Passive Building Systems vs Active Building Systems and the Return On Investment



Similar documents
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings


KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

Metrics That Matter: Pam Greenley MIT EHS Associate Director Steve Lanou MIT Deputy Director, Sustainability

Rev. No. 0 January 5, 2009

ABSTRACT DCMCCT PROJECT OVERVIEW

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Optimizing Power Distribution for High-Density Computing

HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget

Xcel Business Customers: Program and Rebate Summary

SIMULATION OF RADIANT COOLING PERFORMANCE WITH

Chapter-5 Introduction to Building Automation System (BAS)

Green Building Handbook for South Africa Chapter: Heating, Ventilation and Cooling Luke Osburn CSIR Built Environment

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

for K-12 School Buildings

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Measuring The Right Thing For Humidity Control It s the Dew Point Stupid!

Building Energy Systems. - HVAC: Heating, Distribution -

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

HVAC Processes. Lecture 7

Optimizing M&R Investment Strategies using the BUILDER Sustainment Management System

Leveraging the Power of Intelligent Motor Control to Maximize HVAC System Efficiency

Building Analytics Improve the efficiency, occupant comfort, and financial well-being of your building.

UNITED TECHNOLOGIES CARRIER CORPORATION. Remote Monitoring MONITORING YOUR BUILDING 24/7 SO YOU DON T HAVE TO

Enclosed Football Stadium Design History and Lessons Learned

Leading Techniques for Energy Savings in Commercial Office Buildings

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Leading Techniques for Energy Savings in Commercial Office Buildings

BEST PRACTICE GUIDE TO MAXIMIZE ROI OF ENERGY MANAGEMENT SYSTEMS. Bob Zak SVP, Facility Solutions Ecova

AIRAH Presentation April 30 th 2014

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

In Row Cooling Options for High Density IT Applications

OEH Energy Efficient HVAC for Business Training Course

National Grid Your Partner in Energy Solutions

Optimising building HVAC services through control

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings

imagine SOLAR AIR CONDITIONING MADE EASY

Fläkt Woods Building Future

DIABLO VALLEY COLLEGE CATALOG

Columbia University Master Planning & Optimization

Conservation Demand Management Plan London Health Sciences Centre Made for Ontario Regulation 397/11 Green Energy Act, 2009

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

Smart Energy Consumption and the Smart Grid

Element D Services Heating, Ventilating, and Air Conditioning

Scope of Work. See for resources available

Data Centers That Deliver Better Results. Bring Your Building Together

Smart Grid Enabling a Sustainable Energy Future

Impact of Control System Technologies on Industrial Energy Savings

Temperature Controls Design

CGC s Hybrid System Loop Control

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

HVAC Systems: Overview

DABO ADDS INTELLIGENCE AND MEMORY TO A BUILDING S OPERATING SYSTEM

Collaborative Laboratory Commissioning and Sustaining the Optimal Building. By E. Lon Brightbill, P.E Facility Dynamics

Top 5 Trends in Data Center Energy Efficiency

TECHNICAL GUIDE A GUIDE FOR THE SELECTION OF ENERGY EFFICIENT TECHNOLOGIES

Buildings Business. Chris Curtis President & CEO Buildings Business Schneider Electric. June 2009

ENERGY AUDITS FOR EXISTING BUILDINGS: It s like (nearly) free money! FSi consulting engineers

Cornell University Optimizes Energy Efficiency with GE s Proficy Software

Innovative Funding Options for Energy Efficiency Initiatives

ULTIMATE GUIDE TO BUILDING AUTOMATION SYSTEM (BAS)

Illuminating Info: UV-C For HVAC

Case Study. Crown Melbourne & BUENO Systems: Energy and Operational Savings Across a Multi-Use Entertainment Complex.

Heat Recovery from Data Centres Conference Designing Energy Efficient Data Centres

The product segments Heating, ventilation, air conditioning. Control Products & Systems OEM. Answers for infrastructure.

ICONICS GEO Productivity Portals Target Renewable Energy Solutions

J. Freihaut, Ph.D. Architectural Engineering, Professor Penn State Univesity

Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

Legacy Data Centres Upgrading the cooling capabilities What are the options?

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Los Angeles Community College District

APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems

A NEW DESICCANT EVAPORATIVE COOLING CYCLE FOR SOLAR AIR CONDITIONING AND HOT WATER HEATING

Geothermal Heat Pumps: A Pathway to Zero Net Energy (ZNE) for Schools, Homes and Businesses

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates

Flexibility, Efficiency In San Antonio Arena

Transcription:

Passive Building Systems vs Active Building Systems and the Return On Investment Andrew Blumenfeld GSA Deputy Assistant Commissioner for Acquisition William T. Thumm Hensel Phelps Operations Manager

Goals Discussion on the challenges faced by owners in defining performance criteria in a competitive market with a focus on the tradeoffs between maintenance costs and the initial installation costs and how this can effect the Return On Investment. The presenters bring over 40 years of experience from both the public and private sectors to review this issue as they analyze building mechanical systems, envelope design, etc.

Presenters Andrew Blumenfeld A veteran of more than 20 years in public sector construction, Mr. Blumenfeld was recently appointed to be the National Director of Acquisition for GSA s Public Building Service. Previous Assignments include Director of Construction for GSA s National Capitol Region, Project Executive for the Renovation of the Pentagon, Legal Counsel to the Pentagon Renovation Program and Deputy General Counsel for the Baltimore District of the U.S. Army Corps of Engineers. William T. Thumm - Mr. Thumm has managed over 2.5 billion dollars in construction over the last 17 years with Hensel Phelps. His most notable projects include the Pentagon Renovations during 911, the Baltimore Hilton Convention Center Hotel and the Russell Knox Headquarters project at Quantico, VA. He has the following certifications: DBIA, LEED BD+C, STS and PMP. William has an MS from Columbia University and a BS from Lehigh University both in Civil Engineering. He is also the acting President of the Roger Williams University Construction Management Professional Advisory Board.

Market Forces Driving Change Compelling need to reduce energy costs Regulatory Demands (State, Local & Federal) Customer Demands LEED Cachet Market Forces/Discipline of the Marketplace Energy Efficiency is Determined by 4 Key Factors: Active Energy Conservation Passive Energy Conservation Quality of Operations & Maintenance Demand Management (not addressed here)

Bottom Line Up Front Owners tend to: Overinvest in Active Energy Conservation Underinvest in Passive Energy Conservation Underestimate the Maintenance Costs of Complex BAS Complexity is the Price of Performance Toyota vs. Ferrari

Bottom Line Up Front Recognizing & Managing the Impact of Complexity Redistribution of the Total Cost of Ownership Energy Costs Mechanical/Controls Maintenance Costs The Theory: Decreases in Energy Costs should offset increased construction and maintenance costs Rebalancing these Factors can Improve the Owner s return on Investment

Ironic Evolution Functional Purpose Success/Stability brings excess Excess bring Unsustainable Design Unsustainable design brings about regulation Or more simply chaos regulate theory Outcome = Complicated building systems with competing requirements Result High maintenance systems with a potential for a poor ROI

Active Building Systems Active Building Systems Principally Mechanical (HVAC) Automatic Valves, Dampers etc Lighting Controls Occupancy Controls Demand Management & Peak Shaving Elaborate monitoring schemes (Intelligent Systems) Advantages of Active Systems High Performance when properly operated and maintained Integrates multiple systems into a single front end Advanced Analytics and Real-Time performance monitoring Maintenance alerts via alarm Infinitely customizable down to the individual office High Cool Factor

Active Building Systems Disadvantages of Active Building Systems High First Cost (Known) High Maintenance Costs (More Difficult to Predict) VIP Overrides Software Intense Requires Periodic Updates Security Issues: Addressable nodes Lots of Moving Parts Higher Failure Rates Proprietary Owner Locked In Hidden Interdependencies Skill Gap Requires new and different skills Substantial Training Costs Without proper (i.e. costly) maintenance performance deteriorates quickly

Active Building Systems Bottom Line: Beware the Maintenance Tail of Active Systems - Buy What You Can Afford to Maintain Sometimes the Camry is the Right Answer!

Passive Systems 4 Key Building Envelope Issues Water/Air/Vapor/Thermal Advantages of Passive Building Systems One time cost Costs Fixed and Known - High Cost Certainty Predictable stream of benefits Typically requires no Little or No Maintenance No Moving Parts & works 24 hours per day Disadvantages of Passive Building Systems Increases First Cost Essentially Fixed Cannot be easily Upgraded No Sex appeal or cool plaques

Design Drivers

Other Design Drivers Temperature Set Point Constraints 72 degrees plus or minus a degree Future Flexibility Peak vs Off Peak Loads Occupied vs Unoccupied Loads CO2 Monitoring/Occupancy Sensors

Simple Active Mech. Solution Chillers AHU/RTU FPIU VAV Exhaust Fans Boilers Supply Fans

Future Active Systems Adaptive and Fuzzy Logic Enthalpy/Energy Recovery Exchangers Microenvironments (Occupancy Sensors) Geo Thermal Liquid Desiccant Air Conditioning Microchannel Heat Exchangers

Reality Interdependencies are increasing Electrical tied to Controls tied to Mechanical tied to security Controls Packages are getting more proprietary and complicated Addressable Controls create potential security issues

Passive Systems Stagnant systems require no power, no moving parts, no controls and little to no maintenance Built around the Four External Envelope Issues Water / Air / Vapor / Thermal

Water/Air/Vapor Details

Solar

Water/Vapor/Air/Thermal

Passive System Technology Building Science Improvements More studies and experts Better Material Liquid Applied Sprayed Qualified Installers Training Qualified Designers Interface details

Maintenance!!

Maintenance Reality Data Point Overload Massive amounts of data Reactive vs Proactive Maintenance Overrides Manual and Programed

Maintenance Challenges Trouble with Troubleshooting Building system interdependencies create massive issues with troubleshooting. Education/Compensation Lag Unbalanced with current systems System Training vs Technical Training Builder can t make up the difference

Maintenance Moving Forward TSO (Transition to Stabilized Occupancy) Look to the builder to overlap first 180 ~ 360 Days Challenge Industry RFPs should require maintenance savings ideas in the proposals and be willing to pay for them Pump Up the Pay Owners need to analyze the maintenance staff and beef them up to match systems ReCx (ReCommissioning) good benchmark to see how the maintenance is going Don t be afraid of it.

Passive Systems Future Maximize Passive Systems High Initial Cost with a low trailing Cost Building Commissioning Building Pressure tests Water Tests Third Party Inspectors Simple Redundant Systems Gravity is free Belts and Suspenders Method

Active Systems Future Work Backwards Minimalize Realistically Align Systems with Maintenance Capacity Only do if it you need it not because it can do it. Reduce Constraints Technology Lessening some of requirements may encourage a simpler system which may actually enhance maintenance. Use technology that simplifies not complicates e.g. Chilled Beams

Maximize the ROI Owners should seek to maximize the Passive systems, Simplify the Active systems and Balance their Maintenance capabilities to seek the ideal ROI from their investments.