EXTENSION OF PERIODIC INSPECTION INTERVAL FOR LPG CYLINDERS

Similar documents
Reference in RID/ADR (restructured) to published standards and standards in preparation at CEN TC 23/256/261/268/286/296

LIQUEFIED PETROLEUM GAS CHAPTER 218

Rules for the certification of event sustainability management system

COMMISSION REGULATION (EU)

Rules for the certification of asset management systems

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

General Rules for the Certification of Management Systems Code: RG

PUBLICATIONS. Introduction

General Rules for the certification of Management Systems

Network Certification Body

Guidance on the In Vitro Diagnostic Medical Devices Directive 98/79/EC

COMMISSION DIRECTIVE 2003/94/EC

MANAGEMENT SYSTEM CERTIFICATION CONDITIONS & USE OF THE CERTIFICATION MARK

LPG, Flammable Liquids, Toxic and Corrosive Substances

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

2002 No. 618 CONSUMER PROTECTION. The Medical Devices Regulations 2002

MEDICAL DEVICES SECTOR

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

DOCUMENTED PROCEDURE MANUAL

APPLICATION FOR ADR ROAD VEHICLE APPROVAL CERTIFICATE

Supplying new machinery

Working Party on Control of Medicines and Inspections. Final Version of Annex 16 to the EU Guide to Good Manufacturing Practice

Energy Products (Safety and Efficiency) Regulations 2012

Schedule of Accreditation issued by United Kingdom Accreditation Service High Street, Feltham, Middlesex, TW13 4UN, UK

Example of a food company quality

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

Certification Procedure of RSPO Supply Chain Audit

SUMMARY OF FILING REQUIREMENTS DURING THE LIFECYCLE OF A QFC LIMITED LIABILITY COMPANY (LLC) AND BRANCHES OF A NON-QFC COMPANY (BRANCH)

COUNCIL DIRECTIVE 92/42/EEC of 21 May 1992 on efficiency requirements for new hot-water boilers fired with liquid or gaseous fuels

UK Aerospace Industry Controlled Other Party (ICOP) Auditor Authentication Scheme

General Description of The CMC- Services

UMBRELLA CLIMATE CHANGE AGREEMENT FOR THE STANDALONE DATA CENTRES Agreement dated 11 th July 2014

Merchant Marine Circular No. 152

ELECSA and the Fire Industry

London STOCK EXCHANGE

Part 102 CAA Consolidation 24 September 2015 Unmanned Aircraft Operator Certification

APPLICATION FOR LIQUEFIED PETROLEUM GAS PERMIT TYPE OR PRINT LEGIBLY

Raad voor Accreditatie (Dutch Accreditation Council RvA) Assessment of Conformity Assessment Schemes

Customer application package. Included in this package are the following documents. Customer application form

APPLICATION FOR ADR ROAD VEHICLE CERTIFICATION FOR SUBSEQUENT ADR TESTS

ISO/TS 16949:2002 Guidance Document

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

THE UK GREENHOUSE GAS EMISSIONS TRADING SCHEME 2002

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Bylaws of the College of Registered Nurses of British Columbia BYLAWS OF THE COLLEGE OF REGISTERED NURSES OF BRITISH COLUMBIA TABLE OF CONTENTS

LAB 37 Edition 3 June 2013

BUSINESS PLAN CEN/TC 54 UNFIRED PRESSURE VESSELS EXECUTIVE SUMMARY

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

Technical Support Group Designation of a Technical Service Procedure

This Brief explains how the GLA s Active Check service operates and what notifications are issued to users.

Ordinance on Specialised Waste Management Companies (Entsorgungsfachbetriebeverordnung - EfbV) *) of 10 September 1996

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Standard conditions of the Electricity Distribution Licence

CHAPTER 7 PUBLIC PURCHASES, PURCHASE OF LAND OR STRUCTURES AND INVENTORY OF FIXED ASSETS

Guidelines. of

Standard Conditions for Recruitment Services

AFRICAN REGIONAL INTELLECTUAL PROPERTY ORGANIZATION (ARIPO)

VDA Volume 6 Fundamentals for quality audits Certification requirements for VDA 6.1, VDA 6.2, VDA 6.4 based on ISO 9001

REGULATION (EEC) No 2309/93

Eskom Registration Authority Charter

Your essential guide to CE Marking

Med-Info. Malaysia Medical Device Regulations. TÜV SÜD Product Service GmbH. International expert information for the medical device industry

REACH and Safety Data Sheets

UKAS Guidance for bodies operating certification of Trust Service Providers seeking approval under tscheme

The British Institute of Non-Destructive Testing. Accreditation of NDT Training Organisations

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

PARALEGAL PRACTITIONERS RULES 2015

Manual for ITC's clients, Conformity assessment of ACTIVE IMPLANTABLE MEDICAL DEVICES pursuant to Council Directive 90/385/EEC

JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.

INTEROPERABILITY UNIT

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) *

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

UKLPG APPROVED AUTOGAS INSTALLER CONSUMER CODE

A Revised EMC Directive from Europe

RIBA Chartered Practice. Accreditation Criteria and Standards Standards and Enforcement Procedures

Wrap ISA and Wrap Personal Portfolio 1/26

20th February 2015 ScottishPower Standard Domestic Tariff. Prices. Your domestic gas and electricity pricing information

These terms of business (the Terms ) explain the entire rights and obligations of You and Us regarding the provision of our Services.

STATUTORY INSTRUMENTS. S.I. No.[ ] of 2014 SMALL PUBLIC SERVICE VEHICLE (CONSOLIDATION AND REFORM) REGULATIONS 2014

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

Amendments Guide for FP7 Grant Agreements

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

ATEX 94/9/EC Directive Declaration of Conformity: Tips and FAQ s

DEPARTMENT OF ENERGY AND CLIMATE CHANGE. GREEN DEAL CODE OF PRACTICE (Version 4)

Konformitätsbewertung 3.9 B 17. Guidance for Notified Bodies auditing suppliers to medical device manufacturers

Customs End-Use GUIDELINES FOR TRADERS

Changes to Tier 4 Sponsor guidance (version 12/12)

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM a Rev /10/02

IRIS International Railway Industry Standard

STATUTORY INSTRUMENTS. S.I. No. 409 of 2011 THE SOLICITORS ACTS 1954 TO 2008 (PROFESSIONAL INDEMNITY INSURANCE) REGULATIONS 2011

Quality Management System Manual ISO9001:2008

best practice guide BS EN 1154 Controlled Door Closing Devices to in association with

Investment Trust ISA and Savings Scheme. Terms and conditions

Information for Schools and Colleges. So you want to. Know more about the BS EN ISO 9000:2000 family of quality management system standards

Transcription:

EXTENSION OF PERIODIC INSPECTION INTERVAL FOR LPG CYLINDERS VCA guidance for gaining authorisation in Great Britain Page 1 of 7

EXTENSION OF PERIODIC INSPECTION INTERVAL FOR LPG CYLINDERS VCA guidance for gaining authorisation in Great Britain Background Since 2011, ADR has permitted the interval between periodic inspections of refillable welded steel cylinders for UN No. 1011, 1075, 1965, 1969 or 1978 (LPG cylinders) to be extended from 10 to 15 years if authorised by the Competent Authority. Cylinders so authorised may be marked P15Y. A transitional provision (ADR 1.6.2.9) allows previous arrangements to continue until 1 st January 2015. On behalf of the Secretary of State for Transport, who is the competent authority, the VCA Dangerous Goods Office (VCA) has developed a scheme to authorise extended inspection intervals for LPG cylinders which are used only in Great Britain. The VCA scheme is available to any company wishing to comply with the provisions of ADR Packing Instruction P200(10) in advance of the end of the transitional provision. From 1 January 2015 it will be the only means by which inspection intervals may be extended. Requirements for authorisation Companies seeking authorisation to extend cylinder inspection intervals to 15 years must be able to demonstrate that their cylinders and operations meet the requirements of ADR Packing Instruction P200. In particular that: 1. Cylinders shall be manufactured in conformity with: BS EN 1442; or EN 13322-1; or Annex I, parts 1 to 3 to Council Directive 84/527/EEC 2. Cylinders are filled only at suitably equipped LPG filling centres in the UK by competent personnel, in accordance with a documented quality system and procedures* which include checks on the cylinders and their accessories to ensure: conformity to regulations; compatibility with the substance to be carried; absence of damage which might affect safety; Page 2 of 7

compliance with the degree or pressure of filling, as appropriate; presence and suitability of regulation markings and identification. * applying the requirements of BS EN 1439:2008 (except 3.5 and Annex G) 3. Cylinders are filled only with gases of high quality with very low potential for contamination. This requirement is deemed to be fulfilled if the gases conform to the corrosion contaminates level of EN 1440:2008, annex E.1, letter b. or to BS 4250. Application procedure Companies seeking authorisation should apply using the application form which may be downloaded from the VCA website. Note: The application form is intended to be completed and transmitted electronically. Applications received in hard copy will be accepted but may take longer to process. The completed application form should be submitted to VCA by email, accompanied by the following: The type approval certificate for each design and capacity of cylinder to be considered, Evidence of the current Quality Management System (QMS) implemented at each filling centre at time of application. For a registered ISO 9001 QMS this shall include: The ISO 9001 registration certificate Extracts from the quality system documentation which detail the policy and procedures in accordance with BS EN1439 for inspecting cylinders and their accessories prior to filling Extracts from the quality system documentation which detail gas purchasing specification and policy Applicants operating a non-registered Quality Management System must provide extracts from their quality manual and relevant associated procedures highlighting sections dealing with policy and procedures for: purchasing gas to the approved specifications the pre-filling inspection of cylinders. periodical audit of the above. Applicants who have not previously been customers of VCA will also be required to complete a new customer application form for billing purposes. Page 3 of 7

Applications which do not meet minimum requirements and those which three months or more after receipt cannot be completed for lack of information will be rejected and the application fee forfeit. Grant of authorisation Once an application has been assessed as satisfactory, authorisation to extend the interval between periodic inspections to 15 years will be granted in respect of each cylinder type (as defined by the type approval certificate) that meets the criteria. Details of companies and the cylinders types for which they hold authorisation will be published on the VCA website. The authorisation shall remain in force for a period of three years providing: the type approval remains valid there is no change in regulation which would affect the authorisation The holder makes an annual return concerning cylinders which they have caused to be marked P15Y under the terms of the authority There are no grounds for withdrawing the authorisation sooner. Annual return The holder of the authorisation shall make annual return to VCA no later than three months after each anniversary of the initial authorisation. The annual return shall include the following for the year in question: The name of the manufacturer(s) who have supplied cylinders quantity and serial number range of each cylinder type supplied copies of the certificate(s) of conformity for the cylinders supplied Annual returns should be submitted by email using the form which can be downloaded from the VCA website. Variation of authorisation Additional cylinder types (defined by a type approval certificate) may, on application, be added to an existing authorisation at any time during its period of validity (3 years from issue). Application should be submitted by email using the Variation form which can be downloaded from the VCA website and, providing no other changes to the authorisation are necessary, need only be accompanied by the type approval certificate(s) for the cylinders to be added. Additional filling centres may be included in existing authorisations. The procedure described above under Application should be followed, except that type approval Page 4 of 7

certificates will not be required for cylinder types which are covered by the existing authorization Renewal of authorisation Authorisations must be renewed every three years if cylinders are to continue to be marked P15Y. Prior to expiry, an authorisation holder should apply for renewal, certifying that: the type approval(s) remains valid* there have been no changes or additions to the list of filling centers* the quality system documents submitted for the initial application are still current and correct.* * Note: approval holder certification should be a formality as it is a condition of authorisation that any significant changes to must be notified as they occur If the holder of an authorisation is unable to certify all of the above, the approval will cease to be valid and a new application must be made. Application for renewal of an authorisation should be made using the appropriate form which can be downloaded from the VCA website. Renewal applications must be submitted at least 30 days before the authorisation is due to expire, to ensure continuity. VCA will issue a renewal reminder approximately 3 months before expiry of each authorisation. However, this is done as a courtesy, and responsibility for timely renewal application rests entirely with the holder. VCA accepts no liability for the delay or nonreceipt of reminders. Page 5 of 7

Fees The fee structure assumes each application is correct and accompanied by the appropriate supporting documentation. If this is not the case, additional time necessary to complete the application will be charged at the hourly rate. The appropriate fee should accompany each application. Initial application fee For applicants with a single registered ISO 9001 QMS which covers all filling centre(s) named in the application an application fee of 350 and: a registration fee of 75 for each cylinder type approval, to a maximum of 525 per application For applicants operating a different registered ISO 9001 QMS at each filling centre and those operating a non-registered QMS: Variation fee an application fee of 350 and: a registration fee of 75 for each cylinder type approval, to a maximum of 525 per application an additional fee of 75 per hour for time in excess of 3 hours which is necessarily spent in the verification of the QMS. An estimate will be provided before any such work is undertaken. Addition of new cylinder types to an existing authorisation Renewal fee a registration fee of 75 for each cylinder type added Addition of additional filling centres to an existing authorisation an extension fee of 350 per filling centre Renewal of an authorisation at 3 yearly intervals which does not involve the addition of cylinder design types a renewal fee of 350 Addition of a new cylinder type at the time of renewal a registration fee of 75 for each cylinder type NB. Fees correct at April 2013 but are subject to periodic review.. Page 6 of 7

Glossary The VCA Dangerous Goods Office is the designated UK authority for the certification of packaging and IBC, the approval of bulk containers, the appointment of tank and pressure receptacle inspection bodies and approval of other bodies under various European Community (EC) Directives and United Nations Economic Community for Europe (ECE) Regulations. UN No. is the serial number assigned to the article or substance under the United Nations system. UN No 1011 Butane** UN No 1075 Petroleum Gases, Liquefied UN No 1965 Hydrocarbon Gas Mixture, Liquefied, N.O.S UN No 1969 Isobutane** UN No 1978 Propane** ** From 2013 these entries will only apply to the technically pure substance. British and European Standards EN 1442:2006 + A1:2008 EN 1439:2008 BS 4250 EN 1440:2008 + A1:2012 Transportable refillable welded steel cylinders for liquefied petroleum gas (LPG) - Design and Construction Transportable refillable welded steel cylinders for liquefied petroleum gas (LPG) Procedure for checking before, during and after filling Specification for commercial butane and propane Transportable refillable welded steel cylinders for liquefied petroleum gas (LPG): Periodic Requalification Page 7 of 7