PERMA-PIPE, Inc. GOLD COATING SYSTEMS

Similar documents
BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SC2000 CEMENT BONDING PROCEDURES

SECTION WATER STORAGE TANK PAINTING

PRODUCT DATA SHEET DESCRIPTION:

RAPTOR TRUCK BED LINER - BLACK

Tractor Painting Tips

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

Product Information. D8115 Matte and D8117 Semi-Gloss Clearcoat System

TECHNICAL DATA RS European Clear EZ N. Webster Street Dayton, OH Phone Toll Free Fax

This will also provide you with the knowledge to insure long life for your Investment

Sikaflex Sealant Installation. Sika Corporation

Section Four: Linings and Coatings

Acrylic Enamel Topcoat

Colorado State University. Durrell Center Roof Repair

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

COATING & WRAPPING OF UNDERGROUND PIPING

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

Epoxy Floor Coating Problem Solving Guide

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Additional Information. Paint Application

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

Metal Rescue Rust Remover Technical Data

PRISM Low VOC Single Stage Color Flat (76), Satin (77), Semi-Gloss (78), & Gloss (79)

DuPont ChromaOne Acrylic Urethane Single Stage

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS

PRODUCT DATA SHEET Sika Cable System

Division 9. SignaFlor Pad and Pour Flooring System

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

Solvent Cementing Instructions For Plastic Pipe & Fittings

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Imron 1.2 HG High Gloss Waterborne Polyurethane (WG Quality)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

10P20-44 High Solids Epoxy Primer

SECTION 1081 COATING OF STRUCTURAL STEEL

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010

SECTION 560 COATING NEW STRUCTURAL STEEL

Solicitation DTFACN-11-R Attachment #9

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

ULTRA 865HD HIGH PERFORMANCE MULTI PURPOSE GREASE

Autobody/Collision and Repair Technology/Technician CIP Task Grid

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

White rust on galvanized and galvanized pre-painted steel. Technical Information

BENTLEY ELEMENTS COLLECTION LVT

NEOGARD. Preventive Maintenance Manual

3.8 HSP (High Solids Polyurethane)

T R A N S F E R A B L E F U L LY

BLADE REPAIR INSTRUCTION BOOKLET

How to repair your existing low slope flat roof.

Resurfacing Concrete. Page 1 of 5

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

SURFACE PREPARATION STANDARDS

INDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA

SPILLS & SPILL KITS. Spills -General Guidelines:

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

Specification for Pipe Coating Repairs Offshore

Document Library TS Data Sheet M Windo-Weld Super Fast Urethane. Data Sheet. Public

CLEAN ROOM TRAINING CLEAN ROOM AREAS

Material Product Data Sheet Sealers for Thermal Spray Coatings

3M Scotchkote Urethane Coating 165HB

Asbestos. from the Home. Removing. Read this booklet for:

James M. Pleasants Company

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

GENERAL RUBBER LINING PRINCIPLES

ApplicatorTrainingBulletin. The Galvanized Surface. Surface Preparation of New Galvanizing

STERI-SOFT HIGH FOOT TRAFFIC, ULTRAVIOLET RESISTANT, URETHANE RESILIENT FLOORING SYSTEM, 1/8 GREEN BUILDING FEATURES TYPICAL APPLICATIONS

K2 STONE NATURAL VENEER

SECTION FIRE HYDRANTS

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION

BLACK JACK ALL WEATHER ROOF COATING

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

Minor Cracks in Horizontal Surfaces

Asbestos Work Permit Procedures

OPERATING INSTRUCTIONS

Lab PPE Guide Examples of Personal Protective Equipment

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Pipe Protection Tape System

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Knowledge Domain: Plumbing Unit: Leaking Skill: Epoxy

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

Specifications for Programs: 737, 747, 757, 767, 777, 787

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Araldite AV 170. Advanced Materials. One component epoxy adhesive. Structural Adhesives. Key properties. Description. Product data.

Field Welding Inspection Guide

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

THE USE OF STEEL BUILDING PANELS FOR ANIMAL CONFINEMENT

GigaCrete Specification PlasterMax

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

Spray Booth Guideline

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Transcription:

Installation Manual POLY-THERM and XTRU-THERM GENERAL Perma-Pipe offers three different coating options for each of the MULTI-THERM 500 conduit, and POLY- THERM and XTRU-THERM service pipes. The selected coating is applied to the conduit / service pipe OD prior to the application of the polyurethane foam insulation and the FRP (Fiberglass Reinforced Plastic) or the HDPE (High Density Polyethylene) jacket. The three coating options are Epoxy, Urethane Elastomer and Zinc. Epoxy has been used in a wide variety of industrial applications, while Urethane Elastomers have been used for many years for direct burial. Zinc is an excellent coating for high temperatures and when boiling conditions are present. This installation manual supplement provides instructions for each of the three coating systems specific to the field application of each coating system. Refer to the appropriate PERMA-PIPE product Installation Manual for complete installation recommendations. IMPORTANT: As with the application of any paint or coating, proper surface preparation is essential for adhesion of the coating to the steel pipe. Perma-Pipe has blasted the field joint area to be welded at our factory to near-white metal surface cleanliness in accordance with SSPC-SP10. The conduit / service pipe ends are then covered with tape prior to the factory coating application. The protective tape must remain on the pipe ends until welding. The conduit / service pipe surface has been blast cleaned for optimum adhesion and performance of the selected coating. Protecting the pipe ends will minimize additional surface preparation. When cold or wet weather conditions are present, tenting and / or heating may be required to enable the proper application and curing of the field joint coating. Contact Perma-Pipe if you have any questions. MATERIALS All materials, equipment and tools should be readily available before starting. PERMA-PIPE provides the following materials: Field joint coating kits MSDS Sheets Wet Film Thickness Gauges Field joint tape The installer must furnish the following materials: Grinder and grinding wheel Wire Wheel Disposable Mixing Pails (1 Gallon) for cleaning solvents Variable speed drill for mixing Paint Agitator(s) Xylene (or equivalent solvent) for clean-up of zinc or urethane Elastomer systems T-15 solvent for clean-up of epoxy systems Heavy-duty rubber gloves Safety goggles Brushes (3 wide, natural bristle) Dry rags SAFETY Due to the many possible variations in applications, use, installation conditions, and environment, these installation recommendations cannot address all possibilities. These recommendations are for general applicability, they are believed to be reasonably accurate and reliable. The installer is ultimately responsible for a proper installation. Trained and qualified personnel should be used. PERMA-PIPE cannot anticipate every circumstance that might involve hazard. The warnings in this Installation Manual are, therefore, not all-inclusive. The installer must satisfy himself that each procedure, tool, work method and technique is safe. Review the Material Safety Data Sheets (MSDS) for safe handling and use procedures. Wear all recommended safety equipment, including eye protection and gloves. It is important that good ventilation is present when working with any of the coatings. Perma-Pipe recommends wearing the proper NIOSH approved mask / respirator. Solvent vapors are heavier than air and must be ventilated from low and/or confined areas. RECEIVING / STORAGE All materials have been factory inspected and carefully loaded and braced to prevent damage in shipment to the job site. Refer to the appropriate PERMA-PIPE product Installation Manual for complete receiving / storage recommendations. March 2012 1 of 5 Rev. 1

COATING KIT STORAGE Store the coating kits indoors at temperatures at 40 F to 100 F. Keep materials in their original containers. DO NOT ALLOW TO FREEZE. Refer to the Material Safety Data Sheets (MSDS Sheets) for proper handling, storage and use. Contact PERMA-PIPE if additional MSDS Sheets are needed. PIPE UNITS The service conduit / service ends are covered with tape prior to the factory coating application. The tape must remain on the pipe ends until welding to protect the blasted metal surface. NOTE: Once the factory applied protective tape is removed, the steel pipe surface will begin to develop rust bloom. Perma-Pipe recognizes that there may be some amount of time between the welding of the field joint and the application of the coating. It is very important to continue to protect the pipe surface until it is ready to be painted. With the provided tape, securely cover the bare metal surface. Both the Epoxy and Urethane Elastomer coating systems have a limited pot life when their two components are mixed together. Work planning and attention to pot life and temperature will limit waste. You may decide to mix part of a kit to minimize waste and the need to purchase additional materials. If specified, the Epoxy and Urethane Elastomer coating systems can be holiday tested after they have fully cured. Do not remove the protective tape until ready to weld. The conduit closure bands are also coated. The edges to be welded have protective tape. WET FILM THICKNESS GAUGES Each coating system will be brush applied to the field joints and require a minimum mil thickness. To verify and record the correct minimum coating mil thickness at each field joint, Perma-Pipe has supplied throwaway plastic wet film gauges. Inspect the taped ends for damage, adherence or breaks at edge of coating to the tape. Re-tape the pipe end with the factory supplied tape if necessary. WORK PLANNING Each of the three coating systems included in this manual has specific mixing and application instructions. Refer to the specified coating system for the correct application procedure. After the welds are complete, the conduit / service pipe surface will need to again be protected, unless painting begins within two hours. Hold the gauge face perpendicular to the surface and press into the fresh wet coating until the gauge rests square on the base material, and then withdraw without slide movement. The true wet film thickness lies between the highest step coated (5mils) and the next higher step which did not coat (7 mils) as shown in the above diagram. Side 1 of the wet film thickness gauge reads from 2 to 32 mils. Use this side for all measurements. March 2012 2 of 5 Rev. 1

EPOXY COATING The factory applied epoxy coating is a two part coating consisting of a base material and curing agent. It is spray applied to a minimum thickness of 8-12 mils. The coated pipe is holiday tested at 1,000 volts to ensure a void free coating. Areas not passing the holiday test are patch coated and retested. Perma-Pipe provides DEVOE High Performance Coatings DEVMAT 101 Epoxy Coating. The DEVMAT 101 is a 100% solids, two-component coating. The DEVMAT 101 will be provided as premeasured Part A and Part B components. These components ship in a 1 gallon container for field mixing. Clean-up should be done with Xylene. This solvent is not provided by Perma-Pipe and is available at most paint stores. TAPE UNTIL READY TO WELD THE PIPES. The pipe surface must be clean and dry. Remove all oil, dust, grease, dirt, loose rust, and other foreign Temperature: 45 F minimum, 100 F maximum When combined, Part A and Part B will produce ½ gallon of epoxy paint. Mix together the Part A and Part B components. Thoroughly mix using a power drill and a paint agitator. 777 Continue painting the remaining joint area 8 to 12 mils. Use the Wet Film Thickness Gauge to thickness will be the specified 8 to 12 mils. At 77 F and 50% RH, the epoxy paint will cure hard in 12 hrs. One half gallon of DEVMAT 101 will have a coverage area 64 96 sq. ft. when applied at a wet film thickness of 8 to 12 mils. Once mixed, the pot life is 15 to 20 minutes @ 77 F and 50% RH. March 2012 3 of 5 Rev. 1

URETHANE ELASTOMER COATING The Urethane Elastomer coating is a sprayable two component, aromatic, corrosion protection elastomeric coating applied to a minimum thickness of 20 mils. The coated pipe is holiday tested at 2,500 volts to ensure a void free coating. Areas of the pipe not passing the holiday test are patch coated and retested. Perma-Pipe provides Isotec International s IsoCoat KL257 coating for the field joints. The IsoCoat KL257 is a two part coating that can be either hand mixed with a spatula or with a drill and paint agitator. The coating is supplied in two pre-measured cans. The smaller can A is added to the larger can B and then mixed together. The coating is then brush applied to a thickness of 20 mils. Clean spill and splatters immediately with Xylene, R2K4. Clean tools immediately after use with Xylene, R2K4. Temperature: 35 F minimum, 95 F maximum The proper blending ratio for KL257 is 28 parts A to 100 parts B. Perma-Pipe provides the KL257 in premeasured cans. Add can A to the larger can B and then mix together. If hand mixing with a spatula, mix for 90 seconds or until a uniform blend is attained. Mix the two parts for 20-30 seconds when mixing using a power drill and a paint agitator. 777 TAPE UNTIL READY TO WELD THE PIPES. The pipe surface must be clean and dry. Remove all oil, dust, grease, dirt, loose rust, and other foreign Continue painting the remaining joint area. 24 to 26 mils. Use the Wet Film Thickness Gauge to thickness will be the specified minimum 20 mils. At 74 F the pot life is 11-14 minutes. In 20-25 minutes the painted joint will be tack free and will be cured after 45 minutes. March 2012 4 of 5 Rev. 1

ZINC COATING The factory applied zinc coating is a two part high solids inorganic zinc rich coating that protects the steel galvanically, thus eliminating sub-film corrosion. The zinc coating consists of a liquid base portion and a dry powdered metal. The two components are mixed together and spray applied. The dry film thickness shall be in a range of 2 to 4 mils. Perma-Pipe provides Sherwin-Williams ZINC CLAD 5 zinc coating for the field joints. ZINC CLAD 5 is a one-package zinc-rich organic coating. The ZINC CLAD 5 will be provided in one gallon cans. It contains 90% by weight dust pigment in the dried film. Clean spill and splatters immediately with Xylene, R2K4. Clean tools immediately after use with Xylene, R2K4. TAPE UNTIL READY TO WELD THE PIPES. The pipe surface must be clean and dry. Remove all oil, dust, grease, dirt, loose rust, and other foreign Temperature: 35 F minimum, 95 F maximum At least 5 F above dew point Continuously mix the one gallon can of ZINC CLAD 5 using a power drill and a paint agitator. Continual agitation is necessary as the heavy zinc solids will settle to the bottom of the can. 777 Continue painting the remaining joint area. 7 to 10 mils. Use the Wet Film Thickness Gauge to thickness will be the specified 2 to 4 mils. One gallon of ZINC CLAD 5 will have a coverage area 165 219 sq. ft. when applied at a wet film thickness of 7 to 10 mils. When not using the paint, replace the lid, sealing it air tight. DRYING SCHEDULE @ 10 MILS WET 50% RH: 55 F To touch 4 HRS To recoat 30 HRS 77 F To touch 2-3 HRS To recoat 24 HRS 100 F To touch 30 MIN To recoat 1 HRS March 2012 5 of 5 Rev. 1