ISO/TS 16949:2002 Guidance Document



Similar documents
Presentation by BSI on the main changes to the IATF ISO/TS certification scheme

Aerospace Guidance Document

TABLE OF CONTENTS WHAT TYPE OF SITES CAN OR CANNOT BE CERTIFIED?

Single Manufacturing Site with. Extended Manufacturing Site(s)

ISO Registration Guidance Document

ISO/IEC Registration Guidance Document

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

AS9100 B to C Revision

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

Certification Process Requirements

Certification Procedure of RSPO Supply Chain Audit

General Rules for the certification of Management Systems

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

REQUIREMENTS FOR CERTIFICATION BODIES TO DETERMINE COMPLIANCE OF APPLICANT ORGANIZATIONS TO THE MAGEN TZEDEK SERVICE MARK STANDARD

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS and MS OHSAS and MS ISO 50001

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

PSC 05T REGULATION FOR THE CERTIFICATION OF THE ISO TS MANAGEMENT SYSTEM CONTENTS 1. PURPOSE AND SCOPE OF APPLICATION

FSSC Q. Certification module for food quality in compliance with ISO 9001:2008. Quality module REQUIREMENTS

General Conditions for the Certification of Management System

ISO 9001:2000 Gap Analysis Checklist

Rules for the certification of event sustainability management system

ISO 9001:2008 Audit Checklist

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I

Rules for the certification of asset management systems

ISO-9001:2000 Quality Management Systems

DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

MSC Group Chain of Custody (CoC) Guidance for Non-Reduced Risk Groups

Regulations for certification of quality management systems

ISO Energy Management System

General Rules for the Certification of Management Systems Code: RG

FAQ 9101:2014 / 9101E Rev

Implementation Guidance for ISO 9001:2015

Rules for the certification of Food Safety Management Systems

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004

IAQG AS 9104 System Process Flowcharts

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

ISO 9001:2008 Requirements Explained - An Adobe PDF File for Use on a Network System

Certification Process Requirements

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART II

Policies for Accredited Registration and Other Third-Party Services

Certification Body Quarterly Data Submission Instructions QFE-016 Version 1.0

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification

ISO 9001:2000 AUDIT CHECKLIST

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see

Quality Management System Manual

Rules for the certification of Environmental Management Systems

Client information note Assessment process Management systems service outline

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

Application of ISO/IEC for the Accreditation of Food Safety Management Systems (FSMS) Certification Bodies

Review and Revision of ISO/IEC 17021

OLB certification process for Forestry Companies GP01

UL s Medical Quality Management System Registration

REQUIREMENTS FOR GAINING AND MAINTAINING ACCREDITATION SAAS CERTIFICATION REQUIREMENTS TABLE OF CONTENTS 1.0 CERTIFICATION BODY...

Management Systems Recognition Booklet

Quality Management System Manual ISO9001:2008

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

Implementing ISO 9001

IAF Mandatory Document. Witnessing Activities for the Accreditation of Management Systems Certification Bodies. Issue 1, Version 2 (IAF MD 17:2015)

HKCAS Supplementary Criteria No. 8

Procedure PS-TNI-001 Information Security Management System Certification

ISO 9001:2008 Internal Audit & Gap Analysis Checklist

ISO/TS 16949:2009 Changes

QUALITY MANUAL ISO 9001:2015

Certification Manual. Fair Trade USA V2.0 English Version. SCS Global Services Manual

ISO 9001:2008 Quality Management System Requirements (Third Revision)

What is ISO 9001 and should i care? SAFER, SMARTER, GREENER

Camar Aircraft Products Co. QUALITY MANUAL Revision D

FAMI-QS Certification Rules for Operators. Rules for Operators

Asset Management Systems Scheme (AMS Scheme)

DLS QUALITY MANAGEMENT, INC

AS9100:2016 Transition Guide

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 5

Audit Report AS/NZS ISO 9001:2008. RRW and Co Pty Ltd trading as National On Site Training

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

DNV GL Assessment Checklist ISO 9001:2015

TABLE OF CONTENTS WHAT TYPE OF SITES CAN OR CANNOT BE CERTIFIED?

Improving Management Review Meetings Frequently Asked Questions (FAQs)

Contents. Management Policy Manual SEM USA Page 2 of 12

Validation Audit Process Definition and Criteria

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

PSA Peugeot Citroën Customer-Specific Requirements for use with ISO/TS 16949:2009

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART II

Quality Management Standard BS EN ISO 9001:

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Translation Service Provider according to ISO 17100

CERTIFICATION OF SEAFARER RECRUITMENT AND PLACEMENT SERVICE PROVIDERS

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

NABL accreditation is a formal recognition of the technical competence of a medical testing laboratory

Rules for the certification of Quality Management Systems

Quality at GE Energy

ISO 9001 Quality Management System

Certification process ECOCERT Ecological & Recycled Textile Standard

Transcription:

ISO/TS 16949:2002 Guidance Document Introduction ISO/TS 16949:2009 emphasizes the development of a process oriented quality management system that provides for continual improvement, defect prevention, reduction of variation and waste in the supply chain and effectively meeting customer requirements. The certification process will encompass the requirements of the technical specification as well as any customer specific requirements that go beyond the standard. Reading the expectations contained in this document will help an organization understand the certification process. Additional guidance that should be utilized includes: ISO/TS 16949 Technical Specification IATF Guidance to ISO/TS16949:2009 Rules for achieving IATF recognition Frequently asked questions, sanctioned interpretations, customer specific requirements contained on the IATF web site www.iatfglobaloversight.org Request for certification: Not all organizations may qualify for ISO/TS 16949:2009 certification. An organization must be in the automotive supply chain and carry out manufacturing and/or add value to products used in an automobile or other road going vehicles in order to obtain ISO/TS 16949:2009 certification. Companies not yet supplying automotive parts may be issued a letter of conformance providing they can demonstrate that they are on an active bid list. If an organization produces both automotive and non-automotive products, then the scope of the ISO/TS 16949:2009 certificate can only include the automotive products, other nonautomotive products and services may be included on an ISO9001:2008 certificate if required, additional audit days and charges may apply. An organization applying for certification should complete the NQA TS16949 questionnaire and supply information pertaining to the employee numbers, site locations, remote and support functions, shift working and pattern, scope of certification, a list of automotive customers, present certifications held and with whom, any special status placed on the organization by its customers and whether the organization has been deemed product design responsible by one or more of its customers. Corporate certification: A corporate audit scheme can be applied where multiple manufacturing sites are audited collectively with common supporting functions. In order to be eligible for a corporate certification an organization must have a common quality management system that covers all of the corporate locations. The management system must be centrally structured and managed and be compliant with ISO/TS 16949. For corporate certifications the registrar must audit all of the manufacturing sites at least once every year, no site sampling is permitted. Supporting functions may be sampled; however the requirement to audit the design activities at least once every twelve months is still applicable even if the design is conducted in a support location.

Site extensions: Where a site has multiple street addresses typically in the same block or neighborhood, these can be considered to be a single site, providing that the site extensions can meet the following criteria; the additional location is a department of the organization being certified not a separate company all locations operate the same QMS they all have the same management representative they all have a common scope of certification they produce common products they have the same site manager/management they have one financial statement, one set of financial books there is only one supplier code from the customer for all the locations they ship to the customer from only one of the locations Remote Supporting Functions: Supporting functions are those activities that support the manufacturing processes. Where these supporting are remote of the manufacturing location such as a centralized purchasing department or a corporate headquarters, these cannot gain independent TS certification. Only manufacturing sites can be registered to ISO/TS 16949. Remote supporting functions can be referenced on an annex to each of the site certificates that they support. Transfer of certifications: If an organization wishes to transfer their ISO/TS 16949:2009 certification from another certification body to NQA, then, in addition, to the above requested application information, NQA will also request a copy of the organization existing, current certificate(s) and other preliminary information to determine that the company meets the TS16949 criteria to Transfer. NQA will conduct a review of the following information: evidence that the existing certification is valid date of your Initial audit or Recertification audit, whichever is more recent the previous audit report and any applicable corrective action(s) previous corrective action(s) are closed and verified key performance indicators and trends the quality manual evidence of customer satisfaction and/or any special status conditions An onsite transfer audit will be performed, by a new audit team, before the current certification body s next scheduled audit, (duration must be equivalent to a re-certification audit,). Following the successful completion of the audit and closure of any findings, the organization will be awarded an NQA ISO/TS 16949:2009 certificate with a validity of three years from the date of the transfer. NQA will guide you through this process of Transfer from application to certification to ensure that it is straightforward. It should be noted that an organization cannot transfer their registration if: they have previously transferred from another IATF recognized certification body within the last three years if the you are in IATF OEM special status condition, or if you have not yet had an onsite audit from your current CB since being under special status if you are currently in suspended status (and for some conditions, if you have been suspended

within the last 12 months, and you have not yet received an onsite visit from your current Certification Body) Quotation, Contract, and Scheduling: NQA will use the information from the TS16949 questionnaire to determine the number of days and locations to visit during the three-year period of the certification per the latest edition of the "Rules for achieving IATF recognition". NQA will forward a proposal for your organizations consideration, if you have any questions concerning this proposal please contact the quote originator outlined on the proposal for clarification. Once NQA has received a copy of your signed proposal then the stage 1 (readiness audit) audit can be scheduled. Pre-assessment: If a pre-assessment is requested by the organization, this will occur prior to the readiness review. This activity is optional and is not required to achieve certification. Only 1 pre-assessment can be performed by NQA at any single site. Participation by an auditor in the pre-assessment activity will prevent that auditor from returning to the company (or group of companies for a corporate client) to perform any TS16946 certification activities for two years. The pre-assessment cannot exceed 80% of the audit days of the initial certification audit. Initial certification: The initial certification is a two stage process that begins with a readiness review, called a stage 1 audit which is followed by a Main Assessment, called a stage 2 audit. On-Site Readiness Review (Stage 1 audit): The readiness review is an on-site audit to determine if the organization is ready for the stage 2 audit. No nonconformance will be documented during this audit. To prepare for the readiness review the organization will be requested to complete the Readiness Review checklist. The lead auditor will utilize data on this form when conducting the review. It is the responsibility of the company to complete this form and have it and any supporting documentation available for review by the auditor at the start of the stage 1 audit. Organizations who fail to complete the form prior to the arrival of the auditor may be subject to additional onsite activities and charges. The following list is the documentation and actions that will need to have been completed by the organization prior to the stage one assessment, the auditor will review the contents of this list in determining whether the organization is ready for TS16949 certification. Failure to provide requested information and records will lead to a Not Ready recommendation! Please do not schedule the TS16949 stage one audit until all of the documentation and actions outlined below have been completed as the outcome will be Not Ready and a second stage 1 audit will need to be booked. 1. Quality Manual and Procedures for each site audited: The quality manual must contain the scope of the quality management system, including justification for exclusions. (Product design is the only permissible exclusion and can only be taken for non-design responsible organizations. Process design cannot be excluded.) The quality manual must contain documented procedures OR reference to them.

The quality manual must contain a description of the interaction between the processes of the quality management system. 2. 12 months of evidence of key performance indicators, including: Customer satisfaction Customer complaints, Any instances of shipping control or special status imposed by customer due to poor performance On time delivery Customer scorecards Internal and external PPM Employee motivation and awareness Continual Improvement issues Supplier performance Any negative trends or performance data must show evidence of a reaction plan to address the underlying issues including root cause analysis. The auditor will examine these plans to verify their effectiveness. 3. Internal Audits for the past 12 months, including one complete audit conforming to the requirements of ISO/TS 16949:2009, for example a: Quality management system audit Manufacturing process audit Product audit 4. List of Qualified Internal Auditors & Qualification requirements. (Some customers require specific training and competency of internal auditors, see customer specific requirements for details) 5. Management Reviews from last 12 Months. (At least one review must comply with the requirements of ISO/TS 16949:2009 and include an evaluation of the results of a complete cycle of ISO/TS 16949:2009 process, product and system audits) 6. Any other customer metrics or operational performance trends for last 12 Months 7. For all automotive customers requiring ISO/TS 16949:2009 certification the auditor will need to establish whether there are any additional customer specific requirements (e.g. supplier quality manuals and have them available for review by the auditor) The auditor will review this information to determine if the organization is ready for a main audit and that the scope of certification is appropriate. If the required items are NOT present and complete, then the Stage 1 audit shall judge the organization Not Ready. If during the Stage 1 audit obvious major non conformances with respect to the organizations effective implementation of the management system are found, the organization shall be judged Not Ready and will require a second stage one visit to be carried out. No non conformances will be identified during the readiness review. However, areas of concern that may result in a nonconformance during the stage 2 conformance audit will be identified.

Excluding Product Design: Product design is the only clause that can be excluded from a ISO/TS 16949:2009 compliant management system. However, the process design elements of 7.3 cannot be excluded. Since with the exception of those clauses that pertain to product design exclusively, i.e. 7.3.2.1, 7.3.3.1 all other clauses are equally applicable to process as product design and hence cannot be excluded. Please note, only the customer will define product design responsibility and thus whether the exclusion of product design is permissible. Main Assessment (Stage 2 audit): A main assessment must take place within 90 days of the approval of the readiness review. NQA will utilize a process audit approach for the stage 2 audit. All processes will be audited during the visit. Where organizations are operating shifts these will all need to be audited as part of the visit, as will weekend shifts which are dedicated and non-rotating. The audit plan will focus on the management and customer orientated processes, with the on-site support processes being audited as audit trails developed during the audit. Remote supporting functions will be visited prior to the main assessment (e.g. remote sales, design center, engineering, warehouse, etc.). The auditor will expect process owners to be identified and that processes be monitored, measured and analyzed to determine their effectiveness. Effectiveness of the system is considered to be how well the system is deployed as demonstrated by the measures defined by the organization to meet customer satisfaction and company objectives. If non-conformances or opportunities for improvement are identified they will be documented. All nonconformances must be resolved within 90 days of the closing meeting. If not achieved, then the certification process begins again starting with the stage 1 readiness review. The corrective actions taken by the organization to resolve any nonconformance(s) will be verified at a follow-up audit or by adding extra time to the next scheduled audit. Certificate Issuance: Certificates will be issued only if there is 100% compliance to the specification, which means that nonconformances found during the audit are 100% resolved. (Please note, resolved does not necessarily indicate closed nonconformance resolution can include a plan to close the findings within a defined period of time). Certificate issuance typically takes two weeks from the date that the corrective action is received and accepted by NQA. Surveillance Audit Expectations: The process approach to auditing will be utilized for surveillance audits. All shifts including dedicated, non-rotating weekend shifts will be visited during every surveillance visit. Typically, the first two surveillance visits will be carried out 6 and then 12 months after the date of the closing meeting of the first stage 2 audit. Following recommendation from the auditor and in consultation with the organization, the client may be able to transfer onto an annual program after the second surveillance visit. The auditor will expect to examine as a minimum during the surveillance visit the following: customer complaints and organizations response, organizations internal audit and management review results and actions, progress made toward continuous improvement targets, effectiveness of the corrective actions and verifications since the last visit,

new customers since the last audit, Sections 4 and 5, as well as elements 8.1, 8.2, 8.3, and any design elements of ISO/TS 16949:2009 will be subject to audit at least once in a 12 month period. Product Realization processes and all customer specific requirements will be sampled to cover all processes within a three-year period. A surveillance schedule will be arranged with your organization, and once established must be maintained for the 3 year audit cycle. The surveillance intervals follow the table below. Surveillance interval 6 months 9 months 12 months Number of audits per 3 year cycle 5 3 2 Allowable timing -1 month / +1 month -2 months / + 1 month -3 months /+ 1 month Nonconformance Response Expectations: Clients are expected to use their own internal corrective action system in response to nonconformances and may use their own associated forms or those provided by NQA to document actions taken. In either case the completed documentation should show evidence of containment, establish root cause, perform corrective action, and verify implementation of corrective actions for all NQA identified non-conformances. The client s corrective action forms must reference the NQA nonconformance number and be closed or 100% resolved by NQA within 90 days of the closing meeting (or in the case of Transfers and Recertification audits, prior to the expiry, or 90 days, whichever is sooner). NQA would require that organizations submit a corrective action plan to NQA within 20 days of the closing meeting. The evidence to support nonconformance resolution should be submitted within 60 days if possible. The reason being, that if NQA is not satisfied that the actions taken by an organization to resolve the nonconformance then additional evidence will be requested. If NQA is not a position to resolve the nonconformance within the 90 day limit then the audit is terminated and the certification process is started again with a stage one readiness review. 100% resolved means the following: Containment of the condition to prevent risk to the customer A documented evidence such as action plan, instructions, records to demonstrate the elimination of the non-conforming condition, including the assigned responsibilities or verification follow up visit

Decertification process: Once an organization is certified, the decertification process can begin with information coming from the following sources: (a) Organization (e.g. significant changes in ownership, interruption of activity) (b) NQA (nonconformities found during an audit, delayed surveillance audits, noncompliance with a clause of the certification contract by the organization) (c) From an ISO/TS 16949:2009 recognizing customer (e.g. poor quality performance of the organization) (d) Claims from other customers of the organization or information from the field Based on the analysis of this information, a decision to suspend the certification is made (a certification that is put on probation, does not affect its validity). Within 90 days the certification will be fully reinstated if acceptable corrective action is provided by the organization. If corrective action is not provided or cannot be verified, the certification may be withdrawn. Updated 7/6/12