Double-Take Cloud Migration Center (CMC) Tech Brief



Similar documents
Vision Solutions Migration Assurance Program

WHITE PAPER. Header Title. Side Bar Copy. Header Title. Seven Virtualization DR Myths WHITEPAPER

WHITE PAPER. Header Title. Side Bar Copy. Header Title. What To Consider When WHITEPAPER. Choosing Virtual Machine Protection.

The Cost of Free. The Hidden Costs of Server Migrations PERSPECTIVE

How To Run A Modern Business With Microsoft Arknow

Maximizing Data Center Uptime with Business Continuity Planning Next to ensuring the safety of your employees, the most important business continuity

Protecting Exchange 2010 An Executive Overview of Double-Take Availability

CA ARCserve Replication and High Availability Deployment Options for Hyper-V

Virtualized Disaster Recovery from VMware and Vision Solutions Cost-efficient, dependable solutions for virtualized disaster recovery and business

WHITE PAPER. Header Title. Side Bar Copy. Real-Time Replication Is Better Than Periodic Replication WHITEPAPER. A Technical Overview

Deployment Options for Microsoft Hyper-V Server

BMC Control-M for Cloud. BMC Control-M Workload Automation

Veritas Cluster Server from Symantec

Server and Application Migration made easy. Ask us how!

Servermigrationen zu Hyper-V / Azure mit Double-Take Move

Cloud Computing for Education Workshop

Business Continuity and Disaster Recovery Workbook: Determining Business Resiliency It s All About Recovery Time

Asigra Cloud Backup V13 Delivers Enhanced Protection for Your Critical Enterprise Data

Cloud Computing. Chapter 1 Introducing Cloud Computing

Course 20533: Implementing Microsoft Azure Infrastructure Solutions

NETGEAR ReadyRECOVER Offsite Data Protection: Replication Overview and Configuration Guide

Cloud Computing. Chapter 1 Introducing Cloud Computing

Three Ways Enterprises are Protecting SQL Server in the Cloud

More enhanced features.

Drobo How-To Guide. Cloud Storage Using Amazon Storage Gateway with Drobo iscsi SAN

Implementing Microsoft Azure Infrastructure Solutions 20533B; 5 Days, Instructor-led

Course 20533B: Implementing Microsoft Azure Infrastructure Solutions

Replication, Business Continuity and Restoration with Cloud Economics

Implementing Microsoft Azure Infrastructure Solutions

Protecting your SQL database with Hybrid Cloud Backup and Recovery. Session Code CL02

Disaster Recovery with EonStor DS Series &VMware Site Recovery Manager

VMware Solutions for Small and Midsize Business

VMware vcloud Air - Disaster Recovery User's Guide

SteelFusion with AWS Hybrid Cloud Storage

Protecting your Data in a New Generation Virtual and Physical Environment

Building disaster-recovery solution using Azure Site Recovery (ASR) for Hyper-V (Part 1)

Paragon Protect & Restore

OpenStack Cloud Migration : Migrating On-premise workloads to OpenStack Private Cloud

Windows Server 2012 R2 Licensing Datasheet

Deploying Migrated IBM Notes Applications to the Cloud

Pervasive PSQL Meets Critical Business Requirements

Rethink Disaster Recovery with Microsoft

The Benefits of Continuous Data Protection (CDP) for IBM i and AIX Environments

SOLUTION BRIEF: CA ARCserve R16. Leveraging the Cloud for Business Continuity and Disaster Recovery

An Oracle White Paper August Oracle VM 3: Application-Driven Virtualization

VICNET is G-Cloud7 GOV UK Supplier VISIT DIGITAL MARKET PLACE VICNETCLOUD VICNET CLOUD MIGRATION SERVICES

Cloud Courses Description

WHITEPAPER. Beyond Infrastructure Virtualization Platform Virtualization, PaaS and DevOps

How To Use Arcgis For Free On A Gdb (For A Gis Server) For A Small Business

BEDIFFERENT ACE G E R M A N Y. aras.com. Copyright 2012 Aras. All Rights Reserved.

VMware System, Application and Data Availability With CA ARCserve High Availability

Proactively Secure Your Cloud Computing Platform

How To Backup To Cloud

Cloud Backup and Recovery

Windows Server 2012 R2 The Essentials Experience

Capability VMware Hyper-V

EMC VPLEX FAMILY. Continuous Availability and data Mobility Within and Across Data Centers

AVLOR SERVER CLOUD RECOVERY

Part2 Hyper-V Replica and Hyper-V Recovery Manager. Datacenter Specialist

Symantec Backup Exec 2012 Licensing Guide

CA arcserve r16.5 Hybrid data protection

Cloud Computing Services

WHITE PAPER SETTING UP AND USING ESTATE MASTER ON THE CLOUD INTRODUCTION

BEDIFFERENT A C E I N T E R N A T I O N A L

How to Guide: StorageCraft Cloud Services VPN

About the VM-Series Firewall

Five Features Your Cloud Disaster Recovery Solution Should Have

Your Guide to VMware Lab Manager Replacement

Direct virtual machine creation from backup with BMR

Technology Insight Series

Reducing the Complexity of Virtualization for Small and Midsized Businesses

Virtualization and Cloud Computing

(Formerly Double-Take Backup)

Implementing and Managing Windows Server 2008 Hyper-V

WHITE PAPER ENHANCING YOUR SQL REPORTING SERVICES DEPLOYMENT WITH DOUBLE-TAKE

Cloud Computing. Chapter 1 Introducing Cloud Computing

Designing a Data Solution with Microsoft SQL Server 2014

SERVER CLOUD DISASTER RECOVERY. User Manual

Application Note: Failover with Double- Take Availability and the Scale HC3 Cluster. Version 2.0

6422: Implementing and Managing Windows Server 2008 Hyper-V (3 Days)

Virtual Server System and Data Protection, Recovery and Availability

A Guide to Disaster Recovery in the Cloud. Simple, Affordable Protection for Your Applications and Data

Zerto Virtual Manager Administration Guide

Symantec Backup Exec 2014

How To Make A Cloud Based System A Successful Business Model

McAfee Server Security

System Migrations Without Business Downtime. An Executive Overview

Cloud Computing. Chapter 1 Introducing Cloud Computing

Executing Large-Scale Data Center Transformation Projects with PlateSpin Migrate 12

MS 20465C: Designing a Data Solution with Microsoft SQL Server

EMC VPLEX FAMILY. Continuous Availability and Data Mobility Within and Across Data Centers

Leveraging Public Cloud for Affordable VMware Disaster Recovery & Business Continuity

SOLUTION BRIEF: CA ARCserve R16. Virtual Server System and Data Protection, Recovery and Availability

Expert Reference Series of White Papers. Understanding Data Centers and Cloud Computing

WELKOM Cloud met Azure

Cloud Courses Description

Solutions for Disaster Recovery Using Grass Valley Integrated Playout Systems

How to plan for a Disaster Recovery strategy. Nicholas Gee BCAP Jodie Rugless RDNS SA

Veritas InfoScale Availability

5 FEATURES YOUR CLOUD DISASTER RECOVERY SOLUTION SHOULD HAVE

Transcription:

Double-Take Cloud Migration Center (CMC) Tech Brief

Overview Double-Take Cloud Migration Center is an online service that enables migrations from VMware vsphere and Amazon Web Services EC2 to Microsoft Azure Infrastructure as a Service (IaaS). This document provides a detailed technical briefing on the functionality and use of the Double-Take Cloud Migration Center and assumes that the reader will have at least a basic understanding of Cloud IaaS. Terms Environment - The information needed to connect to an infrastructure. This includes the combination of the type of infrastructure and the information to connect to that infrastructure. The connection information may be an access key and secret key (AWS), subscription information, or URL and username/password (vsphere). Infrastructure as a Service - Infrastructure as a Service (IaaS) is a form of cloud computing that provides virtualized computing resources over the Internet. IaaS is one of three main categories of cloud computing services, alongside Software as a Service (SaaS) and Platform as a Service (PaaS).* Server - A computing workload including an OS, applications, data and storage. Proxy Server - A server with Double-Take Proxy software installed on it that is used to communicate to an environment and servers that do not have public IP addresses. The proxy server is used for discovery of servers and creations of migration jobs. Migration - The process of transitioning a server to a secondary environment. Cutover - The final step of migration in which the server is discontinued in the original environment and begins operating in the new platform. * http://searchcloudcomputing.techtarget.com/definition/infrastructure-as-a-service-iaas 1

Requirements To use the Cloud Migration Center, the production workloads and secondary infrastructure must meet or exceed the following requirements. Production - Each production workload must be a virtual server running on a vsphere Virtual Host or within Amazon Web Services EC2. The operating system running within the VM needs to be an operating system that is supported in Microsoft Azure.* The production virtual machine also needs to have remote desktop enabled so that after the migration the desktop will be accessible. There must be at least one TCP/IP network interface that is configured with a routable IP address that can send and receive data to and from the secondary infrastructure. Target Infrastructure: The target infrastructure will be Microsoft Azure IaaS. Users will need to have a subscription account created in Microsoft Azure that can be utilized for the migration process. An AWS account or a proxy server running in vsphere is also required. How the Solution Works Double-Take Cloud Migration Center provides a streamlined migration process for moving workloads to the cloud. 1. Configure Environments First, the user creates environments, as defined in the preceding Terms section. Then the user inputs information for their Azure subscription. CMC makes this easy by guiding the user through the process of downloading a subscription file and then uploading it into CMC. 2. Discover eligible servers - Double-Take Cloud Migration Center will use information provided during environment configuration to find all the servers that are able to be migrated to Azure. These servers will be marked as ready. * At publication time, Microsoft Azure currently supports Windows 2008R2, 2012 and 2012R2. Check azure.microsoft.com for latest OS support information. 2

3. Create Migration - The user will select the source servers they would like to migrate and step through a simple wizard to create the migration. CMC will use information about the source server to select the instance size in Azure that best matches the source server. The user can change the instance to either scale up or scale down when the server is migrated. Once the wizard is complete, CMC will go through several automated steps to reach the point of ready for cutover. Creating target service - CMC creates a Cloud Service in Azure that will hold the server that is being migrated. Creating target instance - A Virtual Machine is created within the Azure Cloud Service. Provisioning target instance - The Target Virtual Machine is automatically provisioned. This includes remapping the D: drive in the target instance if the source machine has a D: drive in use. Creating install points - Firewall rules are set up to allow for remotely installing Double-Take Move on the Source and Target servers. Copying Double-Take to the Source server. Installing Double-Take on the Source server. Activating Double-Take on the Source server. Activating Double-Take on the Target server. Activating Double-Take Move on the Source server. Creating the migration job within Double-Take Move. Synchronizing - The initial mirror is started to send the data from the Source server to the Target server. 4. Cutover - Once the initial mirror is complete, the migration job will be ready for cutover. If automatic cutover was selected in the migration wizard, then the cutover process will begin without any user intervention. If automatic cutover was not selected, then the migration job will remain in the Ready for Cutover state until the user initiates cutover. Throughout the time that the migration job is in the Ready for Cutover state, changes on the Source server are replicated in real-time to the Target server. 3

When cutover begins, CMC automatically completes the migration process, including: Shutting down the Source server, if that option was selected in the migration creation wizard. Utilizing Double-Take Move to apply the system state information on the Target VM. Rebooting the Target VM. Activating Windows on the Target VM to ensure that the Windows licensing is converted to Microsoft Azure licensing. 5. Complete Migration - Once Windows has been successfully activated on the Target VM, the migration is completed and the workload is running in Azure. Conclusion Equipped with powerful automation, the Double-Take Cloud Migration Center eliminates a multitude of steps required with typical migration tools. The Double-Take product installation, activation and target server provisioning are transparent as workloads are moved to the cloud. In just five clicks, anyone can perform an enterprise-level migration. By utilizing Vision Solutions Double-Take Cloud Migration Center, migration with near-zero downtime has never been easier. 4

Migrate, Protect & Recover Anywhere. Vision Solutions. Vision Solutions is the premier provider of software solutions designed to protect data, minimize downtime and maximize resources for the modern data center. We are the only company to deliver workload migrations, high availability, disaster recovery and data sharing across multiple operating systems, on any hardware and on any physical, virtual or Cloud-based environment. Our solutions perform near-zero downtime migration of data, applications and systems to significantly reduce cost, risk and resource requirements. We utilize real-time replication to prevent data loss and enable fast recovery to secondary servers in the event of a planned or unplanned failure at the primary site. Our software also enables different database platforms to seamlessly share and consolidate data in real-time for proactive, business critical decision-making. Vision Solutions has been serving enterprises and managed service providers for over 25 years through our portfolio of Double-Take, MIMIX and itera product brands. For more information call: 1.800.957.4511 (toll-free U.S. and Canada) 1.801.303.5108 or visit Also find us on: Facebook: Twitter: YouTube: Vision Solutions Blog: http://www.facebook.com/visiondoubletake http://twitter.com/#!/vsi_doubletake http://www.youtube.com/visiondoubletake http://blog./ 15300 Barranca Parkway Irvine, CA 92618 800.957.4511 888.674.9495 Copyright 2015, Vision Solutions, Inc. All rights reserved. All trademarks and registered trademarks are the property of their respective owners. 5