Project management and scheduling

Similar documents
Operations research and dynamic project scheduling: When research meets practice

Project Scheduling to Maximize Fuzzy Net Present Value

Abstract Title: Planned Preemption for Flexible Resource Constrained Project Scheduling

Project Management with Dynamic Scheduling

RESCON: Educational Project Scheduling Software

Multi-Mode Resource Constrained Multi-Project Scheduling and Resource Portfolio Problem

An Optimal Project Scheduling Model with Lump-Sum Payment

Mario Vanhoucke. Project Management. with Dynamic Scheduling. Baseline Scheduling, Risk Analysis. and Project Control. Second Edition.

Supply planning for two-level assembly systems with stochastic component delivery times: trade-off between holding cost and service level

SCHEDULING RESOURCE CONSTRAINED PROJECT PORTFOLIOS WITH THE PRINCIPLES OF THE THEORY OF CONSTRAINTS 1

A Robustness Simulation Method of Project Schedule based on the Monte Carlo Method

HYBRID GENETIC ALGORITHM PARAMETER EFFECTS FOR OPTIMIZATION OF CONSTRUCTION RESOURCE ALLOCATION PROBLEM. Jin-Lee KIM 1, M. ASCE

A Hybrid Heuristic Rule for Constrained Resource Allocation in PERT Type Networks

Project management: a simulation-based optimization method for dynamic time-cost tradeoff decisions

Research Article Scheduling IT Staff at a Bank: A Mathematical Programming Approach

Resource Dedication Problem in a Multi-Project Environment*

CLIENT-CONTRACTOR BARGAINING ON NET PRESENT VALUE IN PROJECT SCHEDULING WITH LIMITED RESOURCES

Planning and Scheduling in Manufacturing and Services

Special Session on Integrating Constraint Programming and Operations Research ISAIM 2016

RESOURCE ALLOCATION AND PLANNING FOR PROGRAM MANAGEMENT. Kabeh Vaziri Linda K. Nozick Mark A. Turnquist

Resource Constrained Project Scheduling under Uncertainty: A Survey

Intelligent Search Heuristics for Cost Based Scheduling. Murphy Choy Michelle Cheong. Abstract

Management of Software Projects with GAs

TECHNISCHE UNIVERSITÄT DRESDEN Fakultät Wirtschaftswissenschaften

Resource allocation in IT projects: using schedule optimization

A Genetic Algorithm Approach for Solving a Flexible Job Shop Scheduling Problem

The Project Scheduling and Decision Mechanism Based on the Multi-Resource Leveling

STUDY OF PROJECT SCHEDULING AND RESOURCE ALLOCATION USING ANT COLONY OPTIMIZATION 1

A Multi-level Approach to Project Management under Uncertainty

THREE STEP PROCEDURE FOR A MULTIPLE CRITERIA PROBLEM OF PROJECT PORTFOLIO SCHEDULING

Summary of specified general model for CHP system

Operating room planning and scheduling: A literature review DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT (KBI)

Robust Preemptive Resource Assignment for Multiple Software Projects Using Parameter Design

Integrated maintenance scheduling for semiconductor manufacturing

OPTIMIZED STAFF SCHEDULING AT SWISSPORT

Decision Support and Optimization in Shutdown and Turnaround Scheduling

MULTI-PROJECT SCHEDULING WITH 2-STAGE DECOMPOSITION 1

RESOURCE ALLOCATION USING METAHEURISTIC SEARCH

The Multi-Item Capacitated Lot-Sizing Problem With Safety Stocks In Closed-Loop Supply Chain

Quantitative approaches to the management of human resources in IT projects

A multilevel integrative approach to hospital case mix and capacity planning DEPARTMENT OF DECISION SCIENCES AND INFORMATION MANAGEMENT (KBI)

A Multi-objective Scheduling Model for Solving the Resource-constrained Project Scheduling and Resource Leveling Problems. Jia Hu 1 and Ian Flood 2

Modeling and Optimizing the Evacuation of Hospitals based on the RCPSP with Resource Transfers

An integrated survey of deterministic project scheduling

Maintenance Scheduling of Fighter Aircraft Fleet with Multi-Objective Simulation-Optimization

The Problem of Scheduling Technicians and Interventions in a Telecommunications Company

Optimal Allocation of renewable Energy Parks: A Two Stage Optimization Model. Mohammad Atef, Carmen Gervet German University in Cairo, EGYPT

npsolver A SAT Based Solver for Optimization Problems

A genetic algorithm for resource allocation in construction projects

PROJECT MANAGEMENT USING DYNAMIC SCHEDULING: BASELINE SCHEDULING, RISK ANALYSIS & PROJECT CONTROL By Mario Vanhoucke

Strategic planning in LTL logistics increasing the capacity utilization of trucks

GRASP APPROACH TO RCPSP WITH MIN- MAX ROBUSTNESS OBJECTIVE

Optimization applications in finance, securities, banking and insurance

A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects

MIP-Based Approaches for Solving Scheduling Problems with Batch Processing Machines

Programme doctoral en recherche opérationnelle

INTEGER PROGRAMMING. Integer Programming. Prototype example. BIP model. BIP models

On The Multi-Mode, Multi-Skill Resource Constrained Project Scheduling Problem A Software Application

A Study of Crossover Operators for Genetic Algorithm and Proposal of a New Crossover Operator to Solve Open Shop Scheduling Problem

High-Mix Low-Volume Flow Shop Manufacturing System Scheduling

A BASIC EVOLUTIONARY ALGORITHM FOR THE PROJECT STAFFING PROBLEM

Agenda. Real System, Transactional IT, Analytic IT. What s the Supply Chain. Levels of Decision Making. Supply Chain Optimization

A Hybrid Tabu Search Method for Assembly Line Balancing

Software Project Planning and Resource Allocation Using Ant Colony Optimization with Uncertainty Handling

Management and optimization of multiple supply chains

A Genetic Algorithm for Resource-Constrained Scheduling

The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem

A GENETIC ALGORITHM FOR RESOURCE LEVELING OF CONSTRUCTION PROJECTS

The Psychology of Simulation Model and Metamodeling

A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

Joint Location-Two-Echelon-Inventory Supply chain Model with Stochastic Demand

High-performance local search for planning maintenance of EDF nuclear park

OPTIMIZATION MODEL OF EXTERNAL RESOURCE ALLOCATION FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS

STOCHASTIC SERVICE NETWORK DESIGN: THE IMPORTANCE OF TAKING UNCERTAINTY INTO ACCOUNT

Projects - Neural and Evolutionary Computing

Development of Resource-Driven Scheduling Model for Mass Housing Construction Projects

PROJECT-ORIENTED APPROACH TO PRODUCTION PLANNING AND SCHEDULING IN MAKE-TO-ORDER MANUFACTURING

A Beam Search Heuristic for Multi-Mode Single Resource Constrained Project Scheduling

An Integer Programming Model for the School Timetabling Problem

Scheduling Jobs and Preventive Maintenance Activities on Parallel Machines

Workforce Planning and Scheduling for the HP IT Services Business

Planning and Scheduling in the Digital Factory

A Service Revenue-oriented Task Scheduling Model of Cloud Computing

On a Railway Maintenance Scheduling Problem with Customer Costs and Multi-Depots

Branch-and-Price Approach to the Vehicle Routing Problem with Time Windows

WITH the growing economy, the increasing amount of disposed

1 Publication in International journal

Resource Allocation in Construction Scheduling based on Multi- Agent Negotiation

Editorial Mathematical Modeling Research in Fashion and Textiles Supply Chains and Operational Control Systems

Solving the chemotherapy outpatient scheduling problem with constraint programming

Chapter 11 Monte Carlo Simulation

University of British Columbia Co director s(s ) name(s) : John Nelson Student s name

COLLEGE OF ENGINEERING

MSCA Introduction to Statistical Concepts

The Master s Degree with Thesis Course Descriptions in Industrial Engineering

Overview of Industrial Batch Process Scheduling

Information Visualization in Project Management and Scheduling

A Study of Local Optima in the Biobjective Travelling Salesman Problem

Distributionally robust workforce scheduling in call centers with uncertain arrival rates

Transcription:

Flex Serv Manuf J (2013) 25:1 5 DOI 10.1007/s10696-012-9168-x EDITORIAL Project management and scheduling Erik Demeulemeester Rainer Kolisch Ahti Salo Published online: 2 November 2012 Ó Springer Science+Business Media New York 2012 Project management and scheduling are major issues for every company or organization facing rapid changes in its environment. Furthermore, project scheduling techniques have become indispensable for the attainment of effectiveness and efficiency of processes. This special issue collects 11 carefully selected papers which deal with optimization or decision analysis problems in the field of project management and scheduling. It covers a considerable range of topics, including solution methods for classical project scheduling problems (Bianco and Caramia, Koné et al., Lim et al., Van Peteghem and Vanhoucke), mixed-integer programming (MIP) formulations in order to solve scheduling problems with commercial MIP-solvers (Bianco and Caramia, Koné et al.), models and solution algorithms for multi-project scheduling (Beşikci et al.), extensions of the classical resource-constrained project scheduling problem (Hartmann), models and solution approaches integrating decisions at different managerial levels such as selection and scheduling, or scheduling and control (Gutjahr and Froeschl, Hazir and Schmidt), risk in project management and scheduling (Tian and Demeulemeester, Artigues et al., Hazir and Schmidt, Gutjahr and Froeschl), and the assignment of resources to different stakeholders (Fink and Homberger, Beşikci et al.). The operations research techniques employed include common approaches such as metaheuristics (Lim et al., Fink and Homberger, Van Peteghem and Vanhoucke, Beşikci et al., Gutjahr E. Demeulemeester Research Center for Operations Management, KU Leuven, Leuven, Belgium e-mail: erik.demeulemeester@kuleuven.be R. Kolisch (&) TUM School of Management, Technische Universität München, Munich, Germany e-mail: rainer.kolisch@wi.tum.de A. Salo Department of Mathematics and Systems Analysis, Aalto University, Helsinki, Finland e-mail: ahti.salo@aalto.fi

2 E. Demeulemeester et al. and Froeschl) and mixed-integer programming (Bianco and Caramia, Koné et al.), but also specific approaches such as scenario-relaxation algorithms (Artigues et al.), a Lagrangian-based algorithm (Beşikci et al.), and a Frank-Wolfe type algorithm (Gutjahr and Froeschl). This special issue thus covers a broad range of models, algorithms and applications. It demonstrates that 55 years after the invention of CPM and PERT, the field is more innovative and lively than ever. We encourage the readers to seek inspiration from this unique collection of papers and to continue work in this area, for instance by applying these results in different application areas, by extending these models further, or by developing even better algorithms for solving them efficiently. In what follows, we give a brief summary of the papers. 1 A new formulation for the project scheduling problem under limited resources Bianco and Caramia propose a new mathematical model for the resourceconstrained project scheduling problem to be solved by off-the-shelf commercial MIP solvers. The model employs three types of variables, two binary variables associated with the start time and the finish time of an activity, respectively, as well as a continuous variable associated with the amount of an activity in progress at a given time. 2 Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources Koné, Artigues, Lopez and Mongeau extend three different mixed-integer programming models for the resource-constrained project scheduling problem to the more general case with cumulative resources. The models make it possible to apply standard off-the-shelf MIP-solvers. Computational results show the strength and weaknesses of the three models. 3 New meta-heuristics for the resource-constrained project scheduling problem Lim, Ma, Rodrigues, Tan and Xiao develop two new metaheuristics for the resource-constrained project scheduling problem. The first of these builds on a simulated annealing framework which employs different neighborhoods as well as a forward backward improvement scheme. The second builds on a genetic algorithm framework using two gene pools as well as the neighborhoods introduced for the simulated annealing framework. Experimental results show that both metaheuristics perform competitively and that the genetic algorithm is one of the best performing metaheuristics for the resource-constrained project scheduling problem.

Project management and scheduling 3 4 Project scheduling with resource capacities and requests varying with time: a case study Hartmann presents an extension of the resource-constrained project scheduling problem where the resource demand of activities and the resource supply vary over time. As an application, he discusses a real-world medical research project. A multipass priority rule based heuristic with tournament selection is proposed as a solution procedure. 5 An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives Fink and Homberger consider the multi-agent variant of the resource-constrained project scheduling problem with discounted cash flow objective. In this problem, there are several independent project managers who are in charge of a subset of the activities of a single project. Each project manager wants to schedule his activities so that the discounted cash flow is maximized. The authors propose an ant-based solution procedure for the case that information on the activity network, activity durations as well as resource demand and resource availability is available to all project managers, but that information on the cash flow of activities is only available to the project manager in charge of these activities. 6 An artificial immune system algorithm for the resource availability cost problem Van Peteghem and Vanhoucke tackle the resource availability cost problem where the activities of a single project have to be scheduled such that a project deadline is met and the sum of the weighted peak requirements of the resources is minimized. As a solution procedure, the authors propose a population-based metaheuristic. 7 On the interaction between roadrunner and railway scheduling and priority lists or resource flow networks Tian and Demeulemeester consider the stochastic discrete time/resource trade-off problem where the stochastic work content of each activity can be processed in different modes. In an experimental study, they investigate the performance of activity priority lists or resource flow networks in combination with roadrunner or railway scheduling on different performance measures, including the expected project makespan. The results indicate that in smaller projects the optimal combination strongly depends on the selected performance measure, while in larger projects a combination of roadrunner scheduling with a resource flow network gives good results.

4 E. Demeulemeester et al. 8 Robust optimization for resource-constrained project scheduling with uncertain activity durations Artigues, Leus and Nobibon present an extension of the resource-constrained project scheduling problem in which there is considerable uncertainty in the activity durations so that approaches employing distribution functions for activity durations cannot be readily applied. The authors apply concepts from robust discrete optimization and propose an optimal and a heuristic scenario-relaxation procedure. 9 Resource dedication problem in a multi-project environment Beşikci, Bilge and Ulusoy consider the so-called resource dedication problem in which renewable and nonrenewable resources have to be exclusively assigned to the projects over the entire planning horizon and in which projects are scheduled with the objective of minimizing the total tardiness of all projects. The authors propose two promising solution procedures: a genetic algorithm and a Lagrangian relaxation based heuristic. 10 An integrated scheduling and control model for multi-mode projects Hazir and Schmidt develop an integrated scheduling and control approach for the discrete time/resource trade-off problem. In this approach, the scheduling perspective aims at minimizing the project cost subject to a project deadline, whereas the control perspective serves to minimize the control effort for given activity durations. The authors propose a tabu search procedure for the scheduling problem and a constraint nonlinear programming approach for the control problem. 11 Project portfolio selection under uncertainty with outsourcing opportunities Gutjahr and Froeschl consider the strategic stochastic project portfolio selection problem in which the projects returns and resource requirements are uncertain. Apart from the selection of projects, it is necessary to decide how workers with different qualifications are assigned to projects over time. If the realized resource demand exceeds availability, the excess demand is met by acquiring external resources. The authors propose a two-step solution procedure in which the project selection problem is first solved with a variable neighborhood search algorithm, and then a Frank-Wolfe type algorithm is applied for the remaining staffing and scheduling problem.

Project management and scheduling 5 12 Concluding remarks This special issue has greatly benefited from the cooperation among the authors, reviewers, and editors. We would like to express our sincere thanks to the reviewers for their excellent and timely refereeing. Last, but not least, we thank all authors for their contributions which made this special issue possible.