SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS



Similar documents
AVINO SILVER & GOLD MINES LTD.

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

How To Know If Goldcorp Is A Successful Company

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

CANADA S INTERMEDIATE GOLD PRODUCER

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

2015 Third Quarter Results Webcast October 29, 2015

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

AGNICO-EAGLE MINES LIMITED

Lalor Project Base Metal Zones and Gold Mineralization January 2009

FOR IMMEDIATE RELEASE

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million

Detour Gold Provides New Life of Mine Plan for Detour Lake

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

(NYSE-MKT:XRA, TSX:XRC,

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

Inmet Mining announces third quarter results

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

KATANGA MINING ANNOUNCES 2013 YEAR END RESULTS AND COMMITMENT OF GLENCORE TO EXTEND AND INCREASE LOAN FACILITIES

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

NIGHTINGALE REPORTS FISCAL 2014 RESULTS

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

Year End 2014 Earnings Conference Call

LABRADOR IRON MINES REPORTS QUARTERLY RESULTS

Trip to Pulacayo. Pulacayo - Paca

DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.

Second Quarter Earnings Release Conference Call. July 23, 2009

Coeur Reports Third Quarter 2015 Results

2015 FOURTH QUARTER REPORT BUILDING VALUE

Trevali reports record Santander Mine production for Q and increases 2015 guidance

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

First Quarter 2015 Earnings Conference Call

Q Financial Results Conference Call

First Quarter 2015 Investor Conference Call May 7, 2015

SILVER STANDARD REPORTS THIRD QUARTER 2015 RESULTS

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7

Altus Group Reports First Quarter Financial Results for 2015

Q Results November 12, 2015 FNV TSX/NYSE

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

Intertain Group Limited Announces Third Quarter 2015 Financial Results $41.5 million in operating cash flows generated in Q3

FORM F1 MANAGEMENT S DISCUSSION & ANALYSIS DECLAN RESOURCES INC. ( DECLAN OR THE COMPANY )

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

Q CONFERENCE CALL. Q Earnings Call. Thursday, August 13, :00 am EST.

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

ELECTRA GOLD LTD. MANAGEMENT DISCUSSION AND ANALYSIS QUARTER ENDED JUNE 30, 2014

Sierra Wireless Reports Second Quarter 2015 Results

DATA GROUP LTD. ANNOUNCES SECOND QUARTER FINANCIAL RESULTS FOR 2015

For Immediate Release Toronto Stock Exchange Symbol: RC

Canadian Oil Sands' Second Quarter Results Reflect Continued Progress on Syncrude's Cost Reduction Efforts

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

Savannah North Scoping Study Looking into the future 3 February 2016

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

Postmedia Reports Third Quarter Results

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

NIKO REPORTS RESULTS FOR THE QUARTER ENDED DECEMBER 31, 2015

MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION

FORACO INTERNATIONAL REPORTS Q3 2014

AMERICAS SILVER CORPORATION

Canadian Tire Corporation 2014 Second Quarter Financial Results

BlackBerry Reports 2015 Fiscal First Quarter GAAP Profitability

NEWS RELEASE ROXGOLD ANNOUNCES SECOND PROJECT FINANCE DRAWDOWN FOR THE YARAMOKO GOLD PROJECT & PROVIDES DEVELOPMENT UPDATE

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Endeavour Management Presentation

MANAGEMENT S DISCUSSION AND ANALYSIS

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Acquisition of Rice Lake. December 2015

ACADIAN TIMBER CORP. REPORTS FOURTH QUARTER AND YEAR-END RESULTS

Learning Tree International, Inc. Fiscal Year 2016 Second Quarter Conference Call

NEWS RELEASE. Contact: Matt Barton, President and CEO, (215) Visit our website at

NEW HORIZONS, HOPE & INVESTMENTS WINNERS FOR THE RECOVERY THE DONKIN MINE NOVA SCOTIA

Second Quarter 2015 Investor Conference Call August 7, 2015

Transcription:

SCORPIO MINING REPORTS FIRST QUARTER 015 FINANCIAL RESULTS TORONTO, ONTARIO May 13, 015 Scorpio Mining Corporation (TSX: SPM)(OTCQX: SMNPF) ( Scorpio Mining or the Company ) today reported financial and operational results for the first quarter of 015. This earnings release should be read in conjunction with the Company s MD&A, Financial Statements and Notes to Financial Statements for the corresponding period, which have been posted on SEDAR at www.sedar.com and are also available on the Company s website at www.scorpiomining.com. All figures are in U.S. dollars unless otherwise noted. First Quarter Highlights Revenues of $13.9 million and a net loss of $5.9 million compared with revenues of $8. million and a net loss of $1.1 million in Q1, 014. The increase in net loss is attributable to lower realized metal prices, higher care and maintenance costs, transaction related corporate, general and administrative expenses, exploration, interest and financing expenses, lower income tax recovery and a loss on mining concession sales. Adjusting for non recurring items primarily relating to the transaction and shutdown of the El Cajón Project the net loss would have been $3.8 million 1. Consolidated silver production increased 4% to approximately 708,000 silver ounces and silver equivalent production rose 5% to 1.5 million ounces compared with Q1, 014. Consolidated cash costs were approximately $1.45 per silver ounce, a reduction of 13% compared with Q4, 014 and 5% year over year; while all in sustaining costs were approximately $17.15 per ounce 3, down 6% compared with the previous quarter and 4% year over year. Consolidated guidance for 015 remains at.6 3.0 million silver ounces and 4.6 5. million silver equivalent ounces at cash costs of $11.50 $1.50 per ounce and all in sustaining cash costs of $16.50 $17.50 per ounce. A third party pre feasibility study to be completed in late Q3 015 was initiated on the high grade zinclead silver San Rafael Project. At March 31, 015, the Company had working capital of $14.3 million. The first quarter provided a solid operating start to the year, said President and CEO, Darren Blasutti. We made a decision to place the El Cajón Project on care and maintenance and began the process of fast tracking the high grade zinc lead silver San Rafael project. We maintained productivity at both our operating mines and reduced the workforce at the Cosalá Operations to achieve sustainable cost savings. In the second quarter, we will continue to focus on development of a third major silver lead area and maximizing use of the installed milling capacity at the Galena Complex, while starting the pre feasibility study on San Rafael which we expect to be completed late in the third quarter. Production and Operating Costs As reported in the April 0, 015 press release, consolidated production for Q1, 015 totalled 708,41 silver ounces at a grade of 149 grams per tonne and cash costs of $1.46 per ounce. Silver equivalent totalled approximately 1.5 million ounces at an all in sustaining cost of $17.15 per ounce. These results compare to 1 Non recurring items for the period include closure and care and maintenance costs of El Cajón, severance expenses, loss on sale of mining concessions, and settlement of outstanding foreign exchange forward contracts. Silver equivalent figures are based on prices of $17 per ounce silver, $0.90 per pound lead, $0.95 per pound zinc and $.90 per pound copper. 3 Silver industry cash cost plus all development, capital expenditures, exploration spending and mine based general and administrative costs. 1

consolidated production of 679,45 silver ounces at a grade of 137 grams per tonne and cash costs of $16.51 per ounce in Q1, 014, along with approximately 995,000 silver equivalent ounces at an all in sustaining cost of $.65 per ounce. A net loss of $5.9 million was recorded for the quarter, compared with a net loss of $1.1 million for the first quarter of 014. The increased loss was due to higher care and maintenance, exploration, corporate, general and administrative, interest and financing expenses along with lower realized metal prices, lower income tax recovery and a loss on mining concession sales. Adjusting for non recurring items primarily relating to the transaction and the shutdown of El Cajón Project, the net loss would have been $3.8 million. Cosalá Operations The Cosalá Operations processed 16,45 tonnes of ore at an average grade of 9 grams per tonne to produce 316,616 ounces of silver at a cash cost of $9.83 per ounce, and approximately 650,010 ounces of silver equivalent at an all in sustaining cost of $14.16 per ounce. This compares to 137,317 tonnes of ore processed in Q1, 014 at an average grade of 81 grams per tonne to produce 93,949 ounces of silver at a cash cost of $13.71 per ounce and 534,386 ounces of silver equivalent at an all in sustaining cost of $0.94 per ounce. Higher average silver head grades resulted in an 8% increase in silver production and contributed to a 8% decrease in cash costs for the quarter. Table 1 Production Details Cosalá Operations Q1 015 Q1 014 Total Ore Processed (tonnes milled) 16,45 137,317 Silver produced (ounces) 316,616 93,949 Zinc produced (pounds) 3,53,739,986,66 Lead produced (pounds) 1,00,86 1,197,664 Copper produced (pounds) 515,994 37,664 Silver Equivalent produced (ounces) 1 650,010 534,386 Silver recovery (percent) 84.5 8.6 Zinc recovery (percent) 81.0 71.5 Lead recovery (percent) 73.9 6.8 Copper recovery (percent) 61.7 51.5 Silver head grade (grams per tonne) 9 81 Zinc head grade (percent) 1.7 1.4 Lead head grade (percent) 0.7 0.6 Copper head grade (percent) 0.3 0. Silver sold (ounces) 318,349 307,73 Zinc sold (pounds) 3,13,597,857,884 Lead sold (pounds) 1,416,546 1,61,458 Copper sold (pounds) 475,837 333,98 Realized silver price ($ per ounce) $16.53 $0.45 Realized zinc price ($ per pound) $0.94 $0.93 Realized lead price ($ per pound) $0.8 $0.95 Realized copper price ($ per pound) $.63 $3.08 Silver cash cost ($ per ounce silver) $9.83 $13.71 All in sustaining cost ($ per ounce silver) $14.16 $0.94 1 Silver equivalent ounces are based on prices of $17 per ounce silver, $0.95 per pound zinc, $0.90 per pound lead, and $.90 per pound copper for fiscal 015, and $0 per ounce silver, $0.90 per pound zinc, $0.95 per pound lead, and $3.00 per pound copper for fiscal 014. Please refer to Non-IFRS Measures: Cash Cost per Ounce section in the Company s Management Discussion and Analysis (MD&A).

Galena Complex The Galena Complex processed 37,517 tonnes of ore at an average grade of 340 grams per tonne to produce 391,65 ounces of silver at a cash cost of $14.59 per ounce, and 596,089 ounces of silver equivalent at an allin sustaining cost of $19.57 per ounce. This compares to 35,059 tonnes of ore mined in Q1, 014 at an average grade of 358 grams per tonne to produce 385,503 ounces of silver at cash costs of $18.64 per ounce, and 460,490 ounces of silver equivalent at an all in sustaining cost of $3.95 per ounce. Production of lead increased 38% year over year as silver lead ore milling was moved to the Galena Mill in July 014 to accommodate a higher volume of silver lead tonnage. A reduction in direct mining costs per silver ounce (labour, supplies, utilities etc.) combined with an increase in by product credits from higher lead production resulted in lower cash costs for the quarter. Table Production Details Galena Complex Q1 015 Q1 014 Total Ore Processed (tonnes milled) 37,517 35,059 Silver produced (ounces) 391,65 385,503 Lead produced (pounds) 1 3,446,659 1,00,85 Copper produced (pounds) 1 18,99 176,85 Silver Equivalent produced (ounces) 596,089 460,490 Silver recoveries (percent) 95.6 95.5 Lead recoveries (percent) 90.7 93.6 Copper recoveries (percent) 98.0 94.7 Silver head grade (grams per tonne) 340 358 Lead head grade (percent) 6.4 4.3 Copper head grade (percent) 0.6 0.4 Silver sold (ounces) 363,963 345,874 Lead sold (pounds) 3,380,11 915,07 Copper sold (pounds) 10,455 18,464 Realized silver price ($ per ounce) $16.78 $0.98 Realized lead price ($ per pound) $0.8 $0.95 Realized copper price ($ per pound) $.63 $3.18 Silver cash cost ($ per ounce) 3 $14.59 $18.64 All in sustaining cost ($ per ounce silver) 3 $19.57 $3.95 1 Lead and silver grades only refer to grades in silver-lead and silver-copper ores, respectively. Silver equivalent ounces are based on prices of $17 per ounce silver, $0.90 per pound lead, and $.90 per pound copper for fiscal 015, and $0 per ounce silver, $0.95 per pound lead, and $3.00 per pound copper for fiscal 014. 3 Please refer to Non-IFRS Measures: Cash Cost per Ounce section in the Company s Management Discussion and Analysis (MD&A). Development and Exploration Update Cosalá Operations A review of existing data and recent drilling confirmed the extent of mineralized material in the upper levels of the Nuestra Señora mine. This material is outside the current resource estimate, but readily accessible from existing underground infrastructure. This discovery will be added to the near term production plan which could benefit operating performance beginning in the second half of 015. In addition, the pace of backfilling of historic stope voids at Nuestra Señora picked up through the first quarter in support of future mine operations. 3

San Rafael Project The Company engaged Mine Development Associates to prepare a pre feasibility study for completion in late Q3, 015 which will consider development of an underground mine at San Rafael. Required work includes confirmatory metallurgical testing with sample material to be provided through a surface drill program that began in early May. Although a potential underground mine is permitted already, activities are underway to permit a minor additional surface disturbance to allow rapid construction of mine infrastructure in the event of a positive development decision later in the year. Galena Complex The Galena Hoist was taken out of service as planned in early April to allow for maintenance to be completed on the drive. Until the hoist is returned to service in early Q3, 015, staff and material will be moved from surface primarily through the #3 Shaft. Adjustments in operating practices have been made to provide continued availability of a secondary escapeway. Silver lead ore production will continue to grow over the course of the year with the advancement of underground development into new areas on the 3000 and 4900 Levels. Site personnel are presently considering alternatives for increasing lead concentrate dewatering capacity. The Galena Mill is being prepared for a higher, consistent volume of silver lead tonnage and maintenance work is being done in the second quarter. About Scorpio Mining Scorpio Mining Corporation is a silver mining company focused on growth in precious metals from its existing asset base and execution of targeted accretive acquisitions. Scorpio owns and operates the Cosalá Operations in Sinaloa, Mexico and the Galena Mine Complex in Idaho, USA. Mr. Daren Dell, Senior Vice President Technical Services and a Qualified Person under Canadian Securities Administrators guidelines, has approved the applicable contents of this news release. Quality Assurance / Quality Control ( QA/QC ) The Company maintains a QA/QC Program for assays, including the use of standards, blanks and duplicates. All QA/QC results are routinely evaluated using a program of QA/QC monitoring. Details of the program are provided in the Company s NI 43 101 compliant Technical Report on the Galena Complex and Cosalá Operations which are available at sedar.com For further information please see SEDAR or scorpiomining.com. Cautionary Statement on Forward Looking Information: This news release contains forward looking information within the meaning of applicable securities laws. Forward looking information includes, but is not limited to, the Company s expectations intentions, plans, assumptions and beliefs with respect to, among other things, the Cosalá Operations and Galena Complex. Often, but not always, forward looking information can be identified by forward looking words such as anticipate, believe, expect, goal, plan, intend, estimate, may, assume and will or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions, or statements about future events or performance. Forward looking information is based on the opinions and estimates of the Company as of the date such information is provided and is subject to known and unknown risks, uncertainties, and other factors that may cause the actual results, level of activity, performance, or achievements of the Company to be materially different from those expressed or implied by such forward looking information. This includes the ability to develop and operate the Cosalá and Galena properties, risks associated with the mining industry such as economic factors (including future commodity prices, currency fluctuations and energy prices), failure of plant, equipment, processes and transportation services to operate as anticipated, environmental risks, government regulation, actual results of current exploration activities, possible variations in ore grade or recovery rates, permitting timelines, capital 4

expenditures, reclamation activities, social and political developments and other risks of the mining industry. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. Readers are cautioned not to place undue reliance on such information. By its nature, forward looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific that contribute to the possibility that the predictions, forecasts, and projections of various future events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forward looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law. For more information: Darren Blasutti Nikki Richard President and CEO Investor Relations 416 848 9503 416 848 9503 5