Setting a Global Standard. www.dril-quip.com. SS Series Subsea Wellhead Systems

Similar documents
Setting a Global Standard. SingleBore Subsea Completion System

Setting a Global Standard. SDX BOP Stack Subsea Wellhead Connectors

Setting a Global Standard. HIPPS: High Integrity Pressure Protection System

Subsea Drilling Systems

DRIL-QUIP, INC. OFFSHORE DRILLING AND PRODUCTION EQUIPMENT SPECIALTY CONNECTORS.

DRIL-QUIP, INC. OFFSHORE DRILLING AND PRODUCTION EQUIPMENT.

Subsea wellhead systems. Advanced solutions for extreme conditions

Rigorous Qualification and Development Program

How To Build A Kingkong Production System

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

LINKING SEABED TO SURFACE

Total Subsea Solutions

10 Wireline operations

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

Fishing Jar. Fishing Jar Accessory Tools. Assembly and Operation. Construction. Recommended Spares

The advice. The expertise. Wherever you are.

Easy Tool Retracting System CMC-SR2159ER36

Completion Assembly Services. Critical preparation services whenever they are needed

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Positive Displacement Motors (PDM)

Vrtné trubky Drill Pipe

Carlon Bore-Gard and Boreable Multi-Gard Raceway

Baumann Flexsleev Sanitary Control Valve

Designing Safe and Reliable HPHT Subsea Wellhead Systems

Introduction to Subsea Production System

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

BIW Connector Systems. BIW Connector Systems. Electrical Feedthru Systems for Oil and Gas Wells. Electrical Feedthru Systems for Oil and Gas Wells

Pipe Cutting and Beveling Clamshells

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

RISER SYSTEMS. Our world class innovation solving your riser challenges

Mueller B-101 and A-3 Drilling and Tapping Machines

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

Trunnion-Design Ball Valves

Aker Drilling Riser Brazil

Grayloc Connectors GRAYLOC PRODUCTS. An Oceaneering International Company 07/12

Submersion/Insertion Toroidal Sensor

One and Two-piece Torque Rods and Replacement Bushings LIT NO:

Pipeline Connection & Repair Systems (PCRS)

Varel International Workover Bits for remedial, re-entry AND frac plug Drilling Applications

Toroidal Conductivity Sensor

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

BOP PRESSURE TESTING PROCEDURE

The Python Subsea Wellhead

Texas Oil Tools Subsea Well Intervention Equipment

Competitive Edge through System Engineering

Drilling Problems. pull

STEERING SYSTEM - POWER

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model NOTICE TO USER

Plug and Abandonment Forum

From the Mill to the Well

Installation Instructions

This Addendum supplements and clarifies the contents of Service Bulletin SB

NORSOK Standard D-010 Rev. 4, August 2012

Specification for Rotary Drill Stem Elements

Drill String Design. The following topics will be discussed

SEAL-LOCK HC, GS ANCILLARY SPECIFICATION

SUNNDA CORPORATION. Mud Pump Parts & Expendables. Boost Your Bottom Line! Sunnda Corporation

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

Foam Wiping Technology

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

Guidelines for Choosing and Installing Radar in Stilling Wells and Bypass Chambers

Spicer Axles & Brakes ABIB-0302

SELF-STEERING AXLE TABLE OF CONTENTS

Fisher 249 Caged Displacer Sensors

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Well control equipment. Matanović Davorin, professor

TUBULAR Holing and Slotting Of Casing

Stainless Steel Single and Dual Circulation Kits

Uni-Quick Duct System. Moveable. Uni-Quick. Duct System. DUST COLLECTION and MATERIAL HANDLING APPLICATIONS a McGill AirFlow product

MANUAL TRANS OVERHAUL - TYPE 02J Article Text 1999 Volkswagen Golf This file passed thru Volkswagen Technical Site -

Step-by-step instructions:

STEERING HANDLEBAR/FRONT WHEEL/ FRONT SHOCK ABSORBER

6 Crankcase Ventilation

Stability. Security. Integrity.

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at

powered by ingenuity Corrosion Logging Well Integrity Measurement

Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors

DO NOT attempt to repair hub and wheel bearing assembly.

Vallourec Global Solutions. Tubular Solutions FROM CONCEPTION TO COMPLETION

High Pressure Equipment High Pressure Valves, Fittings and Tubing

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

Flange Insulation Sets

B Dinesh Prabhu, Asst. Professor, P E S College Engg., Mandya, KARNATAKA 1

Ceiba Field Early Production System. Cameron MOSAIC Systems

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

UNIT CONVERSIONS & FORMULAS

IMPORTANT DOCUMENTATION DO NOT DISCARD!

Tubular Management Services

TC 170 & TC 170 PD TRANSFER CASE

3000, 4000, 4100, 7500, 7700

TANKER & STORAGE TANK PRODUCTS

DIRECT PUSH DRILLING.

Rebuild Instructions for and Transmission

Fisher 1061 Pneumatic Piston Rotary Actuator with Style F & G Mounting Adaptations

BUTTERFLY VALVES. An industry leader in underground and in-plant applications. STYLE STYLE Consult factory for sizes

Vertical Break Parallel (VBP) / Vertical Break Slant (VBS)

Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing

Transcription:

Setting a Global Standard www.dril-quip.com SS Series Subsea Systems

Table of Contents Systems SS-15 System...2 SS-15 RLD System...3 SS-15ES System...4 SS-15 BigBore II...5 SS-10C and SS-10 System...6 Components Guide Bases...7 Conductor s...8 18 3 /4" Housing....9 Rigid Lockdown System... 10-11 Seal Assembly, Casing Hangers and Running Tool... 12-13 Multi-Purpose Tool, Adapters, Wear Bushing, Nominal Bore Protector... 14-15 BOP Test Tools...16 Supplemental Casing Hanger Systems...17 Dril-Quip: A Leader in Technology and Quality Recognized worldwide for cutting-edge drilling and production equipment technology, Dril-Quip s state-of-the-art products, support and services offer unique advantages to the many challenges associated with today s drilling and production operations. Dril-Quip provides consistent high quality products in accordance with industry standards. Dril-Quip s quality programs utilize the most advanced equipment and techniques available to ensure dimensional accuracy and performance reliability. Our engineering staff brings their proven skills and experience to resolve the most complex challenges encountered in the field, helping operators find viable product solutions for specific requirements. 1

SS-15 Subsea System Dril-Quip s SS-15 Subsea Systems are rated for 15,000 psi working pressure and feature a fieldproven weight-set metal-to-metal annulus seal. The SS-15 system features the weight-set technique to install and retrieve all of the subsea wellhead components, including Nominal Bore Protector, wear bushings and test tools. SS-15 Reliable, trouble-free operation; fewer trips required Weight-set seal assemblies provide true dual metal-to-metal annulus seal Seal assemblies are designed for 15,000 psi working pressure from above, 10,000 psi from below, and H 2 S service Same seal assembly fits all hangers 13 3 8" and smaller Seal assemblies automatically lock to casing hangers and lock casing hangers to the wellhead Seal assemblies are retrieved by vertical pull; no rotation required All casing hangers are automatically centralized in the wellhead Large flow-by areas around casing hangers High pressure and high load capacity due to a unique single landing shoulder at the bottom of the 18 3 4" wellhead housing High bending load capacity between the conductor and 18 3 4" housing BOP stack can be tested with Nominal Bore Protector and wear bushings installed Tubing hanger sealing area and lockdown profile standard Threaded profile standard on all casing hangers for emergency situations Pressure-balanced, fail-safe in-place annulus shut-off system available The lower OD of the 18 3 4" wellhead has a reaction ring to transfer bending loads to the conductor wellhead Available with a variety of supplemental casing hanger systems In compliance with API 17D, 2nd Edition Field-proven performance 2

SS-15 RLD Subsea System The SS-15 RLD Subsea System is a 15,000 psi system that features weight-set metal-to-metal seals. SS-15 RLD High bending, high pressure and high fatigue capacity Active RLD system preloads 18 3 4" wellhead to conductor wellhead during installation 2 million lbs preload maximum Pressure-balanced annulus shut-off system activated when wellhead is locked down Subsea tie-back profiles standard Minimum number of tools and trips Simple, reliable, trouble- free operations Seal assemblies are designed for 15,000 psi working pressure from above, 10,000 psi from below, and H 2 S service Same seal assembly fits all casing hangers in wellhead All casing hangers are automatically centralized and locked down Large flow-by areas around casing hangers BOP stack can be tested with Nominal Bore Protector, wear sleeves or wear bushings installed Tubing hanger profile standard Can accommodate all manufacturers subsea tubing hangers and subsea completion trees Simple installation steps In compliance with API 17D, 2nd Edition Field-proven performance 3

SS-15ES Subsea System The SS-15ES Subsea System is specially designed for use in deep water where higher bending capacities are required between the subsea wellhead and the BOP stack. Casing hangers, seal assemblies, wear bushings and running tools for the ES system are compatible with the standard SS-15 Subsea System. The SS-15ES Subsea System includes all the field-proven benefits found in the standard SS-15 Subsea System, and is available with all industry-standard locking profiles. SS-15ES High pressure and high load capacity 18-3/4" SS-15ES Rigid Lockdown 38" Conductor Standard 38" conductor wellhead housing High bending capacity between the conductor wellhead and 18 3/4" housings BOP stack can be tested with wear bushings or Nominal Bore Protector installed Subsea tie-back profile standard on all casing hangers 18 3/4'' seal assembly outer lock ring locks seal assembly and casing hanger down Tubing hanger sealing area and lockdown profile standard 38" Supplemental Adapter 38" x 28" Casing Hanger Annulus shut-off system inhibits water surface flow Configured to work with dual-rig, dynamically positioned drilling vessels 38" Casing 38" conductor wellhead will drift 30" bit and bottom hole assembly 28" Casing Available with SS-15 BigBore II features and capabilities 20" Casing Reliable, trouble-free operation Same operational features as the standard SS-15 Subsea System In compliance with API 17D, 2nd Edition Field-proven performance 16" Seal Assembly 20" x 16" Supplemental Casing Hanger 20" x 16" Supplemental Adapter 4 16" Casing 13-3/8" Casing 9-5/8" Casing

SS-15 BigBore II Subsea System Dril-Quip s 18 3 4" BigBore II System is designed for well bores that penetrate shallow water flow zones or require several casing strings to accommodate small pore pressure fracture gradient differentials. The 18 3 4" high pressure wellhead housing is run with 22" pipe and has a large minimum ID bore to pass 18" casing and an 18" casing hanger. Two supplemental hanger adapters are installed in the 22" casing to provide a landing shoulder and seal area for the 18" and 16" hangers and testable, retrievable and replaceable annulus seal assemblies. 18 ¾" BigBore II Housing Illustration depicts a 36" x 28" x 22" x 18" x 16" x 14" x 10-3/4" casing program 36" Conductor SS-15 BigBore II Multiple conductor housings supply resistance to bending and are used to case off hazardous formations and accommodate complex casing programs Available with annulus shut-off system to inhibit surface flow of water/hydrates or ROV-operated ball valves Rigid lockdown system preloads wellheads together for high fatigue life Special 18 3 4" wellhead ID can safely pass 18" OD pipe with flush OD connections 18" intermediate casing string is drilled and set in a standard BOP controlled environment 22" adapters supply landing shoulder and seal area for 18" and 16" supplemental casing hanger systems 18" supplemental casing hanger system is rated for 3,500 psi working pressure with 1 million lbs casing load, or 5,000 psi working pressure with 660,000 lbs casing load, from above, and 2,500 psi working pressure from below 16" supplemental casing hanger system is rated for 6,500 psi working pressure with 1 million lbs casing load, from above, and 5,000 psi working pressure from below 16" supplemental casing hanger system is also available with 10,000 psi working pressure from above and 7,500 psi working pressure from below All casing hangers and seal assemblies are run, set and tested on drill pipe in a single trip Easily accommodates casing programs with the supplemental casing hanger systems 18 3/4'' seal assembly outer lock ring locks seal assembly and casing hanger down 36" Supplemental Adapter 36" x 28" Casing Hanger 36" Casing 22" Casing 14" Casing 10-3/4" Casing 22" x 16" Supplemental Adapter 16" Seal Assembly 22" x 16" Supplemental Casing Hanger 16" Casing 22" x 18" Supplemental Adapter 18" Seal Assembly 22" x 18" Supplemental Casing Hanger Incorporates all other features of the field-proven SS-15 Subsea System In compliance with API 17D, 2nd Edition 18" Casing Field-proven performance 5

18 3 /4 " SS-10C and SS-10 Subsea Systems The SS-10/SS-10C Subsea Systems are 10,000 psi working pressure systems that utilize weight-set metal-to-metal seals. SS-10 Reliable, trouble-free operation Fewer trips required Seal assemblies are weight set and true metal-to-metal seals Same seal assembly fits all hangers 13 3 /8" and smaller Seal assemblies retrieved with vertical pull; no rotation required No left-hand rotation downhole All casing hangers are automatically centralized inside wellhead Large flow-by areas around all casing hangers 18 3 / 4'' seal assembly outer lock ring locks seal assembly and casing hanger down BOP stack can be tested with wear bushings installed (with exception of 7") Threaded tie-back profile standard in the top of the casing hangers Simple installation steps Minimum number of tools Field-proven performance SS-10C Subsea 18 3 /4" 10K SS-10 Subsea DX Connector Permanent Guide Structure Temporary Guide Base 20" Supplemental Adapter 16" Supplemental Casing Hanger System 6

Guide Bases Permanent Guideline and Guidelineless Guide Bases Dril-Quip offers both permanent guideline and guidelineless guide bases to meet operator application requirements. Each guide base can be non-retrievable (expendable), diver-assisted, remote-retrievable or ROV-compatible. The guide bases feature identical center receptacles and are compatible with all SS-15 and SS-10 Conductor s. The guide bases are made of box beam material for greater torsional strength. (Non-Retrievable Permanent Guide Base) Accepts either 36" or 30" housing (other sizes available on request) and housing is locked down to guide base with a self-locking retaining ring Permanent Guide Base Cement Return Holes Conductor Landing Shoulder Multiple cement holes in conductor wellhead for maximum flow-by Post tops are customer specified Retainer Retaining Collar Post length is customer specified (typically 10-13 ft) (Remote-Retrievable Permanent Guide Base) Guidelineless guide bases are available for a variety of operations Gimbal Alignment Pin Easily retrievable with a drill pipe tool Split-retrievable gimbal Suitable for drilling operations using dual activity drilling vessels Accepts 38", 36" or 30" conductor housings and housing is locked down to guide base with a self-locking retaining ring Multiple cement holes mate with the conductor wellhead for maximum flow-by Post tops are customer specified Post length is customer specified (typically 10-13 ft) (Guidelineless Remote- Retrievable Guide Base) Slope Indicator Retainer Conductor Landing Shoulder Alignment Pin Annulus Shut-Off Sleeve A variety of guide bases are available for operations with dynamically positioning drilling vessels Suitable for drilling operations using dual activity drilling vessels Accepts 38", 36" or 30" housing and housing locks down to guide base with a self-locking retaining ring Twelve 3 ½" cement holes 10-foot diameter reentry funnel to guide BOP onto wellhead Easily retrievable with a drill pipe tool Guidelineless Guide Base 7

Standard Conductor s Dril-Quip offers 30" and 36" standard conductor wellheads that can be adapted for a variety of sizes and types of conductor strings. Each conductor wellhead incorporates a dual grooved running profile and anti-rotation slots for a cam-actuated running tool. The upper ID section of the conductor wellhead incorporates a locking profile and a landing shoulder for the high-pressure wellhead housing. The lower ID section includes a bending reaction surface that interfaces with the bending reaction ring of the highpressure wellhead housing for a higher bending capacity. (30"/36" ) Bottom has 30" (or 36") OD in a variety of wall sizes and buttweld preparations Accommodates standard 18 ¾" wellhead housing Multiple large diameter holes for cement returns OD has profile with alignment slots for guide base Indicator Rod Lock Conductor Running Tool Anti-Rotation Slot Conductor Cement Return Holes Hydrate Seal Conductor Running Tool The Dril-Quip Conductor Running Tool features a cam-actuated locking mechanism and low friction bearing surfaces that minimizes torque while the tool is being released from the conductor wellhead. Five rotations of the running string lock and release the tool to and from the wellhead. The running tool is unaffected by ambient pressure and cannot get pressure locked. An ascending/descending indicator rod is used to provide visual confirmation of the tool s lock or unlock status. PGB Alignment Slot Runs wellhead housing and guide base in one trip Removable plugs provide large flow-by area for returns while jetting or turbo drilling 8

18 3 /4 " Subsea Housing Dril-Quip s SS-15 Subsea is designed for 15,000 psi working pressure and H 2 S service. The standard 18 3 /4" wellhead has a primary landing shoulder in the lower ID that supports up to a 7 million lb load, created by a combination of casing weight and BOP stack pressure test. The SS-15 Housing is long enough to contain a three-casing-hanger program plus a subsea tubing hanger. The 18 3 /4" wellhead can be provided with a Dril-Quip DX, H-4, or CIW hub-type locking profile The 18 3 /4" wellhead has a primary landing shoulder on the lower ID to allow all casing weight and pressure loads to be carried at the bottom of the wellhead The wellhead minimum ID will pass a 17½" bit and is available with a variety of buttweld prep sizes and wall thicknesses The 18 3 /4" wellhead has a seal area located in the top ID that allows the wear bushing to remain in place while testing the BOP stack with the BOP isolation test tool The lower OD of the 18 3 /4" wellhead has a reaction ring to transfer bending loads to the conductor wellhead The 18 3 /4" wellhead is designed for 15,000 psi working pressure and H 2 S service The 18 3 /4" wellhead incorporates a subsea tubing hanger lockdown profile standard Subsea Running Tool All Dril-Quip wellhead running tools are cam-actuated and feature left-hand make-up and right-hand release. All wellhead running tools have low friction bearing surfaces to carry tensile and bending loads. The running tools are unaffected by ambient pressure and have ample air exhaust and/or jet return ports. Cam-actuated mechanism is not affected by water depth Lock/unlock indicator rod allows visual confirmation of tool status Low friction-bearing surfaces to carry tensile and bending loads and to ensure easy release even under high bending moments Removable plugs provide large flow-by area for water fill-up and air vent 18 3 /4" Running Tool Running Tool and Tubing Hanger Locking Profile Connector Locking Profile 18 3 /4" Seal Assembly Lockdown Profiles Lock Bending Reaction Casing Hanger Landing Shoulder 9

Rigid Lockdown Conductor s 10 Dril-Quip s Rigid Lockdown (RLD) Conductor is designed to eliminate any alternating load between the conductor wellhead/ high pressure wellhead locking interface. This makes the RLD system particularly suitable for well development applications, and is used for most deepwater applications. Working with the preload features of the 18 ¾" RLD high-pressure wellhead housing, the dual running grooves at the top and the five degree tapered interface at the bottom of the wellhead conductor housing lock the two housings together with up to 2 million lbs of preload, which increases the bending resistance and fatigue life of Dril-Quip s RLD System. The RLD Housing incorporates a dual groove profile and antirotation slots for the cam-actuated drill-ahead running tool. In addition, it includes a lockdown groove for the 18 ¾" housing and can be adapted for a variety of conductor sizes. (30"/36" ) Accommodates standard SS-15 18 ¾" Rigid Lockdown Bottom has buttweld prep for 30" (or 36") OD in a variety of wall sizes Accommodates 18 ¾" Rigid Lockdown wellhead housing Multiple large diameter flow-by holes for cement returns OD has profile with alignment slots for guide base (38" ) Accommodates 18 ¾" Rigid Lockdown ES Housing Bottom has buttweld prep for 38" OD conductor in a variety of wall sizes can be swedged to 36" if desired Multiple large diameter flow-by holes for cement returns SS-15ES conductor wellheads have an extended bore on ID to interface with 18 ¾" housing bending reaction ring Cam-Actuated Drill-Ahead (CADA) Running Tool The Dril-Quip CADA Tool incorporates all the features of the standard conductor wellhead running tool. In addition, the CADA Tool allows the operator to drill the next hole section (once the conductor wellhead is installed) in the same trip. Spring-loaded shear pins trap the outer body in the conductor wellhead to act as a centralizer bushing during the drill-ahead phase, and allow the body of the tool to be sheared out of the wellhead when the tool is retrieved. Simple right-hand rotation puts tool in drill-ahead mode Includes large flow-by area for returns while jetting and drilling ahead Allows passage of 10" drill collars Simple overpull retrieval process to recover tool back to the surface Has a 10" stroke to allow bottom hole assembly to be raised and cleared prior to drilling ahead Cam-Actuated Drill-Ahead (CADA) Running Tool Spring- Loaded Shear Pin(s) Conductor Running Tool and Rigid Lockdown Locking Profile Alignment Slots 5 Tapered Rigid Lockdown Shoulder Lock Indicator Rod Cement Return Holes

18 3 /4 " Rigid Lockdown Housing 18¾" Rigid Lockdown and Annulus Shutoff The 18¾" Rigid Lockdown incorporates all the field-proven features of Dril-Quip s standard wellhead. The Rigid Lockdown includes a locking mechanism that preloads the 18¾" wellhead to the conductor wellhead. This is to increase resistance to bending and increase the fatigue life. The rigid lockdown system can incorporate a pressure-balanced annulus shut-off sleeve that closes off the 30" (36") x 20" annulus after the 20" casing has been cemented into place. Incorporates a locking mechanism that preloads the 18¾" housing to the 30"/36" housing Designed and manufactured for 15,000 lbs H 2 S service Run, landed, preloaded and locked using Mechanical Rigid Lockdown Running Tool and drill pipe pull Customer-specified wellhead connector profile Bending reaction ring on the OD transfers bending loads to the 30"/36" wellhead housing Primary load shoulder can carry all loads at the bottom of the wellhead for 7 million lbs Mechanical Rigid Lockdown and Running Tool The Mechanical Rigid Lockdown and Running Tool is a drill pipe running tool that allows the running, installation and cementing of the 18 3 /4" Rigid Lockdown and casing in a single trip. Operates in conjunction with the 18¾" Housing Running Tool and runs the 18¾" wellhead equipped with the rigid lockdown system Tool activates the rigid lockdown mechanism on the 18¾" wellhead housing Position indicator plate on the OD of the outer sleeve verifies lockdown stroke Mechanical advantage of the system is drill pipe overpull at the wellhead creates a preload between the 30"/36" and 18¾" wellhead Drill pipe overpull on the Tool creates a preload of 2 million lbs maximum Position Indicator Plate Indicator Rod Lock Actuating Sleeve Split Lockdown Presssure- Balanced Annulus Shut-Off System Primary Load Shoulder 18 3 4" Rigid Lockdown Running Tool 18 3 4" Standard Running Tool 18 3 4" Rigid Lockdown Lock for Overpull Bending Reaction 11

Seal Assembly, Casing Hangers and Running Tool SS-15 18 3 4" Seal Assembly The SS Series weight-set 18 3 4" Seal Assembly provides a true dual metal-to-metal seal between the casing hanger OD and the wellhead ID. The Seal Assembly is rated to 15,000 psi working pressure from above and 10,000 psi from below. Seal system incorporates resilient (*Viton ) backup seals Single trip runs seal assembly and casing hanger (seal assembly can also be run separately) Seal assembly is radially energized over a 4-degree tapered sealing area on the casing hanger Seal assembly locks to the casing hanger and locks casing hanger to the wellhead Same seal assembly fits all hangers within a nominal wellhead size Casing Hanger Seal Assembly Running Tool Metal-to-Metal Sealing Area Metal-to-Metal Sealing Area Resilient Seal Metal-to-Metal Sealing Area SS-15 Casing Hangers All casing weights and pressure loads are transferred to the first position casing hanger. Each casing hanger is centralized and lands on a 40-degree shoulder. Each casing hanger is designed to pass 14 square inches of flow-by when running and during the cementing operations. Rated load capacity of 7 million lbs (4.1 million lbs of pressure load and 2.9 million lbs casing load) First position casing hanger rated for 12,500 psi working pressure and H 2 S service, and 15,000 psi standard service; all other casing hangers rated for 15,000 psi working pressure Second position casing hangers with annulus access are available Can be configured to accommodate any casing size 14" or smaller *Viton is a registered trademark of DuPont Performance Elastomers L.L.C. HCLD Seal Assembly Casing Hanger Casing 12

Casing Hanger Seal Assembly Running Tool The SS Series 18 ¾" Casing Hanger Seal Assembly Running Tool is designed to minimize the process associated with installation of the casing hanger and seal assembly in the wellhead. The Casing Hanger Seal Assembly Running Tool is a single-trip, cam-actuated running tool that runs all casing hangers 14" and smaller and all seal assemblies within a given wellhead size. Interchangeable between all Dril-Quip wellheads within a given size Has up to 1.5 million lb load-carrying capacity with 2.0 million lb capacity available upon request Seal assembly is mounted on tool when running, providing maximum amount of flow-by available Running tool automatically locks down seal assembly to casing hanger during first pressure test; seal assembly is retrieved when running tool is recovered if seal assembly is not properly locked down Running tool seals in casing hanger to allow a full test of seal assembly and BOP stack Field-proven performance 18 ¾" Casing Hanger Seal Assembly Running Tool Outer Lock Shear Pins HCLD Seal Assembly Inner Lock Cement Returns Casing Hanger Casing Hanger Seal Assembly Running Tool has been unlocked from the Casing Hanger and has delivered the Seal Assembly to the Casing Hanger and sealing area By pressure testing the Seal Assembly, the Casing Hanger Seal Assembly Running Tool locks the Seal Assembly to the Casing Hanger Casing Hanger landed, cementing position Seal Assembly landed, not set Seal Assembly locked and tested 13

Multi-Purpose Tool, Adapters, Wear Bushing, and Nominal Bore Protector Multi-Purpose Tool The Multi-Purpose Tool (MPT) runs and retrieves the Nominal Bore Protector and Wear Bushings. The MPT retrieves the Seal Assembly and can be used for emergency drill pipe hang-off. The MPT includes a set of running and retrieving adapters, jet subs, cup testers, and a mill and flush adapter. Each accessory is designed to facilitate the running, installation and retrieving operations, including washout, mill and flush, and BOP stack testing associated with the drilling program. All bore protectors and wear bushings are weight-set installed and weight-set retrieved. Multi- Purpose Tool Nominal Bore Protector Dril-Quip s Nominal Bore Protector (NBP) protects the sealing surfaces in the wellhead ID when the 16" or 13 3 /8" hole section is being drilled. O-ring seals on the OD of the NBP provide a trash barrier and lock the NBP into the wellhead. Wear Bushing After installing a casing hanger, the Wear Bushing is run to protect the wellhead ID during the drilling operation. Wear Bushings are available in a variety of sizes to match the casing program and casing hanger size specified. BOP stack testing can be performed with the Wear Bushing installed. Each Wear Bushing is locked to the wellhead with eight spring-loaded shear pins. Nominal Bore Protector Running Adapter Nominal Bore Protector Nominal Bore Protector Retrieval Adapter Jet Sub Extension Jet Sub Wear Sleeves and Selectable Wear bushings In order to facilitate rig operations for deepwater drilling programs, Dril-Quip offers a variety of bit-runnable Wear Sleeves and Selectable Wear Bushings for selected applications. Contact your nearest Dril-Quip Sales Representative for more information on these products. Multi-Purpose Tool configured with the Nominal Bore Protector Running Adapter to run the Nominal Bore Protector Multi-Purpose Tool configured with the Nominal Bore Protector Retrieval Adapter to retrieve the Nominal Bore Protector 14

Multi- Purpose Tool Wear Bushing Retrieval Adapter Wear Bushing Retrieval Adapter Wear Bushing Retrieval Adapter Jet Sub Wear Bushing Cup Tester Wear Bushing Cup Tester Multi-Purpose Tool configured with the Wear Bushing Running Adapter to run the Wear Bushing (the Wear Bushing can also be run with the Multi-Purpose Tool configured with the Wear Bushing Retrieval Adapter and a Jet Sub) Multi-Purpose Tool configured with the Wear Bushing Retrieval Adapter to retrieve the Wear Bushing Multi-Purpose Tool configured with the Wear Bushing Retrieval Adapter and Cup Tester 15

BOP Test Tools BOP Isolation Test Tool The BOP Isolation Test Tool is a weight-set tool that allows testing of the BOP stack and the wellhead housing while drilling. The BOP test tool seals on the ID of the wellhead and cannot be pre-energized. The seal element can only be activated when a release ring engages a known bore in the wellhead, wear bushing or casing hanger. Allows testing of the BOP stack and the wellhead after removal of the Nominal Bore Protector (a slip-on adapter allows landing of the tool on the primary shoulder of the wellhead) Allows testing of the BOP stack with any wear bushing installed (this method tests the BOP stack while isolating the casing hanger seal assembly from test pressure) Can be landed on top of a casing hanger with the wear bushing removed (the seal assembly is isolated from test pressure) Seal activation mechanism does not allow premature activation of the seal element Ample flow-by facilitates running and prevents swabbing when the tool is retrieved Special BOP Test Tool BOP Isolation Test Tool Special BOP Test Tool Dril-Quip s Special BOP Test Tool allows testing of the BOP stack with the Nominal Bore Protector installed. The tool is designed to isolate the Nominal Bore Protector and transfer the loads of the BOP test into the wellhead. Allows testing the BOP stack with the Nominal Bore Protector installed Seal element activation mechanism does not allow seal element to prematurely set Ample flow-by area facilitates running and prevents swabbing when the tool is retrieved 16

Supplemental Casing Hanger Systems Dril-Quip supplies low-pressure and high-pressure supplemental casing hanger systems that provide field-proven, reliable, trouble-free operations, adding flexibility to customers casing programs. SS-Series Low-Pressure Supplemental Casing Hangers The low-pressure supplemental casing hanger is used for intermediate conductor strings in a variety of configurations and is run outside of BOP control. Runs on a cam-actuated drill pipe tool and lands in 30", 36" or 38" supplemental adapter Automatically locks down to supplemental adapter with a self-locking retaining ring, which can support sinking primary conductor pipe up to 1.3 million lbs Incorporates either flow-by or annulus sealing Supplemental Casing Hanger Systems Installed through Low-Pressure Housing 32" 28" 26" 24" 22" Installed through High-Pressure Housing 20" Std. 16" Note: Available with high-pressure, high-temperature capacities SS-Series 20" x 16" (5,000 psi H 2 S Service) Supplemental Casing Hanger System Dril-Quip s standard 20" x 16" Supplemental Casing Hanger System provides a means of installing and sealing supplemental casing strings in the standard wellhead system. The 16" supplemental casing hanger and seal assembly is run on a cam-actuated running tool, landed, cemented, seal assembly weight set and tested all in one trip inside BOP control. Weight-set metal lip elastomeric seal assembly that locks to casing hanger but can be retrieved and then run separately Multiple load shoulder profile of the split ring mechanism automatically engages matching profile in adapter, providing a positive landing point for the casing hanger Shear pins automatically lock casing hanger down, provide overpull verification to confirm casing hanger is properly landed, and prevent casing float during cementing operations Large flow-by areas around casing hanger for cementing operations 20" x 16" casing hanger adapter can be located anywhere in the 20" casing string, thereby reducing the amount of 16" casing needed Seal Assembly Supplemental Adapter 16" Supplemental Casing Hanger 17

WORLDWIDE SALES & SERVICE DRIL-QUIP WESTERN HEMISPHERE DRIL-QUIP, INC. World Headquarters 6401 North Eldridge Pkwy. Houston, Texas 77041 Tel (713) 939 7711 Fax (713) 939 8063 DRIL-QUIP do Brasil, LTDA. Macaé, Brazil Tel (55) 22 2791 8950 Fax (55) 22 2791 8989 DRIL-QUIP New Orleans New Orleans, Louisiana Tel (504) 522 5566 Fax (504) 522 4426 www.dril-quip.com DRIL-QUIP EASTERN HEMISPHERE DRIL-QUIP (Europe), Ltd. Stoneywood Park, Dyce Aberdeen, Scotland, UK AB21 7DZ Tel (44) 1224 727000 Fax (44) 1224 727070 DRIL-QUIP London High Wycombe, Bucks, England Tel (44) 1494 601086 Fax (44) 1494 601094 DRIL-QUIP Norway Stavanger, Norway Tel (47) 51 443700 Fax (47) 51 443701 DRIL-QUIP The Netherlands Beverwijk, The Netherlands Tel (31) 251 22 9250 Fax (31) 251 22 0044 DRIL-QUIP Denmark Esbjerg, Denmark Tel (45) 7518 0944 Fax (45) 7518 0640 DRIL-QUIP Egypt Zahraa El-Maadi, Cairo, Egypt Tel (20) 22 753 8809 Fax (20) 22 753 8907 Alexandria, Egypt Tel (20) 3 450 0507 Fax (20) 3 450 0508 DRIL-QUIP Nigeria, Ltd. Port Harcourt, Nigeria Tel (234) 84 463866 Fax (234) 84 463649 DRIL-QUIP (Ghana) Ltd. Takoradi, Ghana Tel: (233) 312 5384 DRIL-QUIP ASIA PACIFIC DRIL-QUIP Asia Pacific Pte. Ltd. No. 80 Tuas West Drive Singapore, 638417 Tel (65) 6861 0600 Fax (65) 6861 5700 DRIL-QUIP China Shekou, P. R. China Tel (86) 75 5268 97137 Fax (86) 75 5268 97134 DRIL-QUIP Oilfield Services (Tianjin) Co., Ltd. Tanggu, Tianjin, P. R. China Tel (86) 22 2580 7466 Fax (86) 22 2580 7130 DRIL-QUIP Malaysia Kuala Lumpur, Malaysia Tel (60) 3 2168 4308 Fax (60) 3 2168 4201 D.Q. Holdings Pty., Ltd. Perth, Australia Tel (61) 8 9322 8600 Fax (61) 8 9322 8500 DRIL-QUIP Qatar Doha, Qatar Tel (974) 44389715 Fax (974) 44417041 DRIL-QUIP Indonesia Jakarta, Indonesia Tel (62) 21 720 0612 Fax (62) 21 720 1513 09162014 2014 Dril-Quip, inc. Printed in the USA