930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) 998-4175 Tel: 1888 648-4218.

Similar documents
Sabina Gold & Silver Corp.

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Lalor Project Base Metal Zones and Gold Mineralization January 2009

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

Sabina Gold & Silver Corp. A Gold Miner in the Making

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia

Galahad Gold plc (Galahad)

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Q CONFERENCE CALL. Q Earnings Call. Thursday, August 13, :00 am EST.

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

INVESTOR PRESENTATION DECEMBER 2011

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

Golden Band Resources Inc.

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

SAVANT LAKE GOLD PROJECT. May 24,

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

HARTE GOLD CORP. Gold Exploration and Mine Development in White River, Ontario, Canada APRIL 2016 TSX : HRT

(NYSE-MKT:XRA, TSX:XRC,

Further Significant High Grade Intercepts Reported from both Resource Extension and Infill Drilling at the Hot Maden Gold Copper Project

FORWARD-LOOKING STATEMENTS

Aurvista Gold Plans Significant Exploration Program at Douay

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

FORWARD LOOKING STATEMENTS

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

Focusing on Near Term Production and Exploration in Quebec

INVESTOR PRESENTATION January 2014

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

For personal use only

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

NexGen Commences 35,000 m Summer Drill Program at Rook I and Advances Project Development Activities

NOVEMBER January 2013

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Gold Mining Camps in the Canadian Shield

Strategic Metals Ltd.

Corporate Presentation October 2015

The Point Rousse Project - An Economic Analysis

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

CNSX: TV

NexGen Commences Largest Drill Program at Arrow and Expands Site Infrastructure at Rook I

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development. 16 June 2015

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Chalice advances gold exploration initiatives in Australia and Canada

For personal use only

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS

TARGETING +100Moz OF SILVER LA CIGARRA PROJECT, MEXICO

Financial and Operating Highlights through and subsequent to March 31, 2016: Completion of Flow-Through Share Financing

Positioned for Production: Exploring for Growth

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

KINROSS GOLD CORPORATION ANNUAL MEETING OF SHAREHOLDERS

FOR IMMEDIATE RELEASE NR15-19 November 10, 2015 RENAISSANCE GOLD REPORTS FIRST QUARTER 2016 RESULTS

Detour Gold Provides New Life of Mine Plan for Detour Lake

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

NEWS RELEASE April 14, 2009 No

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

TSX.V: HSR Frankfurt: B6IH. Homestake Ridge Kinskuch Project

TSX-V: CDA WKN: A0M6U5

Trip to Pulacayo. Pulacayo - Paca

AVINO SILVER & GOLD MINES LTD.

CANADA S INTERMEDIATE GOLD PRODUCER

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

Savannah North Scoping Study Looking into the future 3 February 2016

For personal use only. MRV Metals Launch February 2016

The last great Canadian gold mining camp controlled by a junior mining company.

Resources Rising Stars

Forward-Looking Statements

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Kevitsa Mine a Big Ni Cu PGE Mine in Central Finnish Lapland

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

Corporate Presentation U.S. Marketing

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

COPPER DISCOVERY GROWS AT TURKEY CREEK

December 8, Visit for pictures of the drill core and maps and sections of the new discovery.

How To Know If Goldcorp Is A Successful Company

Cautionary Statement.

AGNICO-EAGLE MINES LIMITED

C o r p o r a t e P r e s e n t a t i o n A u g u s t

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Gold Eagle Mines Ltd. GEA, TSX

Transcription:

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com September 13, 2011 SBB NR 11 18 SBB TSX SABINA GOLD & SILVER REPORTS CONTINUED EXPANSION AT UMWELT & LLAMA DEPOSITS, BACK RIVER, NUNAVUT Umwelt Hole 11GSE106 returns 12.01 g/t Au over 23.5 m Umwelt Hole 11GSE096 returns 9.02 g/t Au over 26.30 m Llama drilling extends zone 100 m to the south Hole 11GSE077 returns 10.88 g /t Au over 9.80 m Vancouver, BC Sabina Gold & Silver Corp (SBB.T) is pleased to announce new assay results from holes drilled as part of its 2011 exploration program at the Umwelt and Llama deposits on the Goose property at its 100% owned Back River Project in Nunavut, Canada. The 2011 drilling campaign at Back River has been focussing on expanding the existing deposits at Umwelt and Llama, and looking for new discoveries by applying the Company s exploration tool box on open pit targets. Work has been completed or is in progress on the Goose and George claim blocks, as well as the Wishbone gold claims. Aggressive expansion drilling continues at our gold deposits at Goose and we continue to increase the size of Umwelt and Llama. We are now focussed on resource expansion drilling in key areas of the extension to Umwelt prior to season completion. Said Tony Walsh, President & CEO We plan on using up all of our contingency supplies before the season comes to a close at the end of September aggressively working at Goose and at Wishbone looking for new discoveries. Although many assays remain pending and holes are still in progress, it is fair to say that this year s campaign at Back River has delivered on our objectives to expand our existing deposits and make new discoveries. We are looking forward to measuring the results of this year s work and to incorporating them into future studies. Umwelt drilling continues to intersect strong mineralization. New results include hole 11GSE096 drilled on section 4400N, which returned 9.02 g/t Au over 26.30 m including 27.21 g/t Au over 5.0 m. This hole targeted a 230 m gap in drilling between hole 11GSE026 which returned 9.09 g/t Au over 12.0 m and hole 11GSE052 which returned 10.19 g/t Au over 33.0 m.

Hole 11GSE106 drilled on section 4050N, returned 12.01 g/t Au over 23.50 m including 23.46 g/t Au over 9.0 m. This is an infill resource hole which intercepted wide mineralization at a vertical depth of 615 m below surface. These results continue to demonstrate the continuity of the Umwelt deposit and that these resources can continue to expand to the south and to depth. Umwelt Drill Highlights Hole Id Area Section Easting Northing Depth From To Length Au (g/t) Comment / Mineral Zone 11GSE096 Umwelt 4400 430347 7270728 504.6 444 470.3 26.3 9.02 Main Zone East including 461 466 5 27.21 Main Zone East 11GSE105 Umwelt 4250 430509 7270672 578 543.55 549.8 6.25 3.78 Main Zone East 11GSE106 Umwelt 4050 430713 7270571 755 704.85 728.35 23.5 12.01 Main Zone East including 714 723 9 23.46 Main Zone East True widths are estimated to be 70% of drill widths Drilling at Llama, has also extended the zone an additional 100 metres to the south. Hole 11GSE077 on section 4600N returned 10.88 g/t Au over 9.80 m including 29.13 g/t Au over 2.90 m on the western limb of the Main Zone. This hole was a follow-up to hole 11GSE067 also on section 4600N which returned 1.29 g/t Au over 28.90 m. Hole 11GSE067 had a low sulphide content, but contained a number of fine visible gold occurrences which returned higher grades over narrower widths. The Main Zone West at Llama contains many high grade intercepts including hole 10GSE041 drilled in 2010 and which returned 25.43 g/t Au over 20.00 m. Hole 11GSE077 demonstrates that Main Zone West at Llama is open to the south. Also intersected in hole 11GSE077 was a zone called the Flying Wedge located immediately to the west of Llama. A 17.5 m wide zone grading 1.42 g/t Au was intersected along the lower base of an thick iron formation and this interval includes a 5.0 m grading 3.54 g/t Au. While initial geological interpretation indicated this interval maybe down dip, the intercept demonstrates the prospectivity of this extensive thick iron formation. While Llama is more complex than Umwelt, these new results indicate that the resource may be able to expand with further drilling.

Llama Drill Highlights Hole Id Area Section Easting Northing Depth From To Length Au (g/t) Comment / Mineral Zone 11GSE067 Llama 4650 429225 7272030 446 296.6 325.5 28.9 1.29 Main Zone West including 296.6 298.4 1.8 6.44 Main Zone West and 322.5 325.5 3 4.56 Main Zone West 345.5 346.5 1 2.33 Main Zone West 11GSE077 Llama 4600 428817 7271739 434 52.5 70 17.5 1.42 Flying Wedge BIF including 53.5 58.5 5 3.54 Flying Wedge BIF 395.5 405.3 9.8 10.88 Main Zone West including 397.5 400.4 2.9 29.13 Main Zone West True widths are estimated to be 70% of drill widths The Mineral Resources for Umwelt, as calculated by RPA in March 2011 using holes drilled prior to 2011, consist of Indicated Resources of 4,601,000 tonnes grading 6.1 g/t Au for 900,000 ounces of gold and Inferred Resources of 1,067,000 tonnes grading 6.4 g/t Au for 221,000 ounces of gold. The Mineral Resources for Llama, as calculated by RPA in March 2011 consist of Indicated Resources of 1,860,000 tonnes grading 9.4 g/t Au for 562,000 ounces of gold and Inferred Resources of 980,000 tonnes grading 5.7 g/t Au for 180,000 ounces of gold. The global Back River gold resource consists of an Indicated resource of 9,876,000 tonnes grading 8.33 g/t Au for 2,655,000 ounces Au and Inferred resources of 5,602,000 tonnes grading 8.65 g/t Au for 1,562,000 ounces Au. There are currently six drills operating at Back River and Wishbone. Four drills are working on resource expansion at Umwelt while two rigs are operating on the Wishbone property. Many assays from both projects are still pending. SABINA GOLD & SILVER CORP Sabina Gold & Silver Corp. is an emerging precious metals company with district scale, world class undeveloped assets in one of the world s newest, most politically stable mining jurisdictions: Nunavut, Canada. Sabina s primary properties consist of the Back River Gold Project as well as the Wishbone Claims, a vastly prospective grass roots project and the Hackett River poly metallic project all in Nunavut. The Company has announced a proposed sale of Hackett River and certain claims in the Wishbone greenstone belt to Xstrata Zinc Canada Division (Xstrata). The process to close the transaction with Xstrata is well underway and is expected to close later this year.

Quality Assurance Mr. Doug Cater, P. Geo, and Project Manager, Back River Project of Sabina Gold & Silver Corp. is a Qualified Person under the terms of NI43-101 and has reviewed the technical content of this press release for the Back River Project and has approved its dissemination. Mineral resources for Goose and George were generated by RSG Global Consulting Pty Ltd (Coffey Mining) in September 2007. Mineral resources for Llama and Umwelt deposits were generated by Roscoe Postle Associates (RPA) in March 2011. These are all posted on www.sedar.com. Diamond drill core was sent to TSL Laboratories in Saskatoon, Sask. Quality control is monitored on a continual basis and utilizes a system of standards, blanks and duplicates to ensure analytical accuracy. The protocols and procedures used in 2011 are the same as those used in earlier campaigns by Sabina Gold & Silver Corp. and have been deemed appropriate in the above noted 43-101 compliant resource reports. For further information please contact: Nicole Hoeller, Director, Investor Relations: 1 888 648-4218 nhoeller@sabinagoldsilver.com Forward Looking Statements Statements relating to exploration, pre-feasibility work and future operations at the Back River Project and the expected results of this work are forward-looking statements within the meaning of securities legislation of certain Provinces in Canada. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words expects, plans, anticipates, believes, intends, estimates, projects, potential and similar expressions, or that events or conditions will, would, may, could or should occur. Information inferred from the interpretation of drilling results may also be deemed to be forward looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company s properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Sabina s operations and other risks and uncertainties, including those described in Sabina s Annual Report for the year ended December 31, 2010.

Forward-looking statements are based on the beliefs, estimates and opinions of Sabina s management on the date the statements are made. Sabina undertakes no obligation to update these forward-looking statements should management s beliefs, estimates or opinions, or other factors, change.this news release has been authorized by the undersigned on behalf of Sabina Gold & Silver Corp. Tony Walsh, President & CEO 930 West 1 st Street, Suite 202 North Vancouver, BC V7P 3N4 Tel 604 998-4175 Fax 604 998-1051 http://www.sabinagoldsilver.com Table 1: Recent Umwelt Deposit Assay results Hole Id Area Section Easting Northing Depth From To Length Au (g/t) Comment / Mineral Zone 11GSE080 Umwelt 4050 430574 7270462 674 570.8 573.25 2.45 6.25 Main Zone East 11GSE096 Umwelt 4400 430347 7270728 504.6 592.2 592.5 0.3 164.00 Main Zone East 444 470.3 26.3 9.02 Main Zone East including 461 466 5 27.21 Main Zone East 11GSE105 Umwelt 4250 430509 7270672 578 11GSE106 Umwelt 4050 430713 7270571 755 543.55 549.8 6.25 3.78 Main Zone East 704.85 728.35 23.5 12.01 Main Zone East including 714 723 9 23.46 Main Zone East 11GSE114 Umwelt 4650 430196 7270906 479 321.85 324 2.15 2.36 Main Zone East 339 348.6 9.6 9.63 Main Zone East including 347 348.1 1.1 32.12 Main Zone East

Table 2: Recent Llama Deposit Assay results Hole Id Area Section Easting Northing Depth From To Length Au (g/t) Comment / Mineral Zone 11GSE067 Llama 4650 429225 7272030 446 296.6 325.5 28.9 1.29 Main Zone West including 296.6 298.4 1.8 6.44 Main Zone West and 322.5 325.5 3 4.56 Main Zone West 345.5 346.5 1 2.33 Main Zone West 11GSE077 Llama 4600 428817 7271739 434 52.5 70 17.5 1.42 Flying Wedge BIF including 53.5 58.5 5 3.54 Flying Wedge BIF 395.5 405.3 9.8 10.88 Main Zone West including 397.5 400.4 2.9 29.13 Main Zone West 11GSE082 Llama 4550 429291 7271955 476 333.85 334.8 0.95 3.88 Main Zone West 338.5 356.1 17.6 4.20 Main Zone West including 338.5 340.5 2 13.10 Main Zone West including 346.5 348.5 2 5.71 Main Zone West including 353.5 356.1 2.6 12.95 Main Zone West 364 367 3 1.33 Main Zone West 381 382 1 1.17 Main Zone West

Figure 1: Goose property Drillhole target plan

Figure 2: Umwelt Drill hole collar plan with collars highlighted for reported holes.

Figure 3: Umwelt geological section 4050N view looking north Hole 11GSE106

Figure 4: Umwelt geological section 4400N view looking north Hole 11GSE096

Figure 5: Llama Drill hole collar plan with collars highlighted for reported holes

Figure 6: Llama geological section 4550N view looking north hole 11GSE082 Figure 7: Llama geological section 4600N view looking north hole 11GSE077

Figure 8: Llama geological section 4650N view looking north hole 11GSE067