Fourth Revised Leaf No. 135 Consolidated Edison Company Superseding Second Revised Leaf No. 135 (Third Revised Leaf No. 135 Canceled) Applicable to Use of Service for SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE The delivery of power and energy for standby service purposes, subject to the Common Provisions and Special Provisions of this Service Classification. Standby service is available: (1) to replace and/or supplement the power and energy ordinarily generated by a by means of a private generating facility on the premises, except where service is provided under Rider R of the Full Service Schedule, or (2) for station use by a that is a wholesale generator. Station use includes power and energy used by the at its premises in connection with its generating facility (a) during periods when such needs are not served by the generator and (b) to restart the generator after an outage. Where a portion of the s needs at its premises in connection with its generating facility are not selfserved, those needs will be considered to be part of station use if the usage is not served under a separately-metered account. Subject to the Special Provisions of this Service Classification, the generator may be connected for: (1) parallel operation with the Company's service, or (2) isolated operation with standby service provided by the Company by means of a double-throw switch. Character of Service The various characteristics of service listed for the s otherwise applicable Service Classification in the Full Service Schedule and more fully described in General Rule III-2 are applicable, subject to the limitations set forth in such rule and Service Classification. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Sixth Revised Leaf No. 136 Consolidated Edison Company Superseding Fourth Revised Leaf No. 136 (Fifth Revised Leaf No. 136 Canceled) Common Provisions Interconnection Charge SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE (A) s in this Service Classification shall be subject to the following charges for interconnection costs if private generation facilities or wholesale generating facilities on the premises (i) commenced operation prior to February 1, 2000, or (ii) have a total nameplate rating greater than 300 kva, or (iii) are connected in parallel with distribution feeders other than radial distribution feeders, and (iv) are not connected directly to transmission facilities (that is, delivery facilities other than distribution facilities): (1) A charge for the reasonable costs of connection, including the costs of initial engineering evaluations, switching, metering, transmission, distribution, safety provisions, engineering, administrative costs, and any associated tax expenses incurred by the Company directly related to the installation of the facilities deemed necessary by the Company to permit interconnected operations with a, to the extent such costs are in excess of the corresponding costs which the Company would have incurred had the taken firm service under the Service Classification that would have otherwise been applicable to the. All such facilities will remain the property of the Company. The may pay for the foregoing interconnection costs either: (a) by paying in full prior to the commencement of service under this Service Classification; or (b) by paying at least twenty-five percent of the interconnection costs prior to the commencement of service under this Service Classification and arranging with the Company to pay over not more than a five-year period the balance of such interconnection costs plus interest at the other provided capital rate in effect at the time a payment plan is agreed upon with the Company. The Company may require a to provide adequate security for the payment of the balance of the interconnection costs due the Company under the payment agreement. The costs of delivery system reinforcements required for parallel operations and incurred subsequent to interconnection are an element of the interconnection costs and will be charged to the, provided that such costs are initially foreseen, but not necessarily incurred at the time of interconnection. The may pay for this element of interconnection cost at the time it is incurred, or pursuant to a payment agreement similar to the one described in the preceding paragraph. (2) An annual charge of 10 percent of the capital costs of interconnection, including the costs of delivery system reinforcements, to cover property taxes and operation and maintenance expenses. The annual charge shall be determined by multiplying the rate of 10 percent by the total capital costs of interconnection. The annual charge is payable by the in monthly installments equal to onetwelfth of the annual charge. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Sixth Revised Leaf No. 137 Consolidated Edison Company Superseding Fourth Revised Leaf No. 137 (Fifth Revised Leaf No. 137 Canceled) Common Provisions Continued Interconnection Charge -Continued SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE (B) s in this Service Classification shall be subject to the following charges for interconnection costs if private generation facilities on the premises (i) commenced operation on or after February 1, 2000, (ii) have a total nameplate rating of 300 kva or less, and (iii) are connected in parallel with radial distribution feeders: (1) An advance payment for the costs of any equipment and facilities installed on the Company's system, including metering, necessary to permit operation of the 's generation facilities in parallel with the Company's system. The amounts and timing of s payments shall be determined in accordance with the New York State Standardized Interconnection Requirements and Application Process (the SIR ) as adopted by the Public Service and as may be amended from time to time by the Commission. The SIR is set out in Addendum SIR to the Full Service Schedule. (2) A cost-based advance payment for the Company's review of the 's proposed interconnection design package and for any studies, including but not limited to the Coordinated Electric System Interconnection Review, performed by the Company with respect to the interconnection of the 's generation facilities. The Company will reconcile its actual costs with the total of the 's advance payment for estimated costs of equipment and facilities, advance payment for reviews and studies, and application fee (as described in Special Provision G) of this Service Classification. The will pay or the Company will refund, without interest, the difference, except for the application fee, which is non-refundable. (C) A taking service under this Service Classification through direct interconnection to a transmission facility shall be subject to interconnection charges imposed under a tariff of the New York State Independent System Operator in addition to any non-duplicative charges hereunder. (D) Failure of the to pay any of the interconnection charges or annual charges, when due, shall be cause for termination of service in accordance with the procedures specified in this Rate Schedule and the Full Service Schedule. (E) To the extent provided in General Rule III-8 (A) of the Full Service Schedule, eligible s may elect to own their own meter(s) or obtain Competitive Metering Services. Where the meters are Companyowned, the will be responsible for metering costs in excess of the corresponding costs that the Company would have incurred had the taken service under the s otherwise applicable Service Classification. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Fourth Revised Leaf No. 138 Consolidated Edison Company Superseding Second Revised Leaf No. 138 (Third Revised Leaf No. 138 Canceled) Common Provisions Continued Metering and Determination of Demand SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE (A) Interval metering of a type approved by the Public Service Commission for the determination of maximum demand is required for billing under Standby Service rates. The maximum demand for each respective time period shall be the integrated demand occurring during the two highest contiguous fifteen-minute intervals during each applicable time period. (See General Rule III-11(D) of the Full Service Schedule for the definition of maximum demand.) (B) The meter required for service under this Service Classification may include equipment either to prevent reverse meter registration or to separately measure -generated electricity and electricity delivered by the Company. (C) Billing under Standby Service rates requires the establishment of a Contract Demand, expressed in kilowatts ( kw ). Contract Demand for the purpose of this Service Classification means the s maximum potential demand. Where both high tension and low tension service are delivered to a s account, separate Contract Demands will be established for the low tension service, for the high tension service below 138,000 volts, and for the high tension service at 138,000 volts. A may establish its Contract Demand in its application for service hereunder or at any time thereafter. If the Contract Demand is not stated in the application, the Company will establish the Contract Demand. At any time, if the monthly maximum demand exceeds the Contract Demand, the monthly maximum demand will become the Contract Demand in that month and thereafter. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Sixth Revised Leaf No. 139 Consolidated Edison Company Superseding Fourth Revised Leaf No. 139 (Fifth Revised Leaf No. 139 Canceled) Common Provisions Continued Metering and Determination of Demand - Continued (C) - Continued SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE (1) Where the Establishes the Contract Demand A who chooses its own Contract Demand may revise the Contract Demand downward once every 12 months. The new Contract Demand cannot be set at a level that is lower than the highest demand reached in the past 12 months unless the demonstrates, based on an engineering analysis submitted to the Company, that electricity-consuming equipment is removed or abandoned in place or that permanent energy-efficiency or load-limiting equipment is installed. No retroactive adjustment will be made for a reduction in the Contract Demand level. A may revise its Contract Demand upward at any time. If a s monthly maximum demand exceeds the Contract Demand by more than 10 percent, a surcharge will apply to the current monthly bill for the portion of the demand that is in excess of the Contract Demand. To determine the surcharge, the monthly Transmission Contract Demand Charge, Transmission Contract Demand MAC, Distribution Contract Demand Charge, and the Distribution Contract Demand MAC will each be calculated for the excess demand, and the charges will be summed. The surcharge will apply as follows: (a) If the monthly maximum demand exceeds the Contract Demand by more than 10 percent but less than 20 percent, the surcharge will be equal to 12 times the sum of the monthly Contract Demand charges for the excess demand, provided, however, that the surcharge will be waived upon the first incidence of such excess demand in the first year of operation if the bill has a to date on or before January 31, 2007; and (b) If the monthly maximum demand exceeds the Contract Demand by 20 percent or more, the surcharge will be equal to 24 times the sum of the monthly Contract Demand charges for the excess demand. (2) Where the Company Establishes the Contract Demand The Company will determine, and may thereafter re-determine, the s Contract Demand if one is not established by the. Upon receipt of the determination of Contract Demand from the Company, a may elect to establish its own Contract Demand, subject to the surcharge and other provisions established above. Where the accepts a Company-set Contract Demand, no penalties will apply if that Contract Demand is exceeded. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Fourth Revised Leaf No. 140 Consolidated Edison Company Superseding Second Revised Leaf No. 140 (Third Revised Leaf No. 140 Canceled) Common Provisions Continued Metering and Determination of Demand - Continued (C) - Continued (2) - Continued SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE The Company will establish Contract Demand in accordance with the following principles: (a) If the received service from the Company under firm service rates for the past 24 months and is newly installing on-site generation at the premises, the Contract Demand shall be the s monthly maximum demand during the most recent 24 months, subject to reasonable adjustments: (i) upward, for the effect of abnormally cool summer or warm winter weather on the customer's temperature-sensitive load at the time the highest demand was registered, and (ii) upward, to reflect the diversified demand imposed on the Company s delivery system by equipment on the s premises that was not operating, but could have been operating, when the highest demand was registered, and (iii) upward or downward, for permanent changes to the electrical load at the s premises through changes in equipment subsequent to registration of the highest demand. Such adjustments will be reasonably determined through the Company's engineering analyses and information supplied by the at the Company s request. (b) If the received service from the Company for on-site generation at the premises for the past 24 months, and interval metering registers electricity from all sources, including the Company s system and the on-site generating equipment, the Contract Demand shall be the s maximum coincident 30-minute demand from all sources during the most recent 24 months, subject to the adjustments described in (a). No amount will be added to the Contract Demand for the s on-site generation capacity if the demonstrates that its generating equipment was not operating during the period of the maximum 30-minute demand. If the received service from the Company for on-site generation at the premises for the past 24 months, and interval metering did not register electricity from all sources, the Contract Demand shall be the sum of the s monthly maximum demand on the Company s system during the most recent 24 months and the nameplate rating of the generating facility, subject to the adjustments described in (a). (c) If a new or a who received service from the Company under firm service rates for less than 24 months is newly installing on-site generation, the Contract Demand shall be the kw service requested in the s application for service, reasonably adjusted to take into account the Company's engineering evaluation of the customer s electrical equipment and diversity of load. Where the does not supply this information in an application for service, the Contract Demand will be reasonably determined through the Company s engineering analyses of the customer s electrical equipment and diversity of load, premises to be served, and information supplied by the at the Company s request. Date of Issue: November 3, 2003 Date Effective : February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Fourth Revised Leaf No. 141 Consolidated Edison Company Superseding Second Revised Leaf No. 141 (Third Revised Leaf No. 141 Canceled) Common Provisions Continued SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Metering and Determination of Demand Continued (C) Continued (3) For a served under one or more of the economic development programs described in General Rule III-11(W) ( Economic Development Programs ) of the Full Service Schedule, the Contract Demand served under Standby Service rates shall be the s Contract Demand for the premises less any demand allocations under Economic Development Programs. The portion of the s As-used Daily On-peak Demand served under each Economic Development Program will be the ratio of the s demand allocation under that program to the Contract Demand at the premises multiplied by the As-used Daily demand; the balance of the As-used Daily On-peak Demand will be served under Standby Service rates. Where a customer takes high tension service at 138,000 volts and high tension service below 138,000 volts under a single agreement, high tension service under each Economic Development Program refers to the sum of high tension service taken at 138,00 volts and high tension service taken at voltages below 138,000 volts. (D) The Minimum Monthly Charge described in General Rule III-11 (U) of the Full Service Schedule and in Service Classification Nos. 4, 5, 8, 9, 12 and 13 is not applicable to s billed under Standby Service rates. The Minimum Monthly Charge is applicable to s who are served under this Service Classification but billed under their Otherwise Applicable Rate. (E) Provided that interval information is not requested more frequently than once per month and a telephone line was not maintained at expense by the current or a prior, the Company will provide and maintain the telephone line or other remote communications equipment under the following conditions: (1) if the would otherwise be subject to Rate II of Service Classification No. 4, 5, 8, 9, or 12 or to Service Classification No. 13 of the Full Service Schedule, or the equivalent Service Classification under this Rate Schedule; or (2) the was billed under Rate I or Rate II of Service Classification No. 3 or 10, or the equivalent Service Classification under this Rate Schedule, on and before February 1, 2004. Except as specified above, the will, at its expense, provide access to and maintenance of a telephone line or other remote communications equipment required by the Company for a Company- or -owned meter that has remote communications capabilities. If communications is by telephone line, the Company will require the to provide and maintain a dedicated telephone line if the Company is unable to communicate with the meter using the existing telephone line. As explained in this Rate Schedule, in the section entitled, Meters with Telecommunications Capabilities, the will be assessed a charge if the s telephone line is not operational when the Company attempts to read the meter and a charge for an on-site reading on the scheduled reading date. (F) As-used Daily Demand Charges are applicable to s billed under Standby Service rates. Where meter data is not available, the As-used Demand will be based on the best available data. For a who is a wholesale generator, As-used Demand Charges will not apply for any day during which it selfsupplies all of its energy needs from the load side of the meter. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
P.S. C. No. 2 Retail Access Consolidated Edison Company Fifth Revised Leaf No. 142 Superseding Fourth Revised Leaf No. 142 Common Provisions - Continued Definitions SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Existing means a with a Contract Demand of 50 kw or greater who has on-site generation equipment having a total nameplate rating equal to more than 15 percent of the maximum potential demand from all sources and who meets one of the following criteria: (a) received service under Service Classification No. 3 Back-up Service or Service Classification No. 10 Supplementary Service as of January 31, 2003; or (b) commenced construction of, or executed binding financial commitments for construction of, an onsite generation facility as of January 31, 2003; or (c) is named in the Joint Proposal, dated March 11, 2003, in Case 02-E-0781 as a recipient of a New York State Energy Research and Development Authority ( NYSERDA ) feasibility study award and commences operation of the on-site generation facility no later than May 31, 2006; or (d) is named in the Joint Proposal, dated March 11, 2003, in Case 02-E-0781 as a recipient of a NYSERDA on-site generation project award. With Designated Technologies means a who meets both of the following criteria: (a) has an on-site generation facility that: (i) exclusively uses one or more of the following technologies and/or fuels: fuel cells, wind, solar thermal, photovoltaics, sustainably-managed biomass, tidal, geothermal, or methane waste, or (ii) uses small, efficient types of combined heat and power generation that do not exceed 1 MW of capacity in aggregate and meets eligibility criteria that were approved in the order of the New York State Public Service Commission, dated January 23, 2004, in Case 02-E-0781; and (b) has a Contract Demand of 50 kw or greater and has on-site generation equipment having a total nameplate rating equal to more than 15 percent of the maximum potential demand from all sources. Otherwise Applicable Rate means the rate of the firm Service Classification under which the would otherwise be billed if it did not have a private generating facility on the premises or was not a wholesale generator. Date of Issue: January 30, 2004 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003 Issued in compliance with order in Case 02-E-0781 dated January 23, 2004.
Fourth Revised Leaf Bo. 143 Consolidated Edison Company Superseding Second Revised Leaf No. 143 (Third Revised Leaf No. 143 Canceled) Common Provisions Continued Adjustments SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE The charges set forth herein will be subject to the Adjustment Factor MAC and other charges and adjustments, as applicable, as described in General Information Section VII and VIII-(B). Increase in Rates and Charges The rates and charges under this Service Classification, including the charge specified in Special Provisions H and L are increased by the applicable percentages as explained in the Full Service Schedule, General Information Section VIII, and shown on the related statement. Terms of Payment Net cash on presentation of bill, subject to late payment charge in accordance with General Rule III-11(N) of the Full Service Schedule. Term One year from the date of initiation of service hereunder, terminable thereafter by the upon 30 days' prior notice in writing and by the Company in accordance with law or the provisions of this Rate Schedule. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Fourth Revised Leaf No. 144 Consolidated Edison Company Superseding Second Revised Leaf No. 144 (Third Revised Leaf No. 144 Canceled) Rates Applicability: SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE The rate applicable to the is determined by the Service Classification of the Full Service Schedule under which the would otherwise receive service if it did not have a private generating facility on the premises or was not a wholesale generator. All s will be subject to the following rates ( Standby Service rates ), except as provided under the Special Provisions of this Service Classification. A who would otherwise receive service under Service Classification No. 4, 5, 8, 9, or 12 will be subject to the rates shown for s who would be subject to Rate II of the applicable Service Classification under the following conditions: (a) where the s Contract Demand is greater than 1500 kw; (b) where the s Contract Demand is greater than 900 kw and the takes service under Rider J of the Full Service Schedule; and (c) where the would receive service under Special Provision H of Service Classification No. 4, 8, 9, or 12. Where high tension service is supplied at 138,000 volts, the will be subject to the rate shown for high tension service at 138 kv rate regardless of the Contract Demand. All other s who would receive otherwise service under Service Classification No. 4, 5, 8, 9, or 12 will be billed at the rate shown for s who would not be subject to Rate II. All s billed under Standby Service rates are required to pay a Charge per month and Charge Monthly Adjustment Clause ( MAC ) per month. s will also be billed for Transmission Contract Demand Charges, Transmission Contract Demand MACs, Distribution Contract Demand Charges, and Distribution Contract Demand MACs, as well as As-used Daily Transmission Demand Charges, As-used Daily Transmission Demand MACs, As-used Daily Distribution Demand Charges, and As-used Daily Distribution Demand MACs. Transmission Contract Demand Charges, Transmission Contract Demand MACs, and Distribution Contract Demand Charges, and Distribution Contract Demand MACs are each determined by multiplying the Contract Demand by the applicable charge. For each day in the billing period for which As-used Daily Demand Charges are to be determined, the Asused Daily Transmission Demand is the s daily maximum demand during transmission On-Peak hours, and the As-used Daily Distribution Demand is the s daily maximum demand during distribution On-Peak hours. The As-used Daily Transmission Demand Charge shall be determined by multiplying the daily maximum demand during transmission On-Peak hours by the applicable per-kilowatt As-used Daily Transmission Demand Charge; the As-used Daily Transmission Demand MAC shall be determined by multiplying the daily maximum demand during transmission On-Peak hours by the applicable per-kilowatt As-used Daily Transmission Demand MAC. The As-used Daily Distribution Demand Charge shall be determined by multiplying the daily maximum demand during distribution On-Peak hours by the applicable per-kilowatt As-used Daily Distribution Demand Charge; the As-used Daily Distribution MAC shall be determined by multiplying the daily maximum demand during distribution On-Peak hours by the applicable per-kilowatt As-used Daily Distribution MAC. The As-used Daily Demand Charge, as billed, is equal to the sum of the As-used Daily Demand Charges. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Consolidated Edison Company First Revised Leaf No. 145 (Original Leaf No. 145 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE [RESERVED FOR FUTURE USE] Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Fourth Revised Leaf No. 146 Consolidated Edison Company Superseding Second Revised Leaf No. 146 (Third Revised Leaf No. 146 - Pending) If the would receive service under Service Classification No. 4 and would not be subject to Rate II of Service Classification No.4 Low Tension Service Charge: (Per Month) $ 173.09 $ 173.09 $ 173.09 $ 173.09 $ 173.09 $ 173.09 MAC: (Per Month) NYC $ 37.74 $ 36.63 $ 20.28 $ 4.87 $ 8.55 $ 44.24 Westchester $ 120.87 $ 123.54 $ 116.73 $ 103.08 $ 92.46 $ 128.22 $ 0.1552 $ 0.1552 $ 0.1552 $ 0.1552 $ 0.1552 $ 0.1552 NYC $ 0.0339 $ 0.0329 $ 0.0182 $ 0.0043 $ 0.0077 $ 0.0396 Westchester $ 0.1084 $ 0.1108 $ 0.1047 $ 0.0924 $ 0.0829 $ 0.1149 $ 4.09 $ 4.09 $ 4.09 $ 4.09 $ 4.09 $ 4.09 NYC $ 0.89 $ 0.86 $ 0.48 $ 0.12 $ 0.21 $ 1.04 Westchester $ 2.85 $ 2.92 $ 2.76 $ 2.43 $ 2.18 $ 3.02 $ 0.2353 $ 0.2353 $ 0.2353 $ 0.2353 $ 0.2353 $ 0.2353 NYC $ 0.0513 $ 0.0498 $ 0.0275 $ 0.0066 $ 0.0116 $ 0.0601 Westchester $ 0.1643 $ 0.1679 $ 0.1586 $ 0.1401 $ 0.1257 $ 0.1742 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 147)
Fourth Revised Leaf No. 147 Consolidated Edison Company Superseding Second Revised Leaf No. 147 (Third Revised Leaf No. 147 - Pending) If the would receive service under Service Classification No. 4 and would not be subject to Rate II of Service Classification No.4 High Tension Service Charge: (Per Month) $ 173.09 $ 173.09 $ 173.09 $ 173.09 $ 173.09 $ 173.09 MAC: (Per Month) NYC $ 37.74 $ 36.63 $ 20.28 $ 4.87 $ 8.55 $ 44.24 Westchester $ 120.87 $ 123.54 $ 116.73 $ 103.08 $ 92.46 $ 128.22 $ 0.1907 $ 0.1907 $ 0.1907 $ 0.1907 $ 0.1907 $ 0.1907 NYC $ 0.0416 $ 0.0404 $ 0.0223 $ 0.0053 $ 0.0094 $ 0.0487 Westchester $ 0.1332 $ 0.1362 $ 0.1286 $ 0.1135 $ 0.1018 $ 0.1412 $ 3.27 $ 3.27 $ 3.27 $ 3.27 $ 3.27 $ 3.27 NYC $ 0.71 $ 0.69 $ 0.39 $ 0.09 $ 0.16 $ 0.84 Westchester $ 2.28 $ 2.33 $ 2.20 $ 1.94 $ 1.75 $ 2.43 $ 0.1043 $ 0.1043 $ 0.1043 $ 0.1043 $ 0.1043 $ 0.1043 NYC $ 0.0228 $ 0.0221 $ 0.0123 $ 0.0029 $ 0.0051 $ 0.0266 Westchester $ 0.0729 $ 0.0745 $ 0.0704 $ 0.0621 $ 0.0556 $ 0.0772 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 148)
Fourth Revised Leaf No. 148 Consolidated Edison Company Superseding Second Revised Leaf No. 148 (Third Revised Leaf No. 148 - Pending) If the would be subject to Rate II of Service Classification No. 4 Low Tension Service Charge: (Per Month) $ 823.52 $ 823.52 $ 823.52 $ 823.52 $ 823.52 $ 823.52 MAC: (Per Month) NYC $ 146.78 $ 132.62 $ 71.48 $ (14.29) $ 18.18 $ 156.31 Westchester $ 736.62 $ 766.25 $ 773.58 $ 678.84 $ 615.43 $ 751.73 $ 0.1514 $ 0.1514 $ 0.1514 $ 0.1514 $ 0.1514 $ 0.1514 NYC $ 0.0270 $ 0.0244 $ 0.0131 $ (0.0026) $ 0.0033 $ 0.0287 Westchester $ 0.1354 $ 0.1409 $ 0.1422 $ 0.1249 $ 0.1131 $ 0.1382 $ 4.73 $ 4.73 $ 4.73 $ 4.73 $ 4.73 $ 4.73 NYC $ 0.84 $ 0.76 $ 0.40 $ (0.08) $ 0.11 $ 0.90 Westchester $ 4.23 $ 4.40 $ 4.43 $ 3.90 $ 3.54 $ 4.31 $ 0.2741 $ 0.2741 $ 0.2741 $ 0.2741 $ 0.2741 $ 0.2741 NYC $ 0.0488 $ 0.0442 $ 0.0238 $ (0.0048) $ 0.0060 $ 0.0521 Westchester $ 0.2451 $ 0.2551 $ 0.2574 $ 0.2259 $ 0.2047 $ 0.2502 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June -September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 149)
Fourth Revised Leaf No. 149 Consolidated Edison Company Superseding Second Revised Leaf No. 149 (Third Revised Leaf No. 149 - Pending) If the would be subject to Rate II of Service Classification No. 4 High Tension Service Below 138 kv Charge: (Per Month) $ 823.52 $ 823.52 $ 823.52 $ 823.52 $ 823.52 $ 823.52 MAC: (Per Month) NYC $ 146.78 $ 132.62 $ 71.48 $ (14.29) $ 18.18 $ 156.31 Westchester $ 736.62 $ 766.25 $ 773.58 $ 678.84 $ 615.43 $ 751.73 $ 0.1539 $ 0.1539 $ 0.1539 $ 0.1539 $ 0.1539 $ 0.1539 NYC $ 0.0274 $ 0.0248 $ 0.0134 $ (0.0026) $ 0.0034 $ 0.0292 Westchester $ 0.1377 $ 0.1432 $ 0.1446 $ 0.1269 $ 0.1150 $ 0.1405 $ 4.00 $ 4.00 $ 4.00 $ 4.00 $ 4.00 $ 4.00 NYC $ 0.71 $ 0.64 $ 0.35 $ (0.08) $ 0.09 $ 0.76 Westchester $ 3.58 $ 3.72 $ 3.76 $ 3.29 $ 2.99 $ 3.66 $ 0.0959 $ 0.0959 $ 0.0959 $ 0.0959 $ 0.0959 $ 0.0959 NYC $ 0.0171 $ 0.0154 $ 0.0083 $ (0.0017) $ 0.0022 $ 0.0182 Westchester $ 0.0858 $ 0.0892 $ 0.0901 $ 0.0790 $ 0.0717 $ 0.0875 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June -September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 150)
Fourth Revised Leaf No. 150 Consolidated Edison Company Superseding Second Revised Leaf No. 150 (Third Revised Leaf No. 150 - Pending) If the would be subject to Rate II of Service Classification No. 4 High Tension Service at 138 kv Charge: (Per Month) $ 368.36 $ 368.36 $ 368.36 $ 368.36 $ 368.36 $ 368.36 MAC: (Per Month) NYC $ 65.66 $ 59.32 $ 31.97 $ (6.39) $ 8.13 $ 69.92 Westchester $ 329.49 $ 342.74 $ 346.02 $ 303.65 $ 275.28 $ 336.25 $ 0.77 $ 0.77 $ 0.77 $ 0.77 $ 0.77 $ 0.77 NYC $ 0.14 $ 0.13 $ 0.07 $ (0.02) $ 0.01 $ 0.14 Westchester $ 0.69 $ 0.72 $ 0.72 $ 0.63 $ 0.57 $ 0.70 $ 0.1136 $ 0.1136 $ 0.1136 $ 0.1136 $ 0.1136 $ 0.1136 NYC $ 0.0202 $ 0.0183 $ 0.0098 $ (0.0020) $ 0.0025 $ 0.0216 Westchester $ 0.1016 $ 0.1057 $ 0.1067 $ 0.0936 $ 0.0849 $ 0.1037 $ 0.62 $ 0.62 $ 0.62 $ 0.62 $ 0.62 $ 0.62 NYC $ 0.10 $ 0.10 $ 0.05 $ (0.01) $ 0.02 $ 0.11 Westchester $ 0.55 $ 0.58 $ 0.58 $ 0.51 $ 0.47 $ 0.56 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June -September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 151)
Fourth Revised Leaf No. 151 Consolidated Edison Company Superseding Second Revised Leaf No. 151 (Third Revised Leaf No. 151 - Pending) If the would receive service under Service Classification No. 5 and would not be subject to Rate II of Service Classification No. 5 Low Tension Service Charge: (Per Month) $ 34.10 $ 34.10 $ 34.10 $ 34.10 $ 34.10 $ 34.10 MAC: (Per Month) NYC $ 4.23 $ 3.71 $ 1.66 $ (1.14) $ (0.29) $ 4.26 Westchester $ 31.74 $ 31.44 $ 30.18 $ 27.17 $ 25.80 $ 30.63 NYC $ - - - $ - $ - $ - Westchester $ - - - $ - $ - $ - $0.1258 $0.1258 $0.1258 $0.1258 $0.1258 $0.1258 NYC $ 0.0156 $ 0.0137 $ 0.0061 $ (0.0041) $ (0.0011) $ 0.0157 Westchester $ 0.1171 $ 0.1160 $ 0.1113 $ 0.1003 $ 0.0952 $ 0.1130 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 NYC $ 1.17 $ 1.01 $ 0.46 $ (0.32) $ (0.08) $ 1.18 Westchester $ 8.71 $ 8.62 $ 8.27 $ 7.45 $ 7.07 $ 8.41 $0.3805 $0.3805 $0.3805 $0.3805 $0.3805 $0.3805 NYC $ 0.0473 $ 0.0412 $ 0.0185 $ (0.0126) $ (0.0032) $ 0.0477 Westchester $ 0.3543 $ 0.3507 $ 0.3368 $ 0.3034 $ 0.2880 $ 0.3420 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 152)
Fourth Revised Leaf No. 152 Consolidated Edison Company Superseding Second Revised Leaf No. 152 (Third Revised Leaf No. 152 - Pending) If the would receive service under Service Classification No. 5 and would not be subject to Rate II of Service Classification No. 5 High Tension Service Charge: (Per Month) $ 34.10 $ 34.10 $ 34.10 $ 34.10 $ 34.10 $ 34.10 MAC: (Per Month) NYC $ 4.23 $ 3.71 $ 1.66 $ (1.14) $ (0.29) $ 4.26 Westchester $ 31.74 $ 31.44 $ 30.18 $ 27.17 $ 25.80 $ 30.63 $ 0.1231 $ 0.1231 $ 0.1231 $ 0.1231 $ 0.1231 $ 0.1231 NYC $ 0.0153 $ 0.0134 $ 0.0059 $ (0.0041) $ (0.0011) $ 0.0154 Westchester $ 0.1146 $ 0.1135 $ 0.1089 $ 0.0981 $ 0.0931 $ 0.1106 $ 2.70 $ 2.70 $ 2.70 $ 2.70 $ 2.70 $ 2.70 NYC $ 0.34 $ 0.30 $ 0.13 $ (0.09) $ (0.03) $ 0.34 Westchester $ 2.52 $ 2.50 $ 2.38 $ 2.16 $ 2.04 $ 2.43 $ 0.0783 $ 0.0783 $ 0.0783 $ 0.0783 $ 0.0783 $ 0.0783 NYC $ 0.0097 $ 0.0084 $ 0.0039 $ (0.0026) $ (0.0007) $ 0.0099 Westchester $ 0.0729 $ 0.0721 $ 0.0694 $ 0.0624 $ 0.0592 $ 0.0704 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 153)
Fourth Revised Leaf No. 153 Consolidated Edison Company Superseding Second Revised Leaf No. 153 If the would be subject to Rate II of Service Classification No. 5 Low Tension Service (Third Revised Leaf No. 153 - Pending) Charge: (Per Month) $ 1,771.44 $ 1,771.44 $ 1,771.44 $ 1,771.44 $ 1,771.44 $ 1,771.44 MAC: (Per Month) NYC $ 191.15 $ 142.40 $ 40.17 $ (80.61) $ (32.22) $ 168.76 Westchester $ 1,559.62 $ 1,525.90 $ 1,527.64 $ 1,346.42 $ 1,277.91 $ 1,467.97 $ 0.1603 $ 0.1603 $ 0.1603 $ 0.1603 $ 0.1603 $ 0.1603 NYC $ 0.0173 $ 0.0129 $ 0.0036 $ (0.0073) $ (0.0029) $ 0.0153 Westchester $ 0.1411 $ 0.1381 $ 0.1382 $ 0.1218 $ 0.1156 $ 0.1329 $ 5.69 $ 5.69 $ 5.69 $ 5.69 $ 5.69 $ 5.69 NYC $ 0.62 $ 0.45 $ 0.13 $ (0.26) $ (0.10) $ 0.54 Westchester $ 5.01 $ 4.90 $ 4.91 $ 4.32 $ 4.11 $ 4.71 $ 0.2946 $ 0.2946 $ 0.2946 $ 0.2946 $ 0.2946 $ 0.2946 NYC $ 0.0318 $ 0.0237 $ 0.0068 $ (0.0133) $ (0.0054) $ 0.0281 Westchester $ 0.2594 $ 0.2538 $ 0.2541 $ 0.2240 $ 0.2125 $ 0.2442 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 154)
Fourth Revised Leaf No. 154 Consolidated Edison Company Superseding Second Revised Leaf No. 154 (Third Revised Leaf No. 154 - Pending) If the would be subject to Rate II of Service Classification No. 5 High Tension Service Below 138 kv Charge: (Per Month) $ 1,771.44 $ 1,771.44 $ 1,771.44 $ 1,771.44 $ 1,771.44 $ 1,771.44 MAC: (Per Month) NYC $ 191.15 $ 142.40 $ 40.17 $ (80.61) $ (32.22) $ 168.76 Westchester $ 1,559.62 $ 1,525.90 $ 1,527.64 $ 1,346.42 $ 1,277.91 $ 1,467.97 $ 0.1656 $ 0.1656 $ 0.1656 $ 0.1656 $ 0.1656 $ 0.1656 NYC $ 0.0179 $ 0.0133 $ 0.0037 $ (0.0075) $ (0.0030) $ 0.0158 Westchester $ 0.1458 $ 0.1426 $ 0.1428 $ 0.1259 $ 0.1195 $ 0.1373 $ 3.05 $ 3.05 $ 3.05 $ 3.05 $ 3.05 $ 3.05 NYC $ 0.33 $ 0.25 $ 0.08 $ (0.14) $ (0.05) $ 0.30 Westchester $ 2.69 $ 2.62 $ 2.63 $ 2.32 $ 2.21 $ 2.53 $ 0.0884 $ 0.0884 $ 0.0884 $ 0.0884 $ 0.0884 $ 0.0884 NYC $ 0.0095 $ 0.0071 $ 0.0020 $ (0.0040) $ (0.0016) $ 0.0085 Westchester $ 0.0778 $ 0.0761 $ 0.0762 $ 0.0672 $ 0.0638 $ 0.0732 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 155)
Fourth Revised Leaf No. 155 Consolidated Edison Company Superseding Second Revised Leaf No. 155 If the would be subject to Rate II of Service Classification No. 5 High Tension Service at 138 kv (Third Revised Leaf No. 155 - Pending) Charge: (Per Month) $ 756.75 $ 756.75 $ 756.75 $ 756.75 $ 756.75 $ 756.75 MAC: (Per Month) NYC $ 81.66 $ 60.83 $ 17.16 $ (34.43) $ (13.77) $ 72.10 Westchester $ 666.26 $ 651.86 $ 652.60 $ 575.19 $ 545.92 $ 627.11 $ 0.66 $ 0.66 $ 0.66 $ 0.66 $ 0.66 $ 0.66 NYC $ 0.07 $ 0.05 $ 0.02 $ (0.03) $ (0.01) $ 0.06 Westchester $ 0.58 $ 0.57 $ 0.57 $ 0.50 $ 0.48 $ 0.55 $ 0.1226 $ 0.1226 $ 0.1226 $ 0.1226 $ 0.1226 $ 0.1226 NYC $ 0.0132 $ 0.0098 $ 0.0028 $ (0.0056) $ (0.0022) $ 0.0117 Westchester $ 0.1079 $ 0.1056 $ 0.1057 $ 0.0932 $ 0.0885 $ 0.1016 $ 0.47 $ 0.47 $ 0.47 $ 0.47 $ 0.47 $ 0.47 NYC $ 0.04 $ 0.03 $ 0.01 $ (0.03) $ (0.01) $ 0.05 Westchester $ 0.41 $ 0.40 $ 0.41 $ 0.35 $ 0.34 $ 0.40 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 156)
Fourth Revised Leaf No. 156 Consolidated Edison Company Superseding Second Revised Leaf No. 156 (Third Revised Leaf No. 156 - Pending) If the would receive service under Service Classification No. 8 and would not be subject to Rate II of Service Classification No. 8 Low Tension Service Charge: (Per Month) $ 163.70 $ 163.70 $ 163.70 $ 163.70 $ 163.70 $ 163.70 MAC: (Per Month) NYC $ 32.04 $ 27.41 $ 15.36 $ 0.34 $ 5.86 $ 33.47 Westchester $ 120.74 $ 120.10 $ 115.94 $ 97.64 $ 90.37 $ 118.38 $ 0.1325 $ 0.1325 $ 0.1325 $ 0.1325 $ 0.1325 $ 0.1325 NYC $ 0.0259 $ 0.0222 $ 0.0124 $ 0.0003 $ 0.0048 $ 0.0271 Westchester $ 0.0977 $ 0.0972 $ 0.0939 $ 0.0790 $ 0.0732 $ 0.0958 $ 3.75 $ 3.75 $ 3.75 $ 3.75 $ 3.75 $ 3.75 NYC $ 0.74 $ 0.63 $ 0.35 $ 0.02 $ 0.13 $ 0.76 Westchester $ 2.77 $ 2.75 $ 2.66 $ 2.25 $ 2.08 $ 2.71 $ 0.2552 $ 0.2552 $ 0.2552 $ 0.2552 $ 0.2552 $ 0.2552 NYC $ 0.0499 $ 0.0427 $ 0.0240 $ 0.0005 $ 0.0091 $ 0.0522 Westchester $ 0.1882 $ 0.1872 $ 0.1807 $ 0.1522 $ 0.1409 $ 0.1846 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 157)
Fourth Revised Leaf No. 157 Consolidated Edison Company Superseding Second Revised Leaf No. 157 (Third Revised Leaf No. 157 - Pending) If the would receive service under Service Classification No. 8 and would not be subject to Rate II of Service Classification No. 8 High Tension Service Charge: (Per Month) $ 163.70 $ 163.70 $ 163.70 $ 163.70 $ 163.70 $ 163.70 MAC: (Per Month) NYC $ 32.04 $ 27.41 $ 15.36 $ 0.34 $ 5.86 $ 33.47 Westchester $ 120.74 $ 120.10 $ 115.94 $ 97.64 $ 90.37 $ 118.38 $ 0.1325 $ 0.1325 $ 0.1325 $ 0.1325 $ 0.1325 $ 0.1325 NYC $ 0.0259 $ 0.0222 $ 0.0124 $ 0.0003 $ 0.0048 $ 0.0271 Westchester $ 0.0977 $ 0.0972 $ 0.0939 $ 0.0790 $ 0.0732 $ 0.0958 $ 3.15 $ 3.15 $ 3.15 $ 3.15 $ 3.15 $ 3.15 NYC $ 0.62 $ 0.52 $ 0.30 $ 0.01 $ 0.12 $ 0.64 Westchester $ 2.32 $ 2.31 $ 2.24 $ 1.88 $ 1.75 $ 2.27 $ 0.0877 $ 0.0877 $ 0.0877 $ 0.0877 $ 0.0877 $ 0.0877 NYC $ 0.0172 $ 0.0146 $ 0.0083 $ 0.0002 $ 0.0031 $ 0.0180 Westchester $ 0.0647 $ 0.0643 $ 0.0622 $ 0.0523 $ 0.0484 $ 0.0635 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 158)
Fourth Revised Leaf No. 158 Consolidated Edison Company Superseding Second Revised Leaf No. 158 (Third Revised Leaf No. 158 - Pending) If the would be subject to Rate II of Service Classification No. 8 Low Tension Service Charge: (Per Month) $ 504.13 $ 504.13 $ 504.13 $ 504.13 $ 504.13 $ 504.13 MAC: (Per Month) NYC $ 82.32 $ 69.24 $ 30.24 $ (18.53) $ 2.53 $ 89.14 Westchester $ 513.91 $ 522.77 $ 517.31 $ 460.44 $ 413.58 $ 502.20 $ 0.1162 $ 0.1162 $ 0.1162 $ 0.1162 $ 0.1162 $ 0.1162 NYC $ 0.0189 $ 0.0160 $ 0.0069 $ (0.0042) $ 0.0007 $ 0.0206 Westchester $ 0.1184 $ 0.1205 $ 0.1192 $ 0.1062 $ 0.0954 $ 0.1158 $ 3.64 $ 3.64 $ 3.64 $ 3.64 $ 3.64 $ 3.64 NYC $ 0.60 $ 0.50 $ 0.22 $ (0.14) $ 0.01 $ 0.64 Westchester $ 3.71 $ 3.77 $ 3.73 $ 3.32 $ 2.98 $ 3.62 $ 0.2560 $ 0.2560 $ 0.2560 $ 0.2560 $ 0.2560 $ 0.2560 NYC $ 0.0418 $ 0.0352 $ 0.0154 $ (0.0094) $ 0.0013 $ 0.0452 Westchester $ 0.2609 $ 0.2654 $ 0.2627 $ 0.2339 $ 0.2100 $ 0.2550 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 159)
Fourth Revised Leaf No. 159 Consolidated Edison Company Superseding Second Revised Leaf No. 159 (Third Revised Leaf No. 159 - Pending) If the would be subject to Rate II of Service Classification No. 8 High Tension Service Below 138 kv Charge: (Per Month) $ 504.13 $ 504.13 $ 504.13 $ 504.13 $ 504.13 $ 504.13 MAC: (Per Month) NYC $ 82.32 $ 69.24 $ 30.24 $ (18.53) $ 2.53 $ 89.14 Westchester $ 513.91 $ 522.77 $ 517.31 $ 460.44 $ 413.58 $ 502.20 $ 0.1162 $ 0.1162 $ 0.1162 $ 0.1162 $ 0.1162 $ 0.1162 NYC $ 0.0189 $ 0.0160 $ 0.0069 $ (0.0042) $ 0.0007 $ 0.0206 Westchester $ 0.1184 $ 0.1205 $ 0.1192 $ 0.1062 $ 0.0954 $ 0.1158 $ 3.09 $ 3.09 $ 3.09 $ 3.09 $ 3.09 $ 3.09 NYC $ 0.50 $ 0.42 $ 0.18 $ (0.11) $ 0.02 $ 0.54 Westchester $ 3.14 $ 3.21 $ 3.17 $ 2.82 $ 2.54 $ 3.07 $ 0.0879 $ 0.0879 $ 0.0879 $ 0.0879 $ 0.0879 $ 0.0879 NYC $ 0.0144 $ 0.0121 $ 0.0053 $ (0.0032) $ 0.0004 $ 0.0156 Westchester $ 0.0896 $ 0.0912 $ 0.0902 $ 0.0803 $ 0.0720 $ 0.0876 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 160)
Fourth Revised Leaf No. 160 Consolidated Edison Company Superseding Second Revised Leaf No. 160 (Third Revised Leaf No. 160 - Pending) If the would be subject to Rate II of Service Classification No. 8 High Tension Service at 138 kv Charge: (Per Month) $ 294.21 $ 294.21 $ 294.21 $ 294.21 $ 294.21 $ 294.21 MAC: (Per Month) NYC $ 48.04 $ 40.42 $ 17.65 $ (10.81) $ 1.48 $ 52.02 Westchester $ 299.92 $ 305.10 $ 301.91 $ 268.71 $ 241.36 $ 293.08 $ 0.49 $ 0.49 $ 0.49 $ 0.49 $ 0.49 $ 0.49 NYC $ 0.08 $ 0.07 $ 0.04 $ (0.02) $ - $ 0.08 Westchester $ 0.50 $ 0.51 $ 0.51 $ 0.45 $ 0.40 $ 0.48 $ 0.0870 $ 0.0870 $ 0.0870 $ 0.0870 $ 0.0870 $ 0.0870 NYC $ 0.0141 $ 0.0119 $ 0.0052 $ (0.0033) $ 0.0004 $ 0.0153 Westchester $ 0.0886 $ 0.0902 $ 0.0893 $ 0.0794 $ 0.0713 $ 0.0866 $ 0.47 $ 0.47 $ 0.47 $ 0.47 $ 0.47 $ 0.47 NYC $ 0.08 $ 0.07 $ 0.03 $ (0.02) $ - $ 0.08 Westchester $ 0.48 $ 0.49 $ 0.48 $ 0.43 $ 0.38 $ 0.47 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 161)
Fourth Revised Leaf No. 161 Consolidated Edison Company Superseding Second Revised Leaf No. 161 (Third Revised Leaf No. 161 - Pending) If the would receive service under Service Classification No. 9 and would not be subject to Rate II of Service Classification No. 9 Low Tension Service Charge: (Per Month) $ 58.17 $ 58.17 $ 58.17 $ 58.17 $ 58.17 $ 58.17 MAC: (Per Month) NYC $ 10.04 $ 9.15 $ 5.32 $ 0.22 $ 1.99 $ 10.71 Westchester $ 38.95 $ 38.92 $ 37.58 $ 31.86 $ 29.83 $ 38.66 $ 0.1210 $ 0.1210 $ 0.1210 $ 0.1210 $ 0.1210 $ 0.1210 NYC $ 0.0209 $ 0.0191 $ 0.0111 $ 0.0005 $ 0.0041 $ 0.0224 Westchester $ 0.0810 $ 0.0810 $ 0.0782 $ 0.0663 $ 0.0620 $ 0.0805 $ 3.60 $ 3.60 $ 3.60 $ 3.60 $ 3.60 $ 3.60 NYC $ 0.63 $ 0.57 $ 0.33 $ 0.02 $ 0.12 $ 0.66 Westchester $ 2.41 $ 2.41 $ 2.32 $ 1.97 $ 1.85 $ 2.39 $ 0.1956 $ 0.1956 $ 0.1956 $ 0.1956 $ 0.1956 $ 0.1956 NYC $ 0.0337 $ 0.0308 $ 0.0179 $ 0.0008 $ 0.0067 $ 0.0361 Westchester $ 0.1309 $ 0.1309 $ 0.1264 $ 0.1071 $ 0.1003 $ 0.1300 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 162)
Fourth Revised Leaf No. 162 Consolidated Edison Company Superseding Second Revised Leaf No. 162 (Third Revised Leaf No. 162 - Pending) If the would receive service under Service Classification No. 9 and would not be subject to Rate II of Service Classification No. 9 High Tension Service Charge: (Per Month) $ 58.17 $ 58.17 $ 58.17 $ 58.17 $ 58.17 $ 58.17 MAC: (Per Month) NYC $ 10.04 $ 9.15 $ 5.32 $ 0.22 $ 1.99 $ 10.71 Westchester $ 38.95 $ 38.92 $ 37.58 $ 31.86 $ 29.83 $ 38.66 $ 0.1185 $ 0.1185 $ 0.1185 $ 0.1185 $ 0.1185 $ 0.1185 NYC $ 0.0205 $ 0.0186 $ 0.0108 $ 0.0004 $ 0.0041 $ 0.0219 Westchester $ 0.0794 $ 0.0793 $ 0.0765 $ 0.0649 $ 0.0608 $ 0.0788 $ 2.71 $ 2.71 $ 2.71 $ 2.71 $ 2.71 $ 2.71 NYC $ 0.47 $ 0.42 $ 0.25 $ 0.01 $ 0.09 $ 0.50 Westchester $ 1.82 $ 1.81 $ 1.76 $ 1.49 $ 1.39 $ 1.81 $ 0.0654 $ 0.0654 $ 0.0654 $ 0.0654 $ 0.0654 $ 0.0654 NYC $ 0.0113 $ 0.0103 $ 0.0059 $ 0.0002 $ 0.0022 $ 0.0120 Westchester $ 0.0438 $ 0.0438 $ 0.0422 $ 0.0358 $ 0.0335 $ 0.0435 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 163)
Fourth Revised Leaf No. 163 Consolidated Edison Company Superseding Second Revised Leaf No. 163 (Third Revised Leaf No. 163 - Pending) If the would be subject to Rate II of Service Classification No. 9 Low Tension Service Charge: (Per Month) $ 1,003.04 $ 1,003.04 $ 1,003.04 $ 1,003.04 $ 1,003.04 $ 1,003.04 MAC: (Per Month) NYC $ 141.43 $ 124.90 $ 61.57 $ (27.75) $ 8.04 $ 157.99 Westchester $ 890.25 $ 916.36 $ 941.68 $ 831.36 $ 753.23 $ 897.76 $ 0.1646 $ 0.1646 $ 0.1646 $ 0.1646 $ 0.1646 $ 0.1646 NYC $ 0.0233 $ 0.0205 $ 0.0100 $ (0.0045) $ 0.0013 $ 0.0259 Westchester $ 0.1462 $ 0.1504 $ 0.1545 $ 0.1365 $ 0.1236 $ 0.1473 $ 4.75 $ 4.75 $ 4.75 $ 4.75 $ 4.75 $ 4.75 NYC $ 0.68 $ 0.59 $ 0.29 $ (0.13) $ 0.04 $ 0.75 Westchester $ 4.22 $ 4.34 $ 4.46 $ 3.94 $ 3.57 $ 4.26 $ 0.2902 $ 0.2902 $ 0.2902 $ 0.2902 $ 0.2902 $ 0.2902 NYC $ 0.0409 $ 0.0362 $ 0.0178 $ (0.0080) $ 0.0023 $ 0.0457 Westchester $ 0.2576 $ 0.2651 $ 0.2725 $ 0.2406 $ 0.2179 $ 0.2597 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 164)
Fourth Revised Leaf No. 164 Consolidated Edison Company Superseding Second Revised Leaf No. 164 (Third Revised Leaf No. 164 - Pending) If the would be subject to Rate II of Service Classification No. 9 High Tension Service Below 138 kv Charge: (Per Month) $ 1,003.04 $ 1,003.04 $ 1,003.04 $ 1,003.04 $ 1,003.04 $ 1,003.04 MAC: (Per Month) NYC $ 141.43 $ 124.90 $ 61.57 $ (27.75) $ 8.04 $ 157.99 Westchester $ 890.25 $ 916.36 $ 941.68 $ 831.36 $ 753.23 $ 897.76 $ 0.1793 $ 0.1793 $ 0.1793 $ 0.1793 $ 0.1793 $ 0.1793 NYC $ 0.0252 $ 0.0223 $ 0.0111 $ (0.0049) $ 0.0014 $ 0.0282 Westchester $ 0.1591 $ 0.1638 $ 0.1684 $ 0.1487 $ 0.1347 $ 0.1605 $ 3.95 $ 3.95 $ 3.95 $ 3.95 $ 3.95 $ 3.95 NYC $ 0.55 $ 0.50 $ 0.24 $ (0.11) $ 0.03 $ 0.62 Westchester $ 3.50 $ 3.61 $ 3.70 $ 3.27 $ 2.97 $ 3.53 $ 0.1070 $ 0.1070 $ 0.1070 $ 0.1070 $ 0.1070 $ 0.1070 NYC $ 0.0151 $ 0.0134 $ 0.0065 $ (0.0030) $ 0.0008 $ 0.0169 Westchester $ 0.0950 $ 0.0978 $ 0.1004 $ 0.0887 $ 0.0803 $ 0.0958 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 165)
Fourth Revised Leaf No. 165 Consolidated Edison Company Superseding Second Revised Leaf No. 165 (Third Revised Leaf No. 165 - Pending) If the would be subject to Rate II of Service Classification No. 9 High Tension Service at 138 kv Charge: (Per Month) $ 364.60 $ 364.60 $ 364.60 $ 364.60 $ 364.60 $ 364.60 MAC: (Per Month) NYC $ 51.40 $ 45.39 $ 22.38 $ (10.08) $ 2.93 $ 57.43 Westchester $ 323.59 $ 333.08 $ 342.29 $ 302.20 $ 273.80 $ 326.33 $ 0.80 $ 0.80 $ 0.80 $ 0.80 $ 0.80 $ 0.80 NYC $ 0.11 $ 0.11 $ 0.05 $ (0.02) $ 0.01 $ 0.13 Westchester $ 0.70 $ 0.74 $ 0.75 $ 0.66 $ 0.60 $ 0.72 $ 0.1253 $ 0.1253 $ 0.1253 $ 0.1253 $ 0.1253 $ 0.1253 NYC $ 0.0177 $ 0.0156 $ 0.0078 $ (0.0035) $ 0.0010 $ 0.0197 Westchester $ 0.1112 $ 0.1145 $ 0.1177 $ 0.1038 $ 0.0941 $ 0.1121 $ 0.60 $ 0.60 $ 0.60 $ 0.60 $ 0.60 $ 0.60 NYC $ 0.08 $ 0.07 $ 0.03 $ (0.01) $ 0.01 $ 0.10 Westchester $ 0.53 $ 0.55 $ 0.56 $ 0.50 $ 0.45 $ 0.54 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 166)
Fourth Revised Leaf No. 166 Consolidated Edison Company Superseding Second Revised Leaf No. 166 (Third Revised Leaf No. 166 - Pending) If the would be billed for energy and demand under Service Classification No. 12 and would not be subject to Rate II of Service Classification No. 12 Low Tension Service Charge: (Per Month) $ 172.06 $ 172.06 $ 172.06 $ 172.06 $ 172.06 $ 172.06 MAC: (Per Month) NYC $ 22.20 $ 11.79 $ 1.41 $ (6.56) $ (2.74) $ 14.12 Westchester $ 111.08 $ 109.35 $ 114.34 $ 100.88 $ 87.28 $ 99.43 $ 0.0700 $ 0.0700 $ 0.0700 $ 0.0700 $ 0.0700 $ 0.0700 NYC $ 0.0091 $ 0.0049 $ 0.0006 $ (0.0026) $ (0.0011) $ 0.0057 Westchester $ 0.0452 $ 0.0446 $ 0.0465 $ 0.0411 $ 0.0355 $ 0.0404 $ 3.62 $ 3.62 $ 3.62 $ 3.62 $ 3.62 $ 3.62 NYC $ 0.46 $ 0.24 $ 0.03 $ (0.14) $ (0.05) $ 0.30 Westchester $ 2.33 $ 2.30 $ 2.40 $ 2.12 $ 1.84 $ 2.09 $ 0.2131 $ 0.2131 $ 0.2131 $ 0.2131 $ 0.2131 $ 0.2131 NYC $ 0.0275 $ 0.0146 $ 0.0017 $ (0.0082) $ (0.0034) $ 0.0175 Westchester $ 0.1376 $ 0.1355 $ 0.1416 $ 0.1249 $ 0.1081 $ 0.1232 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 167)
Fourth Revised Leaf No. 167 Consolidated Edison Company Superseding Second Revised Leaf No. 167 (Third Revised Leaf No. 167 - Pending) If the would be billed for energy and demand under Service Classification No. 12 and would not be subject to Rate II of Service Classification No. 12 High Tension Service Charge: (Per Month) $ 172.06 $ 172.06 $ 172.06 $ 172.06 $ 172.06 $ 172.06 MAC: (Per Month) NYC $ 22.20 $ 11.79 $ 1.41 $ (6.56) $ (2.74) $ 14.12 Westchester $ 111.08 $ 109.35 $ 114.34 $ 100.88 $ 87.28 $ 99.43 - - - $ - $ - $ - $ 0.0700 $ 0.0700 $ 0.0700 $ 0.0700 $ 0.0700 $ 0.0700 NYC $ 0.0091 $ 0.0049 $ 0.0006 $ (0.0026) $ (0.0011) $ 0.0057 Westchester $ 0.0452 $ 0.0446 $ 0.0465 $ 0.0411 $ 0.0355 $ 0.0404 $ 1.51 $ 1.51 $ 1.51 $ 1.51 $ 1.51 $ 1.51 NYC $ 0.20 $ 0.11 $ 0.01 $ (0.06) $ (0.03) $ 0.12 Westchester $ 0.98 $ 0.97 $ 1.00 $ 0.89 $ 0.76 $ 0.87 $ 0.0506 $ 0.0506 $ 0.0506 $ 0.0506 $ 0.0506 $ 0.0506 NYC $ 0.0066 $ 0.0034 $ 0.0004 $ (0.0019) $ (0.0008) $ 0.0042 Westchester $ 0.0327 $ 0.0321 $ 0.0336 $ 0.0297 $ 0.0257 $ 0.0293 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 168)
Fourth Revised Leaf No. 168 Consolidated Edison Company Superseding Second Revised Leaf No. 168 (Third Revised Leaf No. 168 - Pending) If the would be subject to Rate II of Service Classification No. 12 Low Tension Service Charge: (Per Month) $ 554.51 $ 554.51 $ 554.51 $ 554.51 $ 554.51 $ 554.51 MAC: (Per Month) NYC $ 45.24 $ 17.48 $ (10.52) $ (28.23) $ (17.64) $ 23.81 Westchester $ 332.83 $ 339.31 $ 356.33 $ 321.22 $ 278.49 $ 296.93 $ 0.1075 $ 0.1075 $ 0.1075 $ 0.1075 $ 0.1075 $ 0.1075 NYC $ 0.0088 $ 0.0034 $ (0.0020) $ (0.0054) $ (0.0034) $ 0.0046 Westchester $ 0.0646 $ 0.0658 $ 0.0691 $ 0.0623 $ 0.0540 $ 0.0576 $ 3.94 $ 3.94 $ 3.94 $ 3.94 $ 3.94 $ 3.94 NYC $ 0.33 $ 0.12 $ (0.08) $ (0.20) $ (0.12) $ 0.17 Westchester $ 2.38 $ 2.41 $ 2.53 $ 2.28 $ 1.98 $ 2.10 $ 0.2547 $ 0.2547 $ 0.2547 $ 0.2547 $ 0.2547 $ 0.2547 NYC $ 0.0208 $ 0.0081 $ (0.0048) $ (0.0130) $ (0.0082) $ 0.0109 Westchester $ 0.1529 $ 0.1559 $ 0.1637 $ 0.1475 $ 0.1279 $ 0.1364 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June -September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 169)
Fourth Revised Leaf No. 169 Consolidated Edison Company Superseding Second Revised Leaf No. 169 (Third Revised Leaf No. 169 - Pending) If the would be subject to Rate II of Service Classification No.12 High Tension Service Below 138 kv Charge: (Per Month) $ 554.51 $ 554.51 $ 554.51 $ 554.51 $ 554.51 $ 554.51 MAC: (Per Month) NYC $ 45.24 $ 17.48 $ (10.52) $ (28.23) $ (17.64) $ 23.81 Westchester $ 332.83 $ 339.31 $ 356.33 $ 321.22 $ 278.49 $ 296.93 $ 0.1084 $ 0.1084 $ 0.1084 $ 0.1084 $ 0.1084 $ 0.1084 NYC $ 0.0089 $ 0.0035 $ (0.0021) $ (0.0055) $ (0.0035) $ 0.0047 Westchester $ 0.0651 $ 0.0664 $ 0.0696 $ 0.0628 $ 0.0544 $ 0.0580 $ 1.91 $ 1.91 $ 1.91 $ 1.91 $ 1.91 $ 1.91 NYC $ 0.15 $ 0.05 $ (0.03) $ (0.09) $ (0.06) $ 0.08 Westchester $ 1.14 $ 1.16 $ 1.23 $ 1.11 $ 0.96 $ 1.01 $ 0.0602 $ 0.0602 $ 0.0602 $ 0.0602 $ 0.0602 $ 0.0602 NYC $ 0.0050 $ 0.0019 $ (0.0012) $ (0.0030) $ (0.0019) $ 0.0025 Westchester $ 0.0361 $ 0.0368 $ 0.0386 $ 0.0349 $ 0.0302 $ 0.0322 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June -September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 170)
Fourth Revised Leaf No. 170 Consolidated Edison Company Superseding Second Revised Leaf No. 170 (Third Revised Leaf No. 170 - Pending) RETAIL ACCESS - STANDY SERVICE If the would be subject to Rate II of Service Classification No. 12 High Tension Service at 138 kv Charge: (Per Month) $ 314.69 $ 314.69 $ 314.69 $ 314.69 $ 314.69 $ 314.69 MAC: (Per Month) NYC $ 25.67 $ 9.92 $ (5.98) $ (16.02) $ (10.00) $ 13.51 Westchester $ 188.88 $ 192.57 $ 202.21 $ 182.30 $ 158.05 $ 168.51 $ 0.36 $ 0.36 $ 0.36 $ 0.36 $ 0.36 $ 0.36 NYC $ 0.02 $ 0.01 $ (0.01) $ (0.02) $ (0.01) $ 0.02 Westchester $ 0.21 $ 0.22 $ 0.23 $ 0.21 $ 0.18 $ 0.20 $ 0.0814 $ 0.0814 $ 0.0814 $ 0.0814 $ 0.0814 $ 0.0814 NYC $ 0.0067 $ 0.0026 $ (0.0016) $ (0.0042) $ (0.0026) $ 0.0035 Westchester $ 0.0489 $ 0.0498 $ 0.0523 $ 0.0471 $ 0.0409 $ 0.0436 $ 0.29 $ 0.29 $ 0.29 $ 0.29 $ 0.29 $ 0.29 NYC $ 0.02 $ 0.01 $ - $ (0.01) $ (0.01) $ 0.01 Westchester $ 0.17 $ 0.18 $ 0.19 $ 0.17 $ 0.14 $ 0.16 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June -September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 171)
Fourth Revised Leaf No. 171 Consolidated Edison Company Superseding Second Revised Leaf No. 171 (Third Revised Leaf No. 171 - Pending) If the customer would receive service under Service Classification No.13 High Tension Service Below 138 kv Charge: (Per Month) $ 1,339.42 $ 1,339.42 $ 1,339.42 $ 1,339.42 $ 1,339.42 $ 1,339.42 MAC: (Per Month) NYC $ 140.68 $ 108.02 $ 9.66 $ (96.14) $ (42.81) $ 171.40 Westchester $ 1,572.65 $ 1,636.90 $ 1,687.28 $ 1,513.23 $ 1,348.68 $ 1,550.48 $ 0.1024 $ 0.1024 $ 0.1024 $ 0.1024 $ 0.1024 $ 0.1024 NYC $ 0.0107 $ 0.0083 $ 0.0007 $ (0.0074) $ (0.0033) $ 0.0132 Westchester $ 0.1202 $ 0.1252 $ 0.1290 $ 0.1156 $ 0.1031 $ 0.1186 $ 4.32 $ 4.32 $ 4.32 $ 4.32 $ 4.32 $ 4.32 NYC $ 0.46 $ 0.35 $ 0.03 $ (0.32) $ (0.14) $ 0.56 Westchester $ 5.08 $ 5.28 $ 5.44 $ 4.87 $ 4.35 $ 5.00 $ 0.0908 $ 0.0908 $ 0.0908 $ 0.0908 $ 0.0908 $ 0.0908 As-used Daily Peak Distribution Demand MAC: Per kw of Daily Distribution On-Peak Demand:** NYC $ 0.0095 $ 0.0074 $ 0.0007 $ (0.0065) $ (0.0029) $ 0.0116 Westchester $ 0.1066 $ 0.1110 $ 0.1144 $ 0.1026 $ 0.0915 $ 0.1051 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 172)
Fourth Revised Leaf No. 172 Consolidated Edison Company Superseding Second Revised Leaf No. 172 (Third Revised Leaf No. 172 - Pending) If the would receive service under Service Classification No. 13 High Tension Service at 138 kv Cust Charge: (Per Month) $ 1,266.42 $ 1,266.42 $ 1,266.42 $ 1,266.42 $ 1,266.42 $ 1,266.42 Cust MAC: (Per Month) NYC $ 133.01 $ 102.14 $ 9.12 $ (90.88) $ (40.47) $ 162.06 Westchester $ 1,486.94 $ 1,547.69 $ 1,595.31 $ 1,430.77 $ 1,275.18 $ 1,465.97 $ 0.59 $ 0.59 $ 0.59 $ 0.59 $ 0.59 $ 0.59 NYC $ 0.07 $ 0.05 $ - $ (0.05) $ (0.02) $ 0.07 Westchester $ 0.70 $ 0.72 $ 0.74 $ 0.66 $ 0.59 $ 0.68 $ 0.0769 $ 0.0769 $ 0.0769 $ 0.0769 $ 0.0769 $ 0.0769 NYC $ 0.0080 $ 0.0061 $ 0.0006 $ (0.0055) $ (0.0025) $ 0.0098 Westchester $ 0.0902 $ 0.0939 $ 0.0969 $ 0.0869 $ 0.0774 $ 0.0890 $ 0.66 $ 0.66 $ 0.66 $ 0.66 $ 0.66 $ 0.66 NYC $ 0.07 $ 0.05 $ - $ (0.04) $ (0.03) $ 0.08 Westchester $ 0.78 $ 0.81 $ 0.83 $ 0.75 $ 0.66 $ 0.77 *On-Peak hours for Transmission are Monday through Friday 8AM to 6PM June-September; 8AM to 10PM (Service Classification No. 14 - Continued on Leaf No. 173)
Consolidated Edison Company First Revised Leaf No. 173 (Original Leaf No. 173 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions A. Unless specified otherwise herein, service provided hereunder will be subject to the provisions of the Service Classification that would otherwise be applicable to the. B. A may segregate any portion of its total requirements at the premises so that such portion shall be served exclusively with the Company's service under another and appropriate Service Classification, except as otherwise provided under General Rule III-13 (D) of the Full Service Schedule relating to segregated service. Where direct-current service was provided on a multi-metered account under this Service Classification as of April 1, 1998, the direct-current meter(s) may not thereafter be segregated for billing under an energy-only Service Classification of this Rate Schedule or any other Rate Schedule, unless expressly permitted. C. A being billed under Standby Service rates may purchase power and energy from Con Edison at the Market Supply Charge ( MSC ) and Adjustment Factor MSC of the s Otherwise Applicable Rate in the Full Service Schedule. Charges are assessed on both a per-kilowatthour and a per-kilowatt basis, including any minimum charge that may be applicable under Rate I of Service Classification Nos. 4, 5, 8, 9, and 12. If the would otherwise receive service under Service Classification No. 4, 5, 8, 9, or 12, the will be billed at the MSC and Adjustment Factor-MSC applicable to Rate II of the applicable Service Classification if the : (1) has a Contract Demand greater than 1500 kw; (2) has a Contract Demand greater than 900 kw and takes service under Rider J; (3) receives high tension service at 138,000 volts under this Service Classification; or (4) would receive service under Special Provision H of Service Classification No. 4, 8, 9, or 12. All other s who would receive service under Service Classification No. 4, 5, 8, 9, or 12 will be billed at the MSC and Adjustment Factor-MSC applicable to Rate I of the applicable Service Classification. Where a customer takes high tension service at 138,000 volts and high tension service below 138,000 volts under a single agreement, high tension service under the s otherwise applicable full-service Service Classification refers to the sum of high tension service taken at 138,00 volts and high tension service taken at voltages below 138,000 volts. A purchasing power and energy under this Special Provis ion will be subject to other charges and adjustments, as applicable, as described in General Information Sections VII and VIII-(B) of the Full Service Schedule, increased by the applicable percentage as explained in General Information Section VIII-(A) of the Full Service Schedule and shown on the related statement. Except as provided in Special Provision K, a will be assumed to have elected to purchase supply from the Company, as described in this Special Provision, unless an ESCO enrolls the in the retail access program, or, in the case of a Direct or a who is wholesale generator, the Company receives notification from the that it has a non-company source of supply. If notified by the ESCO that it has terminated service to the or by the that it no longer has a non- Company source of supply, Con Edison will assume that the has again elected to purchase supply from the Company. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Consolidated Edison Company First Revised Leaf No. 174 (Original Leaf No. 174 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions - Continued D. The following types of s will be billed under their Otherwise Applicable Rate, instead of Standby Service rates: (1) s who have on-site generation equipment having a total nameplate rating equal to no more than 15 percent of the maximum potential demand served from all sources; (2) s who would otherwise receive service under Service Classification No. 1-RA, 2-RA, 7-RA, or the energy-only rate of Service Classification No. 12-RA, or one of the corresponding service classifications in the Full Service Schedule, if they did not have on-site generation equipment; and (3) s with a Contract Demand of less than 50 kw, provided, however, that s who are not eligible for service under subparagraphs (1) or (2) may elect to be billed under Standby Service rates, by providing advance written notice to the Company. For all other purposes, s billed under their Otherwise Applicable Rate will receive service under this Service Classification, and the Interconnection Charge and Reactive Power Demand Charge under this Service Classification shall continue to apply. s with a Contract Demand of less than 50 kw who elect billing under Standby Service rates will be billed under such rates commencing with the first full billing period for which interval metering data is available subsequent to the Company s receipt of notice. Such s will be ineligible for any of the rate phase-ins that may be available to Existing s and s With Designated Technologies. s with a Contract Demand of less than 50 kw who elect to be billed under Standby Service rates will be ineligible for billing under the Otherwise Applicable Rate for one year subsequent to commencing billing under Standby Service rates. Should a elect to discontinue being billed under Standby Service rates, such will be ineligible for billing under Standby Service rates for one year subsequent to commencing billing under the Otherwise Applicable Rate. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
P.S.C. No. 2 Retail Access Consolidated Edison Company First Revised Leaf No. 175 (Original Leaf No. 175 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions - Continued E. Backfeed of power into the Company's system will not be permitted under this Service Classification. F. The following provisions are applicable to s with private generation facilities on the premises that (i) commenced operation prior to February 1, 2000, or (ii) have a total nameplate rating greater than 300 kva, or (iii) are connected in parallel with distribution feeders other than radial distribution feeders, and (iv) are not connected directly to transmission facilities (that is, delivery facilities other than distribution facilities): (1) Metering equipment (except meters and metering transformers) and interrupting equipment, as specified by the Company, will be installed and maintained by the in accordance with Company specifications. Where such facilities are located on the Company s property, they will be installed and maintained by the Company at the s expense. (2) All requests for parallel operation will be reviewed on a case-by-case basis. Parallel operation will be permitted only if, and to the extent, such operation does not jeopardize the adequacy or reliability of service to the Company's other s. Failure of the at any time to comply with the terms and conditions specified by the Company in order to permit parallel operation will result in the forfeiting its right to operate in parallel with the Company's system. In the event a forfeits its right to operate in parallel with the Company's system, the will be required to bear the reasonable expense associated with disconnecting the 's private plant from the Company's system. Where there is a dispute between the and the Company with respect to the standards and charges for interconnection, the may apply to the Public Service Commission for a ruling in the matter. (3) The 's generating plant and the Company's system may be operated in parallel as required subject to the 's compliance with the Company's design requirements and operating rules and procedures. To accomplish such parallel operation in a safe, economical, and efficient manner, operating instructions shall be prepared by the Company, and adhered to by the authorized operating representatives of the. Such operating instructions shall include, among other things, procedures for: Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Consolidated Edison Company First Revised Leaf No. 176 (Original Leaf No. 176 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions - Continued F. Continued (3) Continued (a) Maintaining proper voltage and frequency and for putting into effect voltage changes as required from time to time; (b) Phasing and synchronizing the 's generating plant and the Company's system; (c) Taking feeders out of service for maintenance or during emergency conditions and restoring them to service thereafter; and (d) Controlling the flow of real power and reactive power between the 's generating plant and the Company's system. Where there is to be parallel operation, the 's authorized operating representatives shall receive the necessary training from the Company's authorized operating representatives in the Company's operating procedures before parallel operation is begun. (4) Where the operates in parallel, the shall provide and maintain on its premises all necessary facilities, as specified by the Company, for connecting the Company's feeder cables to the 's generating station, including transformers, circuit breakers, and all equipment and facilities necessary and required for synchronizing the 's generating plant with the Company's system and for controlling the flow of energy and wattless current and for protection of the interconnected systems. Such required facilities may include a communication system between the 's generating plant and the Company's system or district operator consisting of transmitting equipment and a communications path such as a leased telephone line or lines connecting these points to provide transfer trip of the tie. Voice communication and telemetering of loads shall be provided at the 's expense. (5) The is solely responsible for providing adequate protection for 's facilities operating in parallel with the Company's system. Except where caused by the Company's negligence, the Company will not be liable for, and the shall indemnify and hold the Company harmless for, damages to the property of the Company or others or injuries to persons arising out of any occurrence related to the 's ownership, use or operation of the 's facilities. (6) When a who is a wholesale generator takes service through the same bus bar that it uses to export power to the wholesale grid, the station power when the generator is operating will be treated as if the generator were self-supplying from the load side of the meter. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Consolidated Edison Company First Revised Leaf No. 177 (Original Leaf No. 177 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions - Continued G. The following provisions are applicable to s with private generation facilities on the premises that (i) commenced operation on or after February 1, 2000, (ii) have a total nameplate rating of 300 kva or less, and (iii) are connected in parallel with radial distribution feeders: (1) The New York State Standardized Interconnection Requirements and Application Process (the SIR ), as adopted by the Public Service Commission and as may be amended from time to time by the Commission, is set out in Addendum SIR to this Rate Schedule. s applications for service under this Service Classification for generation facilities with a total nameplate rating greater than 15 kva, and s' applications for service for single phase generation facilities with a total nameplate rating of 15 kva or less, will be made using the applications set forth in Addendum-SIR. Applications for service for generation facilities with a total nameplate rating greater than 15 kva must be accompanied by a non-refundable $350 application fee. (2) Assuming the conditions of the SIR are met, the Company and the will execute the New York State Standardized Contract set forth in Addendum-SIR. (3) The installation and parallel operation of generation facilities will be in accordance with the SIR, which is set out in Addendum-SIR to the Full Service Schedule. H. A with induction-type generating equipment and taking service under this Service Classification will be charged for the kilovar requirements of such equipment. The kilovar requirements will be determined from the nameplate rating of the 's generating equipment or from the design specifications of the manufacturer of the generating equipment. The kilovar requirements of the 's generating equipment will be reduced by the kilovar rating of any power factor corrective equipment installed by the. The Reactive Power Demand Charge per kilovar per month for each kvar determined in accordance with this provision is $0.26. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Fourth Revised Leaf No. 178 Consolidated Edison Company Superseding Second Revised Leaf No. 178 (Third Revised Leaf No. 178 - Pending) Special Provisions - Continued I. If the was taking service under Special Provision E of Service Classification No. 3 - Back-up Service of the Full Service Schedule on September 9, 2002, the following rates will apply: Energy Charge (cents per kwhr) Monthly Adjustment New York City 0.17 0.10 0.04 (0.05) (0.01) 0.13 Westchester 1.21 1.17 1.22 1.10 0.91 1.08 Transmission 0.04 0.04 0.04 0.04 0.04 0.04 Distribution 0.44 0.44 0.44 0.44 0.44 0.44 Demand Charge (per kw of Contract Demand) Monthly Adjustment New York City $ 0.28 $ 0.25 $ 0.16 $ 0.03 $ 0.06 $ 0.27 Westchester $ 0.90 $ 0.87 $ 0.78 $ 0.65 $ 0.68 $ 0.89 Transmission $ 0.21 $ 0.21 $ 0.21 $ 0.21 $ 0.21 $ 0.21 Distribution $ 1.42 $ 1.42 $ 1.42 $ 1.42 $ 1.42 $ 1.42 If the is served under Special Provision C of this Service Classification, the following Market Supply Charges will apply. The Adjustment Factor-MSC is shown on the Statement of Adjustment Factor-MSC applicable to the Full Service Schedule. Energy Charge (cents per kwhr) Market Supply Charge New York City 7.47 7.30 8.48 8.67 8.16 8.01 Westchester 5.91 5.70 6.71 6.94 6.78 6.58 Demand Charge (per kw of Contract Demand) Market Supply Charge New York City $ 1.18 $ 1.18 $ 1.18 $ 1.18 $ 1.18 $ 1.18 Westchester $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 $ 0.25 (Service Classification No. 14 - Continued on Leaf No. 179)
Consolidated Edison Company First Revised Leaf No. 179 (Original Leaf No. 179 Canceled) SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions - Continued J. Rates and charges stated without reference to a specific month shall apply to all electric service supplied hereunder on and after the effective date hereof. Where a bill includes periods before the effective date and after the effective date, the rates and charges applicable will be prorated based on the number of days of service rendered before the effective date and on and after the effective date related to the total number of days in the billing period. Rates and charges referable to a specific month ( month-specific rates and charges ) shall apply to all electric service supplied hereunder after the last day of the preceding month and through the last day of the named month. Where a bill includes periods before and after the first calendar day of a month, the monthspecific rates and charges applicable will be prorated based on the number of days of service rendered before the first day of the month and on and after the first calendar day of the month related to the total number of days in the billing period. The As-Used Daily On-Peak Transmission Demand Charge and the As-Used Daily On-Peak Distribution Demand Charge, and their associated Monthly Adjustment Charges, will not be prorated. K. A who was served under Service Classification No. 3 Back-up Service or Service Classification No. 10 - Supplementary Service, including Special Provision A of either Service Classification, on February 1, 2004, will automatically be transferred to service under this Service Classification effective with the first meter reading date occurring on or after February 1, 2004. Contract Demand for a who transfers from Service Classification No. 3 or 10 will be established in accordance with Provision C of the Metering and Determination of Demand section of this Service Classification. If the received service under the Full Service Schedule at the time of transfer to this Service Classification, the will be assumed to have elected to purchase supply from the Company, as described in Special Provision C of this Service Classification until the Company receives notice from an ESCO that it is enrolling the in the retail access program, or, in the case of a Direct or a who is wholesale generator, the Company receives notification from the that it has a non-company source of supply. If the received service under this Rate Schedule at the time of transfer, the Company will assume that the has elected not to purchase supply from the Company unless and until the Company receives notice from an ESCO or the that the non-company supply arrangement is terminated or the informs the Company that it desires to obtain supply from the Company in accordance with Special Provision C. L. Where a is served by direct-current service, the will be billed for charges for directcurrent service in addition to the rates stated hereunder. There will be a Charge per month of $385.00 and a delivery charge per kilowatthour of direct-current service per month of 11.00 cents per kilowatthour. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003
Consolidated Edison Company Second Revised Leaf No. 180 Superseding First Revised Leaf No. 180 SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions - Continued M. Where both high tension and low tension service are supplied and billed to a under a single agreement, the low tension service will be billed at low tension rates, the high tension service for voltages below 138,000 volts will be billed at rates for high tension service below 138 kv, and the high tension service at 138,000 volts will be billed at rates for high tension service at 138 KV. N. Special Provision D of Service Classification No. 4 and 9 is not applicable to service under this Service Classification. O. The Riders that would apply under the Service Classification that would otherwise be applicable to the continue to apply under this Service Classification, except that the following Riders may not be applied: D, E, F, I, L, O, R, U, and W. Riders M and V may be applied only to s served under Special Provision C of this Service Classification. Where a receives service under Rider J or Rider S, the bill reduction described in such Rider will apply to the Charge, the Distribution Contract Demand Charge, and the As-used Daily Distribution Demand Charge of the s rate under this Service Classification: no reduction will apply to transmission rates, the MAC or Adjustment-MAC, any applicable charges for direct-current service, the MSC or Adjustment-MSC pursuant to Special Provision C of this Service Classification, the system benefits charge and other applicable charges and adjustments described in General Information Section VIII-(B) of the Full Service Schedule, and the increase in rates and charges described in General Information Section VIII-(A) of the Full Service Schedule. s will be served under Rider Y if they request service or increased service at a load density that exceeds the higher of (i) the Standard Load Density for the type of premises for which service is requested or (ii) the load density that the Company, after consultation with the, concludes is required for safe and adequate service. P. s With Designated Technologies who commence operation of their on-site generation facility between July 29, 2003 and May 31, 2006, will be billed under their Otherwise Applicable Rate, unless they make a one-time election in writing no less than 30 days before commencing operation of the on-site generation facility either to be billed at full Standby Service rates or to be subject to the phase-in of Standby Service rates described in Special Provision Q; provided, however, that if operation commenced between July 29, 2003 and January 31, 2004, the must make its one-time election by March 1, 2004. For all other purposes, s billed under their Otherwise Applicable Rate will receive service under this Service Classification, and the Interconnection Charge and Reactive Power Demand Charge under this Service Classification shall continue to apply. s With Designated Technologies who commence operation of their on-site generation facility between June 1, 2006 and January 31, 2011, will be subject to the phase-in described in Special Provision Q, unless they make a one-time election in writing no less than 30 days before commencing operation of the onsite generation facility to be billed at full Standby Service rates. Date of Issue: January 30, 2004 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003 Issued in compliance with order in Case 02-E-0781 dated January 23, 2004.
Consolidated Edison Company First Revised Leaf No. 180-A Superseding Original Leaf No. 180-A SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions Continued P. - Continued Existing s will be subject to the phase-in of Standby Service rates described in Special Provision Q, unless they make a one-time election in writing by the later of March 1, 2004 or 30 days before commencing operation of the on-site generation facility to be billed at full Standby Service rates. s who elect to be billed at full Standby Service rates will be billed under such rates commencing with the first full billing period for which interval metering data is available subsequent to the Company s receipt of the election notice. s who commence operation of their on-site generation facility between July 29, 2003 and May 31, 2006, and meet the definitions of both Existing s and s with Designated Technologies, will be considered to be s With Designated Technologies for purposes of this Special Provision. Q. s subject to the phase-in of Standby Service rates in accordance with Special Provision P will receive bills as follows: Commencing with the first billing period beginning on or after February 1, 2004, and ending with the billing period beginning no later than January 31, 2008, bills will be calculated at the Otherwise Applicable Rate. Commencing with the first billing period beginning on or after February 1, 2008, and ending with the billing period beginning no later than January 31, 2009, bills will be calculated at the Otherwise Applicable Rate plus 25% of the difference, if greater than zero, between bills calculated at Standby Service rates and at the Otherwise Applicable Rate. Commencing with the first billing period beginning on or after February 1, 2009, and ending with the billing period beginning no later than January 31, 2010, bills will be calculated at the Otherwise Applicable Rate plus 50% of the difference, if greater than zero, between bills calculated at Standby Service rates and at the Otherwise Applicable Rate. Commencing with the first billing period beginning on or after February 1, 2010, and ending with the billing period beginning no later than January 31, 2011, bills will be calculated at the Otherwise Applicable Rate plus 75% of the difference, if greater than zero, between bills calculated at Standby Service rates and at the Otherwise Applicable Rate. Commencing with the first billing period beginning on or after February 1, 2011, bills will be calculated entirely at Standby Service rates. Date of Issue: January 30, 2004 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003 Issued in compliance with order in Case 02-E-0781 dated January 23, 2004.
Consolidated Edison Company First Revised Leaf No. 180-B Superseding Original Leaf No. 180-B SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions Continued [RESERVED FOR FUTURE USE] Date of Issue: January 30, 2004 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003 Issued in compliance with order in Case 02-E-0781 dated January 23, 2004.
Consolidated Edison Company P.S.C. No. 2 - Retail Access Original Leaf No. 180-C SERVICE CLASSIFICATION NO. 14-RA - Continued STANDBY SERVICE Special Provisions Continued R. The Company may enter into individually negotiated agreements for standby service with the following: (1) s who can demonstrate that they can economically isolate from the utility grid, by installing and operating back-up generation at a lower cost than tariffed standby service, and would do so without the negotiated rate alternative; (2) s whose premises are currently isolated from the utility grid and rely on existing on-site generating equipment for electric service and would continue to do so without the negotiated rate alternative; and (3) s who are served by on-site generating equipment having a total nameplate rating of 50 MW or greater, where no less than 90 percent of the site s energy output, net of station power requirements, is sold into the market or to a third party. The rates and charges negotiated will reflect, when applicable, the characteristics of the specific interconnection arrangements, including, but not limited to, the voltage level of the interconnection, whether the interconnection is bi-directional, and the nature of the Company facility where the generator is interconnected with the Company system. At a minimum, the negotiated rate agreement must provide for a reasonable contribution to the Company s recovery of its fixed costs. Within 60 days of a s application for a negotiated rate agreement, the Company shall respond with either an offer or a written explanation for rejection. For information relating to individually negotiated contracts entered into pursuant to the provisions of this Special Provision, see Appendix A to this Rate Schedule. S. For general rules, regulations, terms, and conditions under which service will be supplied, see General Information Section III of the Full Service Schedule. T. Except for s automatically transferred to this Service Classification upon the cancellation of Service Classification No. 3 and 10, requests for service under this Service Classification shall be made in writing. Date of Issue: November 3, 2003 Date Effective: February 1, 2004 Issued by: Joan S. Freilich, Executive Vice President and Chief Financial Officer, 4 Irving Place, NY, N.Y. 10003