CITY OF ROCKFORD Electricity Aggregation Program. Plan of Operation and Governance



Similar documents
Will Electric Aggregation Group. Electric Aggregation Plan of Operation and Governance. Will County Governmental League

Rules of Operation and Governance

Table of Contents. 1. Purpose of Municipal Electricity Aggregation. 2. Background - Illinois Power Agency Act. 3. Opt-Out Process

Plan of Operation and Governance for Municipal Opt Out Electricity Aggregation. City of Greenville

CITY OF CHAMPAIGN, ILLINOIS REQUEST FOR PROPOSALS ( RFP ) MUNICIPAL ELECTRIC AGGREGATION PROGRAM RENEWAL. Accounts Served by Ameren Illinois

Action to opt-out required by June 15, 2012.

BID PACKAGE. Full-Requirements Electricity Supply. and. Electric Aggregation Program. Implementation and Operation

Municipal Aggregation Program FAQs

REVISED REQUEST FOR PRICING (RFP) FOR ELECTRICITY AGGREGATION SUPPLY SERVICES FOR THE CITY OF CHICAGO. Specification No Required for use by:

City of Chicago Electric Aggregation Program

RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS

Re: Great news Mahoning County s Aggregation Program supplied by FirstEnergy Solutions continues to offer savings!

Municipal Aggregation Program FAQs

Kim M. Wissman Director, Department of Energy and Environment Public Utilities Commission of Ohio Executive Director, Ohio Power Siting Board

EXHIBIT E - OPT-OUT NOTICE. Important information regarding the City of Warrenville Electricity Aggregation Program.

Electric Generation Supplier Contract Summary

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

South Hunterdon Renewable Energy Cooperative Community Energy Aggregation

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. Subchapter R. CUSTOMER PROTECTION RULES FOR RETAIL ELECTRIC SERVICE.

CITY OF ATTLEBORO AGGREGATION DOCUMENTS

CONSTELLATION ENERGY TERMS AND CONDITIONS

CITY OF SHARON, PENNSYLVANIA BILL NO ORDINANCE NO

STRATFORD BOARD OF EDUCATION 111 WARWICK ROAD STRATFORD, NEW JERSEY INSURANCE BROKER of RECORD EMPLOYEE HEALTH BENEFITS

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

Company Referral Tariff - A Product Procurement Agreement

For City Council meeting of November 29, 2011 Ordinance 103-O-11: Submission of Community Choice Aggregation Question For Introduction

COUNTY OF UNION, NEW JERSEY

CINCINNATI nterdepartment Correspondence Sheet

To complete the process for a net metering interconnection, please follow the steps below:

INFORMATION FOR ALTERNATIVE ELECTRIC SUPPLIERS

CHAPTER 7 PUBLIC PURCHASES, PURCHASE OF LAND OR STRUCTURES AND INVENTORY OF FIXED ASSETS

DEPARTMENT OF PUBLIC WORKS. m e m o r a n d u m

NAPERVILLE TOWNSHIP RESOLUTION A RESOLUTION providing for Naperville Township to authorize a Plan of

NEXTERA ENERGY SERVICES DISTRICT OF COLUMBIA, LLC RESIDENTIAL ELECTRICITY SUPPLY AGREEMENT FIXED PRICE PRODUCT

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

NHSCA HOME SERVICE CONTRACTS ACT Registration and Financial Assurance Home Service Contracts Only

OUR ELECTRICITY AGREEMENT Constellation Energy Power Choice, Inc. P.O. Box 4911, Houston, TX 77210

Gas Customer Choice Contract Residential and Small Commercial Terms and Conditions of Service

YOUR RIGHTS AS A CUSTOMER

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

DEPARTMENT OF PUBLIC WORKS. m e m o r a n d u m

TOWN OF RAYMOND, MAINE CABLE TELEVISION ORDINANCE Adopted 11/06/2000

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016

HOURLY CONSULTING AGREEMENT

Conditions means the standard terms and conditions set out in this document;

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY

Chase Lincoln Realty & Property Management Company 7045 Summer Place Charlotte, NC Phone: , Fax:

TITLE 135 LEGISLATIVE RULE WEST VIRGINIA COUNCIL FOR COMMUNITY AND TECHNICAL COLLEGE EDUCATION

California Solar Initiative (CSI) Program 2007 Reservation Request Form and Program Contract [follows the second page Reservation Request form]

TABLE OF CONTENTS Arbitration of Extended Warranty Contracts

SECTION BY SECTION ANALYSIS COMPTETITIVE CABLE AND VIDEO SERVICE ACT

MASTER SERVICES AGREEMENT

ENROLLED SENATE. and. Sullivan of the House

Most household services provide you with a fixed monthly bill: Broadband Internet service

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

DOMINION EAST OHIO STANDARD SERVICE OFFER AND STANDARD CHOICE OFFER AUCTION INFORMATION PACKAGE

Electronic Data Interchange (EDI) Trading Partner Agreement

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO and PROJECT ARCHITECT for A PROJECT OF LIMITED SIZE OR SCOPE

REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL AUDIT SERVICES

UTAH COUNTY REQUEST FOR PROPOSALS FOR HEALTH AND LIFE INSURANCE BROKER

Procurement practices of school districts and charter schools; definitions

City of Countryside Electric Aggregation Program

GDS Data Systems, Inc. Terms & Conditions for GDS Network Services (GDS Connect / GDS Insight / GDS Cloud)

Insurance Producer Agreement

INTERNATIONAL SOCIETY OF ARBORICULTURE (ISA) CERTIFICATION PROGRAM ETHICS CASE PROCEDURES

CONSOLIDATED BILLING BUSINESS PROCESSES (UTILITY RATE READY)

How To Pass The Marriamandary Individual Tax Preparers Act

$&71R SENATE BILL NO (SUBSTITUTE FOR SENATE BILL 812 BY SENATOR SCHEDLER)

Request for Proposals

CITY OF LEMOORE REQUEST FOR PROPOSALS FOR CREDIT CARD PROCESSING SERVICE. City of Lemoore Finance Department 119 Fox St Lemoore, CA 93245

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR RESIDENTIAL CUSTOMERS

PART 12 STRIKE OFF AND RESTORATION. Chapter 1. Strike off of company

SECTION B ELECTRICITY SUPPLIER COORDINATION TARIFF

REQUEST FOR PROPOSALS FOR FINANCIAL ADVISORY SERVICES

REQUEST FOR PROPOSALS FOR TELEPHONE SERVICES FOR CUMBERLAND COUNTY GOVERNMENT

BEXIL AMERICAN MORTGAGE INC./AMERICAN MORTGAGE NETWORK BROKER GUIDE

Transcription:

CITY OF ROCKFORD Electricity Aggregation Program Plan of Operation and Governance

1. Purpose of Electricity Aggregation Program & Services This Plan of Operation and Governance has been developed in compliance with 20 ILCS 3855/1-92 regarding governmental aggregation of electric service. The statute defines two types of aggregation programs that may be enacted by a governmental entity; opt-in aggregation and opt-out aggregation. The City of Rockford ( City ) will administer an opt-out aggregation program. Under this Program, the City will aggregate the electric loads of residential and small commercial retail customers located within the City and then solicit bids, select an Alternate Retail Electric Supplier ( Supplier ) and enter into a service agreement to facilitate the purchase of electricity and related service on behalf of its residents and small businesses. Customers will be given prior written notice entitling them to affirmatively elect not to be part of the Program. The City passed the necessary resolution to place the issue of Opt-Out Governmental Aggregation of Electricity on the March 20, 2012 ballot. The ballot issue subsequently passed. The City will follow the Plan of Operation and Governance ( Plan ) outlined below. This Plan was adopted after two public hearings were held in accordance with 20 ILCS 3855/1-92. The City s Aggregation Program ( Program ) seeks to aggregate the retail electric loads of eligible customers located within the City to negotiate the best rates for the generation supply of electric power. With a City population of approximately 150,000 the Program has the potential to combine residential accounts and small commercial accounts into a buying group that will be attractive to an Alternative Retail Electric Supplier ( Supplier ). Participation in the Program is voluntary. Any individual customer ( Member ) has the opportunity to decline to be a Member of the Program and return to the local utility (ComEd) standard offer of service or to enter into a power supply contract with any Alternative Retail Electric Supplier. Residential and small commercial electric customers often lack the ability to effectively negotiate electric supply services. The City s Program provides them an opportunity to benefit from professional representation and bargaining power achieved through an aggregation program. The Program is designed to reduce the amount Members pay for electric energy and to gain other favorable terms of service. The City will not buy and resell the power to the Program Members. Instead, the City will competitively bid and negotiate a contract with a Supplier to provide firm, full-requirements generation service to the Members of the Program. As required by the Act, this Plan of Operation and Governance describes: 1. How the Aggregation Program will provide for universal access to all applicable residential customers and equitable treatment of applicable residential customers; 2. How demand management and energy efficiency services will be provided to each class of customers; and

3. How the Aggregation will meet any other legal requirements concerning aggregated electric service. The City and the selected Supplier will follow the Plan set forth in this document. 2. Bidding / Contract Procedures The City may elect to hold an individual bid or participate in a group bid with other municipalities. The bidding process, whether by the City or in concert with other municipalities, must be conducted in compliance with all applicable City Codes concerning the bidding process. The City may, but is not required to, retain the services of a consultant, broker, or other expert in the field of electrical aggregation to assist in the preparation of the bidding documents and in managing the bidding process. The City will retain the full and absolute right to accept, accept with conditions, or reject any bid. If this bidding process does not result in the identification of an acceptable bidder, the City will conclude the bidding process and not proceed with the Aggregation Program at this time. By majority vote of the Corporate Authorities, the City may select an Alternative Retail Electric Supplier to provide electric power to the Program according to the terms of a written power supply agreement entered into by and between the Supplier and the City. By majority vote of the Corporate Authorities, the City may determine not to enter into a power supply agreement with any Supplier and in such event eligible customers shall continue to purchase electric power through ComEd. If the Corporate Authorities enter into a power supply agreement with a Supplier, ComEd will continue to provide and service delivery of the electricity purchased from the Supplier, and metering, repairs and emergency service will continue to be provided by ComEd. The Program may be terminated upon the termination or expiration of the power supply agreement without any extension, renewal, or subsequent power supply agreement being negotiated. Each individual Member receiving electric supply service under the Program will receive notification 45-90 days prior to termination of the Program. In the event of termination, Members in the Program would either return to ComEd supply service or chose another supplier on their own. 3. Determination of Rates and Other Charges 3.1 Rates The City will solicit bids from Alternative Retail Electric Suppliers certified by the Illinois Commerce Commission to provide electricity to aggregation programs. The bid documents shall require the suppliers to offer a generation charge for firm, full-requirements supply. The prices to be charged to Members in the Program will be those of the Supplier determined to be the lowest responsive, responsible bidder. Members will be notified of the rates and terms of

the Program through a direct mailing sent to each eligible resident and business within the City limits. 3.2 Charges Neither the City nor the selected supplier will impose any terms, conditions, fees, or charges on any Member served by the Program unless the particular term, condition, fee, or charge is clearly disclosed to the Member at the time the Members chose not to opt-out of the Program. ComEd will continue to bill for Late Payments, Delivery Charges and Monthly Service Fees, etc. These charges apply whether or not a Member switches to the Program s Supplier. Switching generation suppliers will not result in any new charges billed to the Member. 3.3 Switching Fees Should ComEd assess a switching fee for Members voluntarily remaining in the aggregation program; the Bid will be written to require the selected supplier to pay the switching fee without assessing a fee to the Members. 3.4 Early Termination Fee Members may terminate their agreement without penalty if they relocate outside of the City or if they decide to return to ComEd for their energy supply. Members that leave the Program for other reasons, such as switching to another Supplier, may be assessed an early termination fee by the Supplier. The City will negotiate with the Supplier to ensure that any early termination fee assessed is reasonable and clearly stated in the opt-out disclosure notice. 4. Determination of Eligible Customer Pool Under the opt-out aggregation provisions, all eligible electric consumers within the City will be automatically included in the Program. However, such customers will be given prior notice entitling them to affirmatively elect not to be part of the Program. Prior to mailing opt-out notices, a thorough review will be performed to see that all ineligible customers are excluded. The review process will include the efforts of numerous parties and utilize a number of resources: ComEd will query their customer database using best efforts to capture all accounts within the City limits. The Supplier, with assistance from the City, using available City resources and publicly available material shall screen out customers who are not located within the City limits. Those resources may include any or all of the following: property records, water and/or sewer records, fire and/or police department address records, 911 address records, street

listings, City maps, internet maps, county parcel mapping databases, and geographical information systems (GIS). Ineligible accounts will be screened out based on codes provided in the ComEd data. The data shall be reviewed to see that all zip codes have been included, all streets included, all customer classes, all customer rate schedules, and finally that an expected total for a community of this population was turned over. Any suspected omissions will be reported to ComEd along with a request to furnish that data. 5. Opt-Out Process The City is using an Opt-Out form of Governmental Aggregation pursuant to 20 ILCS 3855/1-92. Any such person that opts-out of the aggregation program pursuant to stated procedure will default to the standard service offer provided by ComEd until the person chooses an alternative supplier. When a successful supply offer is found the City shall order the eligible customer list from ComEd. ComEd shall turn over the list to the City within ten (10) business days. Once the list is obtained, it will be shared with the selected Supplier and they will have thirty (30) days from the City s receipt of the data to mail the opt-out notices to all eligible Members receiving an offer. The selected Supplier will be required to pay for printing and mailing of opt-out disclosure notices. The notices will be mailed to the owner or occupant residing at the electric account mailing address shown on ComEd s customer list. The selected Supplier and the City will agree upon the format of the opt-out notice prior to mailing it to eligible Members. A City official will sign the notice and it will contain the City s name and logo on the outside to clearly indicate to the recipient that it is a notice from the City. Prior to mailing opt-out notices, a thorough review will be performed to see that all eligible Member receiving and offer are sent the notice. The review process will include the efforts of numerous parties and utilize a number of resources as specified in Section 4 of this Plan. Following acceptance of an offer by the City, the Supplier will mail opt-out notices to eligible Members receiving an offer. Members will have at least twenty-one (21) days from the postmark date on the notice to postmark the return opt-out card if they do not wish to participate in the City s program. The supplier may offer additional means of opting out, such as, a toll-free phone number, website, email address, or fax number. The selected supplier will not enroll those accounts opting out from the Program. In the event that an eligible Member is inadvertently not sent an opt-out notice and is omitted from the Program, the Supplier shall, upon request, enroll the eligible Member at the group rate for the remaining term.

All members of the Program will also be given an opportunity to opt-out without penalty at least once every three (3) years. Procedure Steps: 1. The selected Supplier and the City will agree upon the format of the opt-out notice prior to mailing it to eligible Members. 2. The selected supplier will distribute and Opt-Out Form to all eligible Members via firstclass U.S. Mail; 3. Recipients will have at least twenty-one (21) days from the postmark on the notice to notify the selected Supplier if they do not want to be part of the program; 4. Members will be able to opt-out by returning an opt-out card via U.S. Mail to the selected Supplier. The Supplier shall offer at least two (2) additional means of opting out, such as a toll-free phone number, website, email address, or fax number. 5. Additionally, Members who do not opt-out per step 4 above will receive written notification from ComEd stating that they are about to be switched. That notice will inform them that they have seven (7) days to rescind the contract by contacting ComEd; and 6. The selected Supplier will not enroll those accounts opting out from the Program. The opt-out notice will clearly notify the Program Members of the rates to be charged for electricity and other terms of the contract with the selected supplier. 6. Customer Classes Included All eligible Members are included in the Program but the selected Supplier s bid will determine which groups receive an offer and opt-out notice. It is envisioned that most residential and small commercial customers supplied by ComEd within the City limits are likely to receive an offer. The following eligibility requirements apply: Customers must not have opted-out of the Program Customers must not be supplied generation service from another supplier Commercial customers must have a Peak Demand of <= 100kW Customers must live within the City limits Customers must not be on ComEd s residential electric heat rate Customers must not be on ComEd s bundled hold Customers receiving power from ComEd under particular tariffs as they may be approved and/or amended by the Illinois Commerce Commission from time to time may not be eligible to enroll in the aggregation program. Utility rules approved by the Illinois Commerce Commission (ICC) or other regulatory agencies may determine eligibility to enroll in the aggregation program.

Eligibility may be limited by a Supplier s offer. For example, a fixed rate might not be offered to an account if they would not save when compared to the prevailing ComEd rate. 7. Billing Procedures The City will utilize the coordinated billing services of ComEd and the selected Supplier through ComEd s Purchase of Receivable Consolidated Billing (PORCB) billing arrangement. Most customers are expected to receive a single bill from ComEd that itemizes among other things, the cost of generation provided by the Supplier. Members are required to remit and comply with the payment terms of. The City will not be responsible for late or no payment on the part of any of its members. Furthermore, slow or no payment on the part of some Members will not adversely impact the rates charged to other Members. 8. Credit / Deposit Requirements Collection and credit procedures remain the responsibility of ComEd, the selected Supplier, and the individual Member. Members are required to remit and comply with the payment terms of ComEd and/or the Supplier. This Program will not be responsible for late or no payment on the part of any of its Members. The City will have no separate credit or deposit policy. 9. Procedures for Handling Customer Complaints and Dispute Resolution Members have multiple means of addressing complaints. As a general rule, concerns regarding service reliability should be directed to ComEd, billing questions should be directed to ComEd or the selected Supplier, and any unresolved disputes should be directed to the ICC. 10. Moving Into the City Residents and businesses that move into the City will NOT be automatically included in the City s Program. The City cannot guarantee the rates, terms, and conditions to Members enrolling after the 21-day opt-out period of the initial enrollees. Members wishing to opt-in to the Program may contact the Supplier to obtain enrollment information. There is, however, no guarantee that customers opting-in at a later date will receive the same price, terms, and conditions as did the initial participants. The selected Supplier s decision whether or not to extend an offer will be based, in part, on the market prices at the time of request. 11. Moving Within the City and Maintaining the Same Account Number The selected Supplier shall continue service at the same rate and under the same terms and conditions for any Member who relocates within the City prior to the expiration of the contract term, providing that the Member notifies the Supplier of their desire to do so with thirty (30) days notice. Moving within the City may cause the Member to be served for a brief period of

time by ComEd. The Supplier shall have the right to bill the participant for any associated switching fee imposed by ComEd. Members may also opt-out without penalty under these circumstances. 12. Joining the Aggregation Group after Opting-Out Members who have left the aggregation group and wish to rejoin at a later date are treated in the same manner as new residents moving into the City. These customers may contact the Supplier at any time to obtain enrollment information. There is, however, not guarantee that customers opting-in at a later date will receive the same price, terms and conditions as did the initial participants. 13. Reliability of Power Supply The Program will only affect the generation source of power. ComEd will continue to deliver power through their transmission and distribution systems. Responsibility for maintaining system reliability continues to rest with ComEd. If members have service reliability problems, they should contact ComEd for repairs. The ICC has established Minimum Reliability Standards for all utilities operating distribution systems in Illinois. Customer outages, duration of outages, interruptions, etc., are monitored to ensure reliability remains at satisfactory levels. In addition to maintaining the wires system, ComEd is required to be the Provider of Last Resort. This means, should the selected Supplier fail for any reason to deliver any or all of the electricity needed to serve the Members needs, ComEd will immediately provide for the shortfall. ComEd would then bill the Supplier for the power provided on their behalf. The Members would incur no additional cost. 14. Supplier Qualification Selection Criteria Only Suppliers meeting strict criteria will be considered: Suppliers will need to be certified by the Illinois Commerce Commission. Registered with ComEd to do business in their service territory. Both the certification and registration ensure that Suppliers possess the managerial, technical, and financial competence to perform the services they offer. Agree to hold harmless the City from any financial obligations arising from the Program. The selected Supplier shall demonstrate its creditworthiness by possessing an investment grade long-term bond rating from at least two major rating agencies. Submit a complete response to the request for qualifications including the submission of references, completed certification forms, litigation history, detailed scope of work, and company history and experience. Pursuant to 20 ILCS 3855/1-92, Supplier shall:

Provide for universal access to all applicable residential customers and equitable treatment of applicable residential customers. Describe demand management and energy efficiency services to be provided to each class of customers. Meet any requirements established by law concerning aggregated service offered pursuant to the 20 ILCS 3855/1-92. 15. Miscellaneous The operation of the City s Program may be impacted by any of the following: 20 ILCS 3855/1-92 as it may be amended from time to time. Federal Energy Regulatory Commission (FERC) tariffs as may be enacted or amended from time to time. Illinois Commerce Commission (ICC) rules and regulation as may be enacted or amended from time to time. ComEd tariffs as approved or amended from time to time by the ICC. Federal, state, and local laws. Rules, regulations, and orders approved or enacted by federal, state, or local regulatory agencies. The City will maintain a copy of this Plan of Operation and Governance on file at its administrative office. This Plan will be kept available for public inspection. It will, upon request, be copied for any existing or potential Member of the aggregation in accordance with the City rules for copying public documents.