Construction of 33kV Transmission Line from Tavua to Volivoli Single Circuit from Pole 182(Naseyani Junction) to Pole 555(Volivoli Site)

Similar documents
SPECIAL CONDITION OF CONTRACTS

Business Administration of Windchill PDMLink 10.0

R162-2f-206c. Certification of Continuing Education Course. (1) (a) The division may not award continuing education credit for a course that is

Risk Management Policy

C&A MM Inventory Relieve & Post to Job Cost Installation and Setup Instructions with Process Flow

Mid Willamette Valley: Community Systems Background Document Marion, Polk, Yamhill, Linn, and Benton counties

Contents. iii. ix xi xi xi xiii xiii xiii xiv xv xvi xvii xix

Workflow Administration of Windchill 10.2

Deal or Appeal. Thursday, November 16, :30 PM to 5:45 PM Room # B405

GUIDELINES FOR ONLINE SUBMISSION OF APPLICATIONS

Reg. IV.18.(i). Special Rules: Telecommunications and ancillary service providers. [Adopted July 31, 2008]

ANALYSIS. Vendor Performance: A Shared Responsibility OTTAWA JANUARY 2014 PROMOTING FAIRNESS, OPENNESS AND TRANSPARENCY IN PUBLIC PROCUREMENT

NATO STANDARD AMedP-8.1 DOCUMENTATION RELATIVE TO INITIAL MEDICAL TREATMENT AND EVACUATION

CITY OF BROOKHAVEN INVITATION TO BID NUMBER ARMORED CAR SERVICES

Introduction to Windchill PDMLink 10.0 for Heavy Users

TEXAS A&M FOOTBALL RUNNING BACK DRILLS

INSTRUCTIONS TO FILL UNDERTAKING FOR Point to Point (P2P) LEASED LINE NETWORK CONNECTIVITY

Schedule of Bank Charges Schedule of Charges (Excluding FED)

Book of Needs of the Holy Orthodox Church

INDEPENDENT CONTRACTOR CONSULTING AGREEMENT INSTRUCTIONS, ROUTING AND APPROVAL COVER SHEET

BSM 9.0 ESSENTIALS. Instructor-Led Training

Order for Enforcement of the Act on Prevention of Transfer of Criminal Proceeds

UNIVERSITY OF MIAMI CONSULTING/ SERVICE AGREEMENT

ReDBox SUPPORT AGREEMENT

PWD WORKSHOP MAINTENANCE PROJECT. Tender for the Repair of Main Roof for PWD Workshop

TABLE OF CONTENTS. Simple will with residue pouring over to inter vivos trust

John Allan November 5, 1884 Dunphaile Castle IV December 12, 1884 Laurel II January 17, 1885 Umvoti XV January 29, 1885 Dunphaile Castle V March 16,

Appendix D. Minimum Requirements For Developmental Resources. For

Internet, broadband, and cell phone statistics

Analysis of the Nigerian Oil and Gas Industry Content Act Ozim Ifeoma Obasi Aelex, Lagos

The University of Colorado at Boulder is a large university with a student

CA Public Works Subcontract Page 1

Monterey County Behavioral Health Policy and Procedure

REQUEST FOR QUOTATION YOU ARE HEREBY INVITED TO SUBMIT QUOTATIONS TO THE WATER RESEARCH COMMISSION. 60 Days (COMMENCING FROM RFQ CLOSING DATE)

Forensic Accounting Taxation

List of approved Universities and Programmes by Yayasan Peneraju

Monterey County Behavioral Health Policy and Procedure

POTENTIAL HEALTH & SAFETY HAZARDS

NATIONAL BANK OF GREECE S.A.

Specific and Miscellaneous Professions

TENDER FORM. Tender # FUR/01/ Fabrication, Supply & Fixing of Furniture Items. Last Date of Submission : April 14, 2015 (3:00 pm)

REQUEST FOR QUOTATION YOU ARE HEREBY INVITED TO SUBMIT QUOTATIONS TO THE WATER RESEARCH COMMISSION. 60 Days (COMMENCING FROM RFQ CLOSING DATE)

UBER FACTS YOU SHOULD KNOW

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS

Ministry of Social Justice and Empowerment (Department of Social Justice & Empowerment) Government of India

Windchill Service Information Manager Curriculum Guide

REQUEST FOR PROPOSAL SUPPLY, INSTALLATION AND CUSTOMIZATION OF HELPDESK SOFTWARE. Tender No. ECIL / CSD / dated

Audit Committee Charter

EXECUTIVE SUMMARY. Study Approach. Background. ERP in Concept and in Practice

ANZ MERCHANT AGREEMENT

Request for Proposals for the Purchase or Lease of the Water and Wastewater Systems and Related Assets PART A: RFP SPECIFICATIONS

URBAN LOCAL BODIES, HARYANA SHORT TERM TENDER

RULES FOR INSTALLATION OF COMMUNICATION TOWERS.

Indicative Final Terms dated 16 December ROYAL BANK OF CANADA (a Canadian chartered bank)

Music Business Lecturers Oxford, UK Seeking Part-time and casual appointments

How To Lower Premium Tax In Georgia

Request for Quote Number: PRC Baseball Diamond Backstop Re-Fence

Automation in Banking, Volume

KEY DIFFERENCES BETWEEN THE UNIFORM LAW AND THE NEW SOUTH WALES AND VICTORIAN LEGAL PROFESSION ACTS

Administration. Chapter-11. Appointment of New Directors in the Board

CITY OF ELBERTON, GEORGIA REQUEST FOR PROPOSAL

Windchill PDMLink Curriculum Guide

Local Government Better Practice Guide. Planning and Reporting

Republic of Zambia Ministry of Works and Supply Roads Department Labor-based Routine Maintenance Contract Agreement. C. Kalangwa - Box 33545, Lusaka

How To Build A House

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

ALEXANDER ALEC R. ROTHROCK Born Evanston, Illinois 1959

THE WHITE HOUSE. Office of the Press Secretary. For Immediate Release June 26, 2013 EXECUTIVE ORDER

Customer Acceptance Policy

How To Write A Contract In The European

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Climate and Disaster Resilience Index of Asian Cities

THE REGULATION OF PUBLIC CHARITES AND PRIVATE FOUNDATIONS IN HAWAII. By: Hugh.R.Jones i

LUXEMBOURG PROTOCOL TO THE CONVENTION ON INTERNATIONAL INTERESTS IN MOBILE EQUIPMENT ON MATTERS SPECIFIC TO RAILWAY ROLLING STOCK

Case Study. The economic benefits of vocational education and training in South Africa

Monterey County Behavioral Health Policy and Procedure

Sealed bids will be received by the City of Dearborn, at the Office of the Purchasing

APPLICATION FOR CHIROPRACTORS PROFESSIONAL LIABILITY INSURANCE (Claims Made and Reported Basis)

WILL THE DEADLINE BE EXTENDED?

NOTICE TO OFFERORS REQUEST FOR PROPOSALS ( RFP ) ASPA FSM.INSURANCE FOR ASPA AUTO FLEET. Vehicle Insurance for ASPA Auto Fleet

ACS Final Exam Topic Outline. Functional Area Information Systems. V. Enterprise Information Systems

3SO. 3SO Strategic Sourcing & Procurement Policies & Procedures

Bankruptcy Remote Structuring

How To Get A Premium From An Insurance Contract

This part applies to insurance companies other than listed insurance companies;

SECTION G CONTRACT ADMINISTRATION DATA

CROWDFUNDING GUIDELINES

46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)

The Transfer of Funds (Alderney) Ordinance, 2007

Contemporary Craft Sector Profile and Analysis

INTERNAL REGULATIONS OF THE AUDIT AND COMPLIANCE COMMITEE OF BBVA COLOMBIA

Children and the Long-Term Effects of Poverty

How To Make Index Option Contracts In Karnival Stock Exchange

ERISA FIDUCIARY RESPONSIBILITY: FIDUCIARY RELIANCE ON REGISTERED INVESTMENT ADVISORS

USING EXCHANGE HOSTED ENCRYPTION

MUNICIPALITY OF CENTRE HASTINGS REQUEST FOR QUOTE

APPLICATION FOR CHIROPRACTORS PROFESSIONAL LIABILITY INSURANCE (Claims Made and Reported Basis)

PMI-DVC Board of Directors Roles and Responsibilities

REMODELING CONTRACT., remodeling contractor, whose address is, to on the property located at.

Transcription:

Construction of 33kV Transmission Line from Tavua to Volivoli Single Circuit from Pole 82(Naseyani Junction) to Pole 555(Volivoli Site) TENDER NO: MR 86/205 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page

Bidder s Name: Bidder s Address: Bidder s Telephone Numbers: Bidder s Email Address (Optional): Fiji Electricity Authority is seeking proposals from FEA Trained and Certified Contractors to carry out 33kV Power Line Construction from Tavua to Volivoli-Single Circuit from Pole 82(Naseyani Junction) to Pole 555(Volivoli Site). The project is divided into six stages and has a total of 370 7m wooden poles with a total length of 33km of 33kV Neon O/H line to be strung. There are 67 poles that require upgrading to 7m (will be carried out by FEA) and 303 new 7m poles to be installed (will be carried out by Contractor)..0 Notes:. Bidders are to submit a breakdown of prices (unit rates) together with total included in this tender document. By providing this information the FEA does not take liability of the actual conditions in field. The bidders / contractors shall verify the actual conditions and the geographic terrain during the site visits. The bidders shall self-evaluate the realities in the field and submit firm prices. No variations shall be entertained. 2. Safety plan to be included in the tender bid 3. Lineman, cable jointer and Trainee/Line worker Certificate to be included in the tender bid 4. Safety report for the year 204 shall be submitted with the tender 5. A list of Power Line Construction projects completed for FEA shall be submitted with the tender 6. Certification of equipment to be included in the bid 7. Vegetation Management Training certificate shall be submitted with the tender 8. Please pay specific attention to Clause xii under PART 6., Contractor Requirements: Lineman Contractor shall ensure that the project has one Certified Lineman and 3 Registered Trainee Line Workers/ Linemen working on the project on a full time basis. Records of these personnel shall be submitted with the tender bid. Contractors unable to submit positive proof that they meet this key requirement shall not be considered 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 2

9. Please pay specific attention to Clause xxv under PART 6., Contractor Requirements: Transportation of material The Contractor shall transport all materials including the 7m wooden power poles from FEA Navutu Stores to work site 2.0 Site Inspection Dates:. Site Visits for the 33KV Transmission Line From Naseyani to Tavua at the FEA s navutu Depot at :00a.m on Thursday 28 th May, 205. Interested Bidders are to report to Unit Leader Distribution Western in FEA s Navutu Depot, Lautoka. Name: Saimone Rogoimuri Cell Phone: 999249 2. The site visit requirements for this tender are compulsory and attendance shall be recorded 3. Interested bidders shall provide their own Transport and shall not ride in FEA vehicles 3.0 Lodgement of Tenders in sealed envelopes marked It is mandatory for Bidder s to submit two (2) hard copies of the tender bids in sealed envelope shall be deposited in the tender box located at the Supply Chain Office at the FEA Head Office, 2 Marlow Street, Suva, Fiji. Courier charges for delivery of Tender Documents must be paid by the bidders. This tender closes at 4:00pm, on Wednesday 0 th June, 205. Each tender shall be sealed in an envelope with: The envelope bearing only the following marking: Tender- MR 86/205 Construction of 33kV Line from Tavua to Volivoli-Single Circuit from Pole 82(Naseyani Junction) to Pole 555(Volivoli Site) The Secretary, Tender Committee Fiji Electricity Authority Supply Chain Office Private Mail Bag, Suva It must also indicate the name and address of the tenderer on the reverse of the envelope. All late tenders, unmarked Envelopes and envelopes without bidder s name and address on the reverse of the envelope will not be accepted. For further information or clarification please contact our Supply Chain Office on phone (+679) 3224360 or (+679) 999587. 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 3

4.0 First Schedule 4. Special Conditions of the Contract The work shall comprise of the Construction and installation of 33kV power poles as per attached drawing. Please enter unit rates and lump-sum prices in the table below. The total Contract sum for the work shall be $ VIP 33kV Power Line Construction- Construction of 33kV Line from Tavua to Volivoli-Single Circuit from Pole 82(Naseyani Junction) to Pole 555(Volivoli Site) UNIT RATES: Stage - Pole 82-Pole 233/ (Refer to drawing # A-03-N57-004 Sheet 7 to 2) Item No. Description Quantity Unit Rate VIP Total VIP Excavate foundation holes for new wooden power poles to a depth of 3m, install new Wooden Power Pole [7m]], complete with drilling and scarfing to FEA standards, complete with dressing and stringing of conductor as per drawing 5 2 Install ground stay 3 Install fly stay 4 Transportation of materials from FEA Navutu Depot to Site 5 5 Vegetation Management as per actual condition on site for this stage Stage 2- Pole 234 Pole 29 (Refer to drawing # A-03-N57-004 Sheet 2 to 24) Excavate foundation holes for new wooden power poles to a depth of 3m, install new Wooden Power Pole [7m]], complete with drilling and scarfing to FEA standards, complete with dressing and stringing of conductor as per drawing 5 2 Install ground stay 7 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 4

3 Install fly stay 3 4 Transportation of materials from FEA Navutu Depot to Site 5 5 Vegetation Management as per actual condition on site for this stage Stage 3- Pole 292-355 (Refer to drawing # A-03-N57-004 Sheet 25 to 29) Excavate foundation holes for new wooden power poles to a depth of 3m, install new Wooden Power Pole [7m]], complete with drilling and scarfing to FEA standards, complete with dressing and stringing of conductor as per drawing 5 2 Install ground stay 0 3 Install fly stay 3 4 Transportation of materials from FEA Navutu Depot to Site 5 5 Vegetation Management as per actual condition on site for this stage Stage 4- Pole 356-430 (Refer to drawing # A-03-N57-004 Sheet 29 to 34) Excavate foundation holes for new wooden power poles to a depth of 3m, install new Wooden Power Pole [7m]], complete with drilling and scarfing to FEA standards, complete with dressing and stringing of conductor as per drawing 5 2 Install ground stay 3 3 Install fly stay 4 Transportation of materials from FEA Navutu Depot to Site 5 5 Vegetation Management as per actual condition on site for this stage Stage 5- Pole 43-486 (Refer to drawing # A-03-N57-004 Sheet 2 to 24) Excavate foundation holes for new wooden power poles to a depth of 3m, install new Wooden Power Pole [7m]], complete with drilling and scarfing to FEA standards, 5 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 5

complete with dressing and stringing of conductor as per drawing 2 Install ground stay 7 3 Transportation of materials from FEA Navutu Depot to Site 5 4 Vegetation Management as per actual condition on site for this stage Stage 6- Pole 487-555 (Refer to drawing # A-03-N57-004 Sheet 39 to 44) Excavate foundation holes for new wooden power poles to a depth of 3m, install new Wooden Power Pole [7m]], complete with drilling and scarfing to FEA standards, complete with dressing and stringing of conductor as per drawing 48 2 Install ground stay 8 3 Install fly stay 4 Transportation of materials from FEA Navutu Depot to Site 5 5 Vegetation Management as per actual condition on site for this stage 6 Enclosure for Termination Pole at Volivoli Substation Note: Termination Pole (555 and 555/) position will be confirmed during construction LUMP SUM COSTS: Item No. Material Transport Cost Transportation of materials from FEA Navutu Depot to Site Total VIP 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 6

Item No. Vegetation Management Vegetation Management as per actual condition on site for a total of 6 stages Total VIP The total number of new 7m poles to be erected by the Contractor as per drawing is 303 poles. However, the exact number depending on the pace at which the Contractor progresses and also as per site conditions. This shall also apply to the accessories and materials to be used for the required poles. Power Pole replacement or upgrading of existing poles shall be carried out under FEA power shutdown and a Permit to Work. The power shutdown shall be customarily from 8.30am to 4.00pm All work on existing power lines to be upgraded or diverted will be carried out by FEA including final connections 4.2 Work Schedule (a) Latest date for commencement of the works: (b) Date of completion of Stage : (c) Date of completion of Stage 2: (d) Date of completion of Stage 3: (e) Date of completion of Stage 4: (g) Date of practical completion of the works: (h) Date for final completion of the works: 7 days from issue of LPO 4 weeks from issue of LPO 4 weeks from issue of LPO 4 weeks from issue of LPO 4 weeks from issue of LPO 5 weeks from issue of LPO 5 weeks from issue of LPO 4.3 Supervision of Contract For the purpose of supervising the contract on behalf of the Authority, references in the General Conditions to the Authority shall include the Unit Leader Distribution Western or his designated officer. The Project Manager shall be the Unit Leader Distribution Western, the Project Engineer shall be the 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 7

Construction, Operations & Maintenance Engineer Western, and the Project Supervisor shall be the Construction Coordinator Western. 4.4 Insurance (Refer to Clause 4) (a) Contractor's risk $500,000 (b) Public Liability $500,000 (c) Worker's Compensation $250,000 The contractor shall indemnify FEA against any claims for liability, injuries, losses, damages etc. that may arise during the execution of the works. 4.5 Liquidated and Ascertained damages (Refer to Clause 20): The liquidated and ascertained damages shall be $200 per day 4.6 Defects Liability Period (Refer to Clause 2): The defects liability period shall be 6 months 4.7 Retention Fund (Refer to Clause 24) (a) Limit of retention fund: (b) Nature of retention fund: (c) Release of retention fund: 0% of contract sum cash Subject to no pending defect, and as per FEA Finance Policy. 5.0 Second Schedule 5. Specifications for the Construction of 33kV Power Line from Tavua to Volivoli- Single Circuit from Pole 82 (Naseyani Junction) to Pole 555(Volivoli Site) 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 8

5.. General This specification covers the Construction of 33kV Power from Tavua to Volivoli- Single Circuit from Pole 82 (Naseyani Junction) to Pole 555 (Volivoli Site)as per attached Drawing # A-03-N57-004 under conditions of Contract attached herein. 5..2 Scope of Work The construction of the O/H 33kV Line is divided into six stages as outlined in the table (under Part 4.) Work involved in this contract is broadly classified into 8 parts: i. Drilling and scarfing of the 7m power pole to FEA Standard shall be carried out at Navutu Depot and transported to Site ii. Transportation of materials from Navutu Depot to Site after instruction from FEA iii. Excavate foundation holes for new 7m power poles to a depth of 3m at marked locations iv. Installation of 7m poles complete with dressing v. Stringing of conductors vi. Stay erection- ground and fly stay as specified vii. Enclosure for the Termination Poles viii. Vegetation clearing where required- this shall involve clearing of vegetation within 30m either side of the power line pole 6.0 Third Schedule 6. Contractor Requirements i. Tender Bid Contractor shall submit a firm bid clearly listing unit costs for all items as per required and stated. Vegetation clearing and Transportation costs shall be submitted as a lump sum. ii. iii. iv. Site Visit Contractor shall participate in a site visit which is compulsory. Bids from tenderers who do not participate in the site visit shall be disqualified. Standards All construction work shall be in compliance with FEA Standard Overhead Line Design & Construction Manual. Safety Plan The tender bid shall include a Safety Plan that will be evaluated by the FEA s HSE Unit. Tender bids with incomplete, unacceptable, or without a Safety Plan will not be considered 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 9

for award. v. Safety Record Tender bid shall include a brief report on Safety performance over the last two years. The report shall include all incidents and accidents. vi. Sub-contracting Subcontracting shall not be permitted, except where this is specifically presented in the tender bid, and only upon approval by FEA. Subcontractors shall be required to fulfil all requirements as if they were the contractor. vii. Scope of works - Work involved in this contract is broadly classified into 8 parts, and progress payments shall be processed accordingly. a. Scarfing of the 7m power pole to be carried out at Navutu Depot and transported to Site b. Transportation of materials from Navutu Depot to Site after instruction from FEA c. Excavate foundation holes for new 7m power poles to a depth of 3m at marked locations d. Installation of 7m poles complete with dressing e. Stringing of conductors f. Stay erection- ground and fly stay as specified g. Enclosure for the Termination Poles h. Vegetation clearing where required- this shall involve clearing of vegetation within 30m either side of the power line pole viii. ix. Contact - Contractor shall have a valid postal address, Office phone/fax/e-mail contact. The Principal shall be available by mobile phone at any time. Work Program - Contractor shall submit a work programme before starting of project. This shall be part of the contract. Work shall commence within seven (7) days after receiving an official FEA Local Purchase Order. x. Training Contractor shall ensure his employees have attended FEA Safety Manual Training and Pole Top Rescue Training at least once in the past 6 months, and records of this shall be submitted with the tender bid. In the event that the training has not been carried out, the Contractor shall ensure these training are carried PRIOR to induction for new project. Copies of training records and valid certificates shall be provided with the tender. Bids without these documents will be disqualified 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 0

xi. Ground condition Contractors are to note that sub-soil comprises soapstone and could contain other services like Telecom Fiji Ltd, Water & Sewerage, etc. xii. xiii. xiv. Lineman Contractor shall ensure that the project has one certified lineman and 3 registered Trainee Line Workers/ Linemen working on the project on a full time basis. Records of these personnel shall be submitted with the tender bid. Invoicing Contractor shall submit details of work completed to allow prompt approval of invoice. Safety Induction - A Safety induction must be conducted before start of power line construction work. Contractor shall ensure that all employees who work on the project attend the Safety Induction. All contractor employees are to present a valid company ID card clearly showing a current photo, employee name, employee date of birth and employee job description. xv. Instruction to Commence Work - Contractor shall NOT commence work on site unless an Instruction to Commence Work has been received from the Project Manager. xvi. Signboards - One signboard (6 X 4 ) must be erected at the start of the works and one at the end of the works clearly stating : DANGER PROJECT: POWERLINE CONSTRUCTION [Description of project] CONTRACTOR: POWER LINE CONSTRUCTION WORK xvii. xviii. xix. Accident Reporting All accidents and incidents shall be reported immediately to FEA using approved forms available in the FEA Safety Plan Template, or equivalent. Project Updates - Contractor shall meet with FEA Project Manager, Project Engineer and Project Supervisor on a weekly basis to discuss project progress and bottlenecks. These meetings shall be minuted for records, and circulated to the appropriate stakeholders. 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page

xx. xxi. Vegetation clearing Vegetation clearing shall be in accordance with FEA Vegetation Management Policy. Vegetation, which at a mature height will exceed 2m in height and will be within falling distance from the FEA lines are to be removed. Vegetation debris shall be disposed off neatly at a location agreed to by FEA. No debris shall be left by the roadside, or blocking drains. Tidiness The Contractor shall maintain the worksite in a neat and tidy condition. xxii. Consent for Vegetation clearing no vegetation shall be cleared unless specific instruction to do so has been received from the Project Supervisor. Notwithstanding this, the contractor shall inform the tree owner that he is required to clear the tree, and shall obtain the owner s confirmation that he has given FEA his consent to remove the tree, prior to proceeding with cutting the tree. xxiii. Fires No fires are to be lit at jobsites for the purpose of clearing vegetation or vegetation debris. xxiv. Village Protocols the contractor shall comply with protocols involved in working on land owned by Indigenous Fijians to ensure smooth work progress. xxv. xxvi. Transportation of material The Contractor shall transport all materials from FEA Navutu Stores to work site Security - Contractor shall be responsible for the safekeeping of all materials at work site, and will be required to pay for damage and/or loss. xxvii. xxviii. Damage to property The Contractor shall ensure that there is no damage to roadways, footpaths, drains, water-courses, properties and other services. The Contractor shall make good to the satisfaction to the owner any damage caused by the contractor. Portable signboards - Portable signboards must be placed at 50m intervals. xxix. xxx. Traffic and Pedestrian Control The Contractor shall ensure that there is minimum disruption to the flow of traffic and pedestrian. FEA procedures on Traffic Control and Pedestrian Control shall be diligently exercised. Worksite protection - Bollards/cone must be placed at 0m intervals. xxxi. Barricades - Open trench/pole-hole is to be barricaded on a full time basis by the Contractor. 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 2

xxxii. Jobsite Safety Assessment - Contractor to carry out Jobsite Safety Assessment daily, and as and when required, and submit these to FEA on a weekly basis. xxxiii. Contractor HSE Compliance - Contractor shall comply with FEA/Contractor HSE Manual at all times. xxxiv. Credit of surplus material The contractor shall transport and credit all unused materials to FEA Stores. xxxv. Defects Rectification The contractor shall rectify all defects within seven (7) days as per contract. xxxvi. xxxvii. xxxviii. xxxix. Project completion The contractor shall complete work on time as per contract. Project progress If the Contractor fails to proceed with the works with reasonable diligence or suspends the works or refuses to comply with the reasonable direction from FEA by reason of which the works are materially affected and any such default continues for a period of seven (7) days after the issue of written notice, FEA may itself call any other person to complete the works at the Contractor s risk and expense. Safe Work Procedure Training - Contractor must have completed Distribution Safe Work Procedure training. FEA/Contractor HSE Manual - Contractor shall comply with FEA/Contractor HSE Manual at all times 6.2 FEA Requirements i. FEA Project Supervisor shall obtain Road/footpath opening permits ii. iii. iv. FEA Project Engineer shall obtain clearance from Municipal Council, Telecom Fiji Ltd, Water Supply Department, and Sewerage Department FEA s HSE Unit shall vet Safety Plan submitted by Contractor and approve after queries clarified by Contractor FEA Project Engineer shall ensure that any FEA underground mains on the jobsite is clearly located, marked and identified to the Contractor 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 3

v. FEA Project Engineer shall submit to the Project Manager all necessary approval documentation from Municipal Council, Fiji Roads Authority, Telecom Fiji Ltd, Water Supply Department and Sewerage Department. Upon receipt of these approvals, and the approved Safety Plan, the Project Manager shall issue an Instruction to Commence Work to the Contractor vi. vii. FEA Project Supervisor and Project Engineer shall carry out regular site inspections to ensure compliance with HSE requirements, and submit Safety Visit Reports of the visit FEA Project Supervisor and Project Engineer shall issue Non-Conformance Report if required, and follow up for verification of implementation of Action Items arising out of the Non- Conformance Report. 6.3 Payment Schedule Payment shall be made as per payment schedule: Phase Description Percentage payment Material Transportation to worksite 5% 2 Vegetation Clearing 5% 3 Excavation of new poles, pole scarfing, pole dressing, erection, stays, ABS 50% 4 Conductor Stringing 5% 5 Transformer installation complete 5% 6 Retention 0% to be released after 6 months pending zero defects. 33kV TRANSMISSION LINE FROM NASEYANI TO VOLIVOLI- POLE 82 TO POLE 555 Page 4