BUILDING PROFESSIONAL CONSTRUCTION INDEMNITY INSURANCE GUIDELINES. Australian Procurement and Construction Council Inc



Similar documents
PROFESSIONAL INDEMNITY ENGINEERS & ARCHITECTS PROPOSAL FORM

JUA Underwriting Agency Pty Ltd

Proposal Form. Construction Industry Consultants Professional Indemnity

Allianz Professional Indemnity Insurance Construction Projects

PROFESSIONAL INDEMNITY INSURANCE SCHEME (AGGREGATED & POOLED LIMIT) FOR SMALL AND MEDIUM SIZE CONSULTANTS

Retroactive Date. Subrogation. Privacy. Additional Notes

Schedule 12 - Insurances

MARKETFORM : SYNDICATE 2468 PROPOSAL FORM FOR DESIGN CONSULTANTS PROFESSIONAL INDEMNITY INSURANCE

Hole In One Policy Wording

Professional Indemnity Insurance Proposal Form for Engineers and Construction Professionals

Complete Professional Indemnity

Client Skills: Skills required by Government as the Construction Industry Client

Managing Contracting Risk

Design and Construct. Professional Indemnity Insurance proposal form

How To Insure A Project In The Uk

H. The Contractor shall not begin work under the contract until the required insurance has been obtained and approved by the Contracting Agency.

Risk Management Policy and Framework

QUEST - QBE COMPREHENSIVE MOTOR INSURANCE MASTER POLICY

Carriers Cargo Liability Insurance. Policy Wording

A&E A&E. ProSurance TM. Application Form INSURANCE FOR ARCHITECTS & ENGINEERS

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Submission to WorkCover Western Australia. Legislative Review 2013

Public & Products Liability Proposal

SCHEDULE 9: INSURANCE REQUIREMENTS

How To Insure A Consultant For A Construction Project

PROFESSIONAL INDEMNITY, PUBLIC LIABILITY & CONTINGENT EMPLOYER S LIABILITY INSURANCE

Engineers, Architects, Surveyors and Relation Professions

Marine Professional Negligence Insurance

PROFESSIONAL INDEMNITY/EMPLOYERS AND PUBLIC LIABILITY INSURANCE

Required Insurance Language for PRF Construction Contracts

Professional Indemnity Select

Professional Indemnity Select

ASDEFCON INSURANCE HANDBOOK V2.0

MISCELLANEOUS PROFESSIONAL INDEMNITY INSURANCE (Costs Inclusive) Defence Costs Underwriters agree to pay all Defence Costs as defined below.

QBE PROFESSIONAL INDEMNITY CONSTRUCTION CONSULTANTS PROPOSAL FORM

LiabiLity insurance. Policy Summary

PUBLIC AND PRODUCTS LIABILITY INSURANCE SCHEDULE TO THE POLICY

PRODUCT LIABILITY INSURANCE (Richard Oliver Version)

Architects and Engineers Professional Liability Proposal Form

Insurance requirements for acquisition and service contracts

PROFESSIONAL INDEMNITY FOR ARCHITECTS AND CONSULTING ENGINEERS. Policy Summary

Professional Indemnity Insurance Proposal Form For The Design and Consulting Departments of Contractors

Guideline on professional indemnity insurance for psychologists

SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION Definitions CONSTRUCTION-RELATED INSURANCE REQUIREMENTS...

ARCHITECTS AND ENGINEERS PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

EXHIBIT B CITY OF PHILADELPHIA AND PHILADELPHIA HOUSING DEVELOPMENT CORPORATION INSURANCE REQUIREMENTS

Proposal Form. Architects Professional Indemnity

Asbestos removal and licensing

Engineers Professional Liability Proposal Form

Charity Professional & Trustees Liability Insurance

Land Surveyors Professional Indemnity Insurance Proposal Form

At minimum, Project Co will be required to ensure the following insurance coverage in relation to the D&C Phase:

Public & Products Liability Proposal Form IMPORTANT NOTES

IMPORTANT INFORMATION REGARDING COMPLETION OF THIS FORM

Home Warranty Insurance Policy Domestic Building work by Builder (Victoria)

Complete Professional Indemnity

MOOMBA TO ADELAIDE PIPELINE SYSTEM PROPOSED ACCESS ARRANGEMENT UNDER THE NATIONAL ACCESS CODE FINAL DECISION SUBMISSION #6 (FDS6) INSURANCE ISSUES

insurance policies can now be easily extended to include the new Section 3 coverage for Professional Indemnity which is a market first

Surveyors Professional Liability Insurance Summary

2 Construction insight Thrive in growth economies: Part 2: Professional indemnity

INSURANCE SOLUTIONS SPECIALTY CONSTRUCTION

Guide to Reviewing Contract Documentation

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

INSURANCE STANDARDS 20 May 2009

QBE Professional Indemnity Proposal Form Construction Consultants

Contractors' Combined Liability Insurance Summary

Commercial Builders Structural Defects Insurance Policy (Victoria)

Architects, Engineers, Surveryors ADDENDUM QUESTIONNAIRE. Please complete, sign and return with all attachments to: Name Position Address Phone

MARINE SURVEYORS PROPOSAL FORM PROFESSIONAL INDEMNITY INSURANCE

PLEASE COMPLETE AND RETURN TO: Sutton Specialist Risks Ltd, 31 Great George Street, Bristol, BS1 5QD APPLICATION FORM

A Guidance Note to. Conditions of Contract for Consultancy Services (2005)

1. MONTANA RAIL LINK AND BNSF RAILWAY COMPANY INSURANCE REQUIREMENTS

The Department of Health, Social Services and Public Safety Bodies who must comply with Northern Ireland Public Procurement Policy are listed below:

Business Interruption Insurance

Samantha Ip Clark Wilson LLP tel D/RJR/

APPENDIX 8 INSURANCE REQUIREMENTS

COAG National Legal Profession Reform Discussion Paper: Professional Indemnity Insurance

PROFESSIONAL INDEMNITY. Policy summary

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

Dotting the i s & Crossing the t s Professional Indemnity Insurance

ATTACHMENT A.6 INSURANCE REQUIREMENTS ROUTINE CONSTRUCTION, MAINTENANCE AND REPAIR PROJECTS

1. Company Information Company Name:... Postal Address:... Post Code:... Website Address:... Address... Other Trading Address:...

HOME WARRANTY Insurance Policy [VICTORIA]

COMMERCIAL GENERAL LIABILITY INSURANCE TERMS AND CONDITIONS 1/2013 Valid from

UIB UK PROFESSIONAL INDEMNITY

GENERAL LIABILITY INSURANCE

Airmic review of the supply chain insurance market Review of recent developments in the supply chain insurance market

SPECIALIST INSURANCE SERVICES

Architects and Engineers Professional Liability Insurance Summary

PUBLIC & PRODUCTS LIABILITY INSURANCE

ARCHITECTS, ENGINEERS, SURVEYORS & CONSTRUCTION INDUSTRIES PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

procuring authority should ensure that they possess adequate professional Over the past 18 months there has been some unease among public sector

The Tradesmen policy is available for self employed persons and small businesses with up to 8 people and a turnover of 500,000 or less.

Engineers, Architects, Surveyors And Relation Professions Professional Indemnity Proposal Form

Building and Engineering Contractors Proposal Form

CONSULTING ENGINEERS PROPOSAL FORM PROFESSIONAL INDEMNITY INSURANCE

ADMIRAL INSURANCE COMPANY 9606 N. Mopac #950 Austin, Texas Phone: Fax: Internet:

South Australian Registered Conveyancers Professional Indemnity Master Contract of Insurance

Welcome To Palestine. Tareq Marea

MEDICAL MALPRACTICE. Policy Summary

The Professionals policy is available for small businesses with up to 8 people and a turnover of 500,000 or less.

Transcription:

Australian Procurement and Construction Council Inc PROFESSIONAL INDEMNITY INSURANCE GUIDELINES IN THE BUILDING AND CONSTRUCTION INDUSTRY BUILDING CONSTRUCTION

Australian Procurement and Construction Council Inc PROFESSIONAL INDEMNITY INSURANCE GUIDELINES IN THE BUILDING AND CONSTRUCTION INDUSTRY Requests for additional copies of this document should be addressed to: Australian Procurement and Construction Council Inc. (APCC) PO Box 106 DEAKIN WEST ACT 2600 Unit 6, 42 Geils Court DEAKIN ACT 2600 Phone: 02 6285 2255 Fax: 02 6282 3787 Email: info@apcc.gov.au Web Site: www.apcc.gov.au ISBN 1 920751 06 8 The work contained within this document is copyright. This document may not be in part or whole, reproduced without prior permission from the Australian Procurement and Construction Council. PROFESSIONAL INDEMNITY INSURANCE GUIDELINES

INTRODUCTION These Guidelines have been prepared by the Australian Procurement and Construction Council (APCC) to assist Australian, State and Territory government agencies to determine the level of Professional Indemnity Insurance (PII) which may be appropriate to the services they require from consultants in the building and construction industry. The availability and affordability of Professional Indemnity Insurance to support project procurement is no longer guaranteed given the condition of insurance markets around the world. Insurance therefore needs to be regarded as a limited resource. These Guidelines are intended to assist Government clients (principals) to identify an appropriate level of insurance to be held by consultants (refer Sections 1 and 2). The Professional Indemnity Insurance Guidelines Are intended to guide government agencies and public organisations involved in the procurement of hospitals, schools, custodial facilities, design services, nonconstruction, project management, etc, however this does not preclude them from being used in the private sector; Relate to Professional Indemnity Insurance only and do not refer to other liability issues; Recognise that for particular activities (e.g. asbestos, toxic mould and terrorism) insurance may not be available and that Government clients may need to accept some of the risk; and Recognise that some special cases may require other arrangements. These guidelines only deal with Professional Indemnity Insurance and have not attempted to address some of the broader issues such as: Principal Controlled Professional Indemnity Insurance, Professional Standards Legislation and Limit of Liability. The guidelines will be reviewed in twelve months. DISCLAIMER These guidelines are subject to the impact of the proposed Professional Standards Legislation to be enacted nationally and may require review in relation to any schemes administered there-under. 1

1. THE LEVEL OF COVER Two approaches are presented to indicate the suggested level of cover: A Simplified Method; and A Risk Assessment Based Method The Simplified Method is considered appropriate for simple, non-construction related consultation and all projects under $1million. More complex projects due to the type of construction, technology or environment in which they are constructed may warrant the use of the Risk Assessment Based Method. 1.1 Simplified Method This method is considered appropriate for projects that agencies consider conventional non-construction consultancies and for all conventional projects, (including all projects up to $1 million) undertaken in the civil engineering and building industries. It is suggested that the amount of Professional Indemnity Insurance (PI Insurance) per event and in the aggregate, to be provided for typical projects by the consultant to the principal should be the greater of $1 million or ten times the fee. 1.2 Risk Assessment Based Method This approach addresses particular risks associated with both the project type and the nature of the professional services being provided. The process suggested is as follows: Use the Project Risk Assessment to identify overall project risk (refer section 1.2.1) Use the Professional Service Risk Assessment to identify service risk (refer section 1.2.2) The methodology outlined in the Australian and New Zealand Standard AS/NZS 4360: 1999 Risk Management, provides guidance on these issues. Using Appendix E of AS4360 as a guide, a risk may be categorised in the following terms: extreme, high, moderate and low. On complex or large projects, it is recommended that the risk assessment be carried out in accordance with the Australian and New Zealand Standard. 2

1. THE LEVEL OF COVER 1.2.1 Project Risk Projects need to be assessed to identify the overall project risk and may be thought of in the following terms. The risk descriptor may vary by project depending on the level of complexity and criticality to the project, e.g. acoustic design 1. See Addendum A for a comprehensive list. Risk Descriptor Definition Examples Extreme (E) Immediate action required Repair of collapsed bridge, pollution clean up, contamination, asbestos removal, oil or gas fire High (H) Senior management Tunnels, marine works, mining, attention needed nuclear reactors, temporary structures, certain design services Moderate (M) Management responsibility Pipelines, regulatory codes & must be specified requirements, road & rail infrastructure, bridges, demolition (M/H), project management, design e.g. hospitals Low (L) Managed by routine Non-construction, conventional procedures structures, training manuals, interior & landscape design, planning studies In carrying out a risk identification and analysis in accordance with the AS/NZ 4360 Risk Management Standard to identify the risk inherent in a project, each risk may be considered and defined in terms of consequences. Each agency will have a different view on the nature of risk associated with projects. Some examples are as follows: Extreme High Moderate Low Site Unstable Significant settlement Minor settlement Innocuous, stable Natural Threatened Very sensitive Managed Innocuous, Environment co-existence unmanaged Technology Experimental Innovative or new Innovative Routine application application Function Essential for life Essential with <12 hr 1 Week interruption Non essential Reliance >100,000 people 20,001 to 100,000 1,000 to 20,000 >1,000 people per day people per day people per day per day 1 Please note for building and construction projects, terms are defined in Appendix E Table E3 in the AS/NZ 4360:1999 3

1. THE LEVEL OF COVER 1.2.2 Service Risk The principal is also exposed to risks associated with the service provided by consultants. It is suggested that an analysis of the service risk be undertaken in a similar manner as for the project risk recognising that services risk may vary amongst agencies. In looking at a particular project, the risk associated with each consulting service may be analysed and the risk profile identified. An example follows: Risk Descriptor Activity Service Type Extreme Fire protection engineers, Water treatment Due Diligence Work High Geotech & Mining engineers, Cost Estimating, Construction Cost Estimating (L/H) (refer footnote) Management Moderate Civil, Structural & Mechanical engineers, Design & documentation, Design, Building surveying (M/H) construction planning, Fabrication Schedule, QA Low Architecture, Planning, Studies, Concept Design, Project management (L/M) Asset Management Footnote: Level of risk to be determined on a case-by-case basis, for example availability of time and information and the cost risk manager. Cost management is a high risk activity and related services are provided by a range of professionals including Quantity Surveyors. Quantity Surveyors provide a low risk methodology to manage cost risks. On major projects it is suggested that a more detailed assessment of the risk in the delivery of the service be made part of the principal s procurement and selection procedure of the consultants. In considering the various issues relating to the service or role to be undertaken by the consultant, a principal might identify the risks as follows: Client Staff Expertise & Resources Consultant s Skills Consultant s Experience Extreme High Moderate Low Consultant s Resources Consultant s Systems Technology Cost Program Building Project Delivery Infrastructure Project Delivery See Addendum A 4

1. THE LEVEL OF COVER Based on this assessment it is suggested that principals form a view as to the risk profile of each service they wish to procure. See Addendum A for examples. 1.3 Amount of Cover Having identified the project and service risk, the use of the tables in Addendum B will determine the amount of PI Insurance cover required for the project, exclusive of legal cost. The tables will indicate an amount in a range of $1 million to $10 million (exclusive of legal cost) with intermediate amounts of $2 million and $5 million in line with industry practice. 5

2. POLICY TERMS A Professional Indemnity Insurance policy is what is called a claims made policy, which means that, generally speaking, it covers claims made or deemed to be made during the currency of the policy. The claims can relate to circumstances or events that occurred during or before the period of currency of the policy. However, some policies may limit the retroactive operation of the policy. A claims made policy is to be contrasted with an event occurrence policy such as a Public Liability policy that covers claims no matter when they are made in respect of events that occur during the currency of the policy. PI Insurance is usually purchased as an annually renewable policy covering the consultant s operations as a whole as distinct from a specific project. The guidelines below on excess, duration, exclusions etc. apply to normal annually renewable policies. Single project PI Insurance is available in limited circumstances and needs to be negotiated individually in all aspects including excess, duration, exclusions etc. 2.1 Excess It is suggested that the maximum excess be stated as the higher of $50,000 or 2% of the consultant's gross fee turnover. There should also be scope for a consultant to negotiate a higher excess where acceptable self-insurance arrangements are in place, for example, appropriate captive insurance arrangements for example, a captive insurance facility that satisfies regulatory and reporting requirements in the relevant jurisdiction. 2.2 Duration of Cover Because PI Insurance is purchased as an Annual Policy, renewal has never been guaranteed. In the past, consultants attempted to qualify any contractual requirement to maintain PI Insurance for more than 12 months by stating they would maintain the PI Insurance for the stated period of time as long as the insurance continues to be available at a reasonable cost. Government clients increasingly reject this qualification. 6

2. POLICY TERMS It is suggested that government contracts nominate a period following completion of the services under the contract as the default period for which consultants contract to maintain the specified level of PI Insurance for any engagement, for as long as that insurance is available to consultants in the market on reasonable terms. These terms are to take account of the future market for insurance including factors such as the cost and availability of insurance for certain services. 2.3 Cover and Exclusions An acceptable PI policy must indemnify the consultant against any liability for breach of professional duty and provide general cover for liability arising out of the conduct of the professional business under the Commonwealth Trade Practices Act and the relevant State or Territory Fair Trading Acts. The scope of the cover should include property damage, economic loss and death or bodily injury arising out of the conduct of professional business. In relation to exclusions, each consultant should be required to declare: Any activities forming part of the engagement that are not covered by the policy e.g. asbestos removal; and Whether there are any and what liabilities are created by the proposed terms of engagement that are excluded or are not covered by the consultant s Professional Indemnity Insurance. These matters are to be set out by the consultant as appropriate and notification given by the consultant to the client. 2.4 Evidence of Insurance Acceptable evidence of Professional Indemnity Insurance is a current certificate of currency presented by the consultant as issued by an underwriter or insurance broker. The certificate should specify: Name of the insured Level of cover in the aggregate Policy number (exclusive of legal cost) Expiry date Policy excess Name of the insurer Summary of the cover provided Jurisdictional and territorial limits 7

3. PRINCIPAL CONTROLLED PROFESSIONAL INDEMNITY INSURANCE Recognising the limit in availability and lack of certainty for principals in relation to the insurance contract terms of the consultants, the principal may wish to consider initiating insurance policies themselves. These policies may cover either all consultants involved in an individual project or those involved in a program of projects. In these models, the principal has control over the determination of the scope, excess, etc of the insurance policy. Such a system may relieve the principal from the requirement to check the currency and policy cover of individual consultants except where a basic level of insurance is provided by the consultant. As public sector principals are believed to have a lower level of events leading to claims on consultants PI policies compared with commercial sector clients, this should be reflected over time in the premium cost for such policies. The lower level of events reflects the other risk management processes that public sector contract principals have in place such as pre-qualification of suppliers and well established contract procedures. The ability to obtain such insurance will vary with the insurance market and be very much dependant on the insurance program structure. It is understood that Principal Controlled Professional Indemnity Insurance for large projects may be currently obtainable and as the demand for such policies gathers momentum, program or program periodic should become available. The APCC proposes to further investigate the viability of Principal Controlled Professional Indemnity Insurance schemes for Governments. 8

Australian Procurement and Construction Council Inc PROFESSIONAL INDEMNITY INSURANCE GUIDELINES IN THE BUILDING AND CONSTRUCTION INDUSTRY ADDENDUM 9

ADDENDUM A Project Risk Assessment Guide Risk Descriptor Definition Examples Extreme (E) Immediate action required Repair of collapsed bridge, pollution clean up, contamination, asbestos removal, oil or gas fire suppression High (H) Senior management Tunnels on unstable sites, marine works, attention needed mining, nuclear reactors, temporary structures, hazardous chemical design services Moderate (M) Management responsibility Pipelines, regulatory codes & must be specified requirements, road & rail infrastructure, bridges, demolition (M/H), project management, design e.g. hospitals, schools, housing, temporary structures Low (L) Managed by routine Non-construction, conventional building procedures structures, training manuals, interior & landscape design, planning studies, maintenance & cleaning contract, asset management, concept design, acoustic design (L/H project dependent) 10

ADDENDUM A Professional Service Risk Assessment Guide for Major projects Extreme High Moderate Low Client Staff None General expertise High level expertise High level of Expertise & and limited resources and limited resources expertise & Resources adequate resources Consultant s Does not usually General skills in Recognised skills in Recognised leader Skills operate in the field the field the field in the field Consultant s None in last Experience in related Relevant experience Recent and current Experience 5 years fields in last 5 years in last 5 years in relevant experience single projects for in multiple projects multiple clients for multiple clients Consultant s Project requires >20% of company s >10% of company s <10% of company s Resources 100% of company s corporate resources & resources & >20% resources & <20% resources >50% local resources local resources local resources Consultant s New systems to Multiple systems to be Existing proven Existing systems Systems be developed to integrated into a new systems to be tailored proven on manage services system to manage to manage services of numerous projects of the type to be services of the type the type to be to manage services provided to be provided provided of the type to be provided Technology Experimental Application of New Innovative Routine Analysis & Design Design & Analysis Application of Known Application of Methods Methods Design & Analysis Known Design & Methods Analysis Methods Cost Lump sum fees Lump sum significantly Time plus expense Time plus expense dramatically under under authority budget basis fees to upper basis fee authority budget limit or Lump sum fees >75% of authority budget Program Delays in Delays in consultant s Delays in consultant s Delays in consultant s service could cost more service cost more consultant s service service could than 20% of project than 5% of project cost less than 5% jeopardise project budget budget of project budget Building Alliance Guaranteed Design & Construct Traditional Delivery Project Maximum Price or Construction Delivery Management Infrastructure Build, Own Design, Construct & Traditional Delivery Construction Project Operate Maintain or Design & Management Delivery & Transfer Construct 11

ADDENDUM B Risk Assessment Based Model Suggested amount of Professional Indemnity Insurance Cover for range of Project Risks and Service Risks: Project Risk Low Project Service Risk Value Low Moderate High Extreme $0-$5m $1m $1m $2m $2m $5-$10m $2m $2m $2m $5m $10-$50m $2m $5m $5m $5m Over $50m $5m $5m $10m $10m Project Risk Moderate Project Service Risk Value Low Moderate High Extreme $0-$5m $1m $2m $2m $5m $5-$10m $2m $2m $5m $5m $10-$50m $5m $5m $5m $10m Over $50m $10m $10m $10m $10m Project Risk High Project Service Risk Value Low Moderate High Extreme $0-$5m $2m $2m $5m $5m $5-$10m $2m $5m $5m $5m $10-$50m $5m $5m $10m $10m Over $50m $10m $10m $10m $10m Project Risk Extreme Project Service Risk Value Low Moderate High Extreme $0-$5m $2m $5m $5m $10m $5-$10m $5m $5m $10m $10m $10-$50m $10m $10m $10m $10m Over $50m $10m $10m $10m $10m The level of cover suggested is based on several factors including: Levels accepted or recommended by some government agencies; Recognising the finite amount of insurance availability and the need to allocate it responsibly; and The balance between the cost of insurance and the required level of insurance for each project. 12