KWAZULU-NATAL DEPARTMENT OF HOUSING



Similar documents
NHBRC WARRANTY SCHEME ENROLMENTS AND REQUIREMENTS

HUMAN SETTLEMENTS Programmes and Subsidies

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

Home Warranty Insurance Claim Form

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

NZIA Standard Construction Contract

and the President has proclaimed the following Law:

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES

Government Gazette REPUBLIC OF SOUTH AFRICA. AIDS HELPLINE: Prevention is the cure

HOUSING PROJECT PROCESS GUIDE. A process guide for the following National Housing Programmes:

Chartered Architectural Technologists: Client information for domestic projects

ENGINEERING COUNCIL OF SOUTH AFRICA

Request for Quotation Project Manager to facilitate the Private Sector Energy Efficiency (PSEE) Project in ethekwini Municipality

FIRST TIME HOMEBUYER S PROGRAM OPERATING PROCEDURES. Division of Housing Services Room 218A, City Hall (856) HOME FUNDED

April 1 SASRIA SOC LIMITED. NMI Claims Procedure Manual. The document is aimed at assisting NMI and Brokers in managing Sasria claims

(House and Land) Approved by the Nova Scotia Real Estate Commission for use by Industry Members under the Real Estate Trading Act.

Explaining an architect s services. General information on the usual tasks undertaken by an architect

SCHEDULE F HOME WARRANTY INSURANCE POLICY

An issues paper on a Review of the Residential Building Cover Package. Residential Building Cover Review Panel

Briefing document: Understanding the Royal Institute of British Architects (RIBA) Building Contracts. 5 November 2014

REQUEST FOR PROPOSAL FOR THE DEVELOPMENT OF A CUSTOMISED SOLUTION DRIVEN PERFORMANCE MANAGEMENT PROGRAM RFP NUMBER: TIA 2012/RFP001/02

Property Factors (Scotland) Act 2011

C. Development Permit Requirement in Flood Hazard Areas

International Construction Warranties Limited. Terms & Conditions. Version UK1

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

ENERGY PERFORMANCE CONTRACT

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS Part A

Law Society and Council of Mortgage Lenders Approved Certificate of Title

Facilities Maintenance Contract

BUILDING CONTRACT MEMORANDUM OF AGREEMENT AND CONDITIONS OF CONTRACT

Dated 14 July, Director (A&F) NHIDCL

The Procurement Guidelines of. the Japanese Grant Aid. (Type I-G)

PERSONAL ALERT SYSTEMS REBATE SCHEME PROVIDER PANER DEED

North Ayrshire Council Finance & Property Services. Property Factoring Service. Consultation Report

MPUMALANGA DEPARTMENT OF EDUCATION APPLICATION FOR AN EDUCATOR S POST

qbcc Insurance Policy Conditions Edition 8 1 queensland building and construction commission

ARTWORK COMMISSION AGREEMENT

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

APPLICATION FOR FUNDING IN TERMS OF THE POLICY ON FINANCIAL AWARDS (NATIONAL BUSINESS PLAN)

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.

Request for Quotation: Hosting and Pay Per Click Campaign: Shisa Solar

Guide to Buying a New Build Home

Policy of Insurance under the HBCF (Home Building Compensation Fund)

UIF MATERNITY MATTERS UIF Claims Made Easy

ANNEXURE 1 Policy for Managing the Performance of Section 57 Employees of the City of Johannesburg

Dear Contractor: If you have any questions about the Program or your Application, please feel free to call our office at

Real Estate Acquisition Guidelines For: WEST SACRAMENTO AREA FLOOD CONTROL AGENCY. Sacramento River Southport Early Implementation Project

Guidance on Framework Agreements

Reissue: Request for Quotation: Hosting and Pay Per Click Campaign: Shisa Solar website

Guidelines for Disposal of Goods & Equipment

ICC UNIFORM RULES FOR CONTRACT BONDS

How To Get A Job Done

QBE BUILDERS WARRANTY. Residential Builders Warranty INSURANCE CLAIM FORM CLAIM FORM

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CCF Systems Gap Analysis Checklist. Civil Contractors Federation. Civil Construction Management Code

Let us help you build your dream home

REGULATORY AUDITS OF DISTRIBUTION BUSINESSES ELECTRICITY AND GAS INDUSTRIES

This is the Annexure A to Positive Covenant between and Woollahra Municipal Council

1.1 The following words and expressions have the following meanings, unless they are inconsistent with the context:

HOME WARRANTY INSURANCE REGULATION

CITY OF LUDINGTON RENTAL REHABILITATION PROGRAM PROGRAM GUIDELINES 2009 GENERAL

inform practice note SUBCONTRACTING ARRANGEMENTS Content Synopsis: Practice Note # 7 May 2007 (Version 1 - May 2007) construction industry development

MAITLAND SOUTH AFRICA MANUAL PREPARED IN ACCORDANCE WITH SECTION 51 OF THE PROMOTION OF ACCESS TO INFORMATION ACT

Government of the Kingdom of Lesotho. Ministry of Public Works and Transport. Principal Building Agreement

CLAIMS PROCESS - CONDOMINIUM COMMON ELEMENTS

Standard operating procedure

Guide. Minister s Guide to Auditing for Building Surveyors. April 2014

Building in the ACT. A consumer guide to the building process OCTOBER 2014

Thames Water Utilities Limited. Settlement deed

[This translation is provided for guidance. The governing text is the Arabic text.] Form of Consultancy Engineering Services Contract (Design)

Regional Council of Goyder

CONTRACT MANAGEMENT POLICY POLICY ADOPTED BY COUNCIL ON???? AT ITEM C.????

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

LESS FORMAL TOWNSHIP ESTABLISHMENT ACT 113 OF 1991

INSTALMENT SALE AGREEMENT

Request For Price. Work Schedule The project shall commence within a reasonable time of the request.

Audit, Risk and Compliance Committee Charter

(1 July to date) LOCAL GOVERNMENT: MUNICIPAL FINANCE MANAGEMENT ACT 56 OF 2003

ACCOUNTING OFFICERS CHIEF FINANCIAL OFFICERS HEADS OF PROCUREMENT GUIDELINE FOR BID COMMITTEE MEMBERS

Insurance Broking Terms of Reference

Your home: the next steps

Enhance the standard of building in Alberta Improve consumer protection and recourse options

2.6.2 RESPONSIBILITIES OF PROVINCIAL GOVERNMENT RESPONSIBILITIES OF THE NATIONAL DEPARTMENT... 22

Contractor Performance Report Scoring Guide

BASEMENT FLOOD PREVENTION ASSISTANCE PROGRAM

Standard Monitoring Procedures

OVERSTRAND MUNICIPALITY

RENTAL PROPERTY SET UP QUESTIONNAIRE & TERMS OF SERVICE

Transcription:

KWAZULU-NATAL DEPARTMENT OF HOUSING SUBMISSION TO : THE HOUSING ADVISORY COMMITTEE SUBJECT : POLICY AND PROCEDURE ON THE RECTIFICATION OF HOUSES IN KWAZULU-NATAL 1. PURPOSE To seek the approval of the MEC for Housing for a Policy and Procedure on the Rectification of Houses delivered between 15 th March 1994 and 31 st March 2002. 2. BACKGROUND 2.1 The National Housing Programme: Rectification of Houses delivered between 15 th March 1994 and 31 st March 2002 was approved by Housing MINMEC on the 3 rd March 2005. 2.2 The National Department of Housing has provided broad implementation guidelines for this programme that do not address all issues of implementation. Therefore, a provincial guideline is required to ensure clarity and procedural uniformity in the implementation of the programme within KwaZulu-Natal. 3. POLICY AND PROCEDURE 3.1 Aim of the Programme The aim of the programme is to rectify defects in houses delivered between 15 th March 1994 and 31 st March 2002 in respect of Municipal Services and Top Structure Defects. 3.1.1 Municipal Services a] Inappropriate township layout and design, whereby a house may, for example, be subject to flooding, to the extent that its structural integrity has been compromised; and b] inappropriate storm water drainage systems. 3.1.2 Top Structure Defects a] Insufficient foundation design, where the seriousness of such structural defects compromises the overall structural integrity of the house; b] defective or substandard materials that were used during construction; c] defective construction practices, such as failure to secure roof ties properly or incorrect roof construction practices; Rectification Policy.doc Page 1 of 7 Enq: Product Development

d] incidents of major structural defects which have not been repaired due to the inability of the registered property owner to finance such repairs; e] structural faults caused as a result of inappropriate soil conditions for house building purposes; and f] houses which have been vandalized after completion but before occupation by the rightful housing subsidy beneficiary. 3.2 Precondition of the Programme 3.2.1 The project must be included in the Municipal IDP or Housing Plan. 3.2.2 The Municipality must firstly seek recourse, from the relevant professional institution in whose domain the defect arose through the applicable Professional Indemnity Fund, or applicable insurances and guarantees held by the contractor or implementing agent. 3.2.3 The Department will provide funding for the rectification work if the rectification claim is presented after the indemnity prescribed period has expired. This is subject to the Criteria and Other Conditions of the Programme as stated in paragraph 3.3 below, being met. 3.2.4 In the case of houses built by a contractor through the People s Housing Process, the Department will provide funding only if sufficient proof is provided that all attempts made to contact the PHP contractor was unsuccessful. 3.3 Criteria and Other Conditions of the Programme 3.3.1 Rectification work will only be conducted on houses that are occupied by the original subsidy beneficiary or as approved by the MEC. 3.3.2 The rectification work will be confined only to correct structural defects caused as a result of the factors detailed in paragraphs 3.1.1 and 3.1.2 above. 3.3.3 The subsidized houses that qualify for rectification work, in terms of this Programme, will include all: a] project approved houses delivered between 15 March 1994 and 31 March 2002; b] Developer Driven Individual Subsidy houses approved and delivered, as a project, between 15 March 1994 and 31 March 2002; and c] houses which have been vandalized after completion, but before occupation by the rightful housing subsidy beneficiary. 3.3.4 The rectification work will exclude all the houses built before 15 March 1994 and all the houses built after 31 March 2002. 3.3.5 Defects that are the result of poor maintenance, negligence, or caused as a result of the beneficiary undertaking improvements or changes to the original structure must be excluded from any rectification work. 3.3.6 The rectification work will only involve a once off rectification of defects which cause the housing unit to be structurally unsound and, this rectification will not include any increases of the size of subsidised units. 3.3.7 The National Housing Programme: Housing Assistance in Cases of Emergency will be utilized to deal with structural defects that were caused by natural disasters. 3.3.8 Houses that have been vandalized after completion, but before occupation by the rightful housing subsidy beneficiary must be rectified so as not to disadvantage the new housing subsidy beneficiary. Rectification Policy.doc Page 2 of 7 Enq: Product Development

3.3.9 In addition to the above, the MEC for housing may consider any application for the rectification of houses built in terms of Government s Housing Subsidy Scheme, taking into account all necessary information and supporting documents. 3.3.10 If demolition is required and a new house has to be built to replace it, the Department must endeavour to negotiate a warranty with the NHBRC similar to that available for consolidation subsidies. 3.3.11 The municipality must address the relocation of beneficiaries during the reconstruction period in cases requiring demolition. 3.3.12 The municipality will appoint a suitably qualified professional at risk (cost to be borne by the municipality), to determine and inspect the defects on the houses identified by the municipality. The department will only re-imburse the municipality for the professional s fee on the properties where approval is granted for rectification work to be undertaken. 3.3.13 It is recommended that the qualified professional appointed by a municipality should be a registered professional in the built environment profession. 3.3.14 All appointments of professionals/service providers by the municipality must be in terms of the Tripartite Policy. 3.4 Procedure for the Rectification of Houses The procedure to be followed for the rectification of houses is contained in the flow diagram attached as Annexure A. 3.5 Norms and Standards Applicable 3.5.1 If the defects are due to Municipal Services, details of the shortcomings must be established and the Guidelines for Human Settlement Planning and Design (commonly called the Red Book ) should be utilized to measure acceptable standards for the rectification work. 3.5.2 Rectification work must be measured against the NHBRC s technical requirements, set design and construction standards for NHBRC registered builders, as published in the NHBRC s Home Building Manual. 3.5.3 The materials used must carry the South African Bureau of Standards (SABS) stamp. 3.6 Application Form of the Programme The municipality, for the rectification work, must complete the application form attached as Annexure B. 3.7 Time Frame of the Programme 3.7.1 Due to the Rectification Programme being effectively implemented in KwaZulu-Natal in the 2006/7 financial year, the time frame set by the National Department of Housing for all rectification work to be finalized by the 31 st March 2010 be extended by 1year. 3.7.2 All rectification work in this Province must be finalized by the 31 st March 2011. 3.7.3 All applications for approval in this Programme must be submitted to the Housing Advisory Committee by the 31 st March 2008. 4. Motivation In view of the National Housing Programme: Rectification of Houses delivered between 15 th March 1994 and 31 st March 2002 being approved by Housing MINMEC on the 3 rd March 2005, a provincial guideline is required to ensure clarity and procedural uniformity in the implementation thereof. Rectification Policy.doc Page 3 of 7 Enq: Product Development

5. Financial Implications The cost for the rectification must not exceed the costs as stipulated in the Detailed Cost Breakdown for the housing subsidy during that financial year. The cost of demolition and removal of rubble may be claimed from the housing subsidy allocated for a serviced site. The fee payable to the appointed professional to inspect the defects and estimate the rectification cost, must not exceed the regulated fee as set by the relevant professional council or regulatory body. 6. Legal Implications Nil 7. Recommendation: that, SUBMITTED the policy and procedure as contained in paragraph 3 above, be approved. MR P. WOOLF ACTING GENERAL MANAGER: PLANNING & DEVELOPMENT RECOMMENDED/NOT RECOMMENDED/RECOMMENDED AS AMENDED CHAIRPERSON KZN HOUSING ADVISORY COMMITTEE SUPPORTED/NOT SUPPORTED/SUPPORTED AS AMENDED MS S. Z. F. NYANDU HEAD OF DEPARTMENT APPROVED /NOT APPROVED/APPROVED AS AMENDED MR M. MABUYAKHULU MEC FOR HOUSING Rectification Policy.doc Page 4 of 7 Enq: Product Development

ANNEXURE A PROCEDURES TO BE FOLLOWED WHEN UNDERTAKING RECTIFICATION WORK IN KWAZULU-NATAL Municipality identifies a project with defective houses. Municipality identifies defective houses within the identified project. Municipality appoints a suitably qualified professional to determine and inspect the defects and estimate the rectification cost. Municipality seeks recourse through PI Fund or Contractor / IA. If unsuccessful. Municipality identifies beneficiaries with the assistance of the Department of Housing (DoH). The DoH records and verifies the beneficiary and property details on the Housing Subsidy System [HSS] and the National Housing Subsidy Data Base [NHSDB]. ` Municipality completes the application forms. Submission to KZN Housing Advisory Committee for approval Municipality appoints contractor registered with the NHBRC, in terms of the Tripartite Policy to undertake the rectification Tripartite Agreement entered into between DoH, Municipality & Contractor Contractor undertaking the rectification work submits the claim on finalisation of work, to the department DoH sends a suitably qualified professional to inspect if the rectification work, undertaken by the contractor, conforms to the National Norms and Standards and also to verify if the material used has been approved by the South African Bureau of Standards. If rectification work is satisfactory, DoH records the details of the rectification work on the HSS and the NHSDB. If rectification work is unsatisfactory, DoH instructs the contractor to redo the work Beneficiary signs a Happy Letter DoH processes and records the payment to the contractor for the rectification work. DoH sends a suitably qualified professional to re-inspect if the work undertaken by the constructor conforms to the National Norms and Standards, etc. The National Department of Housing will monitor and evaluate the Programme. Rectification Policy.doc Page 5 of 7 Enq: Product Development

INDIVIDUAL REGISTRATION NUMBER OF THE ORIGINAL SUBSIDY APPLICATION FORM Project Application Registration Number TABLE 1 INDIVIDUAL PHD RESOLUTION NUMBER OF THE ORIGINAL SUBSIDY APPLICATION FORM APPLICATION FORM FOR RECTIFICATION WORK Project Application PHD Resolution Number THE FOLLOWING DOCUMENTS MUST BE ATTACHED Certified copy of Bar-coded Identity Document SELF SPOUSE Certified copy of a contract with the contractor undertaking the rectification work Certified copy of NHBRC certificate of the contractor undertaking the rectification work OFFICIAL USE TABLE 2 (For official use only) PROCESS RECORD 1. Complaint screened by the PHD 2. Beneficiary and property details verified in the Housing Subsidy System (HSS) 3. Beneficiary and property details verified in the National Housing Subsidy Data Base (NHSDB) 4. Defects of the property inspected by the technical team 5. Rectification work cost estimated by the technical team 6. Tender, inviting NHBRC registered contractors, advertised 7. Date of Contractor appointment 8. Rectification work completed 9. Rectification work inspected by the technical team 10. Details of rectification work recorded in the HSS 11. Recourse obtained from Professional Indemnity Fund or relevant contractor: Name of Fund or Contractor: Amount: R 12. Payment made to contractor 13. Payment recorded in the HSS 14. Did occupant when signing Happy Letter, indicated satisfaction with: [i] Quality and structure of housing unit YES NO [ii] Workmanship YES NO [iii] Materials used YES NO [iv] Timeframe for completion of rectification work YES NO [v] Quality control procedures YES NO [vi] Design of housing unit YES NO SIGNATURE ANNEXURE B Surname Maiden or Former Surname Full Names (First Three Only) Identity Number APPLICANT SECTION A: APPLICANT DETAILS SPOUSE (or Deceased Partner) District Township Township Extension Unit number: Street Address: SECTION B: DETAILS OF PROPERTY Municipality Erf (stand) / Lot Number Size of Stand Type of Sanitation Rectification Policy.doc Page 6 of 7 Enq: Product Development

Type of Tenure Ownership Leasehold Deed of grant Other SECTION C: RECTIFICATION WORK DETAILS [To be completed by the Technical Team] TYPE OF DEFECT AND DETAILS OF RECTIFICATION WORK REQUIRED Municipal Services: Top Structure: Vandalized House: Cost of Rectification Work: R Geophysical Variation: Applied/Not Applied Amount: R SECTION D: DETAILS OF CONTRACTOR Name: Emerging Contractor: YES NO Postal address: NHBRC s Registration number Telephone Number Facsimile Number E-Mail Address: Code Code SECTION E:. DETAILS OF REASONS OR ALTERNATIVE SUGGESTIONS AS PER HAPPY LETTER Not satisfied with: i] Quality and structure of housing unit: [ii] Workmanship: iii] Materials used: [iv] Timeframe for completion of rectification work: [v] Quality control procedures: [vi] Design of housing unit: Rectification Policy.doc Page 7 of 7 Enq: Product Development