MANGO PROCESSING. 2.1 Compliance with FPO and PFA Act is necessary.



Similar documents
1.0 INTRODUCTION 2.0 PRODUCTS 2.1 Applications 2.2 Availability of know and compliances

CHILLY AND TURMERIC POWDER

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable.

2.2 Quality Standards and Compliances The BIS has specified quality standards vide IS 1011:1992. Compliance with PFA Act is necessary.

PINEAPPLE AND ORANGE PRODUCTS

TOMATO SAUCE, KETCHUP AND PUREE

1.0 INTRODUCTION 2.0 PRODUCTS 2.1 Applications 2.2 Availability of technology, Quality Standards and Compliances 3.

AMLA PRODUCTS 2.0 PRODUCTS

1.0 INTRODUCTION 2.0 PRODUCT 3.0 MARKET POTENTIAL 3.1 Demand and Supply 3.2 Marketing Strategy

EDIBLE GROUNDNUT FLOUR

VEGETABLE OIL REFINERY

Papaya is grown in considerable quantity in MP. The area of MP in the year is 684 ha and production MT.

1 BISCUIT PLANT. 1.1 Introduction

TISSUE PAPER MANUFACTURING

166. PROFILE ON SMALL RUMINANT MEAT PROCESSING

Corn, Rice, Wheat are the major raw materials required for the production of extruded breakfast cereals.

110. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS

1 VEGETABLE OIL REFINERY. 1.1 Introduction

1 MUSHROOM PROCESSING. 1.1 Introduction

PROJECT PROFILE. RICE MILL (Capacity 4 TPH)

Prepared by : Installed Capacity per Annum :

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation

PROJECT PROFILE ON MOBILE PHONE REPAIRING AND SERVICING

The production of gram dal in the state in is lakh MT. district wise production in the state is given in the table below:

: Promoters Contribution : Term Loan Total Profitability at optimum level. : Optimum Utilization(3 rd Year)

16. PROFILE ON PRODUCTION OF BLACK AND GREEN TEA PROCESSING AND PACKING

SAMPLE CASE STUDIES FINANCE. M/s Vithal Enterprises

221. PROFILE ON PRODUCTION OF PAPER ENVELOPE

Top-fermenting yeasts are unable to ferment some types of sugars, and the resulting beer is sweeter and "fruitier".

ACTIVATED CARBON PLANT IN KERALA

PROJECT PROFILE ON THE ESTABLISHMENT OF NAILS PRODUCING PLANT

HDPE LAMINATED COLLAPSIBLE TUBES

POULTRY HATCHERY UNIT

130. PROFILE ON PRODUCTION OF CORRUGATED PAPER BOX

This quick guide provides a summary of food safety and labelling advice for small scale home producers of chutneys, pickles, flavoured oils and jams.

STATE BANK OF INDIA BRANCH. Interview Form For Loans above Rs.25,000/- (To be submitted to the Sanctioning Authority along with the Application Form)

: Promoters Contribution : Term Loan Total Profitability at optimum level. : Optimum Utilization(4 th Year)

PROJECT PROFILE ON MUSTARD OIL

Project Profile on the Establishment of Electric Water Heater Making Plant

Model Project Report on Fruit & Vegetable Processing Unit

AUTOMOBILE SERVICING STATION

PROFILE ON SHEEP AND GOAT FARM

PROJECT PROFILE ON COTTON GINNING UNIT

PROJECT PROFILE ON PACKAGED DRINKING WATER UNIT

PROJECT PROFILE ON THE ESTABLISHMENT OF HOTEL AND RESTAURANT AT BLUE NILE FALLS PLANT

COVER PAGE. INDICATE NAME OF THE BUSINESS (Top part of page)

PROJECT PROFILE ON SOYA MILK,PANEER & CURD

85. PROFILE ON ENVELOPS, LABELS AND BADGES OF PAPER

PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT

PROJECT PROFILE ON THE ESTABLISHMENT OF LEATHER GOODS PRODUCING PLANT

7. PROFILE ON FATTENING FARM

Molasses Based Ethanol / Rectified Spirit Plant. Molasses Based Fuel Ethanol (Bio-Fuel) Plant

PROJECT PROFILE ON PLASTER OF PARIS

Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme

PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS

CENTRE FOR CONTINUING EDUCATION BBA (AVIATION OPERATION)

ASSEFA Association for Sarva Seva Farms 279, Avvai Shanmugam Road, Royapettah, Chennai

PROJECT PROFILE ON THE ESTABLISHMENT OF CORN FLAKES PRODUCING PLANT

16-2 TABLE OF CONTENTS I. SUMMARY 16-3 III. MARKET STUDY AND FARM CAPACITY 16-4 A. MARKET STUDY 16-4 B. FARM CAPACITY & PROGRAMME 16-7

PROJECT PROFILE PRODUCT CODE ASICC(2000): PRODUCTION CAPACITY : QUANTITY 8,04,000 mtrs. Lancing (P.A) Valued Rs.

PROJECT PROFILE. Product : Red Iron Oxide. Product Code : 24117, Quality Standard : IS : 44 : 1991 IS : 05 : 1994

PROFILE ON THE PRODUCTION OF STEEL TUBES

COMPUTER HARDWARE MAINTENANCE & NETWORKING SERVICE

Business Plan Template

Your business plan. helping you with your business planning and forecasting. Name of business. Date when completed

How To Understand The Cottage Foods Act

FINAL ACCOUNTS FINAL ACCOUNTS AND THE TRIAL BALANCE

II. TOMATO CANNING A. START COMFAR

6.3 PROFIT AND LOSS AND BALANCE SHEETS. Simple Financial Calculations. Analysing Performance - The Balance Sheet. Analysing Performance

Dairy Farming. 1. Introduction. 2. Scope for Dairy Farming and its National Importance. 3. Financial Assistance Available from Banks for Dairy Farming

PROJECT REPORT FOR FLY ASH BRICKS MANUFACTURING UNIT. Qty Price for bricks/day. No s

SUNRISE BISCUIT CO. PVT. LTD.

12. FINANCIAL MANAGEMENT

MINI TOOL ROOM PRODUCT CODE

Introduction. What is a business?

BUSINESS PLAN ON URBAN LEVEL HIGH QUALITY CASSAVA FLOUR PRODUCING ENTERPRISE

48-2 TABLE OF CONTENTS I. SUMMARY 48-3 II. PRODUCT DESCRIPTION & APPLICATION 48-3

Feasibility Study Requirements. Qatar Development Bank

Lesson-13. Elements of Cost and Cost Sheet

7. Term Loan applied for : Rs. 8. Whether any of your relative is working in the Corporation? If so, please specify the name and relationship.

Ratio Analysis Fixed Assets Fixed Assets + Net Working Capital =0.75 Fixed Assets

PROJECT PROFILE DAIRY EQUIPMENTS **********************

Problems on Balance Sheet of a Company as per Revised Schedule III of the Companies Act 2013

Paper 5- Financial Accounting

B. Division of Costs The purpose of a Manufacturing Account is to ascertain Cost of Production ( ).

Financial Plan. A) Estimated One-Time Financial Requirements. Part One

(AA11) FINANCIAL ACCOUNTING BASICS

WORKING CAPITAL MANAGEMENT

Project Description. Market and Growth Drivers. Agro and Food Processing Horticulture Infrastructure. Market

175. PROFILE ON HIGH GRADE CONTRACTOR

Bakery PRODUCTS INTRODUCTION MARKET POTENTIAL

Installation of Greenfield Vs Brownfield Cement Plant

COMMUNITY BASED LIVELIHOODS RECOVERY PROGRAM (CBLRP) FOR EARTHQUAKE AFFECTED AREAS OF AZAD JAMMU AND KASHMIR AND NWFP CBLRP-UNIDO

OBTAINING OPERATING CAPITAL FOR 2016 GRAIN OPERATIONS: NEEDS, RISKS, REWARDS & THE BOTTOM LINE

PROJECT PROFILE ELECTRONIC GAS LIGHTER **************************

44. PROFILE ON PRODUCTION OF SUNFLOWER OIL

Accounting for Branches Including Foreign Branch Accounts

XLPE PRODUCTION PLANT FOR THIRUVALLA UNIT OF TRACO CABLE LTD

Transcription:

MANGO PROCESSING 1.0 INTRODUCTION Mango is a fruit which has many varieties and is grown in majority of the states of the country. Pulp or juice of ripe mangoes is consumed along with main course. Many taste enrichers are made from unripe mangoes and their shelf life is enhanced either by processing them or by using preservatives. Pickles, chutneys and many sweet preparations like murabba are made from unripe or semi-ripe mangoes. This fruit is available only during 4-5 months every year and is generally liked by every one. Mangoes are grown all over the country and Bihar and Jharkhand states have ample production of mangoes and thus mango processing can be started after assessing the market. 2.0 PRODUCT Mango processing is a traditional activity and products like pickle, chutney, murabba are consumed throughout the year. Every region has its own taste or liking and a care has to be taken to understand it and accordingly the recipe has to be finalised. 2.1 Compliance with FPO and PFA Act is necessary. 3.0 MARKET POTENTIAL Indians are fond of table enrichers, which are regularly used along with the main course as well as snacks. Apart from individual households, restaurants, eateries, roadside dhabas, clubs, hostels, caterers etc. are the bulk consumers. There are some branded products available in the market but they are costly. The real competition would be from the age-old practice of making pickles or chutneys or murabba domestically. Many Indian households make these items during the season. But this practice is gradually disappearing due to 151

changing lifestyles, hassles of making these items and their availability throughout the year from market. There are many variants of these products and with certain change in the ingredients, taste differs. Hence, it is imperative to cater to the regional palate. 4.0 MANUFACTURING PROCESS It is very well standardised. In case of pickles, unripe mangoes are washed and cut into small pieces and then salt and turmeric powder is applied on it and then these pieces are sun-dried for couple of hours. Then mango pieces and other ingredients like methi powder, spices etc. are thoroughly mixed with edible oil and finally packing is undertaken. Mango chutney is prepared after washing mangoes and cutting them into small pieces. Then they are cooked with spices and after adding sugar and vinegar, it is packed. Murabba is prepared from pieces of mango. These pieces are soaked in lemon water for couple of hours and then O washed. Then they are cooked with sugar syrup at around 60-65 C and packed. along with sugar syrup after cooling. Removal of seed and process waste account for 35% loss. 5.0 CAPITAL INPUTS 5.1 Land and Building There is no need to undertake construction by purchasing land. Instead, a readymade premise of around 100 sq.mtrs. with 2 or 3 rooms would be sufficient for production, storage and packing. A provision of Rs. 2.50 lacs is made. 5.2 Machinery Majority of the operations are manual and therefore, production capacity is primarily determined by market. Processing of 6 tonnes per month for a period of 8 months would require following facilities: Item Qty. Price (Rs.) Gas furnace with burners 1 20,000 Cutting & Peeling Equipments -- 2,000 Plastic sealing machine, PP Cap sealer, weighing scales etc. -- 25,000 Stainless Steel Utensils, Plastic Jars & Tubs and other tools -- 20,000 Bottle Washing Machine -- 15,000 Mixer Grinder -- 15,000 Total 97,000 5.3 Miscellaneous Assets Other items like furniture and fixtures, storage racks, packing tables etc. shall be required for which a provision of Rs.35, 000/- is made 152

5.4 Utilities Total power requirement shall be 2 HP whereas water required for washing of mangoes and potable and sanitation purposes shall be about 800-900 ltrs. per day. Around 3 gas cylinders shall be required every month. 5.5 Raw Materials The most important raw material will be good quality unripe mangoes. Most of the areas of Bihar & Jharkhand produce mangoes and procuring around 6 tonnes every month is very easy. Mangoes will be available for about 5 months and stock for remaining 3 months shall have to be maintained. Pieces of mangoes should be kept in salt and lime water during the fag-end and after drying them, they should be preserved for 3 months to make pickle and chutney. Murabba can be manufactured during season only and stock of finished goods should be kept. Other materials like salt, spices, edible oil, sugar etc. shall be available from local market. The standard packing could be 500 gms. for each product and preferably food grade plastic bottles should be used. Other materials like labels, corrugated boxes, box strapping etc. shall be required. Proper arrangements should be made for packing materials. 6.0 MANPOWER REQUIREMENTS Particulars Nos. Salary/ Total Month Salary (Rs.) Semi-skilled Workers 2 1,750 3,500 Helpers 5 1,250 6,250 Salesman 1 2,250 2,250 Total 12,000 7.0 TENTATIVE IMPLEMENTATION SCHEDULE Activity Period (in months) Application and sanction of loan 1.5 Site selection and commencement of civil work 0.5 Completion of civil work and placement of orders for machinery 1.5 Erection, installation and trial runs 0.5 8.0 DETAILS OF THE PROPOSED PROJECT 8.1 Building A readymade premise of around 100 sq.mtrs. may be bought. The price is taken as Rs. 2.50 lacs. 8.2 Machinery An expenditure of Rs. 97,000/- is expected as explained earlier. 153

8.3 Miscellaneous Assets A provision of Rs.35, 000/- is made under this head as narrated earlier. 8.4 Preliminary & Pre-operative Expenses There will be certain pre-production expenses on travelling, registration, establishment and administrative expenses, interest during implementation, trial run expenses etc. A provision of Rs.40, 000/- would take care of these expenses. 8.5 Working Capital Requirements There will not be much stock during season whereas during off-season, there will be stock of finished goods. Retailing will be done with the help of small retailers. Bank may find it difficult to finance as per standard norms. Hence, it is assumed that the bank would extend combined pre and post sales facilities of Rs. 50,000/- and promoters would contribute Rs.50, 000/- towards margin money. 8.6 Cost of the Project & Means of Financing (Rs. in lacs) Item Amount Building 2.50 Machinery 0.97 Miscellaneous Assets 0.35 P&P Expenses 0.40 Contingencies @ 10% on Land and Building & Machinery 0.35 Working Capital Margin 0.50 Total 5.07 Means of Finance Promoters' Contribution 1.47 Term Loan from Bank/FI 3.60 Total 5.07 Debt Equity Ratio 2.45 : 1 Promoters' Contribution 29% Financial assistance in the form of grant is available from the Ministry of Food Processing Industries, Govt. of India, towards expenditure on technical civil works and plant and machinery for eligible projects subject to certain terms and conditions. 9.0 PROFITABILITY CALCULATIONS 9.1 Production Capacity & Build-up As against the processing capacity of 6 tonnes per month, the actual utilisation is assumed to be 65% in the first year and 75% thereafter. 154

9.2 Sales Revenue at 100% Processing of 6 tonnes every month would result in production of about 4 tonnes. Assuming selling price of Rs. 50,000/- per ton for each product, total sales will be Rs. 16.00 lacs during a period of 8 months. 9.3 Raw & Packing Materials required at 100% (Rs. in lacs) Product Qty. Price/Ton Value (Tonnes) (Rs.) Mangoes 48 5,500 2.64 Edible Oil 2 60,000 1.20 Sugar - - 0.72 Salt, Spices, Vinegar etc. -- -- 0.80 Packing Materials @ Rs.7,000/Ton -- -- 2.24 Total 7.60 9.4 Utilities Total cost of utilities at 100% activity level for a period of 8 months will be Rs. 20,000/-. 9.5 Selling Expenses A provision of 15% of total sales is made towards selling commission, transportation, publicity, free sampling, etc. 9.6 Interest Interest on term loan of Rs. 3.60 lacs is calculated @ 12% per year assuming total repayment in 4 years including a moratorium period of 1 year whereas interest on working capital loan is computed @ 14% every year. 9.7 Depreciation It is computed on WDV basis @ 10% on building and 20% on machinery and miscellaneous assets. 155

10.0 PROJECTED PROFITABILITY (Rs. in lacs) No. Particulars 1st Year 2nd Year A Installed Capacity ---- 48 Tonnes ---- Capacity Utilisation 65% 75% Sales Income 10.40 12.00 B Cost of Production Raw and Packing Materials 4.94 5.70 Utilities 0.13 0.15 Salaries 0.96 1.10 Repairs & Maintenance 0.24 0.36 Selling Expenses @ 15% 1.56 1.80 Administrative Expenses 0.30 0.36 Total 8.13 9.47 C Profit before Interest & Depreciation 2.27 2.53 Interest on Term Loan 0.38 0.29 Interest on Working Capital 0.07 0.09 Depreciation 0.51 0.44 Profit before Tax 1.31 1.71 Income-tax @ 20% 0.26 0.34 Profit after Tax 1.05 1.37 Cash Accruals 1.56 1.81 Repayment of Term Loan -- 1.05 11.0 BREAK-EVEN ANALYSIS (Rs. in lacs) No Particulars Amount [A] Sales 10.40 [B] Variable Costs Raw and Packing Materials 4.94 Utilities (80%) 0.10 Salaries (75%) 0.74 Selling Expenses (70%) 0.09 Interest on WC 0.07 Adm. Expenses (50%) 0.15 7.09 [C] Contribution [A] - [B] 3.31 [D] Fixed Cost 2.00 [E] Break-Even Point [D] [C] 60% 156

12.0 [A] LEVERAGES Financial Leverage = EBIT/EBT = 1.76 1.31 = 1.34 Operating Leverage = Contribution/EBT = 3.31 1.31 = 2.53 Degree of Total Leverage = FL/OL = 1.34 2.53 = 0.53 [B] Debt Service Coverage Ratio (DSCR) (Rs. in lacs) Particulars 1st Yr 2nd Yr 3rd Yr 4th Yr Cash Accruals 1.56 1.81 2.01 2.25 Interest on TL 0.38 0.29 0.17 0.08 Total [A] 1.94 2.10 2.18 2.33 Interest on TL 0.38 0.29 0.17 0.08 Repayment of TL -- 1.20 1.20 1.20 Total [B] 0.38 1.49 1.37 1.28 DSCR [A] [B] 5.11 1.41 1.59 1.82 Average DSCR --------------------------- 2.48 ------------------------- 157

[C] Internal Rate of Return (IRR) Cost of the project is Rs. 5.07 lacs. (Rs. in lacs) Year Cash 16% 18% 20% Accruals 1 1.56 1.34 1.32 1.30 2 1.81 1.34 1.30 1.26 3 2.01 1.29 1.22 1.16 4 2.25 1.24 1.16 1.08 7.63 5.21 5.00 4.80 The IRR is around 17%. Some of the machinery suppliers are 1. Delight Engg. Works, Lane no. 8, Asalat Pura, Moradabad-244001. Tel No. 2498398/1687, Fax: 2194378 2. Nagpal Bros., C-127, Phase II, Mayapuri Industrial Area, New Delhi-110064. Tel No. 25400407/02631 3. Flora Engg. Corporation, 28 A, Phool Baug, Rampura, New Delhi-110035. Tel No. 25415335/920 4. Eastend Engg. Company, 173/1, Gopal lai thakur Rd., Kolkata-700035. Tel No. 25773416/6324 158