Construction Management at Risk (CMAR)

Similar documents
A&E Briefings. Indemnification Clauses: Uninsurable Contractual Liability. Structuring risk management solutions

Contract Guide Course for Design Professionals: Part II

Claims College School of Construction LEVEL 1

What You Should Know About General Agreements of Indemnity and Why You Should Know It

Bond Form Commentary and Comparison

COMMENTARY. California s New Subcontractor Defense Regime for Non-Residential Projects: Creating Order or Chaos?

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

California Senate Bill 474 Impact on Owners & Contractors

AIA Document A312 - Electronic Format. Performance Bond

If a Client and a Freelancer enter an independent contractor relationship, then this Freelancer Agreement ( Freelancer Agreement ) will apply.

Kentucky Department of Education Version of Document A

INTRODUCING BROKER COMMODITY FUTURES CUSTOMER AGREEMENT WITH E*TRADE SECURITIES LLC

INVESTMENT ADVISORY AGREEMENT

SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)

California Civil Code

CONSULTING SERVICES AGREEMENT

INDEPENDENT CONTRACTOR AGREEMENT INTERPRETATION/TRANSLATION SERVICES

Small business contracts and surety. Risks and opportunities affecting small and large businesses

Flexible Circuits Inc. Purchase Order Standard Terms and Conditions

Client Contracts: Business Risk, Professional Liability & Insurance Coverage

Illinois Official Reports

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF OKLAHOMA ORDER

INDEPENDENT VIRTUAL ASSISTANT AGREEMENT (Company)

Design Development Agreement

Case 8:13-cv EAK-TGW Document 145 Filed 02/12/15 Page 1 of 12 PageID 5551 UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA TAMPA DIVISION

Performance Bond. Business):

Terms and Conditions for Tax Services

The Duty to Defend Your Client

AIA Document A310 TM 2010

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM

AGREEMENT WITH A SELF-EMPLOYED CONTRACTOR FOR CONSULTANCY SERVICES

AIA Document A312 TM 1984

ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS

IN THE NEBRASKA COURT OF APPEALS. MEMORANDUM OPINION AND JUDGMENT ON APPEAL (Memorandum Web Opinion)

TAFT LIBRARY ADDENDUM STANDARD FORM OF AGREEMENT BETWEEN TOWN OF MENDON ( THE TOWN ) AND ( ARCHITECT ) 1.1 Delete space if no additional information.

IN THE APPELLATE COURT OF ILLINOIS FIRST DISTRICT

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment)

PENNSYLVANIA BUILDERS ASSOCIATION INSTRUCTIONS TO HOME IMPROVEMENT MODEL CONTRACT STANDARD FORM Introduction

Terms & Conditions. Introduction. The following terms and conditions govern your use of this website (VirginiaHomeRepair.com).

MAY I HAVE THIS DANCE? TO WRAP OR NOT

CONSTRUCTION AND PURCHASE CONTRACT (Fixed Price - Builder-owned Lot)

North Central Texas College Board of Regents Meeting October 20, Consideration of Approving Fees for Owner s Representative

APPLICATION FOR BUSINESS CREDIT

Terms and Conditions for Purchase Orders for Recycling Materials

CME European Trade Repository Schedule E: Managed Fund Registration

These TERMS AND CONDICTIONS (this Agreement ) are agreed to between InfluencersAtWork,

SAMPLE MODEL LANGUAGE FOR EDWARD JONES TRUST COMPANY FOR THE USE OF LEGAL COUNSEL ONLY

Design-Build Projects Achieving Fair Allocation of Risk between the Contractor and Design Professional. ACEC Risk Management Committee

APPENDIX A that is not acceptable. Arbitration settled by arbitration arbitration shall be held in New Jersey substantive law of New Jersey

388 Blohm Ave. PO Box 388 Aromas CA (831) FAX (831) ADDENDUM NO. 1

Illinois Association of Defense Trial Counsel Springfield, Illinois IDC Quarterly Volume 24, Number 3 (24.3.

CONSULTANT AGREEMENT. THIS CONSULTANT S AGREEMENT (the Agreement ) is effective this day of

How To Write A Contract Between College And Independent Contractor

Tips for Playing The Price is Right on Your Government Contract Claim Breakout Session # F10

HEADNOTE: Kevin Mooney, et ux. v. University System of Maryland, No. 302, Sept. Term, 2007 SECURED TRANSACTIONS SOVEREIGN IMMUNITY

False Claims Laws: What Every Public Contract Manager Needs to Know By Aaron P. Silberman 1

PARTICIPATION AGREEMENT. GlobalDairyTrade operates the Trading Platform known as GlobalDairyTrade to facilitate sales of certain dairy Products.

CSA CONSTRUCTION, INC McAllister Road Houston, Texas SUBCONTRACTOR AGREEMENT

ADHA NBR End User Licensing Agreement

Online Banking Agreement

2015 IL App (5th) U NO IN THE APPELLATE COURT OF ILLINOIS FIFTH DISTRICT

Case 2:15-cv DDP-AGR Document 1 Filed 05/07/15 Page 1 of 15 Page ID #:1 UNITED STATES DISTRICT COURT FOR THE CENTRAL DISTRICT OF CALIFORNIA

Indemnification Clauses, Part 1* Discussion from a/e ProNet's Risk Management and Contract Guide. J. Kent Holland, Jr., Esq.

INDUSTRIAL CARPET CLEANING SERVICES CONTRACT. THIS AGREEMENT executed on this the day of, 20 by and between. (hereinafter "Employer"), and

Sample Arbitration Clauses with Comments

2014 IL App (1st) U. Nos and , Consolidated

Construction Defect Action Reform Act

INDEPENDENT BROKER AGREEMENT October 1, 2011 edition

ASSOCIATION OF AMHERST STUDENTS (AAS) Office of the Treasurer and Budgetary Committee

PROFESSIONAL SERVICES AGREEMENT FOR FINANCIAL ADVISOR

Design/Build... A Good Marriage?

CONSTRUCTION MANAGEMENT

Web Site Hosting Service Agreement

PURCHASE ORDER TERMS AND CONDITIONS

AGREEMENT BETWEEN THE CITY OF CRESTWOOD, MO AND BIEG PLUMBING COMPANY FOR ON-CALL PLUMBING SERVICE FOR THE PERIOD

FOR PROPERTY LOSS AND DAMAGE 1

AIRBUS GROUP BINDING CORPORATE RULES

ALPHA TEST LICENSE AGREEMENT

Anesthesia Providers, Inc. CRNA GENERAL INFORMATION FORM. Name First Name M.I. Last Name. Address Street Address Apt. # City State Zip Code

UNDERSTANDING YOUR CONSTRUCTION CONTRACT [what you don=t know can and will be used against you].

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

NAB CONNECT MERCHANT TRANSACTION REPORTING SERVICE

Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company

Return completed applications to: APAC-Texas, Inc. P.O. Box Beaumont, TX (409) Phone (409) Fax

Document Commentary. AIA Document C , Standard Form Multi-Party Agreement for Integrated Project Delivery

Management Consulting Client and Engagement Intake: Practical Considerations and Tools

TEXTURA AUSTRALASIA PTY LTD ACN ( Textura ) CONSTRUCTION PAYMENT MANAGEMENT SYSTEM TERMS AND CONDITIONS OF USE

WASTE SERVICES & DISPOSAL AGREEMENT. By: By: Name: Name: Title: Title:

CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE

CERTIFICATE OF FORMATION EXAMPLE

Terms of Use/ Disclaimers/ Contract/ Agreement

Below is an overview of the Molex lease process as it applies to Molex Application Tooling equipment.

Website TERMS OF USE AND CONDITIONS

INSURANCE GUIDE CONTRACTS & AGREEMENTS

NPSA GENERAL PROVISIONS

How To Settle A Lawsuit Against The City Of Naperville

Merchant Gateway Services Agreement

MAGUSA LOGISTICS WEBSITE TERMS AND CONDITIONS

BUYING AGENCY AGREEMENT

AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between:

Transcription:

Construction Management at Risk (CMAR) Construction Managers may function as an agent for the owner, with the owner holding separate contracts with design professionals and contractors, or they may be retained as an independent contractor with responsibilities that, in addition to professional services, may also include actual construction, functioning much like a general contractor. The agency role is known as Construction Manager Agency (CMA). In that role, the construction manager does not hold the construction contracts and subcontracts, but instead assists the owner in reviewing the design and construction processes, and even managing the owner s contractors. J. Kent Holland, J.D. ConstructionRisk, LLC Roles and responsibilities of a CMAR A construction manager that accepts responsibility for performing the construction is known as a Construction Manager at Risk (CMAR). The CMAR may look like a general contractor with all the same responsibilities assigned to the typical general contractor through the design-bid-build project delivery method. Unlike a general contractor, however, a CMAR is responsible for providing preconstruction services to the project owner, including, but not limited to, reviewing project feasibility, assisting the owner in determining that the owner s design professional is providing designs that are within the owner s budget and are constructible, and that the schedule is realistic and can be met. Once construction commences, the CMAR is responsible for constructing the project, using the plans and specifications that the owner and its design team (with some review or involvement by the CMAR) have produced. It must be noted that one of the benefits the project owner gets out of using the CMAR delivery method instead of the typical design-bid-build method is that the CMAR and its key subcontractors are generally quite involved in the design phase, reviewing and commenting on designs. Because of the CMAR s early involvement with the design, the construction process may begin earlier well before the design has reached final 100 percent completion. The CMAR may have a Guaranteed Maximum Price (GMP) construction contract directly with the project owner, and will subcontract to various trades subcontractors, just as would a general contractor. 1

The CMAR might have professional liability exposure for providing professional services that fail to meet the standard of care applicable to a CMAR providing such services. Impact of CMAR design phase responsibilities on future construction phase claims When it comes to determining legal responsibilities and liabilities of a CMAR, case precedent from general contractor lawsuits may be applicable depending upon the nature of the issues involved. One issue courts must consider when a case involving a CMAR is litigated is whether the CMAR s design phase services caused the case outcome to be different than if the CMAR was just a general contractor and did not also have all the roles and responsibilities that were assigned to it as a construction manager. Interesting legal issues may arise when the CMAR s duties include providing a design review for the owner. The CMAR might have professional liability exposure for providing professional services that fail to meet the standard of care applicable to a CMAR providing such services. A second issue is what, if any, impact does the CMAR s design phase services have upon its ability to assert claims against the project owner based on defective plans and specifications during construction phase services. Can the CMAR claim reasonable reliance on the owner s plans and specifications making an implied warranty of specifications (Spearin doctrine) claim? To what extent may a CMAR rely upon the partial designs or bridging design documents provided by the project owner? Does a project owner avoid or limit the implied warranty of design by using the CMAR method of contracting instead of the traditional design-bid-build method? These important questions were addressed favorably for a CMAR in the case of Coghlin Electrical Contractors, Inc. v. Gilbane Building Company, (SJC-11778, Massachusetts 2015). The court concluded that (1) a public owner of a CMAR project gives an implied warranty regarding the designer's plans and specifications that the owner provides to the CMAR, but the scope of liability arising from that implied warranty is more limited than in a design-bid-build project; (2) the CMAR contract in this case did not disclaim the implied warranty; and (3) the indemnification provision in the contract did not prohibit the CMAR from filing a third-party complaint against the owner, seeking reimbursement under the implied warranty for damages claimed by the subcontractor, arising from the insufficiency of, or defects in, the design. Case background A public owner in the state of Massachusetts was developing a project to build a psychiatric hospital. It entered into a contract with a designer to prepare the project's designs. When the designs were partially completed, the owner entered into a contract with Gilbane Building Company (Gilbane) as the CMAR. Gilbane in turn entered into a subcontract with Coghlin Electrical Contractors, Inc. (Coghlin) to perform electrical work. Just prior to project completion, the electrical subcontractor submitted a request for equitable adjustment to Gilbane for an adjustment of the contract price. Subsequently, the subcontractor filed suit against Gilbane alleging entitlement to additional costs due in part to design errors. Gilbane then filed a third-party complaint against the owner asserting that, in the event Coghlin proves its claims against Gilbane, Gilbane is entitled to 2

recover from the owner due to the owner s breach of its contract in failing to pay amounts claimed by Coghlin. The subcontractor's factual allegations of design defects and changes included assertions that the design defects were that the ceilings in the project were designed to leave two feet of space between the ceilings and the bottom of the structural steel, but "[w]hen project work began, it was revealed that the design required approximately five feet of mechanical and electrical work to be placed in the ceiling area." After six weeks of attempting to resolve the discrepancy, Coghlin was directed to place the electrical work as high as possible in the ceiling, and was told that the designer and Gilbane would address the issue later. The appellate court stated that in his decision, the trial judge acknowledged that traditionally, where a party provides a contractor with a set of plans and specifications for construction to follow, there is an implied warranty that those plans and specifications are adequate and sufficient. The judge concluded, however, that the implied warranty of the owner applies only where the construction project uses the traditional design-bidbuild construction method, in which the owner retains a designer to design the project, construction bids are submitted based on that design, and the general contractor who wins the contract is expected to build the project in accordance with the plans and specifications of the design. The trial judge determined that this implied warranty does not apply where, as here, the construction project uses the CMAR method, given the "material changes in the roles and responsibilities voluntarily undertaken by the parties" to such contracts. Making matters challenging for Gilbane, the judge determined that the indemnification provision in the prime contract required Gilbane to indemnify, defend and hold harmless the owner from all claims, damages, losses and expenses "arising out of or resulting from the performance of the Work," imposed liability on Gilbane for any damages it might win in its third-party claims against the owner. As explained by the Supreme Court, The judge concluded that, because Gilbane effectively is suing itself in its third-party complaint, Gilbane's third-party claims create an impermissible circuity of obligation. CMAR defined by statute The Massachusetts code (G. L. c. 149A, 2) defines CMAR as follows: "A construction method wherein a CMAR firm provides a range of preconstruction services and construction management services which may include cost estimation and consultation regarding the design of the building project, the preparation and coordination of bid packages, scheduling, cost control, and value engineering, acting as the general contractor during the construction, detailing the trade contractor scope of work, holding the trade contracts and other subcontracts, prequalifying and evaluating trade contractors and subcontractors, and providing management and construction services, all at a [GMP], which shall represent the maximum amount to be paid by the public agency for the building project, including the cost of the work, the general conditions and the fee payable to the construction management at risk firm." 3

Court s description of construction project delivery methods The Supreme Court began its review of the case with an explanation of the procurement code of Massachusetts and the different forms of contracting authorized by the code. The court noted that the code specifically authorizes the CMAR method of contracting, and that in CMAR the owner may contract with the CMAR before the design has been completed. The court then quoted from several learned treatises explaining that by contracting during the design phase, the owner may "involve the [CMAR] in project planning and... benefit from the [CMAR's] expertise" and that the CMAR "provides preconstruction services tailored to introduce construction expertise into the design phase." Citing See G. L. c. 149A, 2; id. at 7, the court also noted, The CMAR provides its services in exchange for a guaranteed maximum price (GMP), representing the maximum amount that the owner will pay. Implied warranty of specifications on a traditional design-bid-build project The court began its analysis by first reiterating that where one party furnishes plans and specifications for a contractor to follow in a construction job, and the contractor in good faith relies thereon, the party furnishing such plans impliedly warrants their sufficiency for the purpose intended. United States v. Spearin, 248 U.S. 132, 136 (1918). The court quoted Bruner & O Connor, This implied warranty between the owner and the contractor is a representation that the design is defect-free, and the contractor need only show that the defect exists and that he suffered damages as a result thereof in order to recover. Quoting from Spearin, the court further explained that in design-bid-build projects, the implied warranty of the owner "is not overcome by the usual clauses requiring builders to visit the site, to check the plans, and to inform themselves of the requirements of the work." Rather, the question is to what extent is reliance in good faith. The court states, The implied warranty in the traditional project delivery method does not absolve a contractor of all liability related to design; where the contractor does not rely in good faith on the designer's plans and specifications, the contractor is responsible for the increased costs arising from design defects. Consequently, concluded the court, where a contractor encounters an "obvious omission, inconsistency, or discrepancy [in the design], he should take steps, by way of his own investigation, or by putting questions to the owner (or owner's representatives), to bridge gaps in the documents." Implied warranty of specifications on a CMAR project Unlike design-bid-build projects where the designer designs and the contractor builds, the CMAR may provide consultation regarding the design of the project and may influence the project's final plans and specifications. Additionally, the CMAR agrees to a GMP and has the opportunity when negotiating the contract to consider 4

the risk of incurring additional costs. Despite the significant differences in the relationship, the court stated, we are not persuaded that the relationships are so different that no implied warranty of the designer's plans and specifications should apply in construction management at risk contracts made and that the CMAR should bear all the additional costs caused by design defects. The court further stated: The CMAR may consult regarding the design of the project, but the owner, through the designer, ultimately controls the design and is the final arbiter of it; unless the contract states otherwise, the owner is generally under no obligation to accept the CMAR's suggestions regarding the plans and specifications. The implied warranty derives in part from the basic principle that responsibility for a defect rests on the party to the construction contract who essentially controls and represents that it possesses skill in that phase of the overall construction process that substantially caused the defect. Although the CMAR may be more likely to bear some responsibility for a design defect than a general contractor in a design-bid-build project, we adhere to this basic principle by applying the implied warranty to public construction management at risk contracts, where the owner maintains control of the design by contracting a separate designer and may be able to transfer liability to the designer responsible for the defect. The possibility that the CMAR may consult regarding the building design does not suggest that the CMAR should be the guarantor against all design defects, even those that a reasonable CMAR would not have been able to detect. Even where a CMAR is given substantial consultative responsibilities regarding the design, the owner remains free to reject the CMAR's advice and suggestions. [W]e understand that the legislative intent in providing the construction management at risk alternative was to permit the CMAR a greater consultative role regarding the project's design, not to eliminate the owner's responsibility for design defects. Scope of the implied warranty may be affected by CMAR method According to the court, the differences between the responsibilities of a general contractor in a design-bid-build project and those of a CMAR affect the scope of the implied warranty. The CMAR may benefit from the implied warranty only where it has acted in good faith reliance on the design and acted reasonably in light of the CMAR's own design responsibilities. Whether the CMAR s reliance was reasonable may be impacted by the level of participation in the design phase of the project and the extent to which the contract delegates design responsibility to the CMAR. As concluded by the court, The greater the CMAR's design responsibilities in the contract, the greater the CMAR's burden will be to show, when it seeks to establish the owner's liability under the implied warranty, that its reliance on the defective design was both reasonable and in good faith. Therefore, the CMAR may recover damages caused by the breach of the implied warranty, but only if it satisfies its burden of proving that its reliance on the defective plans and specifications was reasonable and in good faith. 5

No express contractual disclaimers of implied warranty The next question for the court to decide was whether the language of the contract expressly disclaimed the contractor s right to rely on design specifications provided by the owner. It is a fundamental principle of law that only express and specific disclaimers suffice to overcome the implied warranty that accompanies design specifications. The contract delegated extensive responsibilities to Gilbane to "carefully study" and "carefully compare" all designrelated documents; "take field measurements and verify field conditions," compare them to the designs, and "report to the Designer any questions, errors, inconsistencies, or omissions." The contract also stated that Gilbane must "review" the designs "on a continuous basis" with a group of architects or engineers in order to "discover inconsistencies, errors and omissions," and "review the design documents for clarity, consistency, constructability, maintainability/operability and coordination among the trades." In addition, the contract stated that Gilbane must attend project meetings with the owner and the designer and "consult with [Owner] and the designer concerning planning for construction of the Project." The Supreme Court concluded that none of those provisions constituted an express disclaimer of the implied warranty of the designer's plans and specifications in the contract between the owner and Gilbane. Although Gilbane undertakes significant design-related obligations, there is no express abrogation of the implied warranty." The contract instead stated that the "recommendations and advice of [Gilbane] concerning design modifications and alternatives shall be subject to the review and approval of [Project Owner]," and, the Designer "shall decide all questions which may arise as to the interpretation of the [designs] and as to the fulfillment of this Contract on the part of [Gilbane]." As stated by the court, Such provisions show that the Designer and [Owner] maintain authority and control over the project's design. In addition, the court quoted from the contract, which stated Gilbane would recommend alternative design-related solutions, without assuming the Designer's responsibility for design. According to the court, the plain language of the contract supports, rather than disclaims, the implied warranty. Here, said the court: Gilbane has undertaken extensive design review and consultation obligations while the Designer remains responsible for producing the designs. If Gilbane is found liable for additional costs to Coghlin, Gilbane may be able to recover, but only to the extent that the additional costs were caused by Gilbane's reasonable and good faith reliance on the defective plans and specifications that resulted in a breach of the owner's implied warranty, despite Gilbane's own contractual design responsibilities. 6

About the author: Kent Holland is a construction lawyer located in Tysons Corner, VA, with a national practice representing design professionals, contractors and project owners. He is principal of ConstructionRisk, LLC, providing insurance risk management services and construction risk management services, including but not limited to advice to insurance underwriters; guidance to those procuring insurance; change order and claim preparation, analysis and defense; contract preparation; contract review and contract negotiation. Mr. Holland is publisher of ConstructionRisk.com Report and can be reachedat Kent@ConstructionRisk.com or at (703) 623-1932. Conclusion This important decision clarifies that the historic rule of law concerning an owner s implied warranty of the design specifications to contractors will apply to CMARs just as it does to general contractors, and that the only real difference is the fact-specific question of how much reliance by the CMAR is reasonable under the circumstances. ConstructionRisk, LLC is not a subsidiary or affiliate of Zurich and use of their products and services is independent of, and not included within, Zurich s product or service. Zurich expressly disclaims any and all damages and other costs that may arise related to the use of or reliance upon the products, services, representations or warranties made by, or on behalf of, ConstructionRisk, LLC. 7

Zurich 1400 American Lane, Schaumburg, Illinois 60196-1056 800 382 2150 www.zurichna.com Any and all information contained herein is not intended to constitute legal advice and accordingly, you should consult with your own attorneys when developing programs and policies. We do not guarantee the accuracy of this information or any results and further assume no liability in connection with this publication and sample policies and procedures, including any information, methods or safety suggestions contained herein. The information in this publication was compiled from sources believed to be reliable for informational purposes only. All sample policies and procedures herein should serve as a guideline, which you can use to create your own policies and procedures. We trust that you will customize these samples to reflect your own operations and believe that these samples may serve as a helpful platform for this endeavor. Any and all information contained herein is not intended to constitute advice (particularly not legal advice). Accordingly, persons requiring advice should consult independent advisors when developing programs and policies. We do not guarantee the accuracy of this information or any results and further assume no liability in connection with this publication and sample policies and procedures, including any information, methods or safety suggestions contained herein. We undertake no obligation to publically update or revise any of this information, whether to reflect new information, future developments, events or circumstances or otherwise. Moreover, Zurich reminds you that this cannot be assumed to contain every acceptable safety and compliance procedure or that additional procedures might not be appropriate under the circumstances. The subject matter of this publication is not tied to any specific insurance product nor will adopting these policies and procedures ensure coverage under any insurance policy. This Bulletin is provided for informational purposes only. Please consult with qualified legal counsel to address your particular circumstances and needs. Zurich is not providing legal advice and assumes no liability concerning the information set forth above. This is sent to you by Zurich North America Commercial Construction, a unit of Zurich in North America, located at 1400 American Lane, Schaumburg, IL 60196. If you do not wish to receive future copies of C&DR Briefings from us, we will delete your email address from our email distribution list within 10 days of receiving notification from you. For removal, please send a reply to construction@zurichna.com with your request for deletion. We will honor your request. 2016 Zurich American Insurance Company A1-112007910-A (07/16) 11200910