Fire Alarm Systems Care and Maintenance



Similar documents
Protection of Computer Data and Software

Risk Management Guidelines

Fire Log Book. Provided by Norfolk Fire & Rescue Service. Name and address of premises:...

FIRE SAFETY PRECAUTIONS

Fire Safety Log Book

FIRE SAFETY RECORD OF TESTS LOGBOOK

FIRE DETECTION AND ALARM SYSTEMS

Guidance for Responsible Persons on False Alarm Management of Fire Detection and Alarm Systems

How to claim and get help in an emergency. For leaseholders, owner occupiers and shared owners

Risk Management Guidelines

Risk Engineering. Helping our customers understand and protect themselves from risk

How To Comply With The Loss Prevention Certification Board

Feel Secure Your Guide to Home Safety

BS5839 Part 1:2002 Overview

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

1.1.4 The findings from Fire Risk Assessment must be incorporated into the FRAMS Action Plan to manage fire safety at each premise.

Fire. The Fire Installers Mate. A guide to fire alarm systems design

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

Release 3.2 Oct 2009.

Standard the the Raising

CFP 2/4/8 ZONE CONVENTIONAL FIRE ALARM CONTROL PANEL. user manual & log book. Approved Document No. DFU Rev 1

FIRE SAFETY REGISTER. Premises Name: Premises Address: Fire Safety Manager: Contact No. Kerry County Fire Service

FIRE ALARM PANEL & SYSTEM OPERATION ID50 SYSTEM. The Fire Alarm System can be activated in the following ways :~

ELECSA and the Fire Industry

EDA-Z5008 & Z5020. Radio Fire Alarm System. User Manual

Servicing & Maintenance of Fire Alarm Systems

Guidance for Electrical Contractors on Emergency Lighting Legislation

Greater Manchester Fire and Rescue Service

Conventional Fire Detection and Extinguishant Control System Specification

FIRE ALARM SYSTEM RECORD OF COMPLETION

Smoke Alarm Legislation

FIRE ALARM SYSTEM RECORD OF COMPLETION

Reducing false alarms

USER MANUAL, MAINTENANCE GUIDE & LOG BOOK

Cambridgeshire and Peterborough Fire Authority. Internal Audit Progress Report Overview & Scrutiny Committee meeting 16 October 2014

S17 First published 2011 Version 01. Security. Intrusion and hold-up alarm systems: guidance on event processing and handling.

To promote and protect the private residential landlord. Fire Safety Logbook. Information. Advice. Support. Services START DATE:

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

Fire Alarm Log Book. Any activity regarding this system must be documented in writing.

Public and Products Liability

Your guide to Managing False Alarms. Customer guide. Chubb Fire

Commercially Monitored Remote Signalling Intruder Alarms for Police Response. Recognised Companies

maintenance of CCTV surveillance systems code of practice

City's Central Dispatch shall be the Dispatch Station at the Mt. Vernon Police Station.

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

Fire Policy and Procedures. Cañada Blanch Spanish School

astec Integrated Alarm System USER GUIDE

CCTV Monitoring - Terms and conditions, scope of work

UPP Residential Services Fire Risk Assessment

focusfirst Construction factsheet Escape of water Things to consider

radio fire alarm system Installed with minimum disruption Provides maximum protection

Conditions for ICT Partner Solutions Service Schedule for Phoenix Co-Lo Services

Risk Management Guidelines

TLIB3078A Inspect, prepare and start an electric tram

Electronic Fire and Security Systems Installation: Commissioning (SCQF level 6)

False Alarm/Unwanted Fire Signals Reduction Guidance

FIRE ALARMS. IN DWELLINGS By John Ware FIRE ALARMS

ZURICH TRADESMAN SCHEDULE

Smoke Alarm Legislation Frequently Asked Questions

Burglar Alarms Advice

How to claim and get help in an emergency. For leaseholders, owner occupiers and shared owners

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

HARDWIRED CONTROL PANELS

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service)

Installation/alterations of Security Systems- Terms and conditions

I.S :2013 Fire Detection & Alarm Systems

Section 6 Fire Detection and Alarm Systems Russell Porteous Chief Executive Officer Firewize Services

WTSL-SN-1 Alarm Control Unit with Wi-Safe 2 Installation and User Guide

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS

SECURIT 800L+ CONTROL PANEL

THE POWER TO BUILD YOUR BUSINESS

section one guide to design, installation,commissioning and maintenance of fire systems in non domestic premises Consultant s Guide

Product Support and Maintenance Terms & Conditions

City of Temple Burglar Alarm Permit Process Information Sheet

Maintenance & Support Contract. T F helpdesk@centrix-uk.com

28 th April 2005 Version Final 1.1 CODE OF PRACTICE FOR THE AUTOMATIC FIRE ALARM SYSTEM. Copyright New Zealand Fire Service Page 1 of 1

Car Full Cycle EDI Guide Acturis CLICK HERE TO START

Overview of Fire Alarm Systems and Maintenance

Health and Safety Policy

POLICY ON HEALTH AND SAFETY (GENERAL)

Fire Safety logbook

PRODUCT WARRANTY. Page 20

Guide to Fire Alarm Systems

Your responsibilities if you have an automatic fire alarm. A handy guide for owners and responsible persons

Understanding Fire Alarm Requirements & Inspections. Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc

HEALTH & SAFETY POLICY

Gas and Oil Fired Space Heating

XFP NETWORKABLE ANALOGUE ADDRESSABLE FIRE ALARM CONTROL PANEL. user manual and log book. Approved Document No. DFU Rev 1

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU

25 Years of Manufacturing Excellence INFINITY. The Intelligent 2 Wire Fire Detection System for Professionals

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

AlarmSense 2-wire detection and alarm system. Product Guide

SECURITY SYSTEM NOTES SPECIAL CODES ENTRY / EXIT DELAY TIMES ARM / DISARM CODES

Fire Alarm Systems Certification

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

An introduction to Fire Safety Management

Fire Safety Log Book. Premises Name: Premises Address: Date From: Date To: Location of Log Book:

Essex Fire Authority. Fleet Management. Internal Audit Report (4.12/13) 28 February 2013 FINAL. Overall Opinion

Excess Professional Indemnity. Policy document

Transcription:

April 2011 Country of Origin: United Kingdom Fire Alarm Systems Care and Maintenance Introduction A fire alarm installation is designed to provide early warning of a fire condition. To ensure that the utmost reliance can be placed upon the protection this provides, the alarm should be maintained in perfect working order at all times. For this reason, any fire alarm should be serviced, under contract, with an approved company at predefined intervals. There are also more regular checks that can be undertaken by the user and this Risktopic will provide details of the recommended checks that should be undertaken. Daily Inspection The following daily inspections can be undertaken quickly and easily by looking at the control panel: A visual check should be made daily, to ascertain that the control panel indicates normal operation. If a fault condition is indicated, determine the area affected and decide whether any special action is required (e.g. fire patrols). If possible, determine the reason for the fault or note activities immediately prior to the fault in the area affected. Record the fault in the logbook and notify the servicing company for repair.

Weekly Inspection The following weekly checks can be undertaken by a nominated person: At least one manual call point should be operated during normal working hours, to test the ability of the control and indicating equipment to receive a signal and to operate the fire alarm sounders. If the fire alarm system automatically signals to an alarm receiving centre the test should ensure that the fire signal is received at the monitoring centre to which fire signals are transmitted. The alarm receiving centre should also be made aware of any imminent tests to prevent a false alarm being made to the Fire Brigade. A different manual call point should be used at the time of every weekly test so that all manual call points in the building are tested in rotation over a period of time. There is no maximum limit for this period (e.g. in a system with 50 call points, the user will test each manual call point once every 50 weeks). The result of the weekly test and the identity of the manual call point used should be recorded in the log book. The duration for which the fire signal is given (other than solely at the control and indicating equipment) at the time of the weekly test by the user should not normally exceed one minute so that, in the event of a fire at the time of the weekly test, occupants will be warned by the prolonged operation of the fire alarm system. Monthly Inspection The following monthly inspection can be undertaken by a nominated person: Standby generators used to provide emergency power supplies should be tested monthly under load conditions and allowed to energise the fire alarm supply for a continuous period of at least one hour. During the test, the fire alarm should be monitored to identify any malfunction caused by the use of the generator. If vented batteries are used as a standby power supply, a visual inspection of the batteries and their connections should be made, to ensure that they are in good condition. Action should be taken to rectify any defect, including low electrolyte level. Quarterly Maintenance Inspection and Test If vented batteries are installed for standby power, all batteries and their connections should be examined by a person who is competent in battery installation and maintenance technology. Electrolyte levels should be checked and topped up as necessary. Inspection and Test of the System over a 12 Month Period The period between successive inspection and servicing visits should be based upon a risk assessment, taking into account the type of system installed, the environment in which it operates and other factors that may affect the long term operation of the system. The period between successive inspection and servicing visits should not exceed six months. The appointed maintenance company should make the following checks: Entries in the log book should be checked and any necessary action taken. 2

Visual inspection should be made, to check whether structural or occupancy changes have affected the requirements for the location of manual call points, detectors and sounders. The visual inspection should also confirm that a clear space of at least 500mm is provided around every detector. The records and rate of false alarms should be checked for the previous six months. Batteries and their connections should be examined and tested, as specified by the supplier to ensure that they are in good serviceable condition. The standby power supply capacity should also be checked to establish its suitability for continued service. The alarm and fault functions of the control and indicating equipment should be checked by the operation of a detector or call point. In addition, the operation of any remote signalling system must also be checked. The audible fire alarm devices should be checked for correct operation. It should be confirmed that visual fire alarm devices are not obstructed from view and that their lenses are clean. All ancillary functions (e.g. automatic door closers) of the control and indicating equipment should be tested to ensure they remain in working order. All printers should be tested to ensure that they operate correctly and that characters are legible. Radio systems of all types should be serviced in accordance with the recommendations of the manufacturer. Visual inspection of cable fittings and equipment should take place to ensure these are secure, undamaged and adequately protected. The switch mechanism of every manual call point should be tested, either by removal of a frangible element or by insertion of a test key switch to operate the device as it would in the event of a fire. All automatic detectors should be examined and functionally tested to ensure they are both operational and are capable of responding to the phenomena they are designed to detect. Radio signal strengths should be checked for adequacy. The cause and effect programme should be confirmed as correct. All further annual checks and tests recommended by the manufacturer of the control and indicating equipment and other components of the system should be carried out. Upon completion of the work, a maintenance/test certificate should be obtained. Actions Following a Fire If a fire occurs, subsequent checks should be made of the fire alarm system as follows: Each detector or call point which may have been affected by the fire should be tested. Each fire alarm sounder should be tested. 3

A visual inspection of all parts of the fire alarm installation which could have been affected by the fire should be undertaken. The appointed maintenance company should be instructed to complete a full test of the system and should rectify any defects found. All ancillary functions of the control and indicating equipment should be tested. Upon completion of any repair work, the maintenance company should issue a test certificate. False Alarm Conditions False alarms can result in loss of confidence in the system and may also result in the downgrading of response levels by the local Fire Authority. The following recommendations should be actioned after a false alarm has occurred: Where possible, identify the particular detector or call point that has caused the alarm. Establish the cause of the false alarm. This could be as a result of a change in environmental conditions within the building. Record the false alarm in the logbook and inform the appointed maintenance company. Summary Automatic fire alarm systems are an integral part of building fire safety, providing early warning of fires, allowing occupants to evacuate the building and, in some cases, allowing for a fire to be fought in its early stages, potentially saving the expensive consequences of a large fire. In order for the fire alarm system to remain effective it is imperative that a formal system of maintenance is implemented. As detailed within this Risktopic, the responsibility for the upkeep of a fire alarm system does not rest solely with the maintenance company and users can do their own daily, weekly and monthly checks to ensure the system is fully operational between scheduled service visits. It is important to remember to keep a written log of any checks and performance issues. United Kingdom Approved Maintenance Companies This Risktopic refers to maintenance companies being employed to undertake scheduled testing. In the United Kingdom an approved company is one which accredited to one of the following standards: Loss Prevention Standard (LPS) 1014. Approval via the British Fire Protection Systems Association (BAFE) SP203 1 modular scheme. 4

Further guidance on the care and maintenance of fire alarm systems can be found in: British Standard (BS) 5839 Part 1: 2002 + A2:2008 Code of practice for system design, installation, commissioning and maintenance. 5

The information contained in this document has been compiled and obtained from sources believed to be reliable and credible but no representation or warranty, express or implied, is made by Zurich Insurance plc (UK Branch) or any of its associated companies (collectively the "Zurich Group") as to their accuracy or completeness. Please note that some of the information contained herein may be time sensitive. Information relating to risk engineering is intended as a general description of certain types of risk engineering services available to relevant customers. The Zurich Group does not assume any liability of any kind whatsoever, resulting from the use, or reliance upon any information, material or procedure contained herein. The Group does not guarantee particular outcomes and there may be conditions on your premises or within your organisation which may not be apparent to us. You are in the best position to understand your business and your organisation and to take steps to minimise risk, and we wish to assist you by providing the information and tools to assess your changing risk environment. In the U.S., risk engineering services are available to qualified customers through Zurich Services Corporation. CONTACT Risk Engineering Risk Support Services 126 Hagley Road Edgbaston Birmingham B16 9PF Phone +44 (0) 121 697 9131 www.zurich.com For more information please visit: www.zurich.com/riskengineering Zurich Management Services Limited, Registered in England and Wales no. 2741053, Registered Office: The Zurich Centre, 3000 Parkway, Whiteley, Fareham, Hampshire PO15 7JZ