SELECTING THE BEST DEWATERING TECHNOLOGY FOR A CHALLENGING ASH SLURRY

Similar documents
Dependable dewatering. High corrosion resistance.

Description of the Water Conserv II Facility

Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance

Filter Aid Filtration

BHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES

GRIT CHARACTERIZATION IN FLORIDA WASTEWATER PLANTS

CENTRIFUGAL PUMP OVERVIEW Presented by Matt Prosoli Of Pumps Plus Inc.

VX Series Pumps Rotary Lobe Pumps designed for abrasive and viscous liquids. HIGH PERFORMANCE PUMPS DESIGNED FOR TOUGH APPLICATIONS ENGINEERED TO WORK

aquateam Aquateam - Norwegian Water Technology Centre A/S Report no: Project no: O Project manager: Dr. Bjørn Rusten.

Technical Support Services Accelerated Learning Through the Visual Presentation of Technical Information

Pump ED 101. Positive Displacement Pumps. Part I Reciprocating Pumps

Energy Audits Waste Water Treatment Plants

HUBER The Partner for Paper Industry

Environmental Technology March/April 1998

Heating Water by Direct Steam Injection

John D. Dyson, Manager Municipal Water Group Infilco Degremont Inc. Richmond, VA

William E. Dunn Water Reclamation Facility. Facility Overview & Information

Small Wastewater Treatment Systems

Case Study: Treatment of alluvial sand, treatment of washing water and sludge.

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company)

Class A Foam Mixing and Application Equipment

WASTE WATER TREATMENT SYSTEM (OPERATING MANUALS )

St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids

Cambridge Wastewater Treatment Facility

Rotary Drum Vacuum Filters for Production of Wallboard-Grade Gypsum

Reactor Clarifier Solids Contact Clarifiers

Cooking at the Speed of light!

DECANTER CENTRIFUGE. CENTRIFUGE TECHNOLOGIES

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Raptor Septage Acceptance Plant. For Municipal Wastewater, Septage and Grease Trap Applications

Temporary Batch Plants

DEWATERING AND WATER TREATMENT OPERATIONS OF THE OTTAWA RIVER SEDIMENT REMEDIATION PROJECT

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM

SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS

Background. 179 million gallons saved for make-up water

Algae Harvesting, Dewatering and Extraction

Grit Removal Identification and Removal Methods

Coagulation and Flocculation

PRESS TECH AGRI-PRESS 600 SOLIDS SEPARATOR PERFORMANCE TEST RESULTS USING THE UNIVERSITY OF TENNESSEE TESTING PROTOCOL

Dewatering containers

CENTRIFUGAL PUMP SELECTION, SIZING, AND INTERPRETATION OF PERFORMANCE CURVES

Index Page. Pumping Systems Intensifiers Gas Boosters High Pressure Generators

General Information. Applications

Designing a Zero-Waste Concrete Mix Testing Lab

WASTE WATER TREATMENT for surface treatment applications

UVDB empowered by Achilles

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

BSM MOTOR DRIVEN CENTRIFUGAL PUMPS

Batching and Mixing Plants

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

Residuals Management Somersworth Drinking Water Treatment Facility. Ian Rohrbacher, Treatment Operator IV

Chapter 5 Solids Thickening and Dewatering Systems

Effective Means of Handling Sand-Laden Dairy Manure. by:

How to Choose the Right Air Compressor

ASPHALT PLANT, NOMINAL PRODUCTION OF 160 T/H, IN

ACTIFLO Process For Wet Weather and Wastewater Treatment

Unit 24: Applications of Pneumatics and Hydraulics

An SPX Process Equipment Operation. Universal II Industrial Series Rotary Positive Displacement ECP Pumps

THE MC CLARIFLOW UPFLOW SOLIDS CONTACT CLARIFIER

Water Wash Spray Booth Paint Sludge Recovery

Unit 24: Applications of Pneumatics and Hydraulics

Technical Feasibility of a Wet Weather Flow Treatment Facility

Uniquely designed and engineered specifically for the pulp and paper industry.

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

26th Ward Wastewater Treatment Plant Wet Weather Operating Plan

RULE ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS

TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS

INTERNATIONAL FIRE TRAINING CENTRE FIREFIGHTER INITIAL PUMPS AND PRIMERS. Throughout this note he means he/she and his means his/hers.

Pathogen Indicator (Fecal Coliform) Regrowth In Biosolids Cake Update

CENTRIFUGAL DRYERS JUNE 2013 GALA INDUSTRIES, INC.

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions

Mobile field balancing reduces vibrations in energy and power plants. Published in VGB PowerTech 07/2012

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

HMHF DIRECT DRIVE BELT DRIVE. Manufactured by UDY Corporation. Cyclone Models Available:

Septic System Owner s Manual

Oil Interceptors. The Most Effective Way to Remove Oil and Grease From Water

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

WASTEWATER TREATMENT OBJECTIVES

WASTE WATER Solutions

Plastic Injection Molding

Removing Thallium from Industrial FGD Scrubber Water with Sorbster Adsorbent Media

AGREGADOS RECICLADOS MITOS Y REALIDADES

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK

Basic Hydraulics and Pneumatics

LINEAR ACTUATORS. Linear Actuators. Linear Actuators. Linear Actuators are Actuators that creates motion in a straight line, as contrasted

Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD. Trevor Ghylin, PE PhD

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification

Manual piston sampler...m 11

LITTLE MIAMI WWTP SOLIDS PLAN

Technical Bulletin // Up-Flo Filter

I BAU HAMBURG Dry Product Handling

grundfos biobooster NEXT-GENeRATION WASTEWATER TREATMENT

NEVADA CITY WASTEWATER TREATMENT INQUIRY

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER

EXISTING WASTEWATER TREATMENT FACILITIES

COMPARISON OF PROCESS FLOWS: FLUID BED COMBUSTOR AND GLASSPACK

Transcription:

SELECTING THE BEST DEWATERING TECHNOLOGY FOR A CHALLENGING ASH SLURRY Elijah Williams* and Don Howard City of Greensboro, Water Resources Department Christopher Crotwell, Mary Knosby, and Will Shull HDR *Elijah Williams, PE, City of Greensboro, Operations Engineer, Water Resources Dept, 2602 S. Elm-Eugene Street, PO Box 3136, Greensboro, NC 27402, 336-373-4632, Elijah.Williams@greensboro-nc.gov Abstract The City of Greensboro s TZ Osborne (TZO) Water Reclamation Facility (WRF) is rated to treat 40 mgd and has been in service since 1983. Dewatered WAS and primary sludge are sent to a fluidized bed incinerator. The exhaust from the incinerator is quenched with plant water and an ash slurry is produced. The ash slurry is currently sent to a thickening clarifier and then to a belt filter press for dewatering before hauling to a landfill for ultimate disposal. The existing belt filter press is reaching the end of its useful life and requires frequent maintenance. The City wanted to evaluate alternatives to dewater the ash slurry which would produce equal or higher cake percent solids and also require less maintenance. Several technologies were evaluated, including belt filter press, plate and frame press, dewatering screw, screw press, centrifuge, rotary fan press, and dewatering bin. The fine and abrasive characteristics of TZO s ash presented challenges for several technologies based on the sieve analysis and bench top testing. Ultimately the rotary fan press and the screw press were evaluated further and pilot tests were performed on-site. This presentation will walk through the challenges of dewatering ash slurry, review current dewatering technologies, present both bench top and pilot results from various manufacturers, as well as present the final design criteria. This project is anticipated to be in construction by spring 2014. Introduction The City of Greensboro s (City) T. Z. Osborne (TZO) Water Reclamation Facility (WRF) is rated for 40 mgd and has been in-service since 1983. TZO utilizes a fluidized bed incinerator to dispose of municipal dewatered sludge. An overview of the existing ash dewatering process, summarized in Figure 1, consists of pumping ash slurry to an ash clarifier for thickening followed by pumping the thickened ash to a belt filter press for dewatering. Figure 2 emphasizes the influent and effluent to the existing belt filter press and includes a mass balance of the process. Flow to the ash dewatering equipment would be a maximum of 47 gpm (gravity flow) with a maximum solids loading rate of 1,900 lb/hr. Currently, the raw feed to ash clarifier is approximately 0.38% solids, the percent solids from the ash clarifier to the belt press is approximately 8%, and the cake solids from the belt press is approximately 47%. Table 1, below, shows a 7 day range of data which includes the flow rate, percent solids, wet lbs/hr, and dry lbs/hr from the ash clarifier to the belt filter press. Flow rate data was recorded at the same time as a sample was taken. The data in Table 1 shows that on average the influent solids to the belt filter press are 4.2% but that it can fluctuate between 2.0% to 9.6%. Table 1. Ash Slurry Characteristics Date % Solids Flow (gpm) Wet lbs/hr Dry lbs/hr 3/25/2013 3.59% 46 23,018 826 2.49% 46 23,018 573 1

Table 1. Ash Slurry Characteristics Date % Solids Flow (gpm) Wet lbs/hr Dry lbs/hr 3/26/2013 3/27/2013 9.64% 40 20,016 1,930 2.38% 47 23,519 560 2.77% 38 19,015 527 7.82% 37 18,515 1,448 3/28/2013 4.75% 49 24,520 1,165 3/29/2013 4.58% 47 23,519 1,077 3/30/2013 1.95% 46 23,018 449 4/1/2013 3.27% 44 22,018 720 AVERAGE 4.23% 44 20,018 927 The dry ash is described as a talcum powder-like material. A sieve analysis was performed to obtain a characterization of the ash. The ash slurry itself is more challenging to dewater than most fluidized bed municipal incinerator ash, which might be a result of the finer grade sand, which was put into service in recent years. This sand is smaller in size than typically used in incinerators and has resulted in less being required. Plant staff has reported that 200 lbs of sand are fed into the incinerator per month. Additionally, the sieve analysis shows 98% of solids were below 2mm in diameter. The City also built a pilot scale dewatering inclined screw that produced decent results for short periods of time. However, over time the ash slurry would tend to form a dam and not allow water to drain back down the screw. This would lead to wetter cake being discharged. Review of Dewatering Technologies An initial screening of the available dewatering technologies was performed to reduce the number of alternatives selected for detailed evaluation. Table 2, at the end of this section, summarizes the advantages and disadvantages associated with each alternative, followed by a conclusion regarding further evaluation. Manufacturers were contacted to obtain information regarding each technology. Samples of the ash slurry were also sent to each manufacturer for bench top analysis to determine the expected cake percent solids and the amount and type of polymer required. Each type of dewatering equipment was evaluated based on the manufacturer s information/analysis, engineer s experience, and Owner s input to arrive at a recommendation for solids dewatering. All of the alternatives except the plate and frame press require polymer addition to adequately dewater the solids. A description of the various types of dewatering equipment and manufacturer s comments are summarized below. A summary of the sample analysis results for each technology can be found in Table 2. Screw Press Screw presses have been used for dewatering for over 20 years. A screw press consists of a helical screw mounted on a shaft inside an enclosed tube made of perforated screen. The screw rotates to move sludge from the inlet end of the screw to the outlet. The screw volume between flights decreases towards the outlet of the screw. This forces greater and greater pressure on the sludge as it approaches the outlet. As the pressure builds, water is forced out of the sludge. There are several variations on this basic design. Some manufacturers rotate the perforated tube while the screw remains still. Some screws are mounted horizontal while others are at an angle. FKC has an option to allow steam into the screw press. This increases the cake dryness but is typically used if there is 2

already steam available. Screw presses are sturdy, slow rotating machines that generate solids nearly as high as centrifuges. Typically units have a long and narrow footprint. Benefits of the screw press are: Relatively high solids Fairly rugged equipment Low water usage Centrifuge Centrifuges are a proven dewatering technology in the wastewater industry. The sludge is pumped into the unit which uses centrifugal forces from the high speed machine to separate the solids. Like screw presses, centrifuges typically have a long and narrow footprint. Centrifuges have the following benefits: Higher solids. Limited water usage. Reduced installation costs. Centrifuges are high speed machines and can require specialized maintenance which on-site staff may not be qualified to perform. Grit in sludge can result in premature wear to centrifuges. Belt Filter Press Belt filter presses are also a well know dewatering technology and the City currently uses a belt filter press for ash dewatering. Belt filter presses have three zones; gravity zone, wedge zone, and pressure zone. The sludge is pumped on to the top of the gravity section of the press which drains all free water away and thickens the sludge. Then the sludge travels around the end roller into the wedge zone where it is squeezed between two rollers, and then into the pressure zone where it gets squeezed a second time between two belts. Belt filter presses have the following benefits: Performance of presses are simple to monitor Operator friendly, since the top deck and discharge of the unit are visible Recessed Chamber Filter Press The recessed chamber filter press (filter press) is also known as a plate and frame press. The filter press is a well proven dewatering technology, which unlike other technologies, is a batch process. The filter press equipment consists of several plate pairs which are secured by two shafts on either side of the plate. A hydraulic piston is used to apply force to the plates to keep sludge from leaking out between the plates. Each pair fits tightly together with a gasket. There is a recessed cavity or chamber between the two plates in which sludge is pumped at the beginning of the batch process. Each rectangular plate is fitted with a filter cloth or a diaphragm that allows for water to pass through while trapping solids. Dewatering occurs by applying pressure to the sludge from the sludge feed pumps. This pressure is applied and maintained for a specific time period (typically around 2 hours) during which water is forced out of the sludge inside each cavity. At the end of the cycle, the sludge feed pump is stopped, the plates are opened and the dewatered cake falls out below the filter press. A conveyor can be used to transfer the cake or a roll off storage bin can be located directly under the press. Filter presses also have a long and narrow footprint. Advantages to the filter process include a very dry cake solids product and the ability to handle grit in the sludge. Rotary Fan Press The rotary fan press is a relatively new dewatering technology. The equipment consists of rectangular channels around the outside of a wheel. The sidewalls of the channel rotate. The sidewalls are made of 3

fine screen elements that allow liquid through while retaining the solids. As it moves, the wheel compresses and transports the sludge. Similar to the filter press, the sludge feed pump applies pressure to the sludge; however, at a much lower pressure (2-7 psi). A restricted outlet at the end of the channel applies back pressure to the sludge with a pneumatic piston. The force on the restricted outlet controls the dryness of the cake. As the channel rotates, sludge is forced towards the outlet by way of friction from the sides of the channel and, thereby, force water out through the screen as the volume decreases. A rotary fan press requires minimal wash water, has a small footprint, low rpm, lower power cost, and some redundancy within the unit. The redundancy is due to there being multiple channels on each unit. Each channel can be taken out of service if required while the other channels are still in service. Dewatering Bin The dewatering bin is a dewatering technology that has been used for dewatering ash slurry from coal plants and other industries. The dewatering bin is a batch process that consists of filling the bin and allowing for the sludge to settle at the bottom. There is an outlet at the center of the bin and also on the outside of the tank at the bottom. These outlets are perforated to allow for water to be removed. After the bin is filled, slurry is continuously pumped into the bin. Once the blanket of slurry reaches a certain height in the bin, the pump stops providing flow to the bin to prevent solids carry over. At this point a second bin could be provided to accept additional flow. The first bin would allow for water to filter out the outlets for a period of time (around 8 hours) while the slurry drains. After the cake has reached its desired level of dryness, a bottom gate valve is opened allowing the cake to fall into a truck bed below for disposal at a landfill. Alternative Table 2. Summary of Dewatering Technologies Development Advantages Disadvantages Stage Centrifuge Well-proven Becoming more common for medium to large WWTPs. Drier cake solids than most options. Small footprint. Minimal wash water required and therefore smaller recycle stream. Belt-filter Press Filter Press (Plate-and- Frame) Rotary Fan Press Screw Press Well-proven Well-proven Somewhat Proven Somewhat Proven Most common option in existing plants. Easy to view solids during dewatering process. Can handle grit in sludge. Lower power cost. Drier cake solids than most options. Can handle grit in sludge. Minimal wash water required (intermittent) Slow speed Small footprint Cake solids nearly as dry as centrifuge. Minimal wash water. Sturdy, reliable equipment. Can not handle high grit sludge. Slightly higher equipment costs. Higher power costs. Can be more difficult to maintain for local maintenance staff Continuous wash water is required which generates recycle stream Dewatered solids not as dry as centrifuge Maintenance intensive High equipment cost. Labor intensive process with batch operation High O&M cost Cake solids generally not as high as centrifuge, but drier than belt filter press. High sand content in sludge can lead to premature wear of the screens inside channels. Long narrow footprint 4

Alternative Dewatering Bin Notes: 1. EPA Report on Emerging Management Technologies (2006) 2. Wastewater Treatment & Reuse (2004); WEFTEC 08 proceedings 3. Riedel, D: An Investigation into the Mechanisms of Sludge Reduction Technologies (2009) Sampling Results Several different manufacturers of the technologies listed in Table 2 requested a sample of the ash sludge for bench scale testing. The ash sludge samples were collected according to each manufacturer s instructions and then shipped for testing. Table 3 summarizes the results of the ash samples that were tested. The results of the bench scale tests show that the percent solids vary. Based on the lab tests all technologies could achieve a capture rate of 90% or higher, and four of the technologies were able to obtain greater than 50% cake dryness. The polymer required for each technology varied from none to 7 dry lbs/ton. Belt Filter Press 1 BDP Industries Recommend -ed Model Table 3. Sample Results Total Solids (% by weight) ph 1.5m 3DP 9.5 4.6 Polymer Used Polymer name not provided Polymer Dose (lb/ton) 4-7 Cake Solids (%SBW ) 45% - 50% Capture (%) 2 Andritz Power Press - - 8844FS 1.50 45% 95% 3 Phoenix WXG-6 9.5 6.0 Centri fuge 4 Centrisys CS18-4 11.8 - Recessed Chamber Filter Press (Plate and Frame Type) 5 Andritz 6 M.W. Watermark Screw Press 7 FKC Model 1000/LP Polydyne C-6257 None - polymer 95% 1.98 48% 90% 0-0.5 60% - 70% 98% - 99.5% - - None n/a 48% 98% 1500MM 9.4 4.9 None n/a 71% 99% Table 2. Summary of Dewatering Technologies Development Advantages Disadvantages Stage Well-proven Simple operation Batch process Low maintenance Finer particles are not collected Experience with coal ash; limited experience with municipal sludge incinerated ash Technology Manufacturer SHX- 800x4500L 6.24 7.0 Polydyne C-6257 5.2 55% 92% 5

Table 3. Sample Results Technology Manufacturer Recommend -ed Model Total Solids (% by weight) ph Polymer Used Polymer Dose (lb/ton) Cake Solids (%SBW ) Capture (%) Rotary Fan Press 8 Fournier 6-900/6000CVP 5.6 6.8 Ashland K274FLX 2.0 55% 95% Evaluation of Design of Dewatering Alternatives A proposal submitted by each manufacturer listed in Table 3 was reviewed based on the sampling results, the required space at the WRF, the City s comfort level with the technologies, and equipment capital cost. The plate and frame technology was found to be heavily maintenance intensive, not fully automated, and would not fit into the proposed equipment location. The plate and frame press is also a batch process, which could potentially complicate the incinerator process because it operates continuously. The centrifuge was able to obtain dry cake and had a high capture rate; however it was eliminated due to the high speed at which the bowl turns. The mildly abrasive characteristics of the ash slurry would not be a good application for a centrifuge. The capital cost of the equipment was also the highest. The City currently operates a belt filter press (BFP) and is familiar with the frequent and costly maintenance required. Additionally, the large footprint of the BFP makes it difficult to fit in the desired location while still have room to maneuver and perform maintenance. A sample was sent to the dewatering bin manufacturer. Due to the small size of some of the finer particles, this technology would not work for Greensboro s application. The finer particles would not be captured in the bin and would end up at the head of the WWTP. After the preliminary evaluation it was decided to eliminate the BFP, plate and frame press, and centrifuge technologies because of the reasons listed above leaving the remaining two technologies the be further evaluated: Alternative No. 1 - Screw Press (FKC) Alternative No. 2 Rotary Fan Press (Fournier) To further evaluate these technologies a site visit to witness both technologies in operation and speak to appropriate O&M personnel was completed. Following the site visits, both technologies were further evaluated in respect to on-site pilot results, life cycle cost, and how the equipment would be integrated into the existing incinerator building. Pilot Testing and Results FKC and Fournier were invited to run a pilot test at the TZ Osborne WRF. The pilot would test the effectiveness of each technology on dewatering the incinerator ash sludge and utilizing the City s existing polymer. FKC Screw Press The FKC pilot trailer arrived on site February 4, 2013 and stayed until February 7, 2013. Initial testing revealed problems conditioning the sludge, which lead to a poor capture rate. One issue was that the 6

flocculation chamber cascaded into the screw press and this turbulence appeared to break apart the floc. Several polymers, including the WRF s current polymer, were used to optimize conditioning. A pilot result summary report of the first site visit, including cake dryness and capture rate, was not provided by FKC. The pilot operator decided to take back a sample of the sludge to do more testing at FKC s lab, where more polymers were available, to develop a new strategy. FKC returned the week of March 11th through 15th. They were then able to produce a cake with 50%+ solids. However, to achieve these results required using two different polymers in combination. The amount of new anionic polymer and current cationic polymer needed to achieve these results were 1.3 lbs/dry ton and 6.48 lbs/dry ton respectively. One test was performed with the City s polymer. During this test the screw press was able to produce a cake with 48% solids and a capture rate of 85% by using 6.48 lbs/dry ton of polymer. Rotary Fan Press The Fournier pilot trailer arrived at the WRF on March 1, 2013 and stayed until March 6, 2013. The unit was able to produce visibly dry cake within 30 minutes of setting up. The pilot operator used a different polymer the first day and half of the second day. The remaining trials were conducted using the WRF s current polymer. The most favorable results were achieved using the WRF s current polymer. The results include a capture rate of 86% and a cake dryness of 47%+. The amount of polymer needed to attain these results on average was 3 lbs/dry ton. Pilot Testing Summary Both pilot tests showed significantly lower capture rate and cake dryness than in the bench top lab tests although the same amount of polymer was used. Both manufacturers reinforced that the unique consistency of the ash led to the decrease in performance. Economic Analysis Table 4 lists the economic data and assumptions used to perform the economic analysis. As shown in Table 5, the Fournier Press has a lower energy usage and polymer usage than FKC, but it also has more maintenance cost, slightly higher capital cost, and the cake dryness is 3% less than FKC. A 20-year net present value (NPV) cost showed there Fournier to be approximately $276,622 higher than the FKC screw press. Table 4. Economic Assumptions Parameter Value Hauling Cost (tipping fee) $38/ton Power Cost $0.066/kWhr Neat Polymer Cost (Polydyne) $0.90/lb Discount Rate 4.5% Operation 24/7 Table 5. Equipment Data Assumption Screw Press Rotary Fan Press Total Hp 17.5 hp 4 hp Polymer Usage 8 3 Capture Rate 86% 86% Cake %Total solids (TS) 50 47 Annualized O&M Costs $3,000 (1) $30,000 (2) 7

Table 5. Equipment Data Assumption Screw Press Rotary Fan Press Equipment Cost $425,000 $472,000 20-year NPV $8.3 million (3) $8.6 million Notes: (1) O&M costs include replacement of wear plates every 5 years, screens every 5 years and labor for these replacements. (2) O&M costs include replacement of blades and deflectors every 9 months and replacement of screens every 3 years. (3) Does not include costs associated with new polymer/polymer system (pumps, pipe, mixing equipment, polymer trials, cost of new polymer) Conclusions and Recommendations The City decided to select the Fournier rotary fan press technology to replace the belt filter press for incinerator ash dewatering based on the advantages listed above. The FKC screw press did not produce consistent results during the pilot testing, did not provide multiple results with the City s existing polymer and, due to the screw press s size, does not allow for future installation and does not have any redundancy. Additionally, due to the higher height of the screw press, it presented a challenging installation in the existing room. 8