Preventative Maintenance Policy



Similar documents
LOCK-OUT / TAG-OUT SAFETY TRAINING

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

3088 Lockout-Tagout Training Program Course Outline

BWC Division of Safety and Hygiene

LOCKOUT/TAGOUT PROGRAM ENERGY CONTROL PLAN

Lockout - Tagout Program

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

Machine/Woodworking Shop The Basic Rules

Control of Hazardous Energy (Lockout / Tagout)

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Notes. Material 1. Tools the employee is expected to operate

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

Lockout/Tagout Compliance Guide and Checklist

Lockout / Tagout Program

WEEKLY SAFETY MEETING All Euramax Subsidiaries LOCKOUT / TAGOUT. Safety Meeting Contents. Meeting Notice. Leaders Guide.

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

Page85. Lock-out Tag-out Plan

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

TEMPORARY EMPLOYEES SAFETY PROCEDURES

LOCKOUT/TAGOUT PROGRAM. Table of Contents

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

University of Nevada, Reno

Lockout/Tagout Training Program

MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM

Energy Control Lockout/Tagout

section 5 machine guarding and lockout

Lock-out/Tag-out.

ISSUE: LOCK OUT BLOCK OUT

KELLER S 5-MINUTE WORKPLACE SAFETY TALKS

Safe Operating Procedure

Machine Guarding and Operator Safety. Leader Guide and Quiz

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

File Name: LO/TO Orig. Date: November 2005 Revision Date:November 2006 Reviewed Date: November Standard: OSHA: 29CFR

Lockout/Tagout (LOTO) Compliance Guide

HealthStream Regulatory Script

Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety

Lockout/Tagout. Training: 29 CFR Lockout Tagout Standard States employer must provide training on lockout tagout.

Citations in brackets are from Title 8 of the California Administrative Code.

Tech Shop Safety Level 2 - FN Tech Shop / Tool Safety Operations. (Fermilab machines not covered in course FN000258)

Lockout Tagout Program. Table of Contents

E3902 Seeing Accidents Before They Happen Leader s Guide

OSHA Training Guidelines (An Unofficial Summary)

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions

3053 Electrical Safety Training Program Course Outline

Machine and Power Tool Safety Checklist. Version 1.0 June Chestnut Street, Suite 400, Philadelphia, PA

FORKLIFT SAFETY TIPS

MODEL T-4 TRENCHER. Operators Manual

CONTROL OF HAZARDOUS ENERGY/ LOCKOUT/TAGOUT PROGRAM

Passenger cars.

R02GA. July 31, Dear Blue Bird Owner:

Portable Grinder. Given a properly adjusted portable grinder, instruction and demonstration of use, each student will be able to:

Digital Fingerprint safe

MORE HIGH-IMPACT LOCKOUT/TAGOUT SAFETY TRAINING

Metal or Woodworking Shop Policy

CAER Construction and Environmental Resource

Working Copy WP 05-WH1401. Revision 4. 6-Ton Electric Forklifts 74-H-010B. Technical Procedure EFFECTIVE DATE: 01/04/06. John Guy APPROVED FOR USE

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

PORTAL CRANE STANDARD OPERATING PROCEDURES

Electronic Brake Controller Hayes Brake Controller Company ENERGIZE III P/N # 81741B or ENERGIZE XPC P/N #81745 OPERATION MANUAL

Safety Rules. Car Washes CORPORATE HEADQUARTERS 518 EAST BROAD STREET COLUMBUS, OHIO STATEAUTO.COM

Abrasive Wheel Grinder Safety

Practical accident assistance

CHROME FRONT BRAKE MASTER CYLINDER KIT

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District

INSTALLATION INSTRUCTIONS

Lockout / Tagout Awareness

Multi-information Display (see MID )

Videos for Safety Meetings

INSTALLATION INSTRUCTIONS

Ensure that the operator is properly trained and certified to operate the equipment in the material handling application at hand

PERSONAL PROTECTIVE EQUIPMENT PROGRAM

Texas Department of Insurance. Provided by. Personal Protective Equipment. Division of Workers' Compensation HS96-101C (10-06)

Director, National Institute for Occupational Safety and Health. California Fatality Assessment and Control Evaluation (CA/FACE) Program

MANCON Human Resources Workers Compensation or ext 312 or

Powered Industrial Truck Safety Program

3 WATT LED SPOTLIGHT Model No. SLM

Forklifts, Battery Charging and Material Handling

Safety Manual For Overhead Crane Operators

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

LOS ANGELES UNIFIED SCHOOL DISTRICT DIVISION OF ADULT AND CAREER EDUCATION SAFETY TEST FOR ELECTRICIAN PROGRAM

Class 5 to 7 Truck and Bus Hydraulic Brake System

TABLE-TYER / TABLE-TYER SS POWER STRAPPING MACHINES 04/12/07

RECOMMENDED TOOLS PERSONAL & VEHICLE PROTECTION SAFETY GLASSES

Chapter 7 Hydraulic System Troubleshooting

Accident Case Studies

Responsibilities of a Volunteer Leader

Installation Instructions

L O C K O U T / TA G O U T A D M I N I S T R AT I V E G U I D E

Work Order History Report

Citation 1 Item 1a. #22: Struck by Inspection #

HEALTH AND SAFETY REDUCING ACCIDENTS IN KITCHENS

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Notes. Material 1. Portable Ground Fault Interrupter 2. PPE (safety glasses, gloves, other) 3. Circuit Tester

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.

OPERATING INSTRUCTIONS FOR

Transcription:

Section 7 - Preventative Maintenance Preventative Maintenance Policy It is the Company Policy of to ensure that all equipment, vehicles, and tools are properly maintained in a condition that will maximize the safety of all personnel so as to reduce the risk of injuries to employees, or damage to property or the environment. All supervisors shall ensure qualified personnel carry out preventative maintenance according to a schedule and that proper records are kept. All equipment shall be inspected prior to start-up and any tool or equipment that is not functioning correctly shall be tagged and taken out of service and reported for corrective repair. No worker is expected to operate any tool or equipment unless it is functioning safely. References: Manitoba W.P.S. & H. Act. Sec 4(2) (a), Regulations, Part 16 Machine & Tool Safety, Part 16.4 to.13, 16.14 to 16.18 lockout, 16.19 to 16.21 conveyors, 16.22 to 16.28 misc. Machine tools, Part 17 Welding & Allied Processes, Part 22, Powered Mobile Equipment Sec. 22.22 to 22.23, Part 38 Electrical Safety. * The information in this policy does not take precedence over applicable government legislation, with which all workers should be familiar.

Section 7 - Preventative Purpose Maintenance Defective Tools The purpose of this Safe Work Practice is to discourage, in fact, remove defective tools from being used in the work place. It is important to establish a system of removal, replacement, or repair of defective tools to prevent accidents and injuries. Identify defective tools; tag them for removal - such as: Chisels and wedges with mushroomed heads Split or cracked handles - axes, hammers etc. Chipped or broken drill bits Tools which are not complete, e.g. files without handles Electrical extension cords, damaged insulation or ground pin broken off Tools with guards broken or removed Power saw, portable or bench type - guard wedged back Wrong grinding wheel being used Wrenches with worn out jaws Tools with worn out on-off switch Inspect tools before use Never use a defective tool

Section 7 - Preventative Maintenance Lockout Procedures for Service and Maintenance Personnel Policy, Lock out procedures will be used to prevent unwanted start up of equipment or machines during maintenance tasks. The supervisor should ensure a lock out procedure is used where manufactures procedures cannot be maintained for cleaning, tests, adjustments, and maintenance. Maintenance workers must insure the equipment is locked out or inoperative before any maintenance is performed on equipment. Injury can result due to accidental start up, hydraulic pressure not relieved in system, jammed mechanisms, improperly blocked wheels or tracks, inoperative park systems, electrical system not shut off properly. Safe Work Procedures will be written for maintenance tasks where the manufactures procedures cannot be used. Always follow manufacture procedures for maintenance where applicable Lock out Procedure: Park equipment on level ground where maintenance can be done. Ensure park brake is operative, test park system to ensure vehicle will not move. Set Park Brake and transmission in neutral. Neutralize all hydraulics lower implements, blades, rippers, buckets, to park equipment. Shut down equipment remove ignition key where there is one and keep on yourself while doing repairs. Disconnect negative battery cable at negative post of battery if working in the engine compartment. Shut off master switch if ignition is keyless. Try to start machine push the start button. Ensure the machine will not start. Tag machine with out of service tag on steering wheel, or control lever. Perform the repairs required as per the manufacturer service manual. If working on hydraulics check the service manual to verify the hydraulic system is safe to work on when the machine is off. Check temperatures of components before beginning any repairs as hydraulics may be too hot to work on initially. Verify the repair or service adjustment is complete restart machine and test operation. Road test unit as required in the field to test operation. Return the unit to the operator or to service supervisor.

Section 7 - Preventative Maintenance Lockout/Tagout Directive It is Policy to lockout andlor tagout any equipment that is not operable and is under repair. For vehicular equipment it is mandatory to use the club locking system. For smaller pieces of machinery or tool a tag is only necessary to indicate an out of service or under repair situation. Once you apply the lock or other restraint device, you have to tag it. The tag must indicate: 1. Whoyouare 2. Why the machine or system is locked out 3. The date when the lockout was applied Front 0 EEl DO NOT OPERATE I DO NOT REMOVE THIS TAG NAME. DATE. SEE OTHER SIDE

Section 7 - Preventative Maintenance Equipment Lock Out Facility: Written By: Approved By: Date Created: Date of Last Revision Hazards Present PPE or Devices Required: Additional Training Required: - Electrocution Steel toed boots Fall injury Eye protection Pinch points Hand protection Safe Work Procedure: 1. Inspect the piece of mobile equipment needing repair to ascertain what repair is needed. 2. Turn the machine ignition off and remove key or, if machine has push start button, remove the battery ground cable. 3. Close and lock console if it has a cover and place the key in your pocket. 4. Place a lock out tag on the door handle or ignition. 5. If more than one person is working on the equipment, both people must place a lock out on the machine 6. If it is a mobile piece of equipment, use the chocks to ensure non-movement by others. 7. Repair the machine. 8. After repair, unlock the cover and replace the key. 9. If you require the machine running to test the repair, stand clear of any hazard locations. Do not approach any moving part while machine is running. If an emergency situation occurs while conducting this task, or there is an equipment malfunction, engage the emergency stop and follow the lock out procedure. REPORT ANY HAZARDOUS SITUATIONS TO YOUR SUPERVISOR Guidance Documents/Standards: This Safe Work Procedure will be reviewed any time the task, equipment or materials change and at a minimum MB Workplace Safety & Health Act & Regulations: of every three years. 6 Personal Protective Equipment Reviewed by Worker Rep/WSH Committee: 14 Fall Protection 16.14 Machines, Tools and Robots 22 Powered Mobile Equipment Date:

Section 7 - Preventative Maintenance Trucks & Equipment Due to the misuse of trucks & equipment, you will be held responsible for all damages to Crown s vehicles, including Accident - Dents - Scratches - or ANY abuse that may damage to drive train. There is no reason for this damage to occur. reliable fleet. Crown is trying to keep a good and If damage occurs, you must notify the office that day. Then we can set a time for the vehicle to be repaired that will not interfere with the work at hand. I will be responsible for the Trucks & Equipment that I use at