DRILLED SHAFTS. Section 465 of Standard Specifications

Similar documents
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SECTION 411 DRILLED PIERS

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

High Strain Dynamic Load Testing of Drilled Shafts

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

Section 2100-Trenching and Tunneling

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION 1 GENERAL REQUIREMENTS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Section SEWER PIPE INSTALLATION AND TESTING

SECTION GRAVITY SANITARY SEWERS

SANITARY SEWER SPECIFICATIONS

Section Installation of pipe and casing for sanitary sewer by methods of augering.

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Stormwater/Wetland Pond Construction Inspection Checklist

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

SECTION STORM DRAINAGE SYSTEM

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION EARTH MOVING

SECTION PRECAST CONCRETE STRUCTURES

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

C. Section TESTING LABORATORY SERVICE.

SECTION SHEETING, SHORING AND BRACING

Proposed Minimum Subterranean Termite Treatment Standards

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

SECTION PRECAST CONCRETE UTILITY STRUCTURES

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

SKT-SP Tangent Terminal

SECTION DRILLED CONCRETE PIERS (CAISSONS)

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

SECTION STORM DRAIN SYSTEM

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Wastewater Capital Projects Management Standard Construction Specification

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

Chapter. Restoration of Damaged Structures

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Laying the First Course. 1. Excavate the site and construct the footing.

METHOD OF STATEMENT FOR STATIC LOADING TEST

Design and Construction of Auger Cast Piles

Section 402. STORM SEWERS

Moving Small Mountains Vesuvius Dam Rehab

A. Casing: Steel cylinder used to resist earth and water pressures, to serve as concrete form, and to protect personnel.

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

Lab 1 Concrete Proportioning, Mixing, and Testing

Pro-Lift Steel Pile Foundation Repair

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SECTION ABANDONMENT OF SEWER MAINS

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

GLOSSARY OF TERMINOLOGY

Wisconsin Building Products Evaluation

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

DIVISION 4300 STORM DRAINAGE

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

6 RETROFITTING POST & PIER HOUSES

SECTION WINDOW WASHING SYSTEMS

TORO STEEL BUILDINGS. BOLTS: o " diam. x " diam. x " diam. C.J. - Control Joints to minimize cracking.(0.

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

How To Retaining Wall Guide

Drilling Problems. pull

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

CHAPTER 6 - SANITARY SEWER

Specifications for Residential Property Owners Connection to New Public Sewer

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

LS 2540 SEWER LATERALS AND INSPECTION TEES

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SECTION 5: SANITARY SEWER SYSTEM DESIGN

Embedded Parts Introduction - Anchors

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

ATLAS RESISTANCE Pier Foundation Systems

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

FY08 SEWER POINT REPAIRS BID TABULATION

Bridge, Culvert, and Retaining Wall Construction Manual. Georgia Department of Transportation

Specification Guidelines: Allan Block Modular Retaining Wall Systems

SECTION GUARDRAILS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

The International Workshop on Micropiles, 2007

SECTION SUPPORT OF EXCAVATION

Acceptance Codes APPENDIX - A. Acceptance Criteria

Transcription:

DRILLED SHAFTS Section 465 of Standard Specifications

What is a Drilled Shaft? Type of substructure foundation. A cylindrical shaft excavated into the ground and then filled with resteel & concrete. Supports loads primarily through skin friction between the concrete and the adjacent soil. End bearing generally not considered. Typical sizes: 30 to 72 in diameter and can extend 50 or more into the ground.

What is a Drilled Shaft? Drilled shafts require rigorous inspection. Initial plan review is a must. Should read Section 465 of Standard Specs to clearly understand different types of shaft construction. Need to become familiar with procedures in the specs in event problems are encountered.

Casing Most drilled shafts require a steel casing to be used to facilitate the shaft excavation. The casing is a steel plate rolled and welded to form a large diameter pipe. Casings are placed either before, during or after excavation. Casings are large enough in diameter to permit the drilling auger to pass through them. They should have teeth on the bottom to allow anchoring of the casing into the desired soil formation.

3 Basic Methods of Construction Dry Construction Method Temporary Casing Method Permanent Casing Method Sometimes a combination of the above types of drilled shaft construction methods is used.

Preparing for Construction: Prior to Construction the Contractor needs to address 3 items, required by specification. They are: -1. Concrete Mix Design. -2. Drilled Shaft Installation Plan. -3. Drilled Shaft Preconstruction Meeting.

Drilled Shaft Concrete Mix Design Contractor must submit a concrete design mix along with materials, including water reducer, to Central Materials Lab at least 40 days prior to construction, for approval. The materials are used by the Lab to verify the Contractor s proposed mix design.

Concrete Mix Requirements 28 Day Compressive Strength = 4500 psi Slump Range: 6 to 8 for free fall or tremie method 7 to 9 for concrete pumped through a tremie. In addition, slump shall be maintained above 4 for 4 hours after batching (set retarder). Entrained Air Content of 5% to 7 1/2% Max. Water/Cement Ratio for Design of Mix = 0.44 (Each established mix design will have a maximum water/cement ratio) Slump achieved by use of water reducer. Superplasticizers are NOT allowed. Minimum Cement Content of 780 lbs/yd 3

Drilled Shaft Installation Plan Contractor must submit a Detailed drilled shaft installation plan 30 days prior to drilled shaft construction.

Equipment List Cranes Drill Augers Pilot Bits Bailing Buckets Cleanout Equipment Water Pumps Tremies Concrete Pumps Concrete Chutes Steel Casing Diameter Wall Thickness

Construction Sequence and Methods Sequence of Shaft Construction Elevations of Proposed Work Berms or Platforms Contractor is required to verify site conditions prior to installation plan submittal. How Casing is to Be Installed Method(s) of Excavation

Method of Cleaning Out Excavation Details of Resteel Centering Devices Method of Lifting & Supporting Resteel Cage Method(s) of Concrete Placement

Pre-Drilled Shaft Meeting Pre-Drilled Shaft Meeting is Mandatory 5 Working Days Prior to Construction of Drilled Shafts.

Representatives of the Following are Required to Attend: Bridge Contractor Drilling Sub-Contractor Concrete Supplier Area Office Office of Bridge Design and/or Foundations

Purpose Drilled shaft construction can be complex. There are many unknowns. Successful drilled shaft construction depends on everyone involved being fully aware of what each parties responsibilities are. Meeting is used to review step-by-step the procedures and construction methods used. Possible problem scenarios are reviewed & corrective construction procedures are discussed.

Drilled Shaft Excavation: Dry Construction Method Drill the shaft through relatively stiff, stable soil formations in which ground water infiltration is not a problem. Not typically used in SD because of this. Clean out bottom of excavation. Set the resteel cage in proper position. Place concrete.

When Dry Excavations Encounter Caving or Water Bearing Soils: Contractor should immediately stop drilling The hole should immediately be filled with water to a point above the groundwater elevation. A positive 10 foot head of water should be maintained above the groundwater elevation if possible.

Temporary Casing Method -Can be used when shafts are drilled through a layer of granular material, before hitting bedrock, causing side wall caving, shaft squeeze or water infiltration. -The Temporary Casing Method is used when: Excavations, begun by the Dry Construction Method, encounter caving or water bearing soils, or when Specified on the plans.

Temp. Casing Method When the Temporary Casing Method is Specified on the Plans: The steel casing is drilled or pushed through the unstable soils prior to the start of excavation. All other procedures are the same as previously discussed.

Temp. Casing Method A cleanout bucket is used to clean the bottom of the excavation. The resteel cage is placed in the proper location. Concrete is placed. The casing is extracted during concrete placement.

Permanent Casing Method A steel casing is drilled or pushed through the unstable material prior to start of excavation. The drilled shaft is excavated through the steel casing. If water is encountered, a positive head of water is required just the same as was discussed for the Temp. Casing Method

Permanent Casing Method The steel casing is left in place. It may sometimes be required to remove portions of the permanent casing after the concrete has attained strength. A cutoff saw, or other approved methods, are required for removal of the casing. Torch-cutting is NOT allowed (unless used before concrete placement)

A Combination of These Methods May Be Used The foundation conditions may be such that a casing is required through unstable soil, but the casing is able to be seated into the underlying foundation material such that water infiltration is stopped. This results in a casing being used through the unstable material, but the dry construction method is utilized for the remainder of the drilled shaft.

Drilled Shaft Inspection Preliminary Inspection Prior to Drilling

Inspection Equipment Plans and Specifications Rod and Level 100 ft. Weighted Tape Mirror Carpenter s Level

Location of Drilled Shafts Verify Location of Stakes Check by more than one method Check or Set Offset Stakes Set Temporary Bench Mark May be able to establish elevation of one or more of the offset stakes.

Casing Check and Record Casing Dimensions Diameter Length Roundness Make Sure Casing Length has been Adjusted for Work Berms, Etc.

Resteel Cage Check Resteel Cage for: Proper Number, Size, and Grade of Bars Proper Diameter and Pitch of Spirals or Hoops Proper Splice Lengths Adequate Approved Centralizers CSL Tubes Correct Spacing and Length Length Adequate to Allow for Splice at Construction Joint

Contractor s Equipment Verify that all Equipment Listed in the Drilled Shaft Installation Plan is on the Site and is in Good Working Condition.

Mandatory Equipment Tremie (Even if concrete is to be pumped) T-Bar Cleanout Bucket of proper size Pilot Bit Water Pump Weighted Tape

Concrete Make Sure Mix Design has been Approved Check Inside of Tremie Pipe to Assure it is Clean To function properly, Tremie Pipe must be smooth inside. If concrete was not properly cleaned on previous use, concrete will not flow.

Drilled Shaft Inspection Setting Casing

Setting of the Casing Specifications Require that Casing be Installed using a T-Bar on the Kelly Bar. Accurately Setting Casing can be Difficult Re-check location and Plumbness often Check to assure that casing didn t become outof-round during installation.

If Casing Needs to be Removed and Replaced with a Longer Casing, the Excavation is Backfilled Before the New Casing is Installed Bottom of Casing Should be Screwed into Foundation Material to Attain Watertight Seal if Possible Top of Casing Should be at the Approved Construction Joint Location Typically 1 foot above groundline

Drilled Shaft Inspection Excavation

Inspection of Excavation Excavation into Frictional Bedrock Should not be Allowed Unless it can be Reasonably Expected that Excavation and Concrete Placement will be Completed the Same Day 24 Hour Time Limit Begins upon excavation into frictional bedrock Frictional Bedrock Elevation is designated on plans

Record Time that Frictional Bedrock Elevation is Reached Re-Check Location, Plumbness and Depth Often During Excavation Measure from offset stakes for location Use Carpenter s Level on kelly bar for plumbness Use weighted tape to check depth A Mirror Should be Used to Periodically Check Sides of Excavation for Caving or Water Infiltration

If Caving or Water Infiltration is Encountered the Contractor Should Immediately Flood the Excavation with Water When the Excavation Reaches Plans Depth, The Contractor Must Clean the Bottom of the Excavation with the Cleanout Bucket Use the mirror to inspect the bottom of the excavation if the excavation is dry If the excavation is wet, require continued use of the cleanout bucket.

Drilled Shaft Inspection Resteel Placement

Resteel Placement Ensure CSL (Crosshole Sonic Log) tubes are in place before resteel cage is placed Extreme Care Needs to Used in Lifting the Resteel Cage into Place Long Resteel Cages may need to be lifted at more than one point so as not to cause permanent deformation during lifting.

Resteel Placement The Resteel Cage Shall be Carefully Lowered into the Excavation If centralizers are knocked off or damaged during resteel placement, the cage shall be raised from the excavation and the centralizers replaced.

Resteel Placement The Resteel Cage Shall be Properly Supported Off of the Bottom of the Excavation Held up by use of crane or other equipment Concrete Donut can be attached to bottom of cage

Resteel Placement Resteel Cage also Needs to be Tied Down Concrete can FLOAT the resteel cage up during concrete placement Do not tie resteel cage to casing. If resteel cage settles or floats during concrete placement, the watertight seal at the bottom of the casing may be broken.

Resteel Placement Check Resteel Extension above Construction Joint to Assure Specified Minimum Splice Length

Drilled Shaft Inspection Concrete Placement

Concrete Placement in a Dry Excavation Dry Excavation is defined as an excavation in which water accumulates at a rate of no more than 3 inches per hour.

The Excavation is to be Dewatered Immediately Prior to Concrete Placement No more than 3 inches of water allowed in bottom of excavation For Drilled Shafts 36 inches in Diameter or Less, Concrete Shall be Placed Through a Drop Tube that Extends to the Bottom of the Excavation Typically, the tremie is used

For Drilled Shafts 36 Inches in Diameter or Larger, Concrete May be Placed by the Free- Fall Method A hopper with a drop tube is required to assure that the concrete is dropped down the center of the excavation so as not to fall through any resteel.

Concrete Placement in a Wet Excavation Concrete Must be Placed Underwater Utilizing the Tremie Method This can be achieved either by use of a tremie or a concrete pump

Tremie Method Excavation is Partially or Fully Filled with Water Mark Tremie at Five Foot Intervals The End of the Tremie is Plugged The pig(a foam ball) is placed in the pump and pumped into the shaft to separate the concrete from water in the shaft The pump line needs to be at leaste 4 diameter and be steel for the length of the shaft

The Empty Plugged steel pump line is Lowered to the Bottom of the Excavation As the pump is started slowly lift the pump line as the shaft fills making sure the line is imbedded in fresh concrete at least 5 feet

Process Continues Until all Water has Been Displaced and Enough Concrete has Run Out of the Shaft Such that Only Uncontaminated Concrete Remains. Concrete Placement Should be Performed in One Continuous Operation.

Restarting a Tremie If a problem is encountered and Restarting is Required the tremie must be used: The pump line is inadvertently raised such that the minimum 5 foot embedment is not maintained. There is a delay in concrete placement of more than 30 minutes. The pump line plugs.

Tremie Pipe Requirements Must be Steel Do not allow the use of Aluminum 7.5 Min. Inside Diameter 1/4 Min. Wall Thickness Watertight Joints Gasketed & Bolted Welded Smooth Interior Free of Hardened Concrete

Steps to Restart a Tremie Measure and Record Depth to Top of Concrete. Remove pump line Put Plug on End of Tremie Push Empty Plugged Tremie into Concrete to a Minimum Depth of 5 Feet Below Measured Depth Follow Same Procedure as to Begin Placement

Work Adjacent to Fresh Concrete Drilling Operations and Free-Fall of Concrete in Adjacent Shafts Can Result in Vibrations Damaging Freshly Placed Concrete This can be monitored by driving a stake into the ground near the fresh concrete and setting a glass of water on top of the stake If ripples appear on the water, operations should be stopped Should not resume these operations for at least 72 hours after concrete placement or until the concrete attains a minimum compressive strength of 1600 psi.

Construction Tolerances Horizontal Position 1/12 Shaft Dia. or 3 Inches, Whichever is Less Bottom of Shaft Elevation Plus or Minus 6 Inches Vertical Alignment 1/4 Inch per Foot Depth or 3 Inches, Whichever is less

Diameter of Shaft Plus 2 Inches Top of Shaft Elevation Plus or Minus 1 Inch Bottom of shaft shall be relatively flat. Consideration Needs to Be Given to the Fact that the Shafts May be an Extension of the Column Which Require More Stringent Construction Tolerances.

Drilled Shaft Construction Report (DOT Form 297) Should be Completed for Each Drilled Shaft Constructed All Events of the Drilled Shaft Construction Should be Thoroughly Documented on the Form

CSL Testing Cross Hole Sonic Log (CSL): Test that determines the integrity of the newly placed drilled shaft concrete. Test requires an ultrasonic pulse to pass through the concrete through water filled access tubes. Access tubes are secured to the inside of the rebar cage, and should extend 4 feet above construction joint and be within 3 inches of the bottom of the resteel cage and are cast in the concrete during placement.

CSL Testing Concrete quality is based on the relationship between pulse velocities and the receiver response energy. High velocities indicate sound quality concrete.

CSL Testing Testing will be done by an independent testing organization proposed by the Contractor and approved by the DOT. Acceptance of the drilled shaft will be the decision of the DOT (Foundations Office), based on the results of the CSL reports and other information about the shaft placement.

CSL Testing In the case that any shaft is determined to be unacceptable, the Contractor shall submit a plan of remedial action for approval. All costs to perform this remedial action will be at no cost to the State.

CSL Testing CSL testing will be used on all single column bents or when drilled shaft construction is suspect. If drilled shaft construction goes well, no CSL testing will be required. After final acceptance of a shaft, the access tubes shall be de-watered, cut off at construction joint and grouted full according to the plans. Any CSL questions?