Creating A Leading High Grade Gold Company Definitive Terms Reached with Government of Ecuador for Fruta del Norte Project

Similar documents
The Fruta del Norte Project - A Guide to Stock & Share Information

LUNDIN GOLD INC. Management s Discussion and Analysis Nine Months Ended September 30, 2015 (Expressed in U.S. Dollars, unless otherwise noted)

Lalor Project Base Metal Zones and Gold Mineralization January 2009

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

Detour Gold Provides New Life of Mine Plan for Detour Lake

AVINO SILVER & GOLD MINES LTD.

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

Acquisition of Rice Lake. December 2015

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

CENTURY ENERGY LTD. FORM F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

(NYSE-MKT:XRA, TSX:XRC,

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

NOT FOR DISSEMINATION TO US NEWS WIRE SERVICES OR DISSEMINATION INTO THE UNITED STATES. FOR IMMEDIATE RELEASE

CANADA S INTERMEDIATE GOLD PRODUCER

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

TELSON RESOURCES INC.

The last great Canadian gold mining camp controlled by a junior mining company.

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

Sierra Wireless Reports Second Quarter 2015 Results

Denver Gold Show September 24, 2013

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million

Sabina Gold & Silver Corp.

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

MASUPARIA GOLD CORPORATION

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

DEFIANCE SILVER CORP. (an exploration stage company) CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS FOR THE SIX MONTHS ENDED DECEMBER 31, 2015

GUYANA GOLDFIELDS INC.

EQUITY RAISING ANNOUNCEMENT

RAGING RIVER EXPLORATION INC. ANNOUNCES 2015 YEAR END RESERVES AND UPDATED 2016 GUIDANCE

Chesapeake Gold Corp.

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

NEWS RELEASE FOR IMMEDIATE RELEASE

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Management S Discussion and Analysis For The Six Months Ending June 30, 2010

Management Discussion and Analysis For The 9 Months Ended, June

KOPY GOLDFIELDS AB. A thorny path of a public Junior Gold Exploration Company in Russia Russian & CIS Metals Summit 2014, Moscow, February, 2014

Condensed Interim Consolidated Financial Statements

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7

Disclaimer TSX: WPX FSE: AHE

Q Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

Brookfield Property Partners Offer to Purchase Any or All Issued and Outstanding Common Shares of Brookfield Office Properties Inc.

K+S CANADA HOLDINGS INC. K+S AKTIENGESELLSCHAFT POTASH ONE INC.

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

CADILLAC VENTURES INC. MANAGEMENT S DISCUSSION AND ANALYSIS

Corporate Presentation October 2015

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

TIMIA CAPITAL CORP. (the Company ) (FORMERLY GREENANGEL ENERGY CORP.) MANAGEMENT DISCUSSION AND ANALYSIS in Form F1 ( MD&A )

GOLDCORP INC. OFFER TO PURCHASE

GEOLOGIX EXPLORATIONS INC. CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2003

CONDENSED INTERIM FINANCIAL STATEMENTS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2015 (UNAUDITED)

NSS Resources Inc. MANAGEMENT DISCUSSION AND ANALYSIS For the year ended June 30, 2015

GOLD BULLION DEVELOPMENT CORP. Condensed Interim Consolidated Financial Statements March 31, Unaudited

International Tower Hill Mines Ltd.

Q Financial Results Conference Call

Minera Andes rejects TNR Gold Corp. s claim of Back-in Right

Summary of Terms. Platinum Group Metals Ltd. ( PTM or the Company ) Platinum Group Metals (RSA) Proprietary Limited ( PTM (RSA) )

Canadian Spirit Resources Inc.

For Immediate Release

Inca One Gold Corp. Insider Trading Policy

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

Financial Statements December 31, 2014 and 2013 Josephine Commons, LLC

FORM 7 MONTHLY PROGRESS REPORT

INSIDER TRADING POLICY

SILVER STANDARD REPORTS THIRD QUARTER 2015 RESULTS

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

Interim Unaudited Condensed Consolidated Financial Statements December 31, 2013

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014

FORM 40-F. ALEXCO RESOURCE CORP. (Exact Name of Registrant as Specified in its Charter)

TACTEX F1 PRIVATE EQUITY FUND LP SUMMARY OF PRINCIPAL TERMS

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

Q Results November 12, 2015 FNV TSX/NYSE

Management s Discussion and Analysis of Results of Operations and Financial Condition For the Nine Months Ended June 30, 2014

MANAGEMENT S DISCUSSION AND ANALYSIS U308 CORP. (A DEVELOPMENT STAGE COMPANY) THREE AND SIX MONTHS ENDED JUNE 30, 2007 (UNAUDITED)

3.1 Forecasting and Reporting

Annual Information Form ( AIF ) Nevada Copper Corp. Suite Granville Street Vancouver, British Columbia, Canada V6C 1S4

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

NIGHTINGALE REPORTS FISCAL 2014 RESULTS

Cautionary Statement

ELECTRA GOLD LTD. MANAGEMENT DISCUSSION AND ANALYSIS QUARTER ENDED JUNE 30, 2014

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

Palangana expansion fully permitted; Burke Hollow receives disposal well permit. Associate: Michael Wichterle, MBA,

Enbridge Income Fund Holdings Inc. Announces Second Quarter Results; Declares Monthly Dividend

NEWS RELEASE. Centerra Gold 2015 Year-End Reserve and Resource Update

Aastra Technologies Limited First Quarter ended March 31, 2003

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

AMENDED CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS PERIOD ENDED JULY 31, (Expressed in Canadian Dollars)

Transcription:

Webcast Presentation January 15, 2016 Creating A Leading High Grade Gold Company Definitive Terms Reached with Government of Ecuador for Fruta del Norte Project

Caution on Forward-Looking Information Certain information contained in this presentation, including any information relating to the Fruta del Norte Project, and any other statements regarding Lundin Gold s future expectations, beliefs, goals or prospects constitute forward looking information within the meaning of applicable securities legislation (collectively, "forward looking statements"). All statements in this presentation that are not statements of historical fact (including statements containing the words "expects", "does not expect", "plans", "anticipates", "does not anticipate", "believes", "intends", "estimates", "projects", "potential", "scheduled", "forecast", "budget" and similar expressions) should be considered forward looking statements. All such forward looking statements are subject to important risk factors and uncertainties, many of which are beyond Lundin Gold s ability to control or predict. A number of important factors could cause actual results or events to differ materially from those indicated or implied by such forward looking statements, including without limitation: the ability of the Company to successfully enter into exploitation and investment protection agreements, the timely receipt of regulatory approvals, permits and licenses and the cost of compliance with applicable laws; difficulty complying with changing government regulations and policies, including without limitation, compliance with environment, health and safety regulations; uncertainty as to reclamation and decommissioning liabilities, risks related to carrying on business in an emerging market such as possible government instability and civil turmoil, economic instability and uncertain tax environments, unreliable infrastructure and local opposition to mining; the accuracy of the mineral resource estimates for the Fruta del Norte Project and the Company s reliance on one project; vulnerability of title and surface rights and access; shortages of resources, the Company s lack of operating history in Ecuador and negative cash flow, the Company s ability to obtain financing and other risk factors as described under Risk Factors in the Company s most current most recent annual information form. Lundin Gold assumes no obligation to update the information in this presentation, except as otherwise required by law. Additional information identifying risks and uncertainties is contained in Lundin Gold s filings which are available online at www.sedar.com. Forward looking statements are made for the purpose of providing information about the current expectations, beliefs and plans of the management of Lundin Gold relating to the future. Readers are cautioned that such statements may not be appropriate for other purposes. Readers are also cautioned not to place undue reliance on these forward looking statements, that speak only as of the date hereof. Unless otherwise indicated, all dollar values herein are in US dollars. Information of a scientific and technical nature concerning the Fruta del Norte Project was prepared under the supervision of Anthony George, P.Eng., a mining engineer and Lundin Gold s Vice President Project Development, and Nicholas Teasdale, MAusIMM CP(Geo), Lundin Gold s Vice President Exploration, both of whom are Qualified Persons within the meaning of National Instrument 43 101 Standards of Disclosure for Mineral Projects ( NI 43 101 ). Important Information for US Investors This presentation uses the terms measured resources, indicated resources and inferred resources. The Company advises readers that although these terms are recognized and required by Canadian regulations (NI 43 101), the United States Securities and Exchange Commission does not recognize them. Readers are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. In addition, inferred resources have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Economic Assessment as defined under NI 43 101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. This presentation is not an offer of securities for sale in the United States or in any other jurisdiction. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended and may not be offered or sold within the United States absent registration or an application exemption from registration. 2

What is an Exploitation Agreement? To advance Fruta del Norte to production, Lundin Gold requires an exploitation permit from the Government of Ecuador At the time of the acquisition, Lundin Gold had 18 months to submit a phase change application Deadline is June 17, 2016 One of the requirements to obtain an exploitation permit is the completion of an Exploitation Agreement Exploitation Agreement defines fiscal terms (royalty, tax, calculation methodology), establishes mining rights, title to concession and a legal framework to finance the project in international debt and equity markets 3

Success: Definitive Terms Settled After six months of negotiations, a definitive form of Exploitation Agreement was agreed to on January 14, 2016 The definitive form of Exploitation Agreement has been approved by the Board of Directors of Lundin Gold The definitive form of Exploitation Agreement has been approved by the Government of Ecuador 4

Key Terms of EA Long Term: Lundin Gold has right to develop and produce gold from Fruta del Norte for 25 years, which may be renewed Reasonable Royalty: Lundin Gold has agreed to pay the Government of Ecuador a royalty equal to 5% of net smelter revenues from production Advanced Royalty of $65 million to fund social infrastructure in the local communities Initial payment of $25 million being due upon execution of EA Two payments of $20 million on the first and second anniversaries of signing of EA Rapid Advance Royalty Recovery: Advance royalty payment will be recoverable against the lesser of 50% of royalties payable in six month period or 20% of the total advance royalty payment 5

Windfall Tax Important Changes to Windfall Tax: Will not apply until Lundin Gold has recouped: its cumulative investment in the development of Fruta del Norte since its inception; plus present value of actual cumulative investment incurred from signing of Exploitation Agreement until the start of production Will be calculated with reference to a calculated base price for gold and silver Base price will be equal to the trailing 10-year average of the daily price of gold or silver, escalated by U.S. Consumer Price Index, plus one standard deviation Calculated on a monthly basis Tax will apply to the net smelter revenue over and above what revenue would be using the base price at a rate of 70% 6

Sovereign Adjustment Benefit for the People of Ecuador: Parties have settled on a fair sovereign adjustment provision EA provides that Government s share of cumulative benefits derived from FDN will not be less than 50% To extent that Government s cumulative benefit falls below 50%, the Company will pay a sovereign adjustment Calculation of benefits to Company will be the net of: cumulative investment incurred in development of Fruta del Norte since its inception; plus net present value of cumulative free cash flow subsequent to signing of Exploitation Agreement Government s benefit will be calculated as present value of cumulative sum of taxes paid including corporate income taxes, royalties, windfall tax, labour profit sharing paid to the state, non-recoverable VAT, and previous sovereign adjustment payments 7

Other Aspects of EA Bankable Agreement Government of Ecuador has agreed to a legal framework to facilitate project financing Certainty for Lundin Gold Includes a mechanism for correcting any economic imbalance that is the result of changes in taxes or applicable laws Continued Government Support Government provided assurances that it will guarantee continuity of Lundin Gold s activities and not interfere with Lundin Gold s contractual rights Government committed to working to achieve best possible conditions for the normal performance of mining activities, which include measures for public safety, infrastructure, utilities and assistance with land requirements 8

Other Developments Income Tax Rate fixed at 22% VAT Recovery Mining now eligible after passing of legislation in December VAT will be recoverable effective January 1, 2018 Current VAT rate is 12% Profit Sharing: 15% of before tax earnings split between government (12%) and employees (3%) 9

Summary Current Previous Project Terms Royalty 5% 5 8% based on Au price Advanced Royalty $65 million 1 st Installment $25 M 2 nd Installment $20 M 3 rd Installment $20 M $65 million 1 st Installment $40 M 2 nd Installment $25 M Advanced Royalty Recovery Over 5yrperiod Over 10 yr period Profit Sharing 15% 15% Windfall Tax Base Price: 10 yr moving avg + 1 std dev $1,650 per oz. Capital recovery No capital recovery VAT Recovery January 1, 2018 No Recovery Income Tax Rate 22% 22% Sovereign Adjustment 50% Calculated on NPV basis 52% Calculated on straight cash flow 10

What s next? Feasibility Study Task 2016 2017 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Environmental Permitting Finalization of EA Agreement (01/14/16) Finalization of EA Technical Information (06/1/16) Submittal of Phase Change Application (06/15/16) Review of Phase Change Application Approval of Application (08/17/16) Financing Signing of EA (01/15/17) Production Decision (1/17/17) Detailed Engineering & Construction First Production (Late 2019) 11

Head Office Lundin Gold Inc. Suite 2000, 885 West Georgia Street Vancouver, B.C., Canada V6C 3E8 +1 (604) 689-7842 Corporate Office Aurelian Ecuador SA Av. Amazonas N37-29 y UNP Edificio Eurocenter, Piso 5 Quito, Ecuador +593 (2) 299-6400 www.lundingold.com TSX and Nasdaq Stockholm: LUG 12