Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

Similar documents
Estimation of electrical losses in Network Rail Electrification Systems

Your Power. Traction energy

National Passenger Survey Autumn 2012 Main Report

Passenger Rail Service Satisfaction Quarter 2 Statistical Release. 18 December Responsible Statistician: Dr Fazilat Dar

SSE s criteria used for GHG emissions reporting

Appendix A. About RailSys 3.0. A.1 Introduction

Fact sheet. Conversion factors. Energy and carbon conversions 2011 update

Report on structure and functionalities of the new online energy efficiency screening tool for railways

PR13: ORR consultation on electricity for traction charges for CP5

3. Output framework. Key messages in this chapter

Hybrid shunter locomotive

Trapeze Rail System Simulation and Planning

Railway Business Strategy and R&D in Europe

UK Railway Systems Reliability - Modelling the Future a case study. Nigel Best, Bradley Hyland Network Rail 7 th March 2012

Best Practice Guide BPGCS007

Prudential plc. Basis of Reporting: GHG emissions data and other environmental metrics.

Case Study 5 Use of Wind Turbine Technology

Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited

Thameslink new Class 700 trains

DC Traction Power Supply. Powerful, efficient and safe. siemens.com/mobility

MITRAC Driven by Reliability. Propulsion & Controls

A Review of Passenger Rail Franchising in Britain: 1996/ /2012

European Distribution System Operators for Smart Grids

NERA Analysis of Energy Supplier Margins

Passenger & Freight Rail Performance: Quality and Methodology Report

Modern electrical propulsion systems for rolling stock

Technical Paper E1 (a) Energy Consumption in Cornwall. Cornwall Council January N.B. This is a live document that will be updated.

Kinetic energy recovery on railway systems with feedback to the grid

Demand Response Market Overview. Glossary of Demand Response Services

Name: Partners: Period: Coaster Option: 1. In the space below, make a sketch of your roller coaster.

Power Systems Engineering Research Center

The function of a power station is to deliver

Bussmann series Third rail fuse links application guide. Leadership in fusible circuit protection solutions

Electricity North West Carbon Footprint Report

Analysis of fuel cell

Our Group strategic framework

Conservation Voltage Reduction (CVR)

Domestic Energy Prices: Data sources and methodology

Virtual sales. assistant. Navigating within ABB to find complete Industrial IT solutions

Social Return on Investment

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER

System operation. A consultation on making better use of the railway network. August 2015

gasnetworks.ie Methodology for forecasting gas demand

RailML use in the project

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations

Electricity Terminology. Simplifying energy management

Management Incentive Plan Statement

KINETIC ENERGY RECOVERY SYSTEM BY MEANS OF FLYWHEEL ENERGY STORAGE

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation

How To Powertrain A Car With A Hybrid Powertrain

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

Carbon Footprint Calculator for Royal Society of Arts

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013

NRE Information Feeds Developer Pack

5 Things to Understand When Going Solar It s Pretty Simple

Network Rail Sussex Rail Utilisation Study (RUS)

Free electricity for your home, offices or factory with solar PV panels

We appreciate your feedback

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

NOTES ON AURORA LINE CHARGES FOR NETWORK DESIGNERS, CONSULTANTS AND ELECTRICAL CONTRACTORS

ELECTRICITY DEMAND DARWIN ( )

Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques

FREQUENTLY ASKED QUESTIONS

ECO Stars Fleet Recognition Scheme Improving Local Air Quality Through Operator Engagement

GTR (Govia Thameslink Railway)

The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE

Technical note. 1. Background. 2. Document Purpose. Project: A350 Chippenham Dualling

December Reviews of Public Electricity Suppliers 1998 to Distribution Price Control Review. Final Proposals

Fuel cell microchp: Greener and cheaper energy for all

Network Rail Monitor. Quarters 3-4 of Year 1 of CP5 12 October 2014 to 31 March June 2015

FACOGAZ Association of European Gas Meter Manufacturers

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles

Application of Systems Engineering to Enhance Safety and Risk Management in Railway Projects. R N Dumolo Mott MacDonald Limited

Asset Management Policy March 2014

Tram-train in the UK?

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

BGE/BG/FVTT/1010. Business Natural Gas Tariff guide October 2011

Overview of Long Island Electric Service Territory

Power Quality Paper #3

Network Rail October 2007 Strategic Business Plan. Supporting Document. Demand Forecasting in the SBP

Transcription:

Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008

2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption Rates for Electric Traction... 3 3 Proposed Method for Calculating Electrical Energy Consumption Rates... 4 RAILSYS modelling process to generate mechanical energy consumption rates... 4 List of assumptions made during the EC4T RailSys modelling... 5 Outputs from Railsys... 6 Conversion of Mechanical to Electrical Energy Consumption Rate... 6 Production of the rates... 7 4 Responses to this Consultation... 8 Appendix 1 - Draft Consumption Rates... 9 Appendix 2 Assumed Auxiliary Load Levels... 24 Locomotive Hauled Trains... 24 Multiple Units... 25

3 1 Introduction Context & background Network Rail, as part of its role as an operator of Britain s rail infrastructure, procures electricity from electricity suppliers, and then supplies electric current for electric traction to the Train Operating Companies (TOCs). The electricity is supplied via the overhead line and third rail electrical systems from a number of supply points around the country. Network Rail pays the electricity supplier based on the metered amount of electricity used at the supply points and recovers the costs from the TOCs which use it. The electricity consumed by electric rolling stock comprises of electric current for traction and auxiliaries (air conditioning, heating etc.). However, in contrast with other large users of electricity and in the absence of metering, there is no means of directly recording the train s electricity consumption and in the absence of metering, the consumption is based on an estimated approach. It is anticipated that in the medium to longer term the industry will move towards metering and there has been already a lot of constructive work done by industry parties to that end. Indeed the Department for Transport (DfT) in their Rail Technical Strategy, which was published in July 2007, have argued that it is desirable that trains have meters and envisages that this will happen from 2012 onwards. It is not anticipated that metering will be rolled out by April 2009. Under the estimated approach, electricity consumption rates were specified for each combination of train consist and train service code; by kilowatt hours (kwh) per train mile for multiple units and in Watt hours (Wh) per gross tonne mile for locomotive hauled trains. For each journey the following calculations are made: For multiple units train: Estimated Cost (Charge) = electricity tariff *electricity consumption rate* train miles For locomotive hauled train: Estimated Cost (Charge) = electricity tariff *electricity consumption rate* tonne miles A reconciliation process (known as the volume Wash-up) is carried out at the end of each financial year that compares the estimated consumption and the actual consumption measured at the grid intake meters. The wash-up is necessary because the consumption rates are only theoretical and actual consumption is likely to deviate from those rates. This deviation can either be positive or negative. The current electricity consumption rates were derived from a computer simulation model called TRATIM developed by AEA Technology in 1993. The system has since been decommissioned and hence the need for a new model to do the calculations. 2 Calculation of The New Electricity Consumption Rates for Electric Traction Given TRATIM was no longer available it was necessary to come up with a new modelling tool to calculate electricity consumption rates, as otherwise it would not be possible to develop a rate for new vehicles. We looked at a number of options, both internal and external, evaluating them on the following criteria:

4 1. Simplicity; 2. Ease of use; 3. Intellectual property rights maintained within Network Rail; 4. Data feeds taken where possible from Network Rail systems; 5. Ease of maintenance and data update; 6. User support; and 7. Visibility of the methodology. The chosen solution was a model based on a system used internally for timetable performance modelling, called RailSys (Version 6). When RailSys is combined with a bespoke in-house system, it will enable the calculation of a consistent set of train electricity consumption rates for each train operator and their associated train service codes. It should be noted that the system is not intended to replicate the results of TRATIM. 3 Proposed Method for Calculating Electrical Energy Consumption Rates The method used by Network Rail to calculate energy consumption rates (electrical energy) is divided into two stages. The first stage, as described below, involves using the RailSys software to generate the train s mechanical energy which is the energy exerted at the wheel rims of the powered axles. The second stage requires the conversion of mechanical energy (outputs from RailSys) into the electrical energy. RAILSYS modelling process to generate mechanical energy consumption rates RailSys has been used as a timetable performance modelling tool by Network Rail since April 2005. This software is supplied by Rail Management Consultants (RMCon) based in Hanover, Germany and its main purpose is to compare how the planned timetable reacts to primary delay events. It is used to test the operability of a development timetable and compare its performance to the current timetable. Since RailSys has been introduced there have been a number of refinements to the system. The latest version currently used at Network Rail, RailSys Version 6, incorporates some new and better features such as the calculation of a train s mechanical energy consumption. For this project, all the trains simulated in RailSys are based on an actual planned train timetable which takes into account the dwell time and allowances such as engineering, pathing and performance. The purpose behind this method is to ensure that trains are modelled according to how they actually run in reality.

5 The following flow chart shows the RailSys modelling process including the description of the inputs into RailSys: Route Data and infrastructure Timetable Data Rolling Stock Characteristics Run model INPUTS Evaluation Mechanical energy consumption rate for trains OUTPUTS Figure 1: The RailSys modelling process There are three main inputs into RailSys namely the route data and infrastructure, the timetable data, the rolling stock characteristics. The key inputs for the purposes of train s energy consumption Route Data and Infrastructure The UK railway infrastructure in RailSys contains detailed track characteristics, including line speeds and names, gradients, overlaps, block sections and complete signal details. Timetable Data The train timetables selected, as agreed by the project team, were based on the principle 2008 timetable (from December 2007 to May 2008). Rolling Stock Characteristics Network Rail maintains a technical traction database which has been incorporated into RailSys. This database contains majority of rolling stock in use. List of assumptions made during the EC4T RailSys modelling In deriving the mechanical energy consumption rate from RailSys, the following assumptions were made: 1. The timetable used is the principal 2008 timetable (from December 2007 to May 2008), which was extracted from the software programme called TrainPlan ;

6 2. The timetable is divided on a TOC by TOC basis and in turn each TOC is further divided into service codes; 3. The standard passenger trains braking rate is 0.57 m/s 2 ; 4. It is assumed that all trains have a 100% load factor (fully loaded); 5. The performance factor is assumed to be 95% (This factor is applicable for both flat out and timetable running of trains as the latter occasionally runs flat out at sections where the allocated Sectional Running Time is insufficient or has reached it s maximum capacity.); and 6. All trains are assumed to be running on green signals. Outputs from Railsys Based on the input data and assumptions above the RailSys software will produce a calculation of mechanical energy at the wheel rims for each vehicle type by service group. This calculation is done using two different train driving patterns: 1. Time-table running: (the train adheres to the timetable not always requiring the maximum acceleration, speed or braking rate. In some cases, the Sectional Running Time allocated for a train is more than sufficient and as a consequence the train will coast most of the way to the next stop, contributing to a non representative driving pattern in reality); and 2. Flat out: (the train runs through the route as quickly as possible - the train will accelerate at a maximum rate, maintain a maximum speed, and brake at a maximum rate). It should be noted that RailSys is only able to simulate the train driving patterns mentioned above. In order to obtain a suitable driving pattern that mimics reality, the average of the two RailSys driving patterns is calculated. The final outputs from RailSys are the average mechanical energy consumption rates. Conversion of Mechanical to Electrical Energy Consumption Rate Extra processing is then done to convert the amount of mechanical energy to electrical energy at the pantographs or shoes, using the electrical characteristics of the trains. The equivalent electrical energy can then be calculated by applying an efficiency factor, which is directly determined by the speed of the train, to the mechanical energy calculated by Railsys. In addition to this, energy is added for the non-traction, or auxiliary loads on the trains (saloon heating etc), based on assumed values, which are set out in Appendix 2. For each TOC an average of the summer / autumn combination and winter and spring load is used. The electrical characteristics for the majority of trains are sourced from a system developed by Deltarail called OSLO. The OSLO traction performance databank is by far the largest organised collection of such data, available to Network Rail. Whilst every effort has been undertaken to make sure that the electrical characteristics are suitable, it would be of great benefit if the TOCs, through the individual train manufacturers they use, could provide updated sets of data, so the consumption rates are as accurate as possible. The specific energy consumption figures are referred to as consumption rates ; the units are watt-hours per tonne-mile for trains powered by separate locomotives and kilowatt-

7 hours per train-mile for electric multiple units (in which the power equipment is distributed along the length of the train). The program produces a passenger service energy consumption rate with the following level of detail: Train Operating Company; Service Code (these were taken directly from the timetable); Rolling Stock Type; Production of the rates The average consumption rate for TOC, Service Code and Rolling Stock Type is outlined in Appendix 1. We encountered problems with some of the representative infrastructure on RailSys. In particular this impacted on the modelling of the rates for certain parts of the southern route, where infrastructure models were unavailable on peripheral parts of the network. Where this occurred we used the Thameslink model to simulate their running, as generally the service codes were the same. We will share the detail with the affected TOCs. It should also be noted that the following were not included in the calculation: 1. Transmission losses: Due to a variation in the level of losses between the AC and DC distribution systems, more than one loss factor is required. The OLE 25kV AC systems transmission losses can be calculated to between 1% - 5%, depending on assumptions of train demand, position, quantity of train, feeding arrangement etc. All of these factors have some influence, but there is no dominant factor. It is recommended that a value of 2.5% is assumed as a loss factor for all AC consumption rates. The 750V DC system was originally designed for much lower current demand than at present. The transmission losses in the AC high voltage cabling network are low (around 1%-2%) but the losses in the steel conductor rail are higher. The magnitude of these losses are a function of many different parameters, and so it is not easy to simplify into a single loss factor. The dominant factor is the current drawn by the train) and so it is proposed that different loss values are used dependant upon the number of multiple units. I 5% 2 7.5% 3 12.5% 2. The energy consumption from a train parked at a siding over night or station dwell time was not modelled. This could be in the region of 10%. Although we are working to derive a more accurate uplift for this, in the meantime we suggest a 10% uplift to the consumption rate would be appropriate. In addition, a further adjustment was made to the rates. Based on the calculated consumption rates for a single Multiple Unit formation (i.e. 1 x 4-car E), we then use factors to reflect the increase in consumption from running Multiple Units in larger formations (i.e. 3 x 4-car Es). The factors are those currently used in the Passenger Access Billing System (PABS) and derived originally from the work undertaken by AEAT

8 using TRATIM, i.e. 100% for one E; 192% for combinations of two Es; and 285% for combinations of three Es. It is recognised that the above factors may no longer be sufficiently accurate given the introduction of new rolling stock, especially where asynchronous motors are being used. As a result of this Network Rail intend to continue to model combinations of rolling stock to further refine these factors over the forthcoming weeks. In Appendix 1, there are also a number of default rates that are used when trains are operated by other operators or over routes for which rates have not been calculated. They are denoted with a ** for the TOC and a ******** for the Train Service Code and reflect averages of the rates for a particular stock type. 4 Responses to this Consultation Should you wish to comment on the principles and methodology used for deriving the new consumption rates, please respond by 3 September 2008. For responses related to the consumption rates which are set out in Appendix 1, the detail behind them and the auxiliary loads set out in Appendix 2 please respond by 18 September 2008. We will also share the technical rolling stock characteristics we have in Railsys, with each operator individually. Both responses should be sent in electronic format (if this is not possible; in hard-copy format) to: John Kennedy, Planning and Regulation Network Rail 40 Melton Street London NW1 2EE Tel: 020 7557 8168 E-mail: pr08.charges@networkrail.co.uk On receipt of your comments we will review them and revise the rates where appropriate. A final list will then be submitted to ORR in autumn 2008. Please advise us if you wish any part of your response to remain confidential.

9 Appendix 1 - Draft Consumption Rates The Table shows the draft consumption Rates for CP4 1 2 First Capital Connect 21960000 313 3 12.26 23.53 34.93 21960000 317 4 10.00 19.20 28.50 21961000 317 4 13.28 25.50 37.85 21960000 365 4 11.81 22.68 33.66 21961000 365 4 12.92 24.81 36.82 21962000 365 4 10.94 21.00 31.18 21963000 313 3 13.31 25.56 37.93 21963000 317 4 9.97 19.14 28.41 21964000 313 3 12.61 24.21 35.94 21964000 317 4 14.66 28.15 41.78 21964000 365 4 14.98 28.76 42.69 21965000 317 4 13.66 26.23 38.93 21965000 365 4 15.03 28.86 42.84 21967000 317 4 11.76 22.58 33.52 21967000 365 4 11.85 22.75 33.77 24207000 319 4 11.14 21.39 31.75 24207001 319 4 9.54 18.32 27.19 24207003 313 3 8.09 15.53 23.06 24207003 317 4 7.94 15.24 22.63 24207003 319 4 6.70 12.86 19.10 24207003 365 4 10.45 20.06 29.78 24612000 319 4 9.23 17.72 26.31 24662000 317 4 6.17 11.85 17.59 24662000 319 4 10.06 19.32 28.67

10 1 2 24662001 319 4 9.35 17.95 26.65 25961000 365 4 13.13 25.21 37.42 25962000 365 4 11.25 21.60 32.06 25963000 313 3 13.38 25.69 38.13 25963000 365 4 14.86 28.53 42.35 25964000 313 3 11.91 22.87 33.94 25965000 313 3 9.67 18.56 27.55 25965000 317 4 11.91 22.87 33.94 25965000 365 4 12.87 24.71 36.68 25967000 365 4 12.29 23.60 35.03 London Midland Rail 12256320 321 4 14.40 27.65 41.04 12256320 323 3 7.94 15.24 22.63 12256320 350 4 20.49 39.34 58.40 12259320 321 4 11.52 22.12 32.83 12259320 323 3 12.92 24.81 36.82 12259320 350 4 13.81 26.52 39.36 12263310 321 4 16.25 31.20 46.31 12263310 323 3 12.98 24.92 36.99 12263310 350 4 12.96 24.88 36.94 12271310 323 3 9.58 18.39 27.30 12272320 323 3 9.27 17.80 26.42 12272820 323 3 7.38 14.17 21.03 22209000 321 4 8.76 16.82 24.97 22209000 350 4 11.78 22.62 33.57 22213000 321 4 8.18 15.71 23.31 22259000 321 4 6.96 13.36 19.84 22259000 350 4 12.61 24.21 35.94 22272000 323 3 8.18 15.71 23.31

11 1 2 22300000 321 4 10.14 19.47 28.90 22300000 323 3 13.31 25.56 37.93 22300000 350 4 12.24 23.50 34.88 London Overground 22204000 313 3 9.68 18.59 27.59 22214000 313 3 11.04 21.20 31.46 22216000 313 3 7.00 13.44 19.95 22216001 313 3 6.87 13.19 19.58 22216001 508 3 5.38 10.33 15.33 Merseyrail 12301012 508 3 11.43 21.95 32.58 12302012 508 3 8.13 15.61 23.17 12303012 508 3 8.29 15.92 23.63 12304212 508 3 10.07 19.33 28.70 12305012 508 3 8.52 16.36 24.28 12306212 508 3 9.45 18.14 26.93 22304003 508 3 8.02 15.40 22.86 22306003 508 3 8.59 16.49 24.48 National Express East Anglia 21770002 321 4 9.33 17.92 26.60 21781002 350 4 11.31 21.71 32.23 21890002 315 4 5.17 9.93 14.74 21890002 317 4 13.33 25.59 37.99 21890002 350 4 7.94 15.24 22.63 21894002 315 4 7.24 13.90 20.63 21896002 315 4 9.34 17.93 26.62 21897002 317 4 9.05 17.38 25.79 21910000 315 4 12.46 23.92 35.51 21910000 317 4 11.51 22.10 32.80 21911000 317 4 14.24 27.34 40.58

12 1 2 21912000 315 4 16.54 31.76 47.14 21912000 317 4 17.50 33.60 49.88 21913000 317 4 13.46 25.84 38.36 21915000 317 4 8.93 17.15 25.45 21916400 315 4 7.16 13.75 20.41 21916400 317 4 8.32 15.97 23.71 21920000 315 4 12.72 24.42 36.25 21920000 317 4 14.79 28.40 42.15 21926001 315 4 6.11 11.73 17.41 21939001 321 4 10.69 20.52 30.47 21939001 360 4 16.32 31.33 46.51 21940001 315 4 12.74 24.46 36.31 21943001 315 4 11.17 21.44 31.83 21943001 321 4 10.20 19.58 29.07 21945001 315 4 8.63 16.57 24.60 21945001 321 4 6.98 13.40 19.89 21945001 360 4 12.38 23.77 35.28 21945101 321 4 6.31 12.12 17.99 25910000 315 4 13.51 25.94 38.50 25910000 317 4 13.85 26.59 39.47 25910000 321 4 11.60 22.27 33.06 25911000 317 4 15.16 29.11 43.21 25912000 315 4 16.90 32.45 48.17 25912000 317 4 18.38 35.29 52.38 25913000 317 4 12.18 23.39 34.71 25915000 317 4 11.65 22.37 33.20 25920000 315 4 12.25 23.52 34.91 25920000 317 4 15.48 29.72 44.12

13 1 2 25926001 315 4 6.37 12.23 18.15 25939001 321 4 9.30 17.85 26.50 25939001 360 4 14.80 28.42 42.18 25940001 315 4 13.76 26.42 39.22 25943001 315 4 9.71 18.65 27.68 25943001 321 4 9.67 18.57 27.56 Scotrail 13560015 317 4 12.70 24.38 36.20 13562015 315 4 11.18 21.47 31.86 13563015 317 4 12.79 24.56 36.45 13564825 317 4 7.57 14.53 21.57 13569815 315 4 10.94 21.00 31.18 13571015 317 4 11.15 21.41 31.78 23580903 317 4 7.88 15.12 22.44 23584003 317 4 10.42 20.01 29.70 23971103 317 4 7.42 14.25 21.15 National Express East Coast 21700001 91 loco + 10 29.07 21702001 91 loco + 10 27.07 21703001 91 loco + 10 27.41 21704001 91 loco + 10 28.94 Virgin 22100001 390 9 31.31 22104001 390 9 35.53 22108001 390 9 32.10 22109001 390 9 37.10 22112001 390 9 31.77 22114001 390 9 33.72 C2C 21936004 357 4 12.75 24.48 36.34 24936004 357 4 11.12 21.35 31.69

14 1 2 25936005 357 4 10.52 20.20 29.98 26936004 357 4 13.26 25.46 37.79 27936004 357 4 13.37 25.67 38.10 28936004 357 4 13.27 25.48 37.82 29936004 357 4 13.09 25.13 37.31 Gatwick Express 24617001 460 8 17.59 24617002 460 8 19.51 Northern 11818620 321 4 8.84 16.97 25.19 11818620 333 4 16.39 31.47 46.71 11819020 321 4 12.11 23.25 34.51 11819020 333 4 18.44 35.40 52.55 11820820 333 4 23.22 44.58 66.18 11821020 333 4 21.46 41.20 61.16 11824820 321 4 12.51 24.02 35.65 11870820 333 4 18.66 35.83 53.18 12228110 323 3 7.91 15.19 22.54 12229820 323 3 11.08 21.27 31.58 12230110 323 3 7.83 15.03 22.32 12231820 323 3 8.11 15.57 23.11 12232820 323 3 9.09 17.45 25.91 12233820 323 3 13.59 26.09 38.73 12974820 323 3 8.07 15.49 23.00 21831000 321 4 9.79 18.80 27.90 Southern 24610000 377 4 14.33 27.51 40.84 24610004 375 4 8.84 16.97 25.19 24610004 377 4 11.25 21.60 32.06 24614006 377 4 12.01 23.06 34.23 24615006 319 4 14.12 27.11 40.24

15 1 2 24615006 375 4 7.87 15.11 22.43 24615006 377 3 14.49 27.82 41.30 24618000 377 4 14.56 27.96 41.50 24618004 319 4 9.26 17.78 26.39 24618004 377 4 10.86 20.85 30.95 24618004 455 4 9.09 17.45 25.90 24660004 319 4 13.11 25.17 37.36 24660004 377 4 8.46 16.24 24.11 24660004 455 4 7.14 13.71 20.35 24661000 319 4 14.97 28.74 42.66 24661000 377 4 14.48 27.80 41.27 24661000 455 4 11.46 22.00 32.66 24661000 456 2 7.37 14.15 21.00 24661005 319 4 11.77 22.60 33.54 24661005 375 4 16.36 31.41 46.62 24661005 377 4 14.42 27.69 41.10 24661005 455 4 10.84 20.81 30.89 24661005 456 2 7.86 15.09 22.40 24663000 377 4 8.23 15.80 23.46 24663004 377 3 10.84 20.81 30.89 24664000 377 4 13.29 25.52 37.88 24664004 377 4 11.47 22.02 32.69 24665000 377 4 14.69 28.20 41.87 24665004 377 4 13.63 26.17 38.85 24666000 377 4 13.43 25.79 38.28 24666004 377 4 11.16 21.43 31.81 24667000 377 4 15.39 29.55 43.86 24667004 319 4 10.63 20.41 30.30

16 1 2 24667004 375 4 8.41 16.15 23.97 24667004 377 4 11.42 21.93 32.55 24667004 455 4 6.91 13.26 19.68 24668000 455 4 15.41 29.59 43.92 24668000 456 2 10.48 20.12 29.87 24668005 319 4 14.57 27.97 41.52 24668005 455 4 14.98 28.76 42.69 24668005 456 2 7.64 14.67 21.77 24669000 319 4 14.51 27.86 41.35 24669000 377 4 19.09 36.65 54.41 24669000 455 4 14.58 27.99 41.55 24669005 377 4 18.57 35.65 52.92 24669005 455 4 13.99 26.86 39.87 24669005 456 2 9.95 19.10 28.36 24674005 375 4 11.19 21.49 31.90 24674005 377 4 11.59 22.25 33.03 24683000 319 4 16.31 31.32 46.48 24683000 377 4 20.91 40.14 59.58 24683000 455 4 15.77 30.28 44.94 24683000 456 2 21.09 40.49 60.11 24683005 319 4 16.68 32.03 47.54 24683005 375 4 14.64 28.11 41.72 24683005 377 4 16.13 30.97 45.97 24683005 455 4 15.41 29.59 43.92 24683005 456 2 10.75 20.64 30.64 24684000 319 4 14.61 28.05 41.64 24684000 377 4 17.90 34.37 51.02 24684000 455 4 14.56 27.96 41.50

17 1 2 24684005 319 4 12.08 23.19 34.43 24684005 377 4 19.35 37.15 55.15 24684005 455 4 10.26 19.70 29.24 24684005 456 2 11.84 22.73 33.74 24685000 319 4 13.01 24.98 37.08 24685000 377 4 13.78 26.45 39.26 24685000 455 4 13.37 25.67 38.10 24685000 456 2 18.58 35.67 52.95 24685000 466 2 7.28 13.98 20.75 24685005 319 4 13.44 25.80 38.30 24685005 377 4 16.10 30.91 45.89 24685005 455 4 13.29 25.52 37.88 24685005 456 2 9.93 19.07 28.30 24685005 466 2 6.99 13.42 19.92 24686000 319 4 13.55 26.01 38.61 24686000 377 4 18.55 35.62 52.87 24686000 455 4 13.39 25.71 38.16 24686005 319 4 16.24 31.18 46.28 24686005 377 4 19.21 36.88 54.75 24686005 455 4 13.99 26.87 39.89 24687000 319 4 15.13 29.04 43.11 24687000 377 4 20.81 39.96 59.32 24687000 455 4 14.87 28.55 42.38 24687000 456 2 19.71 37.84 56.17 24687005 319 4 16.43 31.55 46.83 24687005 377 4 14.62 28.07 41.67 24687005 455 4 11.46 22.00 32.66 24687005 456 2 10.88 20.89 31.01

18 1 2 24688000 319 4 12.86 24.69 36.65 24688000 377 4 18.83 36.15 53.67 24688000 455 4 11.18 21.47 31.86 24688005 319 4 12.12 23.27 34.54 24688005 377 4 13.55 26.02 38.62 24688005 455 4 9.24 17.74 26.33 24688005 456 2 9.14 17.55 26.05 South West 24620104 442 5 19.25 36.96 54.86 24620104 450 4 15.23 29.24 43.41 24620204 442 5 16.89 32.43 48.14 24620204 450 4 13.04 25.04 37.16 24621104 442 5 14.56 27.96 41.50 24621104 450 4 13.39 25.71 38.16 24621204 442 5 16.29 31.28 46.43 24621204 450 4 13.40 25.73 38.19 24621204 455 4 6.16 11.82 17.55 24621304 442 5 16.85 32.35 48.02 24621304 450 4 15.11 29.00 43.05 24629104 442 5 19.83 38.07 56.52 24629104 450 4 19.52 37.47 55.62 24629204 442 5 16.68 32.03 47.54 24629204 450 4 14.65 28.13 41.75 24629304 421 4 8.16 15.67 23.26 24631104 450 4 18.50 35.52 52.73 24631204 442 5 15.77 30.28 44.94 24631204 450 4 17.22 33.06 49.08 24632104 442 5 21.03 40.38 59.94 24632104 450 4 11.13 21.37 31.72

19 1 2 24632204 450 4 14.41 27.67 41.07 24671105 442 5 20.08 38.55 57.23 24671105 450 4 17.47 33.54 49.79 24671205 450 4 19.00 36.48 54.15 24671205 455 4 12.06 23.16 34.37 24671305 450 4 19.37 37.19 55.20 24671305 455 4 30.49 58.54 86.90 24671405 450 4 22.67 43.52 64.60 24671405 455 4 11.49 22.06 32.75 24671505 450 4 10.16 19.50 28.95 24671505 455 4 10.27 19.71 29.26 24671605 450 4 13.73 26.37 39.14 24671605 455 4 8.40 16.13 23.94 24672104 450 4 13.46 25.84 38.36 24672104 458 4 10.86 20.85 30.95 24672204 450 4 17.32 33.25 49.36 24672204 458 4 13.14 25.22 37.44 24672404 450 4 15.97 30.66 45.51 24672404 458 4 15.31 29.40 43.63 24673105 455 4 10.23 19.64 29.15 24673205 450 4 22.39 42.99 63.81 24673205 455 4 7.45 14.30 21.23 24673305 455 4 9.40 18.04 26.78 24673405 455 4 10.27 19.72 29.27 24673505 455 4 8.28 15.90 23.60 24673605 450 4 14.64 28.11 41.72 24673605 455 4 7.32 14.05 20.86 24673705 455 4 9.15 17.57 26.08

20 1 2 24676004 450 4 10.23 19.64 29.16 24676004 455 4 6.20 11.90 17.66 South Eastern 24601000 375 3 9.10 17.47 25.94 24601000 508 3 7.55 14.50 21.52 24601004 375 3 10.63 20.41 30.30 24601004 377 4 6.59 12.65 18.78 24601004 508 3 6.09 11.69 17.36 24602000 375 4 10.76 20.66 30.67 24602004 375 3 11.49 22.06 32.75 24602004 377 3 11.26 21.62 32.09 24602004 465 4 12.59 24.17 35.88 24602004 508 3 8.12 15.59 23.14 24604000 375 4 10.34 19.85 29.47 24604000 465 4 9.64 18.51 27.47 24604004 375 3 9.26 17.78 26.39 24604004 376 5 9.48 18.21 27.03 24604004 456 2 6.07 11.65 17.30 24604004 460 4 10.25 19.68 29.21 24604004 465 4 10.02 19.24 28.56 24604004 508 3 3.41 6.55 9.72 24605000 375 4 9.96 19.12 28.39 24605000 465 4 9.58 18.39 27.30 24605004 375 3 11.96 22.96 34.09 24605004 377 4 11.48 22.04 32.72 24605004 465 4 9.10 17.47 25.94 24605004 466 4 8.79 16.88 25.05 24605004 508 3 8.51 16.34 24.25 24606000 375 4 12.05 23.14 34.34

21 1 2 24606000 465 4 9.49 18.22 27.05 24606004 375 4 10.42 20.01 29.70 24606004 465 4 8.41 16.15 23.97 24607006 375 3 8.19 15.72 23.34 24607006 508 3 6.11 11.73 17.41 24608006 375 4 10.86 20.85 30.95 24608006 465 4 10.82 20.77 30.83 24608006 466 2 6.01 11.54 17.13 24608006 508 3 7.69 14.76 21.92 24609006 375 4 12.18 23.39 34.71 24609006 377 4 15.71 30.16 44.77 24609006 508 3 6.91 13.27 19.69 24650000 376 5 20.83 39.99 59.36 24650000 465 4 13.64 26.19 38.87 24650005 375 4 9.63 18.48 27.43 24650005 376 5 15.14 29.07 43.15 24650005 465 4 11.02 21.16 31.41 24650005 466 2 6.93 13.31 19.75 24652000 375 3 + 4 27.01 24652000 465 4 11.81 22.68 33.66 24653000 375 4 16.65 31.97 47.45 24653000 376 5 20.45 39.26 58.28 24653000 465 4 13.59 26.09 38.73 24653005 376 5 22.11 42.45 63.01 24653005 465 4 13.72 26.34 39.10 24655000 376 5 18.05 34.66 51.45 24655000 465 4 24.95 47.90 71.11 24655005 375 4 7.66 14.71 21.83

22 1 2 24655005 376 5 12.93 24.82 36.84 24655005 465 4 9.48 18.20 27.02 24655005 466 2 5.06 9.72 14.42 24655005 508 3 7.98 15.32 22.74 24656000 465 4 12.30 23.62 35.06 24656005 465 4 12.02 23.08 34.26 24656005 466 2 5.71 10.96 16.27 24657000 376 5 18.75 36.00 53.44 24657000 465 4 12.80 24.58 36.48 24657005 375 4 12.50 24.00 35.63 24657005 376 5 14.71 28.24 41.92 24657005 465 4 9.82 18.85 27.99 24657005 466 2 5.87 11.27 16.73 24658000 375 4 5.44 10.45 15.51 24658000 465 4 8.34 16.01 23.77 24658000 466 2 4.77 9.16 13.59 24658005 376 5 14.30 27.46 40.76 Default Rates ** ******** 313 3 10.53 20.21 30.01 ** ******** 315 4 10.73 20.60 30.59 ** ******** 317 4 11.84 22.74 33.75 ** ******** 319 4 12.75 24.47 36.33 ** ******** 321 4 10.28 19.74 29.31 ** ******** 323 3 9.82 18.85 27.98 ** ******** 333 4 19.44 37.32 55.39 ** ******** 350 4 12.89 24.75 36.74 ** ******** 357 4 12.48 23.97 35.58 ** ******** 360 4 14.50 27.84 41.33

23 1 2 ** ******** 365 4 12.70 24.38 36.19 ** ******** 375 3 10.82 20.77 30.83 ** ******** 376 5 16.67 32.02 47.52 ** ******** 377 3 14.27 27.41 40.68 ** ******** 390 9 33.59 ** ******** 442 5 17.72 34.03 50.51 ** ******** 450 4 15.08 28.96 42.98 ** ******** 455 4 11.67 22.40 33.25 ** ******** 456 2 11.52 22.12 32.83 ** ******** 458 4 13.10 25.16 37.34 ** ******** 460 8 18.90 ** ******** 465 4 11.66 22.38 33.22 ** ******** 466 2 6.38 12.25 18.18 ** ******** 508 3 7.79 14.96 22.21

24 Appendix 2 Assumed Auxiliary Load Levels Locomotive Hauled Trains Auxiliary Load Levels Class of Locomotive Winter kw loco only Spring / Autumn kw loco only Summer kw loco only 73 50 50 50 86 50 50 50 87 50 50 50 90 50 50 50 91 50 50 50 92 50 50 50 Auxiliary Load Levels Coach Details Winter kw per coach Spring / Autumn kw per coach Summer kw per coach Coaches: Mk1, 2A, 2B, 2C in "heritage" trains (AC lines) Coaches: Mk1, 2A, 2B, 2C in "heritage" trains (DC lines) 20 0 0 13 0 0 Coaches: Mk 2D 28 8 20 Coaches: Mk3 (not catering) Coaches: Mk3 (catering) Coaches: Mk4 (not catering) Coaches: Mk4 (catering) 31 8 22 81 58 72 31 8 22 81 58 72

25 Multiple Units Auxiliary Load Levels Train Class Winter kw per vehicle Spring / Autumn kw per vehicle Summer kw per vehicle 313 20 8 8 314 20 8 8 315 20 8 8 317 20 8 8 318 20 8 8 319 20 8 8 320 20 8 8 321 20 8 8 322 20 8 8 323 31 10 10 332 36 25 50 333 36 25 50 334 35 10 35 350 46 25 50 357 35 10 35 360 36 25 50 365 31 10 10 375 35 10 35 376 35 10 10 377 35 10 35 378 35 10 35 390 53 36 34 421 15 5 5 442 36 25 50 444 36 25 50

26 Auxiliary Load Levels Train Class Winter kw per vehicle Spring / Autumn kw per vehicle Summer kw per vehicle 450 36 25 50 455 20 8 8 456 20 8 8 458 35 10 35 460 35 10 35 465 31 10 10 466 31 10 10 507 20 8 8 508 20 8 8