SECTION PRECAST CONCRETE

Similar documents
GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Guide Specification Precast Concrete Products

SECTION NONREINFORCED CONCRETE SEWER PIPE

SECTION STORM DRAINAGE SYSTEM

SECTION PRECAST CONCRETE STRUCTURES

SECTION PRECAST CONCRETE STRUCTURES

Wastewater Capital Projects Management Standard Construction Specification

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

DIVISION 4300 STORM DRAINAGE

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

C. Section TESTING LABORATORY SERVICE.

INDEX. Sec. No. Items Page Nos.

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Learning Objectives. History of Vacuum Testing for Precast. Vacuum Testing. Terminology and purpose

SECTION CAST-IN-PLACE CONCRETE

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

SECTION STORM DRAIN SYSTEM

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

PROPERTIES AND MIX DESIGNATIONS

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Acceptance Codes APPENDIX - A. Acceptance Criteria

SECTION DUCTILE IRON PIPE AND FITTINGS

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Section SEWER PIPE INSTALLATION AND TESTING

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

SECTION STORM DRAINAGE TABLE OF CONTENTS

DMS REINFORCED CONCRETE PIPE AND MACHINE-MADE PRECAST CONCRETE BOX CULVERT FABRICATION AND PLANT QUALIFICATION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

MeltonStone Cast Stone Product Specifications

James M. Pleasants Company

Section Four: Linings and Coatings

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION POLYVINYL CHLORIDE (PVC) PIPE

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

Concrete Waterproofing Systems. Integral Protection.

PLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

SECTION REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

Example Specification for Concrete using Current Building Code Requirements

Manufacturing Standards for Precast Concrete Products. March 2009

GUIDE SPECIFICATION FOR PLANT-PRECAST CONCRETE PRODUCTS

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

Division 4 Section Concrete Masonry Specifications

Section 2100-Trenching and Tunneling

PRECAST CONCRETE MANHOLES

SECTION GROUND WATER STORAGE TANKS

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

725-R-599 PIPE LINING. (Revised ) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

MATERIALS DIVISION MEMORANDUM

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19

SECTION DUCTILE-IRON PIPE AND FITTINGS

Mechanical Installation

SECTION 1 GENERAL REQUIREMENTS

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Native InDesign 2890 SaniTite Brochure 1/8" CMYK April 17, 07

(B) Reinforcing and Tie Bars shall conform to the requirements of Mn/DOT 3301 unless otherwise shown on the Contract Drawings.

SECTION DUCTILE IRON PIPE AND FITTINGS

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes

The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe

Construction Specifications for Keyhole Pavement Coring and Reinstatement

SECTION SHEETING, SHORING AND BRACING

SECTION STANDING SEAM METAL ROOFING

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

High Performance PSA in Sheet Membrane in Water Protection

Special Specification 7021 Water Main and Sewer Line Replacements

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification GRAVITY SANITARY SEWER SYSTEM

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Transcription:

SECTION 03 40 00 PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Section Includes 1. Precast concrete structures, including but not limited to wet wells, valve vaults, metering vaults, etc. 2. Precast concrete liners (HDPE). 3. Joint wrap 4. Accessories required for precast structures. 1.02 REFERENCES A. American Society for Testing and Materials 1. ASTM C-33, Standard Specifications for Concrete Aggregate 2. ASTM A615, Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement. 3. ASTM A497, Standard Specification for Steel Welded Wire Reinforcement, Deformed, for Concrete. 4. ASTM C890, Standard Practice for Minimum Structural Design Loading for Monolithic or Sectional Precast Concrete Water and Wastewater Structure. 5. ASTM C913-08, Standard Specification for Precast Concrete Water and Wastewater Structures. 1.03 SYSTEM DESCRIPTION A. Concrete Compressive Strength (ASTM C39): 5,000 psi minimum at 28 days. B. Water Resistive: No water intrusion through wall, base or top sections. C. Concrete shall be designed to be resistant to sulfate. D. Design standard precast concrete units to withstand design load conditions in accordance with applicable industry standards. Design must consider stressed induced during handling, shipping, and installation to avoid cracking or other handling damage. Herbert, Rowland & Grubic, Inc. 03 40 00-1 UAJA Standard Specifications

1.04 SUBMITTALS A. Comply with Section 01 33 00. B. Product Data: 1. Manufacturer s data 2. Manufacturer s standard storage, handling, and installation instructions C. Shop Drawings: Shop drawings shall be sealed by a Professional Engineer registered with the Pennsylvania State Registration Board and shall illustrate: 1. Plans, elevations, sections, and details of base, wall and top components. 2. Joint details illustrating sealant and external wrap material. 3. Pipe penetration details illustrating size, location and type of seal. 4. Liner details illustrating embedment, field welding, joint coverage and interfacing with penetrations. 5. Hatch frame details. D. Calculations: Calculations shall be sealed by a Professional Engineer registered with the Pennsylvania State Registration Board and shall include. 1. Buoyancy calculations assuming ground water elevation is equal to the top of concrete elevation provided on the Contract Drawings. 2. Structural calculations. E. Quality Assurance/Control Submittals 1. Design date 2. Test Reports a. Upon request, the precast concrete producer shall supply copies of material certifications and/or laboratory test reports, including mill tests and all other test data, for Portland cement, blended cement, pozzolans, ground granulated blast-furnace slag, silica fume, aggregate, admixtures, and curing compound proposed for use on this project. b. Upon request, the precast concrete producer shall submit copies of test reports showing that the mix has been successfully tested to produce concrete with the properties specified and will be suitable for the project conditions. Such tests may include compressive strength, plastic air content, temperature of freshly mixed concrete, and slump of freshly mixed concrete. c. Concrete Testing i. Slump: A slump test shall be performed at least once per day per mix design used. Slump tests shall be performed in accordance with ASTM C 1611 for self-consolidating concrete. Herbert, Rowland & Grubic, Inc. 03 40 00-2 UAJA Standard Specifications

ii. ii. Temperature: The temperature of fresh concrete shall be measured each time a slump, air content, or compressive strength tests are made. Temperature shall be measured in accordance with ASTM C 1064. Compressive Strength: At least four compressive strength specimens shall be made each day for each mix design unless otherwise specified. In accordance with ASTM C 31, C 39, C 192. 3. Qualification Statements a. Upon request, the precast concrete producer shall supply copies of inplant QA/QC inspection reports. 1.05 QUALITY ASSURANCE A. Qualifications: Manufacturer s standard product listing shall include wastewater products. The precast concerted producer shall have a quality control program which is audited for compliance. B. Certifications: Manufacturer shall be certified by the National Precast Concrete Association (NPCA) and shall have been for a minimum of five (5) years. C. Quality Control 1. The precast concrete producer shall show that the following quality control tests are performed as required and in accordance with ASTM International standards: a. Concrete Testing 1. Slump: A slump test shall be performed at least once per day per mix design used. Slump tests shall be performed in accordance with ASTM C 1611 for self-consolidating concrete. 2. Temperature: The temperature of fresh concrete shall be measured each time a slump, air content, or compressive strength tests are made. Temperature shall be measured in accordance with ASTM C1064. 3. Compressive Strength: At least four compressive strength specimens shall be made each day for each mix design unless otherwise specified. In accordance with ASTM C 31, C 39, C 192. 4. Air Content: Tests for air content shall be performed if the mix design specifies air entrainment. The air content will be measured in accordance with ASTM C 231. The Air Content shall be measured once per day per mix design. 5. Density (Unit Weight): Tests for Density (Unit Weight) shall be performed monthly for each mix design used at a minimum. Tests shall be in accordance with ASTM C 138 b. Aggregate Testing 1. A full set of aggregate tests shall be performed on each aggregate at least annually by an independent testing agency or Herbert, Rowland & Grubic, Inc. 03 40 00-3 UAJA Standard Specifications

D. Outside Inspection DIVISION NO. CONCRETE an in house test lab. These tests will include gradations (ASTM C136), Soundness (ASTM C 88), Organic Impurities (ASTM C 40), Sand Equivalent for fine aggregates only (ASTM D 2419). 2. Potential reactivity shall be performed once per each aggregate source, and when aggregate sources change (ASTM C 1260 or C1293). 3. Monthly, at a minimum, gradations shall be performed per ASTM C33. 4. Aggregate Moisture tests: Moisture tests on aggregates shall be performed in accordance with ASTM C 70 or ASTM C 566. Fine aggregate moisture content tests shall be performed at least once per day if there are no moisture meters, otherwise it shall be performed once per month. Alternatively the speedy moisture test is acceptable (ASTM D 4944). c. Preplacement Check 1. All products shall be inspected for accuracy prior to placing concrete. Checks shall include, but not be limited to, form condition and cleanliness, form dimensions, joints, release agent, blockouts, inserts and locations, lifting devices, reinforcing steel size, spacing, clearances and proper placement. 2. Preplacement checks shall be documented and initialed by the inspector. A drawing with verifications of the above criteria can be used as documentation. d. Postplacement Check 1. All products shall be inspected for accuracy after the concrete forms have been removed. Checks shall include, but not be limited to, dimensional checks, finishing, insert locations, squareness, honeycombing, cracking, marking, coatings, racking, hole size and location. Postplacement checks may require a corrective action report. 2. Postplacement checks shall be documented and initialed by the inspector. A drawing with verifications of the above criteria can be used as documentation. 1. The customer or customer s agent (specifier) may place an inspector in the plant when the units covered by this specification are being manufactured. The precast concrete producer shall give notice of 3 days prior to the time the precast concrete units will be available for plant inspection E. Pre-installation Meeting 1. Contractor shall coordinate a project site meeting prior to delivery and installation with representatives of Authority, precast manufacturer, and installer to review site conditions, access to site, requirements of related of prerequisite work (i.e. Herbert, Rowland & Grubic, Inc. 03 40 00-4 UAJA Standard Specifications

excavation, subgrade preparation, etc.), storage and hauling procedures, and protective measures. 1.06 DELIVERY, STORAGE, AND HANDLING A. Packing, Shipping, Handling, and Unloading: Ship and handle precast sections in a manner as recommended by the manufacturer that will prevent damage. Units shall not be shipped until they have reached at least 70% of their specified 28-day design strength, unless damage will result. B. Acceptance at Site: Contractor shall be available at the site to take acceptance of all deliveries. Authority shall not be responsible for acceptance of deliveries. All deliveries attempted to be made without a Contractor s representative will be refused. C. Storage and Protection: Store precast concrete units in a manner that will minimize potential damage. PART 2 PRODUCTS 2.01 PRECAST REINFORCED WET WELLS A. Manufacturers 1. Terre Hill Concrete Products 2. By-Crete 3. Monarch Precast Concrete Corporation B. Concrete: Comply with Section 03 30 00. C. Pre-cast Concrete Sections: 1. Pre-cast wet wells shall conform to specifications for ASTM C 478 Pre-cast Reinforced Concrete Manhole Sections. 2. The minimum wall thickness shall be eight inches. Pre-cast wet-wells shall be constructed with a pre-cast monolithic base structure having a minimum base thickness of eight inches. 3. All sections shall have tongue and groove or otherwise overlapping joints. Joints shall be self-sealing utilizing a double layer of bituminous, butyl rubber sealant meeting or exceeding the requirements of ASTM C-990-91. 4. The date of manufacture and the name or trademark of the manufacturer shall be clearly marked on each pre-cast section. 5. Pre-cast concrete top slabs shall be used. Herbert, Rowland & Grubic, Inc. 03 40 00-5 UAJA Standard Specifications

6. Lift rings or non-penetrating lift holes shall be provided for handling pre-cast sections. Non-penetrating lift holes shall be filled with non-shrink grout after installation of the sections. 7. The wet well joints shall be encapsulated with a heat shrink-wrap with a minimum thickness of 0.100. The wrap shall have a cross-linked polyolefin backing coated with a protective heat activated adhesive. The wrap should effectively bond to the substrate via primer provided by the manufacturer, providing corrosion and moisture protection. Joint wrap shall be ConWrap CS-212 by ConSeal conforming to ASTM E-1745, C-877, C-990 Specifications, or equal. D. Pipe Openings: Custom preformed during manufacturing to accommodate type of pipe and pipe opening seal specified. 1. Modular Mechanical Type Pipe Opening Seals: Sleeves shall be cast into the concrete with water stop collar. Seals shall be modular mechanical type consisting of interlocking synthetic rubber links shaped to continuously fill the annular space between the pipe and wall opening. Links shall be loosely assembled with bolts to form a continuous rubber belt around the pipe with a pressure plate under each bolt head and nut. After the seal assembly is positioned in the sleeve, tightening of the bolts shall cause the rubber sealing elements to expand and provide an absolute watertight seal between the pipe and the wall opening. The seal shall be constructed so as to provide electric insulation between the pipe and wall to reduce the occurrence of cathodic reaction between the two members. Wall penetration closures shall be Link- Seal as manufactured by Thunderline Corp., or equal. E. HDPE Liner: All interior wall and top surfaces of the wet wall shall have a protective liner. 1. The HDPE embedment sheeting shall be mechanically bonded to the concrete by integral studs. The liner shall be cast in place by the precast manufacturer and all joints shall be fielded welded by a qualified and trained representative. Minimum thickness of the liner shall be 5 mm. All inserts and sleeves for piping shall be in accordance with the liner manufacturer s recommendations and shall result in complete coverage of all pre-cast sections. F. Exterior walls shall receive two coats of coal tar coating. G. Access Hatches shall be integrally cast into the concrete top to maximize the opening dimensions based on the wet well diameter and top configuration in accordance with Section 08 31 13. 2.02 PRECAST REINFORCED VAULTS A. Manufacturers 1. Terre Hill Concrete Products 2. By-Crete Herbert, Rowland & Grubic, Inc. 03 40 00-6 UAJA Standard Specifications

3. Monarch Precast Concrete Corporation B. Concrete: Comply with Section 03 30 00. C. Pre-cast Concrete Sections: DIVISION NO. CONCRETE 1. Pre-cast vaults shall conform to specifications for ASTM C 478 Pre-cast Reinforced Concrete Manhole Sections. 2. The minimum wall thickness shall be six inches. Pre-cast vaults shall be constructed with a pre-cast monolithic base structure having a minimum base thickness of eight inches. 3. All sections shall have tongue and groove or otherwise overlapping joints. Joints shall be self-sealing utilizing a double layer of bituminous, butyl rubber sealant meeting or exceeding the requirements of ASTM C-990-91. 4. The date of manufacture and the name or trademark of the manufacturer shall be clearly marked on each pre-cast section. 5. Pre-cast concrete top slabs shall be used. 6. Lift rings or non-penetrating lift holes shall be provided for handling pre-cast sections. Non-penetrating lift holes shall be filled with non-shrink grout after installation of the sections. 7. Vault joints shall be encapsulated with a heat shrink-wrap with a minimum thickness of 0.100. The wrap shall have a cross-linked polyolefin backing coated with a protective heat activated adhesive. The wrap should effectively bond to the substrate via primer provided by the manufacturer, providing corrosion and moisture protection. Joint wrap shall be ConWrap CS-212 by ConSeal conforming to ASTM E-1745, C-877, C-990 Specifications, or equal. D. Pipe Openings: Custom preformed during manufacturing to accommodate type of pipe and pipe opening seal specified. 1. Modular Mechanical Type Pipe Opening Seals: Sleeves shall be cast into the concrete with water stop collar. Seals shall be modular mechanical type consisting of interlocking synthetic rubber links shaped to continuously fill the annular space between the pipe and wall opening. Links shall be loosely assembled with bolts to form a continuous rubber belt around the pipe with a pressure plate under each bolt head and nut. After the seal assembly is positioned in the sleeve, tightening of the bolts shall cause the rubber sealing elements to expand and provide an absolute watertight seal between the pipe and the wall opening. The seal shall be constructed so as to provide electric insulation between the pipe and wall to reduce the occurrence of cathodic reaction between the two members. Wall penetration closures shall be Link- Seal as manufactured by Thunderline Corp., or equal. E. Exterior walls hall receive two coats of coal tar coating. Herbert, Rowland & Grubic, Inc. 03 40 00-7 UAJA Standard Specifications

F. Access Hatches shall be integrally cast into the concrete top and located to facilitate removal of internal equipment, valves, piping, etc. Opening shall be a minimum of 30 square. Refer to Section 08 31 13. PART 3 EXECUTION 3.01 INSTALLATION A. Prepare subgrade as specified in Division 31. B. Place base unit, wall sections and top unit. Insure that gaskets for water tightness are properly installed between successive units. C. Remove or conceal lifting devices or inserts, and protect from rust or corrosion. D. Backfill structures in accordance with Division 31. 3.02 FIELD QUALITY CONTROL A. Field Test: Leak resistance testing is required for all precast concrete structures. Contractor shall utilize one or both of the of the following methods 1. Vacuum Testing a. Prior to backfill, vacuum test system according to ASTM C 1244 for manholes and ASTM C 1227 for septic tanks. 2. Hydrostatic Testing B. Inspection a. First Backfill the structure, then fill to the high water level, let stand for 24 hours. Refill to the original water line and measure the water level change over a 24 hour period. Loss due to leakage shall not exceed 1% of volume. 1. Final field elevations and compaction properties shall be verified and documented. END OF SECTION Herbert, Rowland & Grubic, Inc. 03 40 00-8 UAJA Standard Specifications