Quality Assurance Surveillance Plan (QASP) for



Similar documents
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

SAMPLE PWS FOR HRC MEO

NIE 14.1 INTEROPERABLE SOFTWARE VOICE CLIENT SOLUTION

CHARTER OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS OF GLOBAL MEDICAL REIT INC. ADOPTED AS OF JUNE 13, 2016

Quality Assurance Surveillance Plan For Field Reference Data Activities Dixie NF (and Portions of the Fishlake NF)

Office of Small and Disadvantage Business Utilization (OSDBU) Logistics Support Contract

Statement of Work (SOW)

CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS

Vermont Behavioral Risk Factor Surveillance System. Strategic Plan and Performance Measures

Surgi Manufacturing Quality Manual

Generic CMMS Quality Assurance Plan

Standard Operating Procedures (SOP) for: Reporting of Serious Breaches of GCP or the Trial Protocol sponsored CTIMP s. Lisa Austin, Research Manager

Supplier Requirements Manual M M 0 3

CDO WORKFORCE INVESTMENT BOARD. REPLACES CDO Workforce Investment Board Procurement Policy, dated 9/30/05

CHARTER OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS OF EVERBANK FINANCIAL CORP

AGREEMENT FOR SECURITY AND TRANSPORT SERVICES

REQUEST FOR PROPOSAL

Checklist. Standard for Medical Laboratory

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

CHARTER OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS OF ARMSTRONG FLOORING, INC. ADOPTED AS OF MARCH 30, 2016

Performance Management Overview

Section 100 Contractor Quality Control Program

APPENDIX E WAREHOUSE INSPECTION GUIDE AND INSTRUCTIONS FOR PREPARATION OF THE WAREHOUSE INSPECTION REPORT (DD FORM 1812)

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

Securing safe, clean drinking water for all

ALLEGIANT TRAVEL COMPANY AUDIT COMMITTEE CHARTER

Audit of Contract Management Practices in the Common Administrative Services Directorate (CASD)

CP#64 / Environmental Monitoring Services

Presented by: James Concannon, MSA FAC C Level III Contracting Officer

An Introduction to. Metrics. used during. Software Development

AAOIFI Shari a Standards: Translation from Arabic to French Request for Proposal (RFP)

Quality Assurance QUALITY ASSURANCE PLAN

MARYLAND DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT SMALL PROCUREMENT CONTRACT (FOR CONTRACTS OF $25,000 OR LESS) [Insert Contract Name and No.

Compliance Management Systems

Employee vs. Independent Contractor: Protecting Your Company

Effective Monitoring of Outsourced Plan Recordkeeping and Reporting Functions

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

Approaching the Response to Audit Observations

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment)

Information Technology General Controls And Best Practices

Amended and Restated. Charter of the Audit Committee. of the Board of Directors of. Tribune Publishing Company. (As Amended November 11, 2014)

Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection

The primary purposes of the Audit Committee shall be to:

REQUEST FOR PROPOSALS

CRITERIA FOR EVALUATION OF NUCLEAR FACILITY TRAINING PROGRAMS. (Formerly Titled: Guidelines for Evaluation of Nuclear Facility Training Programs)

Sample Performance Standards

The Law of the City of Moscow. No. 30 dated the 30 th of June On the Chamber of Control and Accounts of Moscow

International Standard on Auditing (UK and Ireland) 315

Chapter 5 SUPERVISORY COMMITTEE TABLE OF CONTENTS

Classification Appeal Decision Under Section 5112 of Title 5, United States Code

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

UNIVERSITY OF MINNESOTA DULUTH Joint Employee Performance Appraisal Form

FY and ongoing Mental Health Crisis Evaluation Services

ISO/IEC QUALITY MANUAL

FORTRESS TRANSPORTATION AND INFRASTRUCTURE INVESTORS LLC CHARTER OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS MAY 11, 2015

LEGAL NOTICE REQUEST FOR BID SEALED BID For SQL MONITORING SOFTWARE RE-BID. For ST. CHARLES COUNTY GOVERNMENT ST.

Quality Management Plan Procedure

INTRODUCING BROKER COMMODITY FUTURES CUSTOMER AGREEMENT WITH E*TRADE SECURITIES LLC

COST PLUS AWARD FEE CONTRACT ADMINISTRATION DESKGUIDE

TERMINATION OF CONTRACT / SUSPENSION AND DEBARMENT May 2015

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

REQUEST FOR QUOTATION Quote # CAR WASH PUMP REPLACEMENT (This Is Not A Sealed Bid)

10 LC A BILL TO BE ENTITLED AN ACT

Request for Quotes Small Purchase (Hourly Rate Pricing) Accounting Services

HIPAA NOTICE OF PRIVACY PRACTICES

Northwest Cardiology Associates 400 W. Northwest Hwy Barrington, IL Fax HIPAA Notice of Privacy Practices ( Notice )

SCOPE OF WORK. Project Ready to Learn

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES

Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) elindsay@blueyonder.co.

Department of Budget and Management Central Collection Unit

Time Warner Cable Inc. Audit Committee Charter. Effective February 14, 2013

2016 OCR AUDIT E-BOOK

Approaching The Response To Audit Observations

The Kroger Co. Board of Directors. Guidelines on Issues of Corporate Governance. (Rev. 5/11/15)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

UTAH COUNTY REQUEST FOR PROPOSALS FOR HEALTH AND LIFE INSURANCE BROKER

Senior Security Analyst

Foreign Exchange Inspection Manual

IOWA LOTTERY AUTHORITY BID Security Assessment Services

GRANTS ADMINISTRATION. Audit Report No. AGM0110. May 11, 2010

Clearing and Settlement Procedures. New Zealand Clearing Limited. Clearing and Settlement Procedures

Contract Management Principles and Practices

HP Hardware Support Onsite 6-Hour Call-to-Repair Service HP Customer Support Contractual Service Package

REPORT 2016/035 INTERNAL AUDIT DIVISION

DOCUMENT. General Purchase Conditions

KITCHEN CONTRACT FOR WORK OVER $5000 COMPANY NAME: ADDRESS: DATE: CONTRACT PRICE: Please read all attached information and terms.

Internal Audit Checklist

Setting the Expectation for Success: Performance Management & Appraisal System

Contracting Officer/Administrator s Quality Assurance Program GUIDEBOOK

Environmental Management Consolidated Business Center (EMCBC) Subject: Contracting Officer s Representative Designation and Continuing Learning

Transcription:

Quality Assurance Surveillance Plan (QASP) for EPIDEMIOLOGY ANALYTIC SUPPORT FOR U.S. ARMY MEDICAL SURVEILLANCE ACTIVITY / ARMED FORCES HEALTH SURVEILLANCE CENTER Contract Number: Task Order Number: Date of Award: Contractor s Name and Address: Installation: Contracting Officer s Representatives (COR): LTC STEVEN TOBLER Contracting Officer: GILBERT HOVERMALE APPROVED: DATE: Contractor Manager Name and Title 1

1. INTRODUCTION: This Quality Assurance Surveillance Plan (QASP) has been developed to ensure the performance of critical contract elements. The QASP serves as the plan for surveillance of performance and identifies the performance indicators, standards, inspections methods and procedures to be used in monitoring performance. It details thresholds for acceptable and unacceptable performance for specific tasks within the SOW/PWS. 1.1 Overview. This QASP outlines the procedures for surveillance of the contract order. Included are procedures for evaluating the contractor s performance and how key services will be inspected. 1.2 Purpose and Objectives. The objective of this surveillance plan is to provide a systematic method to evaluate the services the Contractor is required to furnish by the contract. The primary interest is in the final product/service that the Contractor is providing and not in the details of how the contractor is accomplishing the task. The COR may evaluate work at any time during the Contractor s work performance. This plan documents the methods to be used for measuring each contract requirement, the scheduling of inspections, and the results of the surveillance program. 2. RESPONSIBILITIES: The Contractor is responsible for management and quality control actions necessary to meet the terms of the contract. The role of the government is quality assurance to ensure contract services are achieved. 2.1 The contractor, not the Government, is responsible for the management and quality control actions necessary to meet the terms of the contract. It is understood that on rare exceptions unforeseen and uncontrollable problems do occur. This has been recognized and incorporated into thresholds for acceptable and unacceptable performance. Good management and use of an adequate quality control plan will allow the contractor to operate within specified performance requirements. The contractor is responsible for providing all information to the government that is necessary to accurately evaluate performance. 2.2 The government desires to maintain a quality standard for completion of all tasks specified in the SOW/Contract and is responsible for developing measurable standards to evaluate performance against. This contract requires services in the field of public health which directly impacts the security of the U.S. and which requires access to protected health information. Due to the sensitivity and the nature of this contract and the adverse events that will occur if inadequate performance is allowed, the level of surveillance and performance standards will be higher than for many governmental contracts. COs / CORs are to be objective, fair and consistent in evaluating contractor performance against the standards. 2.3. Each document provided for analysis by the contractor will be maintained by the contractor for inspection for the period of the contract. Each evaluation made by the 2

CO/COR will also be documented and filed for further reference, audit, and proof of inspection by the CO/COR. 3. PROCEDURES/METHODS OF ASSESSMENT: 3.1 Contracting Officer Representative Surveillance Schedule. The COR will develop a routine monthly, weekly, and daily surveillance schedule based on the surveillance plan s requirements. The monthly schedule shall be completed not later than the last workday of the preceding month. Copies of the schedule shall be sent to the Contracting Officer. The schedule shall be marked FOR OFFICIAL USE ONLY and shall not be shown to the Contractor. In addition, periodic unscheduled surveillance will also be conducted. 3.2 Inspection Methods. This plan may use a combination of surveillance methods which adequately assures the Government of the Contractor s performance. 3.2.1 Periodic Inspection: Periodic inspection is a QA method based on a predetermined plan to evaluate part of the contract outputs using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspects it (daily, weekly, monthly, quarterly, etc.) as determined by the COR. 3.2.2 100% inspection: 100% inspection is a QA method designed to evaluate all outputs of the contract requirement. This method requires a total inspection of Contractor s performance. 3.2.3 Validated Customer Complaints: Validated customer complaints is a QA method whereby deficiencies in the outputs of the contract requirement are identified by a person other than the COR/QAE. These persons (customers) are made aware of contract requirements and monitor the services provided by the Contractor. Where there is a case of poor performance or nonperformance, the COR is notified. Then, the COR/QAE investigates the report, and, if found to be valid, documents it. Each complaint should be validated to ensure the service was required, and that the requirement was not fulfilled. 3.3 Inspection Method Selection. The depth and detail of observations of work shall be based on the relative importance of the items of work under evaluation. The principal method of surveillance shall be periodic inspection with 100% inspection of key requirements; however, any surveillance method can be used at the Government s discretion. Certain tasks may be so important that nonperformance or poor performance may significantly impact the mission and warrant 100% inspection. Joint inspections may be made by the COR/QAE and the Contractor. These are beneficial when routinely performed. They are vital when any disagreement or misunderstanding occurs. 3.4 Performing Surveillance. Surveillance results must be able to support action taken by the COR/Contracting Officer when nonperformance or unacceptable performance occurs. 3

3.4.1 Inspection Checklists. An essential part of any QASP is the Inspection Checklist for the service that will be evaluated. A standard Inspection Checklist form ensures documented, uniform appraisal of each service occurrence, and that equal weight is given to each evaluation. The checklist shall contain such information as type of service, QAE, inspection results, date, time, and other remarks relevant to the inspection. These checklists form the basis for all QA evaluations and constitute the documentation which will be used to substantiate determination of unsatisfactory performance should that occur. Required Service Evaluation of Present analytic processes management approach Provide Analytic Staff Support to AMSA/AFHSC Provide Consultative Support Continued Enhanced Data Analysis, Interpretation, and Reporting Capabilities in Support of AI/PI Missions-Ad Hoc Request Timeliness Paragraph Number Task 1/ Para 3.1 Task 2/ Para 3.2 Task 3/ Para 3.3 Task 3/ Para 3.3 Performance Standards Contractor begins evaluation within 15 days of contract award Contractor completes evaluation within 30 days of contract award Hire personnel within 30 days upon request to fill vacancies Personnel demonstrate adequate skills and knowledge to function within work environment At least one PhD level Epidemiologist and one PhD Biostatistician with the level of expertise in study methods and design necessary to provide consultative support will be employed. Contract staff completes all rapid turnaround requests within four hours of receipt Contract staff completes all ASAP turnaround requests within two days of receipt Contract staff completes all other turnaround requests within timeline Maximum allowable deviation from requirement (AQL) Method of Surveillance and Procedures 0% Contractor provides oral outbrief to COR at evaluation completion date Contractor provides written evaluation/ synopsis within 7 days of the oral outbrief date <10% of work days will be unfilled with qualified candidates <10% of work days will be unfilled with qualified candidates <5% of reports not completed within timeline Periodic Review Review of Monthly reports by CORs and PM Periodic Reviews and customer (including governmental personnel) complaints Rapid turnaround ad hoc requests-hourly or more frequent monitoring by PM and COR/designee Others: There will be a daily status assessment to monitor progress and completion. The DMSS Management Tool, a customized application used for DMSS,will be used as applicable to track progress. 4

Continued Enhanced Data Analysis, Interpretation, and Reporting- Special Studies and Report Timeliness Continued Enhanced Data Analysis, Interpretation, and Reporting -Quality ALL TASKS-Data release Task 3&4/ Para 3.3 and #.4 Task 2, 3, 4 / Para 3.2, 3.3, 3.3 Task 1-5/ Para 3.1-3.5 developed by governmental staff and customers Contract staff completes all special study and MSMR requests within timeline developed by governmental staff, customers and MSMR editor and publishes them in the specified format within specified intervals. Contract staff completes all analysis and reports without error and meeting the requirements specified in the project proposal. Contract staff (analysis PM) will always (100%) contact the governmental staff if instructions or methods are unclear prior to beginning work Contract staff (analysis PM) will always (100%) contact the governmental staff prior to deviating from project proposal No information will be released without clearance from governmental staff and the Director, AFHSC No data will be copied on personal media or electronically transferred without written clearance from the Director, AFHSC No breach of <5% of reports not completed within timeline <5% of reports with errors 0% (large amounts of protected and sensitive health information is stored and used that fall under HIPPA; personnel that violate this are removed and the government stops paying for the position immediately. There is no remediation possible in this case.) There will be a weekly meeting to monitor progress and completion. The DMSS Management Tool will be used to monitor compliance. As necessary contract staff will meet with MSMR editorial staff. The DMSS Management Tool and Excel file of report due dates which lists report due dates will be used to monitor requirements compliance. After review by senior contract analyst/ epidemiologist there will be a 100% review by governmental staff. Immediate correction if incorrect. Governmental staff will document if standards not met. Periodic Reviews / customer complaints-if any instance of this occurs, whoever discovers it will immediately notify the Director, AFHSC and the PM will immediately be notified. Contract staff involved will immediately be escorted from the building and suspended from employment. An emergency meeting with senior contract staff will be scheduled. 5

Monthly reports on expenditures and status of funds Task 1-5/ Para 3.1-3.5 protected health information laws will occur A status of funds will be provided in excel spreadsheet format to the CORs at least once per 30 day period. The spreadsheet shall list each charge per CLN 0% PM shall maintain a by CLIN, by month list of billed items. This will be provided to the CORs on a routine monthly basis. Excel file shall be provided within 3 days if requested by COR. 3.4.2 Other Surveillance Records. The COR/QAE at times will need to make other types of records such as MFRs, or Memoranda of Telephone Conversation. 4. SUCCESSFUL PERFORMANCE AND REMEDIES: 4.1 Unacceptable Performance. If performance is judged unacceptable, the COR will initiate a Contract Discrepancy Report (CDR) and obtain the contractor s representative s initials on the record of the observation and submit the CDR, along with the Inspection Checklist recording the unacceptable performance, to the Contracting Officer. The seriousness of the situation should govern whether the COR should provide the CDR to the Contracting Officer as soon as unacceptable performance is indicated or wait until not later than the third workday of the month following the surveillance. 4.2 Inform Contract Manager. The COR must always contact the Contractor s manager or on-site representative and inform them of the unacceptable performance, and have the manager initial the entry on the Inspection Checklist. The COR must note on the back of the checklist where the defect was found, the time and method of notification, and the COR s initials. 5. EXAMPLE CDR: 6

Contract Discrepancy Report (CDR) 1. CONTRACTOR 2. CONTRACT NUMBER 3. Reference 4. INCIDENT 5. DATE OCCURENCE 6. CONTROL NUMBER 7. MAJOR MINOR FINDING: FINDING IMPACT: 7

8. COR TYPED NAME AND GRADE SIGNATURE AND DATE 9. CONTRACTOR CORRECTIVE ACTIONS AND ACTIONS TAKEN TO PREVENT RECURRENCE 10. Contractor's Representative/On-site manager TYPED NAME AND POSITION SIGNATURE AND DATE 11. COR Evaluation of Contractor Response ACCEPTED REJECTED 13. COR/Government Program Manager TYPED NAME AND GRADE 12. CLOSE DATE SIGNATURE AND DATE 8

6. REVISIONS TO QASP: revisions to the surveillance plan are the joint responsibility of the COR and the Contracting Officer. 9