Hub North Netværksarrangement d. 14. Juni 2011

Similar documents
Nordex SE. Nordex goes Offshore

PMDD WIND TURBINE 1.5MW

V MW. Your best option for low cost energy production at low and medium wind sites. Federico Gonzalez Vives. Director Technology.

Document number #12 DNS Authors #20 Telephone: Date #40 AUGUST 2013

Research and Education in the Field of Wind Energy at the Technical University of Denmark

Swancor 上緯企業. Composite & Energy

Nordex SE. Capital Markets Day Products & Sales - Lars Bondo Krogsgaard

GE Renewable Energy. GE s 3 MW Platform POWERFUL AND EFFICIENT.

Design and interiors. Index. Design og indretning

Danish Blade Service Steen Blichers Vej Kolding Denmark Wire udskiftning.

Newsletter September 2013

Wind turbine database: Modelling and analysis with focus on upscaling. Master s thesis in the Master programme Applied Mechanics

FLOWSTAR-Energy Validation NoordZee Wind Farm

How To Boot A Cisco Ip Phone From A Cnet Vlan To A Vlan On A Cpower Box On A Ip Phone On A Network With A Network Vlan (Cisco) On A Powerline (Ip Phone) On An

LM Wind Power Group - Strategic SWOT Analysis Review

PRESSEKIT INTERNATIONALE STUDERENDE

Getting smart(er) in Offshore Wind O&M

STATE OF THE ART and NEW TECHNOLOGIES OF DIRECT DRIVE WIND TURBINES

Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore

PowerLabDK and ongoing research

ultrafilter VARIOBLO Heat Regenerated Adsorption Dryer

Danish Wind Industry Association Danish Wind Turbine Owners' Association

Turbines R&D and Global Solutions & Services Less investment more value. by Anders Vedel, Executive Vice President, CTO

ROMO Wind Juan Carlos Martínez-Amago Jornadas Técnicas - AEE September 26 th 2012

Analysis One Code Desc. Transaction Amount. Fiscal Period

2.1MW PLATFORM Generations ahead

NORDEX USA, INC. GREAT LAKES SYMPOSIUM

Siemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines. Reduced complexity, increased profitability. siemens.

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

DIRECT MATCHING TO GRID WITHOUT INVERTER VARIABLE PITCH. 20/24/30 mt TOWER WITH HYDRAULIC SYSTEM YAWING SYSTEM SAFETY LEVELS PLC CONTROL

V kw The turbine that goes anywhere

ENERCON WIND TURBINES

Siemens Wind Turbine SWT The new productivity benchmark.

Simplified Design as Secret to higher Performance: Siemens Direct Drive Technology

EXPERT REMANUFACTURED WIND TURBINE

Wind Turbine Manufacturing a case for consolidation

ERFARINGER MED VINDKRAFT OG VEIEN VIDERE FOR OFFSHORE VIND

Reduce Levelised Cost of Energy. Anders Vedel, Executive VP & CTO Johnny Thomsen, SVP, Product Management Jorge Magalhaes, SVP, Engineering Solutions

Siemens D7 platform 6.0-MW and 7.0-MW direct drive wind turbines. The new standard for offshore. siemens.com/wind

Lecture 4 Energy Conversion in Wind Turbine

Ensuring Vestas current and future competitiveness

GE Power & Water Renewable Energy. Digital Wind Farm THE NEXT EVOLUTION OF WIND ENERGY.

VHDL programmering H2

offshore wind The future of

Case Study 5 Use of Wind Turbine Technology

V MW & V MW (OFFSHORE)

BWEA Summary Report for the C&F Green Energy Small Wind Turbine, Model No. CF20 (Phase A)

V MW Making wind even more profitable

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

Some scientific challenges in aerodynamics for wind turbines

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community.

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Hot & New in Symantec Management and Windows Protection

London Array Off-Shore Wind Farm

WIND TURBINE TECHNOLOGY

Maskinmesteren. Maskinmesteren. management and technology. Stor fjernvarmeudvidelse hos SK Forsyning

Testing of a new morphing trailing edge flap system on a novel outdoor rotating test rig

Sweden s leading manufacturer of small-scale wind power stations!

Morten Lund 1

in-service inspections

Offshore Windfarm Egmond aan Zee 4 years of Operation

The installation and servicing

Sound Power measurements according to IEC

Haliade 150-6MW Experiencia funcional con la nueva generación offshore

Nordic Built Active Roofs and Facades ELLEBO RENOVATION

Presentation of Semco Maritime

Avaya Brugergruppe dage

Press Presse Press Presse

Energy Supply Technologies: Wind Power

Christopher Monk Engineering Manager STRUCTeam Ltd

IBM Quality Management Strategy. En proces. Vi laver kun 3 ting. IT Operational Service. Solution Deployment. Solution Development.

MENA Wind Power Outlook

Results of wake simulations at the Horns Rev I and Lillgrund wind farms using the modified Park model

C.K. Prahalad & The New Age of Innovation

GE Energy 1.5MW. Wind Turbine

Title: IEC WT 01 vs. IEC Development of a new standard and innovations in certification of Wind Turbines. mike.woebbeking@gl-group.

WindPRO version jun 2010 Project:

Databases. by David Cerda Salzmann

STATUS OF OFFSHORE WIND ENERGY DEVELOPMENT IN GERMANY

P-EG stainless steel housing for gas filtration

The DTU 10-MW Reference Wind Turbine

EWEA Technology Workshop, Analysis of Operating Wind Farms: Learning the Lessons from Operational sites July 02-03, 2012 Lyon, France

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

ultrafilter HEATLESS HL Adsorption Dryer

The BASIS module in WindPRO is necessary for the use of any of the other calculation modules. It contains the four following elements:

Azfar Bassir. Summary. Experience. Developer at SHFT

Transcription:

Hub North Netværksarrangement d. 14. Juni 2011 Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Jan Bisgaard Responsibility at Envision Energy : - Verification (did we build the thing right) - DK prototype and assembly sites - Supporting Director on business development aspects Age : 39 years Resume : Oct. 2010 - Present Envision Energy (Denmark) - Senior Verification Engineer Feb. 2010 Sep. 2010 Siemens Wind Power - Program Manager for 2,3 MW product platform Jun. 2009 Jan. 2010 Jan Bisgaard Consult - Freelance Wind professional Mar. 2003- May 2009 Vestas Technology R&D - Senior Manager of Vestas Test centers - Project manager (Establishing of R&D test center) - Product Manager V120-4,5MW - Design Engineer (generator design) Mar. 1997- Feb. 2003 FLSMIDTH - Sales engineer - Product development engineer - Project Engineer 2 Hub North meeting 2011-06-14 Public

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Technology pioneer in China in 2009 ranked by Forbes (cover enterprises) Lei Zhang startede Envision Energy op i 2006, og virksomheden tæller i øjeblikket lige under 300 medarbejdere globalt. Over 100 af disse arbejder med forskning og udvikling. Hovedkvarteret og produktion er placeret i byen Jiangyin nordøst for Shanghai. Vores mission er at være konkurrencedygtig på offshore vind og samtidig tilbyde et pålideligt produkt. Derfor arbejder vi med, at møllen skal have så få komponenter som muligt. Jo færre dele, jo mindre kan gå galt. Det er en af vores grundantagelser for, hvordan vi skaber et pålideligt produkt, der er let at servicere. Derudover arbejder vi med et koncept, hvor vi køber mange af vores komponenter fra leverandører i et globalt integreret leverandørnetværk Hub North meeting 2011-06-14 Public 4

Global smart company in the wind power industry Wind Business North America Chicago USA Global Innovation Center Silkborg,Denmark Global RD and Engineering Service Center Jiangyin China Global Operation Center Shanghai China America International market developing, integrating and operating wind assets Denmark Cut-edge technology development Partial Pitch scalable rotor technology E128-3.6MW Offshore turbine development Integration of European RD utilities China Global manufacturing center supported by international supply chain, engineering and service center Global RD center backed by platforms of core control, load optimization, aerodynamic etc. Hub North meeting 2011-06-14 Public 5

Envision Engineering Center -- Jiangyin Hub North meeting 2011-06-14 Public 6

Envision Engineering Center -- Jiangyin Hub North meeting 2011-06-14 Public 7

Envision Operation Center -- Shanghai Hub North meeting 2011-06-14 Public 8

Envision Manufacturing Workshop -- Jiangyin Hub North meeting 2011-06-14 Public 9

Envision Energy, Silkeborg, Denmark Global Innovation Centre Established in 2008 Strategy and Management ready in 2010 At present the office employs 27 highly experienced Engineers > 15 years of average experience from wind with knowledge within Wind Turbine Development and Business. Hub North meeting 2011-06-14 Public 10

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Envision Global Partners World class supplier chain Certification body Financial Institution Envision to be Leading wind turbine manufacture with partnership of global active players Leading customers of wind market 12

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Envision Energy - Product and IP Roadmap New Product New feature E128-3.6MW E115-2.0MW (60Hz) E103-2.3MW (60Hz) E100-2.5MW (60Hz) Offshore direct drive, modularized blade design and partial pitch tech Innovative drive train with best cost effective 20+ IP to register in the US and EU E115-2.0MW (50Hz) E103-2.3MW (50Hz) E100-2.5MW (50Hz) Envision Converter and Pitch system developed Advanced control system for largediameter rotor E87-1.5MW 60hz products Low voltage ride through Wind farm management system E82-1.5MW Intertidal turbine Typhoon resistant turbine Low wind speed algorithm E77-1.5MW E70-1.5MW 50 Hz products 65m, 70m, 80m hub height configurations E128-3.6MW Presentation May 25, 2011 Confidential

Ultimo 2010 500MW installed. 甘 肃 向 阳 (50 MW) 辽 宁 康 平 (100 MW) 江 苏 潮 间 带 (3MW) 安 徽 来 安 (150MW) 河 北 滴 水 壶 (50 MW) 江 苏 启 东 (50 MW) 海 南 峨 蔓 (50 MW) 福 建 东 山 (50 MW) E128-3,6MW Presentation 2011-05-26 Confidential 15

Hub North meeting 2011-06-14 Public 16

Hub North meeting 2011-06-14 Public 17

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Global Innovation Centre 27 employees average 15 years from wind industry. Hub North meeting 2011-06-14 Public 19

Current activities in DK Hub North meeting 2011-06-14 Public 20

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark

Product Conceptual Design The Conceptual Design is a Horizontal, Two Bladed, Direct Drive [DD] WTG with a Permanent Magnet Generator [PMG]. Design objectives: 1) Scalable rotor for different wind regimes 2) Extreme load reduction 3) Modular architecture 4) Optimized for offshore installation 5) Minimize need for inhouse manufacturing capacity Hub North meeting 2011-06-14 Public 22

Envision 1XX-3.6MW Product Family (Scalable Rotor) 132 E1XX-3.6MW Product Family 130 128 128 126 Rotor diameter 124 122 120 118 116 114 Based on site assessment Envision scale the rotor diameter and optimize customer return of investment using standard products 0 5 6 7 8 9 10 11 Wind Speed m/s Hub North meeting 2011-06-14 Public 23

Rated Power [kw] Power Curves & Wind Regimes 3.800 3.600 3.400 3.200 3.000 2.800 2.600 2.400 2.200 2.000 1.800 1.600 1.400 1.200 1.000 800 600 400 200 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Wind Speed [m/s] E128-3.6MW E122-3.6MW E115-3.6MW The E128-3.6MW Product Family: The E1XX-3.6MW platform has an adaptable rotor design with the design objective to cover several wind regimes with only a very few changes in the design. Only the structural part blade extender will be modified across the product line, all other systems and structures will be standard configurations. Hub North meeting 2011-06-14 Public 24

Agenda: 1. Presenting (Jan Bisgaard) 2. Company profile 3. Strategies 4. Product road map and track record 5. Global Innovation Center GIC 6. GC-1 offshore turbine 7. Q & A Jan Bisgaard Envision Global Innovation Centre Silkeborg, Denmark