Fear of Shop Drawings: What Is the Process, Really, and Does It Need Fundamental Change?



Similar documents
LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

Contract Guide Course for Design Professionals: Part II

HAWAII STANDARD GENERAL CONDITIONS FOR FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:

Document B105 TM. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

Spec. Standard: 11/27/ Revision: 11/27/06

Document Comparative

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

Document Commentary. A General Conditions of the Contract for Construction

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised )

AIA Document A141 TM Standard From of Agreement Between Owner and Design- Builder

Document A312 TM SURETY. (Name, legal status and principal place of business)

The AIA B Standard Form of Agreement between the Owner and Architect is hereby amended as follows:

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment)

Best Practice Guidelines for Legal Information Web Site Providers

Recommended Best Practices for the Use of Construction Management/General Contractor on Highway and Transportation Projects in the Public Sector

Document A312 TM SURETY. (Name, legal status and principal place of business)

Client Contracts: Business Risk, Professional Liability & Insurance Coverage

AIA Document A310 TM 2010

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

MDB Harmonised Particular Conditions

City of Portsmouth, Portsmouth, NH School Department Plumbing Repair Services INVITATION TO BID

PURCHASE TERMS & CONDITIONS (EFFECTIVE MAY 23, 2014)

AIA Document A312 - Electronic Format. Performance Bond

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

CITY OF LANCASTER RFP NO LANCASTER PERFORMING ARTS CENTER TICKETING SOFTWARE SUBMISSION DEADLINE. July 24, 2015 BY 11:00 A.M.

AIA Document A312 TM 1984

DESIGN IS GOOD BUSINESS

Document Comparison. AIA Documents A and A131CMc 2003

Terms and Conditions v

Merchant Gateway Services Agreement

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Document A312" of business) OWNER'S REPRESENTATIVE: (Architect, Engineer or other party:) 500 North Main Street Monroe, North Carolina 28112

Manage Deliverables - Construction Step 6. July 12, 2012

May 5 th, Dr. Andrew Keith Optimal Spine & Health 2361 S Azusa Ave West Covina, CA 91792

Terms and Conditions

Contract Terms and Conditions Of Engagement Of Limited Company Suppliers

Contract Administration

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

REQUEST FOR QUOTE NUMBER: 09RD65575YB WILL BE RECEIVED UNTIL 1/21/2009

Guide, Instructions and Commentary to the 2013 AIA Digital Practice Documents


VDOT GOVERNANCE DOCUMENT

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Cayo Software Reseller Agreement

Code of Business Conduct and Ethics THE WOODBRIDGE WAY. integrity honesty respect responsibility

Document B101 TM. Standard Form of Agreement Between Owner and Architect

AIA Document A107 TM 2007

CHAPTER PUBLIC IMPROVEMENT BIDS AND CONTRACTS

Internet Acceptable Use Policy

THESIS GUIDELINES. Master s of Science

REQUEST FOR PROPOSAL FOR: LONG DISTANCE SERVICE Work Order: IT00928

Design-Bid-Build v. Guaranteed Maximum Price Contracting: The Basics for Owner's Counsel

A Quick Introduction to Construction Risks and Contracting Practices

Helical Products Co., Inc.

SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)

If a Client and a Freelancer enter an independent contractor relationship, then this Freelancer Agreement ( Freelancer Agreement ) will apply.

UNDERSTANDING YOUR CONSTRUCTION CONTRACT [what you don=t know can and will be used against you].

Agreement between Owner and Architect

AGREEMENT BETWEEN THE DELAWARE RIVER BASIN COMMISSION AND FOR

Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

Performance Bond. Business):

GENERAL CONDITIONS OF THE CONTRACT

Generic CMMS Quality Assurance Plan

Design-Build Projects Achieving Fair Allocation of Risk between the Contractor and Design Professional. ACEC Risk Management Committee

BBC.NET WEB SPACE USER AGREEMENT

CAKE & WHISKEY LLC BLOGGER AGREEMENT RECITALS. 3. Blogger is a writer and/or professional that desires to provide Entries to CAKE&WHISKEY.

EADS-NA Code of Ethics

TERMS OF USE & SERVICE

Shawnee County ATTN: Bill Kroll 200 SE 7 th Street, Rm B-30 Topeka, KS Phone Bill.Kroll@snco.us

All copyright, trade mark, design rights, patent and other intellectual property rights (registered or unregistered) in the Content belongs to us.

ACQUISITION ALERT Delegation of Invoice Approval Authority

AGREEMENT FOR DESIGN/BUILD SERVICES WITH GUARANTEED MAXIMUM PRICE

Document Commentary. AIA Document C , Standard Form Multi-Party Agreement for Integrated Project Delivery

How to Write the Construction Management RFQ/RFP

CHAPTER ARCHITECTS AND LANDSCAPE ARCHITECTS

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

IEC Electronics Terms and Conditions

Bond Form Commentary and Comparison

Public Works Contract Completion

Writing Competitive Research Grant Proposals. Suggestions from Program Managers of the ACS Petroleum Research Fund

Terms of Use. Please Read Carefully Before Using This Website and Provided Services and Products:

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

NORTH CAROLINA WEATHERIZATION ASSISTANCE PROGRAM SUBCONTRACTOR AGREEMENT - PLUMBING

Robla School District

CONSULTING SERVICES AGREEMENT

GUIDELINES FOR AUGUST 1995

Building Capital Projects in Tough Times John Lynch, State of Washington

Transcription:

Fear of Shop Drawings: What Is the Process, Really, and Does It Need Fundamental Change? The first in a series of Web seminars sponsored by the AIA Construction Contract Administration Knowledge Community Following the debate surrounding the March 2010 article Why We No Longer Stamp Shop Drawings at Leo A Daly, the AIA Construction Contract Administration Knowledge Community will present a webinar discussion of this controversial issue. Dale L. Munhall, the author of the article, will discuss how to turn common misconceptions into innovation. As a counterpoint, Steven Shapiro, a construction manager and attorney, will present arguments for the more traditional approach to submittal review.

Fear of Shop Drawings: What Is the Process, Really, and Does It Need Fundamental Change? CCA Knowledge Community Webinar, Sept. 21, 2010 Presenters: Dale Munhall, AIA Director of CA, Leo A Daly, Architects and Engineers DLMunhall@leoadaly.com Steven Shapiro, Esq. CM, Whiting-Turner Contracting Company steven.shapiro@whiting-turner.com Moderator: Burton Roslyn, AIA, Chair of CCA KC President, Roslyn Consultants, LLC broslyn@roslynconsultants.com

Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speakers is prohibited. Dale Munhall, AIA and Steven Shapiro, Esq.

What are Shop Drawings, contractually? Per industry standard, AIA A201 General Conditions (this process has been approved by AGC) 3.12.1, 3.12.4: Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work The purpose is to demonstrate the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents.

What are the pitfalls of Shop Drawing review? Examples of claims on actual shop drawings: Approval of this door schedule will take precedence over architectural drawings and specifications. Approval of these drawings by architect, contractor, or owner shall constitute acceptance for design, dimensions and conditions. At items requesting verification, if no notations made by architect or general contractor on returned submission, will be presumed correct as scheduled/detailed and fabricated/ordered accordingly.

Contractors, via their shop drawings, illustrate their plan for when and how they intend to construct the Work. Remember, the Architect s drawings and specifications, The Contract Documents, are to define design intent, project scope and terms of the Construction Contract they are not an instruction manual for how to assemble a building.

So, it would be less confusing to call shop drawings what they actually are: basic components of The Contractor s Work Plan of, by, and for the Contractor s own use to carry out their means and methods of construction.

What Shop Drawings are NOT: they are NOT part of the Contract Documents they are NOT the Architect s work product

Then, why do Contractors need to submit them? to show the Architect how the Contractor plans to meet the intent of the contract s design requirements to confirm that both parties are on the same page to uncover potential non-conformance (and our last chance to uncover potential design conflicts!) before materials are ordered and installed

What are the Contractor s duties? 1. to prepare the specified Submittal Schedule for the Architect s review (and concurrence after it becomes satisfactory to both parties) 2. to build-in time for adequate reviews and a potential re-submittal before material will be needed on site

Contractor s duties 3. to thoroughly mark-up subs work to clearly show how it will fit into the surrounding work 4. to Approve their own submittals from subs and suppliers before submitting to Architect for Review

NOTE, per A201, 3.12.8: Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop Drawings and, The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect's approval thereof.

For example, from a General Contractor s stamp: General Contractor s review shall not relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements. and from a CM s shop drawing stamp: Review is for general conformance with the design concept only.

What are the Architect s duties? 1. to evaluate for compliance with requirements of the Contract Documents and as reasonably inferable from the design intent (but not to make or allow changes to the Contract Documents) caution: architects can incur liability by giving inappropriate instructions or by making unauthorized changes on shop drawings!

Architect s duties Think of it this way: Our review is to carefully approve for conceptual compliance not to order materials or to give assembly instructions or coordinate subcontractors. We check for compliance with the Contract Documents because delays due to misunderstandings which could have been prevented at the shop drawing stage will impact our client s project if not discovered before installation.

Architect s duties 2. to review and approve or take appropriate action on submittals, with reasonable promptness, allowing sufficient time, in the architect s judgment, for adequate review (per A201 4.2.7) What appropriate action is the Contractor entitled to? How prompt is the Architect required to be? What is the difference between review and approve?

What approval means, contractually, per A201 4.2.7: The Architect will review and approve, or take other appropriate action upon, the Contractor's submittals but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents... Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation all of which remain the responsibility of the Contractor.

What approval means, if not fully explained Think of it this way: Contractors (and many owners) erroneously believe that Approved by Architect means that the Architect is now solely responsible for this item. Knowing this, we must proactively but gently educate them at the start of CA about contractual roles and responsibilities. Then we have to firmly insist that the submittals process follow all the project safeguards spelled out in the General Conditions.

What are the most misunderstood aspects of the shop drawing process? Contrary to commonly held misconceptions: 1. Approval by the Architect does not relieve the Contractor of full responsibility for any deviations, errors or omissions that the Contractor or any subcontractor may have made on a shop drawing.

Think of it this way: Architects cannot shift responsibility for a code deviation or an error or omission that slips through on a design submittal to code officials, and neither can contractors shift their responsibility for a contract deviation or an error or omission that slips through on a shop drawing submittal to the architect.

Approval by Code Officials is limited, too. An example: Approval has been granted in order to begin work... Any omission of requirements on submitted plans or any omission during plan review shall in no way authorize violation of applicable requirements under the Kansas Fire Prevention Code. Plan reviews are provided as a courtesy of the Kansas State Fire Marshal, are cursory in nature, and compliance to the appropriate standards is expected. Such language would also clarify our shop drawing approval!

Contrary to commonly held misconceptions 2. Shop Drawings are not Contract Documents they are part of the Contractor s work plan for means and methods of construction (not a design responsibility of the Architect) and cannot alter any requirements of the Construction Contract.

Think of it this way: On non-contract documents like shop drawings, neither the Contractor nor the Architect can make substitutions or other significant changes that would alter the Construction Contract Documents without the Owner s signature.

Contrary to commonly held misconceptions 3. A professional s stamp/seal denotes authorship and legal responsibility; a shop drawing stamp does not. Since shop drawings are strictly of, by and for the Contractor s means-and-methods work plan, it would be a violation of license law for architects to stamp/seal and sign them, as if shop drawings were professional design documents prepared under the Architect s supervision.

Think of it this way: Architects Contract Drawings define the what and why of design ; contractors shop drawings define the when and how of construction.

Are fundamental changes in store for the traditional design-bid-build shop drawing process? 1. To avoid misconceptions, shouldn t architects stop the misleading tradition of stamping and signing the contractor s shop drawings? (note: AIA contracts and other typical forms of Agreement do not require the Architect to stamp the Contractor s shop drawings) but, if we stop stamping, what is the alternative?

alternatives to architects stamping submittals Specify a Shop Drawing Transmittal Form/cover page containing the Contractor s Approval and signature, instructions, disclaimers, and contractual definitions of Architect's action taken (incorporating A201 language). Example of Action Codes: (in lieu of the word Approved ): A = No Exceptions Noted B = Exceptions Noted (do not resubmit) C = Revise and Resubmit (See Notes) D = Rejected E = Not Required - Returned without Action

Are fundamental changes in store for the traditional design-bid-build shop drawing process? 2. Are changes needed for CM at-risk delivery? 3. Or, for Design-Build delivery? 4. Or, for Integrated Project Delivery?