. Fueling Environmental Progress. Powering the Economy

Transcription:

Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013

Overview O Background (pollutants) O Federal permitting regulations O Colorado permitting regulations O Colorado Department of Public Health and Environment (CDPHE) permitting initiatives O Engines O Boiler MACT O Questions?

Background O Criteria pollutants: For which National Ambient Air Quality Standards (NAAQS) have been established: O Nitrogen dioxide (NO 2 ) O Sulfur dioxide (SO 2 ) O Carbon monoxide (CO) O Particulate matter (PM 10, PM 2.5 ) O Lead O Ozone (O 3 ): formed in atmosphere from precursors: nitrogen oxides (NO x ) and volatile organic compounds (VOCs)

Background, con t O Hazardous air pollutants (HAPs) (187 federal) O Colorado non-criteria reportable pollutants (NCRPs): overlap with federal HAPs but includes additional pollutants O Others of interest: O Greenhouse gases (GHGs): federal regulations cover carbon dioxide (CO 2 ), methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride O Carbon dioxide equivalent (CO 2 e) is sum of each multiplied by their global warming potentials

Federal Permitting Regulations O Pre-construction permitting for major sources (New Source Review (NSR)/Prevention of Significant Deterioration [PSD]) O Major sources have potential to emit (PTE) at least one regulated pollutant >100/250 tons per year (tpy) except GHGs. PTE includes controls if federally enforceable O Obtain permit before commence construction O Operating (Title V) permits O Apply for permit within 12 months after commencing operation (renew every 5 years)

Colorado Permitting Regulations O Colorado s permitting regulations implement the federal requirements and add permitting for sources not covered by federal regulations O Regulation 3 O Part A: General provisions and Air Pollutant Emissions Notices (APENs) O Part B: Minor source construction permits O Part C: Operating permits O Part D: Major source construction permits O See also Part G: Statement of Basis and Purpose

Part A: General Provisions & APENs O APENs are used as entry into permitting and are also emission inventory tools O General and specialty forms O Must be filed for individual emission units or groups of like units if not categorically exempt and have uncontrolled actual emissions > 1 tpy attainment area, > 2 tpy nonattainment (Front Range for ozone [VOCs & NO x as precursors]) O Colorado: Uncontrolled actuals = uncontrolled emissions at expected maximum rate or capacity

Part A, con t O APENs for NCRPs based on bins and threshold emissions in pounds per year (lb/yr). Each NCRP is assigned a bin: A:50, B:500, C:1,000 lb/yr O Submit APENs for new sources and renew 30 days before 5 year anniversary, annually if significant emissions increase (April 30 for previous calendar year), change in ownership, or other changes to source O Initial APEN for new source reports expected emissions; subsequent APENs report actual emissions O Also submit APENs with any permit application

Part B: Construction Permits O New/modified minor or synthetic minor sources O Synthetic minor would be major except for enforceable restrictions O HAPs if subject to Colorado or federal National Emission Standards for Hazardous Air Pollutants (NESHAP) or Maximum Achievable Control Technology (MACT) standards O Obtain permit before construct/install/modify O If APEN-exempt, permit exempt

Part B, con t O Additional categorical exemptions O Also emission-based exemptions (1-5 tpy nonattainment, 5-10 tpy attainment depending on pollutant) O Based on uncontrolled actuals O Emission thresholds are for entire facility O Application form, project description, emission calculations & backup, possible dispersion modeling for NAAQS compliance O Permit will not necessarily include all requirements that apply to source

Part B, con t O 60 day completeness review O 60 days preliminary analysis O 15 + 30 days if public comment required O 30 days permit issuance following end of public comment period

Part B, con t O There are also General Permits (GPs) for some types of sources (petroleum tank batteries, natural gas-fired internal combustion engines, etc.) O If your source meets the General Permit requirements, can register under the applicable GP on APEN form and must comply with GP requirements

Catchall Provision O Sources subject to: O New Source Performance Standards (NSPSs) O National Emission Standards for Hazardous Air Pollutants (NESHAP) O Maximum Achievable Control Technology (MACT) standards O Must file an APEN and/or obtain a construction permit, regardless of emissions IF the regulation has been incorporated into Colorado regulations

Part C: Operating Permits O Applies to: O Any PSD/NSR major source O Major HAP source (10 tpy individual, 25 tpy all HAPs) O PTE > 100 tpy any regulated pollutant O Apply after source in operation O Renew every 5 years O Forms(!) O Application must list most air requirements that apply to source (applicable requirements)

Part C, con t O Should not impose new requirements, except perhaps monitoring O Permit shield (can request for inapplicable requirements) O Application shield (shields from enforcement for not having an operating permit while application is processed). Application must be complete and timely to be granted.

Part D: Major Sources O Implements federal PSD and nonattainment NSR construction permit requirements O Based on PTE, not uncontrolled actuals O PSD application: project description, emission calculations & backup, best available control technology (BACT) analysis, air quality impact analysis (dispersion modeling for NAAQS compliance, PSD increment consumption, air quality related values), and growth, soils, and vegetation impact analysis

Part D, con t O PSD review required for pollutants emitted in significant amounts if source is major for any pollutant O Nonattainment NSR application: Project description, emission calculations & backup, lowest achievable emission rate (LAER) analysis, emission offsets, certification that owner s other sources are compliant O Nonattainment NSR only applies to the pollutant or pollutants that the area is nonattainment for (major is > 100 tpy)

Part D, con t O New/modified source may be PSD for some pollutants and nonattainment NSR for others O Major source permitting is a lengthy process (usually 1 year+ from submission of application) O Permit must be obtained before commence construction O Tailoring Rule: Increases threshold for PSD permitting for GHGs from 100/250 tpy to 100,000 tpy CO 2 e (major) and sets a significance level at 75,000 tpy CO 2 e

CDPHE Initiatives O Stakeholder process 2013 O Raise APEN thresholds to 2 tpy attainment & nonattainment O Simplify NCRP APEN requirements by eliminating A & B bins (threshold would be 1,000 lb/yr for all NCRPs) O Raise construction permit thresholds in both attainment & nonattainment areas to 25 tpy for all pollutants except lead O Get rid of catchall provision

Internal Combustion (IC) Engines O Engine source types: O On-road and off-road mobile sources (including cars, trucks, aircraft, water craft, locomotives, construction equipment, etc.) O Stationary engines O Determined by use, not by engine design or technology O Federal government regulates mobile source emissions (e.g., tailpipe standards for cars/trucks, nonroad engine standards, etc.) O Both state/local and federal government regulate stationary sources

Nonroad Engines O A type of mobile source that can become a stationary source (and vice versa) O Self-propelled, or propels another piece of equipment, portable, or transportable engines (wheels, skids, handles, etc.) O Requirements placed on manufacturers, not owners/ operators O BUT: If a nonroad engine (or replacement) remains at a single location (not just a single facility) for more than 12 months (or entire season for seasonal source), it becomes a stationary source, subject to stationary source regulations

Federal Stationary Engine Regulations O New/modified/reconstructed compression ignition (CI) (diesel) New Source Performance Standard (NSPS): 40 Code of Federal Regulations (CFR) 60, Subpart IIII O New/modified/reconstructed spark ignition(si) NSPS: 40 CFR 60, Subpart JJJJ O Existing and new/reconstructed reciprocating IC engine (RICE) MACT: 40 CFR 63, Subpart ZZZZ. Applies at major and area (< major) HAP sources

Colorado Engines O 40 CFR 60, Subpart IIII has been incorporated into Colorado regulations O 40 CFR 60, Subpart JJJJ has not but may be incorporated next year O 40 CFR 63, Subpart ZZZZ has only been incorporated for major HAP sources; area source provisions not in Colorado regulations O Note: catchall provision only applies if regulation incorporated in Colorado regs

NSPS Subpart IIII: CI Engines O Applies to owners/operators/manufacturers of new/modified/reconstructed stationary CI engines: O (Excluding fire pumps) ordered after July 11, 2005 and manufactured after April 1, 2006 OR modified or reconstructed after July 11, 2005 O Fire pump engines ordered after July 11, 2005 and manufactured after July 1, 2006 OR modified or reconstructed after July 11, 2005

NSPS Subpart IIII: CI Engines O Applies to both emergency and nonemergency stationary engines O Excludes engines being tested at stationary test cell/stand O Notification, recordkeeping, reporting requirements O Emission limits O Use on-road (ultra low sulfur) diesel only for displacement <30 liters per cylinder (l/cyl)

NSPS Subpart IIII: CI Engines O Limitations on installing older engines (dates after which older engines cannot be installed) O Testing and monitoring requirements

NSPS Subpart JJJJ: SI Engines O Applies to owners/operators/manufacturers of new/modified/reconstructed stationary SI engines: O Ordered, modified, or reconstructed after June 12, 2006 O Manufactured after dates depend on use, size, and type (ranges from July 1, 2007 to January 1, 2009) O Applies to both emergency and non-emergency stationary engines O Applies to engine burning any gaseous fuel as well as gasoline or LPG

NSPS Subpart JJJJ: SI Engines O Excludes engines being tested at stationary test cell/stand O Notification, recordkeeping, reporting requirements O Emission limits O Limitations on installing older engines (dates after which older engines cannot be installed) O Testing and monitoring requirements

RICE MACT Subpart ZZZZ O Applies to owners/operators of new and existing stationary RICE at both major and area sources of HAPs O In general, new stationary engines follow NSPS requirements O New for >500 hp engines at major sources is ordered/installed/reconstructed on or after December 19, 2002 O For other engines and area sources, generally June 12, 2006

RICE MACT, con t O O Existing stationary engines have requirements, including: O O O Recordkeeping, reporting, notifications Emission limits Testing & monitoring, etc. Compliance date for existing SI RICE 500 hp at major HAP source and existing SI RICE at area sources is October 19, 2013

RICE MACT, con t O Certain engines >500 hp located at major HAP sources are exempt O Commercial/residential/institutional emergency engines at area sources are exempt, with certain exceptions O Emergency engines are limited to 100 hours per year for non-emergency operation or they are no longer considered emergency engines

Colorado Engine Requirements O Colorado has additional control technology/emission standard requirements for existing, new/modified, and relocated natural gas RICE (see Regulation 7, XVI for ozone nonattainment area [control technology requirements] and XVII for statewide requirements) O Section XVII is designed to gap fill, engines subject to emissions control in a federal MACT or NSPS are exempt

Colorado, con t O Section XVII includes emission standards for new or relocated engines > 100 hp and control technology requirements for existing engines (unless too expensive) O Regulation 6 NSPS relocation requirements: Under federal NSPS, moving an existing NSPS-type source into Colorado does not make it new under the federal rules

Colorado, con t O However, the federal NSPS requirements in Regulation 6 are triggered by relocation of an NSPS-type source into the state so that an existing (used) NSPS-type source would have to meet the federal NSPS requirements for NEW affected facilities (state-only requirement) O Regulation 6 relocation requirement only applies to NSPS that have been incorporated into Colorado regulations (for engines, NSPS IIII; RICE MACT for major HAP sources but not NSPS JJJJ or RICE MACT for area HAP sources)

Colorado, con t O Requirement was revised May 16, 2013 for engines because: O Add-on controls may be infeasible (or very expensive), especially for smaller engines O Was encouraging companies to keep old engines in state O For engines < 500 hp, there is a 5 year grace period (that is, you may relocate a <500 hp, < 5 year old engine into Colorado without triggering new emission standards) O Engines > 500 hp still trigger NSPS if relocated into Colorado as do engines older than 5 years

Boiler MACT O Promulgated December 2012 O 40 CFR 63, Subpart JJJJJJ (area sources), 40 CFR 63, Subpart DDDDD (major sources) O Does not apply to boilers at area sources that burn natural gas O Work practice standards, recordkeeping, reporting, emission limits (larger sources) O Existing area source boiler compliance: March 2014 O EPA having Webinars to explains the requirements in November: www.epa.gov/ttn/atw/boiler/boilerpg.html

Questions?