(No. 114) (Approved August 16, 2007) AN ACT

Similar documents
P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 135 STATE OF UTAH. Net Metering Service

Net Energy Metering Southern California Edison

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT

(No. 228) (Approved August 24, 2004) AN ACT

No. 99. An act relating to self-generation and net metering. (H.702) It is hereby enacted by the General Assembly of the State of Vermont:

NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Blue NRG Terms and Conditions Solar Feed in tariff customers (Victoria)

Explanation of Net Energy Metering and Annual Net Surplus Electricity Settlement Options

TERMS AND CONDITIONS

Power Purchase Agreements and Lease Arrangements: Tools to promote Distributed Renewable Energy

State of South Dakota

Photovoltaic Incentive Program

To assist you with getting started with the SRECs program, find enclosed a copy of the following:

The terms set forth in 220 CMR shall be defined as follows, unless the context otherwise requires.

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

Md. PUBLIC UTILITIES Code Ann

(No. 131) (Approved June 1, 2004) AN ACT

Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

SCHEDULE FIT TIER 1 AND TIER 2

Distributed Generation: Frequently Asked Questions

THE NARRAGANSETT ELECTRIC COMPANY RENEWABLE ENERGY GROWTH PROGRAM FOR RESIDENTIAL CUSTOMERS

Report on the Status of Net Energy Metering In the State of Maryland. Prepared by The Public Service Commission of Maryland

MAKING SOLAR ENERGY COST-EFFECTIVE TODAY IS A SNAP

Renewable Energy and Energy Efficiency Portfolio Standard (REPS).

The Narragansett Electric Company d/b/a National Grid

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

(No. 210) (Approved August 28, 2003) AN ACT

INDEPENDENCE POWER & LIGHT DEPARTMENT Independence, Missouri. Schedule NM-1 Customer-Generator Net Metering Contract Service Rider

Strategies for the Use of Sustainable and Renewable Energy (SURE) Track 7 State and Federal Policies and Incentives.

GUIDE TO NET ENERGY METERING.

Public Act No

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -

Senate Bill No. 7 Texas Electric Restructuring Act

Bylaw last revised: Nov. 26, 2012 Sheet Effective January 1, 2013 B/L 5786

A Proposal for Solar Energy Power in the city of Boulder, Colorado

Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209

(No. 104) (Approved June 27, 2011) AN ACT

NOTICE OF INTENT Department of Revenue Policy Services Division. Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.

Commercial & Industrial

Electric Rate Schedule

Schedule NEM Sheet 1 NET ENERGY METERING

CALIFORNIA ALTERNATIVE ENERGY AND ADVANCED TRANSPORTATION FINANCING AUTHORITY Meeting Date: February 18, 2014

Standard conditions of the Electricity Distribution Licence

Combined Heat and Power (CHP) En Banc Hearing October 7, 2014, University of Pittsburgh

TAMPA ELECTRIC COMPANY UNDOCKETED: SOLAR ENERGY IN FLORIDA STAFF S REQUEST FOR COMMENTS INTRODUCTION PAGE 1 OF 1 FILED: JUNE 23, 2015.

BELIZE ELECTRICITY LIMITED

DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA

Solar Power HourSM. Solar educa on for your community.

POWER PURCHASE AND SALE AGREEMENT [NON-INCENTIVE]

Issue #2 January 25, RECENTLY ASKED QUESTIONS ABOUT THE REAL PROPERTY TAX LAW on the topic of SOLAR ENERGY SYSTEMS

Jason B. Keyes Keyes & Fox, LLP Kansas Solar Round Table Topeka, Kansas March 3, 2009

(No ) (Approved December 27, 2011) AN ACT

Renewable Energy: Essential terms terms and and concepts for citizens and a dvocates advocates

(No ) (Approved March 4, 2014) AN ACT

Web Site Hosting Service Agreement

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016

(No. 180) (Approved July 27, 1998) AN ACT

Understanding Your Colorado XCEL Energy Electric Bill April, 2015 Reed Consulting Services 1. INTRODUCTION

JEA Net Metering Policy Tiers 1-3

Service Contract Act of 1965, as Amended

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY

Renewable Choice Energy

Incentivizing Generation of More Renewable Energy in Residential and Commercial Sector in Hawaii

The California Solar Initiative

ELECTRICITY PRICING INFORMATION. This list shows the terms that appear on electricity bills and what they mean:

Commercial and Industrial Electric Rates

SENATE BILL 1419 AN ACT

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Be it enacted hy the Senate and House of Refveseiitathes United Sttttes of America in Congress asse-mbled^

To complete the process for a net metering interconnection, please follow the steps below:

Western Australian Feed-In Tariff Discussion Paper

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29

Commonly asked Question about Green Power, and Kit Carson Renewable Energy Program.

FOR INFORMATION PURPOSES ONLY.

1. DATE AND PARTIES This agreement, dated, 20, is between:, from now on called LANDLORD,, from now on called TENANT(S).

Solar Power Frequently Asked Questions

ENSA TERMS AND CONDITIONS

Transcription:

(S. B. 1212) (Conference) (No. 114) (Approved August 16, 2007) AN ACT To direct and authorize the Electric Power Authority to establish a net metering program allowing interconnection to its electric transmission and distribution system and electricity feedback for customers who have installed solar electric equipment, a windmill or any other source of renewable energy capable of producing electric energy; to grant credits in the bills for the electricity generated by this equipment and compensate the unused excess energy generated by the same; and for other purposes. STATEMENT OF MOTIVES The excessive dependency on fossil fuels to generate electricity and their ensuing environmental pollution, high costs in electricity bills, questionable charges in the matter of fuel costs and the purchase of energy, frequent interruptions in the electrical service caused by greater power demand opposite a stagnant generation capacity, and the absence of efficient preventive maintenance in the electrical system of the Island, leave little hope for relief in energy costs for the people of Puerto Rico. It is for this reason that we must resort to new options to provide solutions to our energy problems that adjust to our geographic and climactic realities. It is necessary to stimulate energy production through renewable sources such as the sun and the wind. A way to make investments in solar and wind energy systems attractive is through the establishment of a program requiring interconnection and net metering of the Puerto Rico Electric Power

Authority (PREPA) with those customers that install solar electric equipment, windmills or other sources of renewable energy. At present, forty states and the District of Columbia of the United States of America, as well as some areas of other countries such as Canada, Japan and Germany, offer alternative net metering programs. Three reasons are indicated for establishing such programs in these countries. First, customers instantly receive an economic benefit for the electricity produced by consuming this energy or eventually by means of a credit or payment for the excess feedback to the electricity company. Second, net metering reduces customer costs by eliminating the need for a second meter. Third, net metering provides a simple, inexpensive, and easily administered mechanism for encouraging the use of solar electric equipment and windmills which at the same time benefit the environment and the economy in general. Net metering is an essential incentive for investment in equipment that generates electricity using sources of renewable energy. This is obtained by means of the interconnection of PREPA s system of transmission and distribution and the solar and wind energy system installed by the customer. Net metering enables customers to use the electricity generated by their solar electric equipment, windmills or other source of renewable energy to offset the consumption of electricity provided by PREPA by means of a single meter that registers the flow of electricity in the opposite direction when it generates electricity in excess of the demand. Net metering translates into benefits for the customer because it promotes the use of clean and inexpensive energy, and the customer receives compensation for the excess electricity generated and only pays for the net electricity supplied by PREPA. It is also an encouragement to save energy

because the greater the amount of excess energy generated and not used, the greater the credit or the payment the customer will receive from PREPA. In the same way, PREPA benefits because when customers produce electricity during peak periods, it alleviates the load on the transmission and distribution system. PREPA also reduces its operating expenses by receiving energy at a lower cost than what it costs the public utility to produce said energy and increases its reserve. The operation of a net metering program is very simple. During the day, the solar or wind energy system installed in a residence deposits any excess energy generated on PREPA s transmission and distribution system, generating a credit in the customer s bill. At night, the system automatically extracts the electricity that the customer needs from PREPA s grid. In the cases of businesses and industries, this process mostly takes place in inverted schedules. The feedback the outflow and inflow of electricity is completely automatic, providing a smooth and uninterrupted flow of electricity to meet the household or business needs. The benefit provided in this Act is available for residential and commercial customers who install equipment whose generating capacity is not greater than twenty-five kilowatts (25 kw) and one megawatt (1 MW), respectively. In addition, it is hereby provided that a credit shall be granted in the bills for excess in the production generated by the installed renewable energy equipment. The Act further establishes the distribution of the credit accrued and unused by the feedback customer during the previous billing year, reserving a credit or reduction of twenty-five percent (25%) in the electricity bills for public schools and seventy-five percent (75%) for a reasonable compensation to the feedback customer. The rate of the compensation provided is ten (10) cents per kilowatt-hour or the amount

resulting from the subtraction of the adjusted fuel fee based on the variable costs incurred by PREPA exclusively for the purchase of fuel and energy from the total price PREPA charges its customers, converted into kilowatthours, whichever is greater. BE IT ENACTED BY THE LEGISLATURE OF PUERTO RICO: Section 1.- Mandate.- The Electric Power Authority is hereby directed and authorized to establish a net metering program allowing the interconnection to its electric transmission and distribution system and electricity feedback for customers who have installed a solar electric equipment or windmill capable of producing electric energy using a meter that registers the flow of energy in two directions, in accordance to the applicable provisions of the federal legislation and regulations, such as the Energy Policy Act, Pub. L. 102-486, Oct. 24, 1992, 106 Stat. 2776, as amended, and the Standards for Electric Utilities, Pub. L. 95-617, Title I, Sec. 111, Nov. 9, 1978, 92 Stat. 3121, as amended, among others, and the regulations to be adopted thereunder. Section 2.- Eligibility.- To be eligible for this benefit, the solar electric equipment, windmill or other source of renewable energy must comply with the requirements established in the federal legislation and regulations applicable to net metering programs that allow for interconnection to transmission systems. Unless otherwise provided or unless another requirement is specifically imposed through the applicable federal legislation or regulations to expressly prevent state legislation, every solar electric equipment unit, windmill or other source of renewable energy must comply with the following requirements:

a) Have a generating capacity of not more than twenty-five kilowatts (25 kw) for residential customers and one megawatt (1 MW) for commercial, industrial or agricultural customers, or educational institutions or medical-hospital facilities; b) be installed on the customer s premises; c) conduct the operation compatible with the Electric Power Authority s existing transmission and distribution facilities; d) comply with the standards and specifications on minimum requirements of efficiency established by the Energy Affairs Administration or government body designated for such purpose; e) be installed by a person certified by the North American Board of Certified Energy Practitioners and registered with the Energy Affairs Administration; and in the case of windmills with a generating capacity of more than twenty-five kilowatts (25 kw), the installation thereof shall be conducted under the supervision of an engineer registered with the Energy Affairs Administration; f) be guaranteed for five (5) years or more by the manufacturer or distributor; g) provide that it be used primarily to offset part or all of the customer s electric energy demand; h) every installation shall incorporate emission and noise control and mitigation measures, if applicable due to the nature of the equipment, and the operation thereof shall comply with environmental, zoning and use laws and regulations in effect for the location site; if there are no regulations in effect for said

type of equipment or location site, said matter shall be addressed in the regulations to be created pursuant to this Act. Section 3.- Meter.- The installation of the net meter that registers the flow of energy in two directions and the connection to the transmission and distribution system of the Electric Power Authority shall be at the customer s expense and must be made by an expert electrician. All installations of this sort shall include an automatic distribution line flow disconnection mechanism, in the event of an interruption of service of the Electric Power Authority. The Electric Power Authority may, at its own expense, install one or more meters to monitor the flow of electricity in each direction. Section 4.- Prohibition.- The Electric Power Authority may not establish by regulation or by any other means, additional requirements to those provided in Section 2 of this Act. Neither may it charge an additional fee nor increase the monthly rate for electric energy use to the customer who chooses to connect his or her solar electric equipment or windmill or other source of renewable energy to the transmission and distribution system of this public corporation. Section 5.- Energy Measuring.- With the exception of those cases in which the applicable federal laws or regulations in effect expressly and specifically direct otherwise, the measuring and accreditation process shall be as follows: a) The Electric Power Authority shall measure the net electricity produced or consumed by the customer during a billing cycle in accordance with standard metering practices in effect.

b) In those cases in which the Electric Power Authority supplies a customer more electricity than the customer feeds back to the public utility during a billing cycle, the Electric Power Authority may charge the customer for the net electricity it supplied. c) In those cases in which a customer feeds back to the Electric Power Authority more electricity than it supplied to the customer during a billing cycle, the Electric Power Authority may charge the customer a minimum monthly service fee not greater than that which it charges other regular customers who do not consume electricity during a billing cycle. However, this public corporation shall be bound to credit the feedback customer for the excess kilowatt-hours generated during the billing cycle up to a daily maximum of three hundred kilowatt-hours (300 kwh) for residential customers and ten megawatt-hours (10 MWh) for commercial customers. d) For the purposes of this Act, excess shall be understood to be the production of electricity generated by the customer s solar electric equipment or windmill or other source of renewable energy over the energy consumption supplied to the customer by the Electric Power Authority, minus any service fee, if applicable. Likewise, the term kilowatt-hour shall be understood to be the unit of electric power equivalent to the electricity yielded by the power of one kilowatt acting for one hour. e) For the billing cycle closing in June of each year, any excess kilowatt-hour credit accumulated by the feedback customer

during the previous year and which remains unused shall be compensated as follows: 1) Seventy-five percent (75%) of the excess shall be purchased by the Electric Power Authority at the rate of ten (10) cents per kilowatt-hour or the amount resulting from the subtraction of the adjusted fuel fee based on the variable costs incurred by the public corporation exclusively for the purchase of fuel and energy, from the total price charged by the public utility to its customers, converted into kilowatt-hours, whichever is greater; and 2) the remaining twenty-five percent (25%) shall be granted to the Electric Power Authority to distribute as a credit or reduction in the electricity bills of public schools. Section 6.- Liability.- The Electric Power Authority shall not be directly or indirectly liable for allowing or continuing to allow solar electric equipment or a windmill or other source of renewable energy to be connected to its transmission and distribution system, or for acts or omissions of the feedback customer that cause losses or injuries, including death, to any third party. Section 7.- Regulations and Education.- The Electric Power Authority and the Energy Affairs Administration are hereby authorized to jointly adopt the necessary regulations for the faithful compliance with this Act. They shall also regularly develop and implement educational campaigns directed to informing consumers of the benefits of net metering and of the different technologies available in the market for the generation of energy from renewable sources.

Regulations shall be promulgated not later than twelve (12) months after the approval of this Act. Section 8.-Reports.- The Electric Power Authority shall render semiannual reports on the progress of the net measuring program to the Legislature during the period of approval of regulations and once the program s implementation begins. The reports may include recommendations on additional legislation needed to achieve the objectives of the program. Section 9.- Effectiveness.- This Act shall take effect immediately after its approval.

CERTIFICATION I hereby certify to the Secretary of State that the following Act No. 114 (S.B. 1212) (Conference) of the 5 th Session of the 15 th Legislature of Puerto Rico: AN ACT to direct and authorize the Electric Power Authority to establish a net metering program allowing interconnection to its electric transmission and distribution system and electricity feedback for customers who have installed solar electric equipment, a windmill or any other source of renewable energy capable of producing electric energy; to grant credits in the bills for the electricity generated by this equipment and compensate the unused excess energy generated by the same; and for other purposes, has been translated from Spanish to English and that the English version is correct. In San Juan, Puerto Rico, today 30 th of August of 2007. Francisco J. Domenech Director