Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors



Similar documents
Ron Miedema Cement Contractor 1865 Pine Ridge ~ Jenison, MI 49428

International Greenhouse Company

Metropolitan Builders Association Masonry & Concrete Standard

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

Free-Form Concrete Pool

Resurfacing Concrete. Page 1 of 5

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

Minor Cracks in Horizontal Surfaces

Concrete warranty and customer information

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Construction Specification for Concrete Curb and Concrete Curb and Gutter

SECTION EARTH MOVING

Chapter 2 Basis of design and materials

GUIDELINES FOR POLISHED CONCRETE FLOORS A Guide for Integrally Colored, Dyed and Stained Polished Floors

Installation PowerPoint for Grasscrete Formers

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

GUIDELINE FOR EXPOSED AGGREGATE FINISHES

PROPERTIES AND MIX DESIGNATIONS

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

Lab 1 Concrete Proportioning, Mixing, and Testing

Cold Weather Concrete Practices

Pervious Concrete Pavement Maintenance and Operations Guide

LAYING BLOCK AND BRICK

These recommendations generally follow the Construction Specifications Institute (CSI) Master Format.

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

How to Install Pavers

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Example Specification for Concrete using Current Building Code Requirements

Adhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)

GigaCrete Specification PlasterMax

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SEE HOW TO MAKE LIME PLASTER WHY USE LIME? PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013

Lesson 3. Portland Cement and Concrete

Solvent Cementing Instructions For Plastic Pipe & Fittings

PERFORMANCE GUIDELINES

Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

SECTION 4Aggegate Subbase

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Quality Assurance Concepts. Outline

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

APPENDIX B. I. Background Information

ELASTOCEM. Technical features. Applications. Two-component flexible, waterproofing and protective cementitious grout.

Onion & Leek Planting Guide

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

ASPHALT & CONCRETE SPECIFICATIONS

Advancements in Permeable Pavements

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Specification Guidelines: Allan Block Modular Retaining Wall Systems

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

STANDARD SPECIFICATIONS

BEST PRACTICE GUIDE. Fibrelime Premixed Universal Plaster and Render

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

C. Section TESTING LABORATORY SERVICE.

The Concrete Life Cycle: Maintain to Sustain. Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

Lay blocks with mortar

How to build a Pizza Oven in 4 days

Soils, Foundations & Moisture Control

SECTION POLISHED CONCRETE FINISHING

OHIO ASPHALT PAVING CONFERENCE

Moisture and Resilient Floor Covering

Concrete Resurfacing. System Guide. by Parchem Construction Supplies

SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB

GUIDE SPECIFICATION COMBINATION SURFACE SYSTEM FOR NEW HOT MIX ASPHALT TENNIS COURTS I. PART 1 - GENERAL

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson

Renovating Your Basement

SC2000 CEMENT BONDING PROCEDURES

Virginia Gardener

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

Cupped Floor STEP 1. Flooring absorbing excessive moisture on the underside causes expansion and cupping with the edges raised.

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

Baumit Renders for Porotherm Masonry. Application Guidelines. n Light and easy application n Tried and tested

White rust on galvanized and galvanized pre-painted steel. Technical Information

Chapter. Restoration of Damaged Structures

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Benefits of Preventative Maintenance Pavement Sealers

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

symptoms of a faulty foundation

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Herringbone Pattern Flooring

Section 300 Base Courses

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

Concrete Repair. Applications and Procedures

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

WATERPROOFING OF WET ROOMS

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

Wecryl Waterproofing System under surfacing supplied by others

Transcription:

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to resist weathering action, chemical attack, abrasion or any other process of deterioration. Durable concrete will retain its original form, quality and serviceability when exposed to its environment." For quality concrete around the home, we recommend 1. Planning 2. Preparation 3. Specifications for concrete 4. Placing 5. Finishing 6. Curing, and 7. Extending life of your concrete 1. Planning a. Thickness. 4 inches is generally enough, unless heavy trucks will park on it regularly. b. Base. Firm, sound subsoil is entirely adequate as a base for residential concrete. There is no need to bring in sand, gravel, or stone unless it is specified or for leveling, drainage, or uniformity. c. Reinforcement. Wire mesh is not necessary in residential slabs-on-grade when proper joint spacing and subgrade procedures are followed. d. Drainage. Surface of the finished slab should slope a minimum of 1/8 in. per ft. A slope of 1/4 in. per ft. is preferred. 1

2. Preparation a. Excavating. Be sure to take out all organic matter - sludge, leaves, tree roots, wood, etc. Don't dig deeper than you need to. b. Compaction. Subsoil on which concrete is to be placed must be compacted uniformly and evenly so the slab won't settle and won't vary in thickness. c. Forms. Stake securely. See item 1-d for surface slope. Scrape base away from forms so edges will be at least full thickness, because if edges are thinner, cracks could start at the edge and slowly work their way across the whole slab. d. Isolation. Before concrete is delivered, install premolded joint material wherever flatwork comes against buildings, steps, walls, existing slabs, etc. This is so new concrete won't bond to the structures. Joint material must extend all the way to the bottom of the slab. e. Moistening. Shortly before placing concrete, wet the forms and the subgrade. Don't make the subgrade so wet that it's muddy. And don't spread plastic under the slab; that forces all the extra water in the concrete to escape through the top and weakens the surface. 3. Specifications for Concrete a. Strength: A durable concrete mix design must be a minimum 4000 psi at 28 days. b. Air: Air content when placed 6 1/2 % - (5% to 8%) c. Slump: Slumps should be 4 in. +/- 1 in. the slump should not exceed 5 in. for durable concrete. Anything more than 6 in. is entirely too wet to use. Slumps greater than 4 will prolong the time you have to wait before finishing, particularly in cool weather. d. Aggregates: Use clean, sound aggregates. 2

4. Placing a. Addition of Water: Water should not be added at job site. Adding water dilutes the mixture to less than its designed strength. If it is absolutely necessary to add water to get the desired slump, put it all in at once, then run the mixer at full speed for two full minutes and record amount added. b. All concrete should be placed within 90 minutes from the time the truck was loaded. In hot weather the purchaser should shorten the time limit to maintain durable concrete. Prolonged mixing time or waiting time on the job cart result in a loss of air content and/or slump. c. Filling the Forms: Chute, wheel or shovel concrete directly to its final position. Don't dump it in piles and then flow, drag or rake it the rest of the way. d. Leveling: Screed (strike-off) twice to level the surface. Immediately use wood or mag bullfloat to take out small high and low spots. Then, stop everything on that portion of the slab until bleed water (water sheen) disappears from the surface. e. Finishing operations should not be performed I when there- is excess moisture or bleed water on the surface. No adding of water or cement to the concrete surface to assist in finishing. 5. Finishing a. Steel troweling of the concrete surface is not recommended. b. When to finish: Immediately after all the bleed water is gone is the proper time to (1) broom OR float surface; (2) if hand tooled, cut control joints while concrete is still plastic and (3) edge. c. Final Finis: A broom finish is recommended particularly on driveways, walks, etc. Where a smooth finish is desired (garage floors, patios, etc.) a wood hand float finish should be used. Machine floating and/or troweling is not recommended. d. Joints: Control joints may be hand tooled or sawed (sawing is recommended). In either method, they must be cut to a depth of at least 1/4 the thickness of the slab and spaced so that the dimension in either direction does not exceed that shown in the following table. 3

Slump 4 in. to 6 in. Slab thickness, in. Maximum-size aggregate less than 3/4 in. Maximum-size aggregate 3/4 in. and larger 4 8 10 5 10 13 This means that, in addition to transverse jointing, a joint must be cut down the center for the full length of a driveway that is 12' wide and 4" thick, or for one that is 16' wide and 6" thick. Joints usually are at much shorter intervals in public sidewalks. Most common spacing is 5 ft. Local codes or ordinances govern. Joints must be straight and continuous; not staggered of offset. When control joints are sawed, this should be done after all other finishing and curing applications are complete and as soon as the concrete has hardened sufficiently to permit sawing without raveling. Under normal conditions, joints should be sawed in 6 to 24 hours. e. Caution: Do not overwork or over finish the surface of any exposed concrete slab. Not only is it time consuming and expensive but tends to bring too much fine material to the surface and weaken it. Never use a steel trowel on concrete exposed to weather. These practices could result in spalling or scaling. 6. Curing a. Need for Curing: Curing is one of the most important steps in concrete construction and, regrettably, one of the most neglected. Effective curing is absolutely essential for surface durability. Fresh concrete must be kept warm and moist until the mixing water combines chemically with the cement (hydration). That's what hardens the concrete and gives it its strength. Without proper curing the, 4000 psi concrete may not reach 2000 psi in 28 days. 4

b. Curing in Warm Weather: Using a curing compound applied according to the manufacturer recommendations. In very hot weather, a white pigmented liquid membrane curing compound is best because it keeps the surface up to 40 F cooler and avoids excess evaporation. c. Curing In Cold Weather: It is absolutely essential that fresh concrete be kept from freezing for at least the first week after it is placed. In cold weather, membrane curing may not keep the concrete warm enough. A better way is to spread a thick layer of straw over it and then cover that with a plastic sheet (black preferred to retain heat). d. What Not to Use: Avoid any curing procedure that lets the surface dry in a short time. Quick drying stops the hardening process thus making a weak surface that is likely to scale. e. Drying: Newly placed outdoor concrete not only needs time to cure, but it also needs time to dry in warm air. Concrete placed early enough in the season so that it has one month of temperature above 40 F for curing and still another month for drying out before freezes are expected (certainly before deicers are applied) has a decided advantage over concrete that has not dried out when cold weather begins. 7. Items to Consider Extending the Life of Your Concrete a. Wait - to drive on your concrete for 7 days. b. Protect - your new concrete from drain water so it cannot undermine the slab and cause settlement cracks. c. First Winter: Be advised not to use salt or other deicers during the first winter, especially if concrete was placed after September 15th and was not sealed. Suggest the use of sand instead. d. Safe Use of Deicers: Deicers containing salt/or calcium chloride should be generally safe for use on a quality concrete pavement after the first winter. Never use any deicer that contains either ammonium sulphate or ammonium nitrate. Anyone who buys a deicer under a brand name should read the label to see what it contains. 5

e. Sealers: Water-repellent coatings and sealers can help reduce damage from freeze/thaw cycles and salting. They keep water from getting into the surface pores. Some of them will cause some darkening of the slab. Newly cured concrete should have its period of air-drying before being sealed. Most sealer applications are effective for about a two-year period. f. The Value of your concrete in place far exceeds the cost of sealing. It is highly recommended that you make this small investment to help provide the durability you expect and to maintain a relatively blemish free surface throughout the driveway's service life. Benson Ready Mix Central Ready Mix Danube Ready Mix Glenwood Ready Mix (320) 843-4177 (320) 354-2219 (320) 826-2364 (320) 634-4765 Redwood Falls Ready Mix Sauk Centre Ready Mix Willmar Ready Mix (507) 644-2586 (320) 352-3017 (320) 235-0660 6