Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions



Similar documents
Page85. Lock-out Tag-out Plan

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

BWC Division of Safety and Hygiene

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Lockout/Tagout Compliance Guide and Checklist

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

3088 Lockout-Tagout Training Program Course Outline

Lockout/Tagout Training Program

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

Energy Control Lockout/Tagout

Lockout - Tagout Program

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

Lockout/Tagout (LOTO) Compliance Guide

ISSUE: LOCK OUT BLOCK OUT

Lock-out/Tag-out.

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

LOCKOUT/TAGOUT PROGRAM. Table of Contents

Control of Hazardous Energy (Lockout / Tagout)

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

Lockout / Tagout Awareness

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

LOCK-OUT / TAG-OUT SAFETY TRAINING

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

Lockout / Tagout Program

File Name: LO/TO Orig. Date: November 2005 Revision Date:November 2006 Reviewed Date: November Standard: OSHA: 29CFR

Planned, Limited Notice and Emergency Outage Guidelines

L O C K O U T / TA G O U T A D M I N I S T R AT I V E G U I D E

Lockout Tagout Program. Table of Contents

section 5 machine guarding and lockout

Planned and Emergency Utility Outage Guidelines

Business Unit/Area: N/A. Protocol No.: COR-3S3-PR

Lockout/Tagout. Training: 29 CFR Lockout Tagout Standard States employer must provide training on lockout tagout.

Preventative Maintenance Policy

Oil and Coolant Circulating Heating System. Model - OCSM

HealthStream Regulatory Script

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

Electrical Safety in the Workplace

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

HERSHEY ENTERTAINMENT & RESORTS COMPANY LOCKOUT / TAGOUT PROCEDURE

Preventing Overheated Boiler Incidents

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

UC Berkeley Energy Isolation Lockout Tagout (EI-LOTO) Program

MORE HIGH-IMPACT LOCKOUT/TAGOUT SAFETY TRAINING

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

ABC-1000 Automatic Boiler Level Controller Operation and Installation Manual

PC1130 Electric Air Compressor

Customized Assessment Blueprint

WORKING IN CONFINED SPACES GUIDELINES

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

Quik Lining Systems Heater Owners Guide

3053 Electrical Safety Training Program Course Outline

Lawn Sprinkler Systems Reserve Irrigation Inc. O & M. Version Roseland Drive Macedonia, Ohio

MANCON Human Resources Workers Compensation or ext 312 or

SERVICE MANUAL FOR 6535 SERIES TWO TON HIGH EFFICIENCY PACKAGED HEAT PUMPS

Install Guide CT100. Caution. Caution ENGLISH. disconnect the power supply before beginning work.

ACCUMULATOR INSTALLATION

12V Portable Diaphragm Compressor Operating and Maintenance Instructions

PC1131 Electric Air Compressor

AE R6 December Digital Capacity Control for Copeland Scroll Refrigeration Compressors AE R6

Section 1: Safety. General Safety. Recognizing Safety Precautions. Locking Out the Machine. Safety Circuits. Interpreting the Light Column

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Magnetic Starter - 30A, 120/240V Coils

Job Hazard/Safety Analysis For the Paint & Finish Worker

Technical Information

OPTIONAL INFORMATION ELECTRICAL SAFETY WORK PRACTICES SELF INSPECTION CHECKLIST

HEAT PUMP FREQUENTLY ASKED QUESTIONS HEAT PUMP OUTDOOR UNIT ICED-UP DURING COLD WEATHER:

ENERGY TRANSFER SYSTEMS AND THEIR DYNAMIC ANALYSIS

SunMaxx Solar Filling Station Operating Instructions

Hazards associated with the gas system and how to mitigate them

High kw Electric Tankless Water Heater Troubleshooting Guide

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

Skills Canada National Competition Instructions and Competition Details 38 Refrigeration and Air Conditioning / Post - Secondary May 27-30,

Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

Cooling Fan Replacement September Rev A1 Page 1 of 6

Energy Systems Test Area (ESTA) Electrical Power System Test Operations Test Request Worksheet

Installation Instructions for Alarm Module Kit A043F059

SELECTION, APPLICATION AND MAINTENANCE

3620 W 11th Streetб Houston, TX Telephone: sales@kellogg-american.com Website:

Install Guide CT101. Caution. Caution

Machine Guarding and Operator Safety. Leader Guide and Quiz

INSTALLATION AND OPERATION INSTRUCTIONS - (LOW FLOW MODELS) (Before installation, compare electrical needed for the model of heater selected)

Electrocution Hazards

Transcription:

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions Note Only one ELP is required for identical equipment set up in an identical configuration. The template includes the following required sections: Signatures Employee who completes the procedure should sign and date, then take the procedure to his/her supervisor for review and signature. If the supervisor has questions regarding any elements of the procedure, these should be taken to the next level manager and Environmental Health & Safety. The supervisor shall keep a copy of the completed form on file, and the original will be kept by the employee performing the work. Section A: Procedure Purpose No additional information is required in this section. Section B: Equipment Description Enter the building and room where the equipment is located. The equipment description should include enough detail to uniquely identify the specific piece of equipment covered by this procedure. If the equipment has an existing identification tag or number, this should be noted. Examples of equipment identification include, Motor powering pump P-2, Air Handler located in southwest corner of the room, etc. Section C: Hazardous Energy Assessment Identify hazardous energy to which you may be exposed during your servicing work. Example: Type of Energy Type / Magnitude Danger Zone Isolation Point(s) Electrical- low voltage (50-600 V) - list amperage 480VAC 3 phase 100 amp service Wiring connection points in motor housing junction box Disconnect adjacent to motor on right hand side. Section D: Preparation and Notification Step 1, Preparation: Identify group lockouts, authorized personnel, and shift changes. Step 2, Notifications: Notify and record affected employees (example: department technician who will lose compressed air when compressor is shut down). Step 3, Equipment Shutdown: List equipment shut down procedure (note: this is NOT the lockout procedure, this is just the steps to stop and shut down the machine/equipment).

Control of Hazardous Energy: (ELP) Template Instructions (continued) Section E: Steps for Controlling Hazardous Energy Identified in Section C For EACH energy source / isolation point identified in Section C, complete the applicable information. Example: Energy source description: 480 VAC 3 phase 100 amp service Isolate: Switch disconnect to off Control: Apply lock and tag to disconnect Dissipation: N/A Verify zero energy state appropriate to the type of hazardous energy involved: Check voltage at wiring connection point on motor Section G: Steps to Return to Service

Author Employee who completed this form(print name & sign) date This document has been reviewed and approved by Supervisor (print name & sign) date Section A. Procedure Purpose The purpose of this procedure is to identify all hazardous energies and hazardous energy isolation points and list all required steps to safely shut equipment down and return it to service after work is completed. Failure to follow this lockout procedure may result in injury to personnel or damage to equipment and may result in disciplinary action, up to and including termination. Section B. Equipment Description Equipment Location: Building Number: Room Number: Equipment Description:

Section C: Hazardous Energy Assessment Cal Poly Facility Services Evaluate the equipment for all hazardous potential energy sources and check the left hand box if present. For each, describe the type and magnitude, danger zone (the part(s) of the equipment where the energy is found), and isolation points. Note: Describe how to control each identified hazardous energy source in Section F. Types of Energy Type / Magnitude Danger Zone Isolation Point(s) Electrical - low voltage (<50 V) - list amperage Electrical- low voltage (50-600 V) - list amperage Electrical - high voltage (>600 V) - list amperage Pressure - hydraulic, pneumatic > 150 psi in rigid pipe 50 psi in flexible, unsecured lines Vacuum Mechanical - capable of crushing, pinching, cutting, snagging, striking Thermal- high temperature-surface temperature, hot liquids, steam Liquids or gases > 125 F (52 C) Surfaces 140 F (60 C) Thermal, cryogenic - super cold surface or cryogenic liquid < 27 F (-3 C) Stored energy - flywheel, springs, differences in elevation, capacitors, batteries, etc. Emergency power- does the equipment maintain an emergency power/uninterruptible power supply? Other- describe

Section D: Preparation and Notification Step 1. Is this a Group Lockout? Yes No If yes list all authorized employees working under this lockout: Primary Authorized Employee: Other Authorized Employees: Will this lockout span a shift change? Yes No If yes then supervisor or manager must sign this section confirming that the following shift has been notified of the presence of the lockout and the need to place their locking devices at the energy control point before working on the locked out equipment : Name of Supervisor/Manager: Signature of Supervisor/Manager: Step 2. Notify Prior to starting work, notify affected workers of the lock out activity. Employees notified: Step 3. Shut equipment down steps:

Section E. Steps for Controlling Hazardous Energy Identified in Section C Energy source description: Isolate: Control: Dissipation: Verify zero energy state appropriate to the type of hazardous energy involved: Energy source description: Isolate: Control: Dissipation: Verify zero energy state appropriate to the type of hazardous energy involved: Energy source description: Isolate: Control: Dissipation: Verify zero energy state appropriate to the type of hazardous energy involved: Energy source description: Isolate: Control: Dissipation: Verify zero energy state appropriate to the type of hazardous energy involved:

Section G: Steps to Return to Service Step 1. Verify equipment and area is clear of tools, workers, equipment, materials, and debris. Step 2. Unlock and remove any blocking devices; remove linkages. Step 3. Reposition any safety devices, guards, interlocks. Step 4. Warn workers to stay clear of area. Step 5. Remove all locks and tags for energy control points. Step 6. Verify affected areas are clear of personnel. Step 7. Re-energize the equipment. Note: be certain to consider effects of re-energization on all systems downstream of energy source. Step 8. Notify supervisor when work is complete. Step 9. If you find any errors in this procedure, or have suggestions on how to improve it, provide your comments to your supervisor.