Liquidated and unliquidated damages



Similar documents
Performance bonds and bank guarantees

Defects liability period an introduction

and contractual notices

AIA Document A141 TM Standard From of Agreement Between Owner and Design- Builder

Policy of Insurance under the HBCF (Home Building Compensation Fund)

(INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03

The Indian Contract Act, 1872

Workers Compensation Amendment (Transitional) Regulation 2012

TERMS & CONDITIONS CONTRACTOR SERVICES

Recent changes to the Home Building Act, 1989 and Home Warranty Insurance

Long and Short Form. Contracts

Residential Tenancies and Rooming Accommodation Amendment Bill 2011

Home Building Amendment Act 2011 No 52

SAMPLE. Professional Indemnity Insurance (PII) Policy 2015/16. lawcover.com.au Page 1

Termination of Contract: A practical guide on when and how to terminate a contract and common mistakes

Australian Proportionate Liability Regime

Diners Club Corporate Travel System Terms and Conditions

Home Building Amendment (Insurance) Act 2009 No 24

Owner-Builder VIC Resıdentıal Constructıon Warranty Insurance

New South Wales: Amendments to Workers Compensation Legislation June 2012

A Guide to Debt Recovery

Legal Profession Amendment (Fixed Costs) Regulation 2013

Tipsheet 7 Insurance Clauses Named Insured vs Interested Party

Home Indemnity Insurance - Western Australia Policy Wording

1.3 These Conditions may only be amended or varied by written agreement signed by both Parties.

NSW Self Insurance Corporation Amendment (Home Warranty Insurance) Act 2010 No 30

Workers Compensation and Rehabilitation and Other Legislation Amendment Bill 2015

WORKCOVER QUEENSLAND AMENDMENT BILL 2002

DAVID THOMAS LTD GUIDE TO COMPANY INSOLVENCY

UNISCOPE COMMUNICATIONS PTY LTD. P a g e 1 ABN: Unit 3/10, Advantage Way, Wangara, Western Australia, 6065.

Home Building Amendment (Warranties and Insurance) Act 2010 No 53

Owner s Damages for Construction Defects:

Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of

This document must be read in conjunction with Beacon Consulting s Fee Proposal. Together they form the Rules and Conditions of Service Delivery.

Professional Indemnity Insurance Glossary of Terms

delayed fulfilment: in which case, besides the penalty (for delay), compensation for damage for non-fulfilment can be sought.

Motor Accidents Compensation Amendment Act 2006 No 17

Building Indemnity Insurance - South Australia Policy Wording

New-Gen Electrical (ABN ) Terms & Conditions

NSW Residential Construction Warranty Insurance

Home Warranty Insurance - Western Australia Insurance Policy

I loved reading the terms & conditions! said no one, ever. term deposit terms + conditions

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

Explanatory Paper TPB(EP) 03/2010

Are you covered? Coverage issues for construction professionals Part 2

BMT Tax Depreciation Pty Ltd - Terms of Engagement

Multi-employer withdrawal arrangements

QUEENSLAND ELECTRICAL CONTRACTORS CONSUMER PROTECTION ENDORSEMENT

Exposure Draft National Consumer Credit Protection Amendment (Enhancements) Bill Commentary on amendments: Reverse mortgages

Citation: Sadler, Pauline and Guthrie, Rob Sports Injuries and the Right to Compensation. Legal Issues in Business 3: 9-14.

COMMERCIAL CREDIT ACCOUNT APPLICATION

HOME INDEMNITY INSURANCE - WESTERN AUSTRALIA POLICY WORDING

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Submission to WorkCover Western Australia. Legislative Review 2013

NEC3: Early Warning and Compensation Events

TRANSFER OF STRUCTURED SETTLEMENT PAYMENT RIGHTS

Our standard terms and conditions for Your Advanced Personal Loan.

late payment The Late Payment of Commercial Debts (Interest) Act 1998: A User s Guide

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

Assessing Damages Under Section 151Z: An Interaction of Schemes

ANNEXURE TO Australian Standard Minor Works Contract Conditions (Superintendent Administered) AS Part A

Liquidated damages or contractual penalty

ARIZONA TITLE 12 - COURTS AND CIVIL PROCEEDINGS, CHAPTER 20, STRUCTURED SETTLEMENTS, ARTICLE 1, GENERAL PROVISIONS

Consumer Code. for Home Builders. This document contains the Rules that govern the behaviour of Home Builders and Home Warranty Bodies

Westpac Guaranteed Income Plan Policy Document

Building Work Contractors Act 1995

THE SECOND HARBOUR TUNNEL. A case study illustrating recent issues in construction insurance

Banking & Finance Policies and Procedures Manual (Extract)

PERSONAL ALERT SYSTEMS REBATE SCHEME PROVIDER PANER DEED

MODEL STATE STRUCTURED SETTLEMENT PROTECTION ACT

Telstra Corporation Limited ABN Standard Terms and Conditions of Purchase Order

No loss argument in construction claims: what it is and how to deal with it

AS 11000: General conditions of contract

NAB Commercial Cards Liability Insurance

LAW REFORM (CONTRIBUTORY NEGLIGENCE) AMENDMENT BILL 2001

To gross-up or not to gross-up

ALM GL ch. 231C, 1 (2004) 1. Definitions.

Breed Communications Limited - limited company consultancy agreement

Workers Compensation Amendment (Advertising) Regulation 2005

JUSTICE G. STEVEN AGEE v. Record No June 8, FROM THE CIRCUIT COURT OF FAIRFAX COUNTY Michael P. McWeeney, Judge

Completing your Superannuation guarantee charge statement quarterly

Standard Terms & Conditions for Supply of Software Development Services

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

NAB CONNECT MERCHANT TRANSACTION REPORTING SERVICE

THE PARLIAMENT OF THE COMMONWEALTH OF AUSTRALIA HOUSE OF REPRESENTATIVES GENERAL INSURANCE SUPERVISORY LEVY IMPOSITION AMENDMENT BILL 2006

Government Response to the Hanks Enquiry / Accident Compensation Act Amendment Bill

Transcription:

Investing in Infrastructure International Best Legal Practice in Project and Construction Agreements January 2016 Damian McNair Partner, Legal M: +61 421 899 231 E: damian.mcnair@au.pwc.com Liquidated and unliquidated damages www.pwc.com.au

Liquidated and unliquidated damages Introduction Liquidated damages clauses are used in many types of contracts, most frequently in IT and construction contracts. A liquidated damages clause (or an agreed damages clause), is a provision in a contract that fixes the sum payable as damages for a party's breach. In comparison, unliquidated damages are damages for a party's breach which have not been pre-estimated. The Principal function of a liquidated damages clause is to quantify the damages payable in the event of breach of the contract. The clause will only be relevant once liability is proven or admitted. In an action for breach of contract, to recover damages beyond nominal damages, damage must either be proven or admitted. The advantage of a liquidated damages clause is that there is no need to prove the actual loss, because the clause stipulates a pre-assessment or pre-estimation of damages. 1 Some of the advantages of including a liquidated damages clause in a contract are that it: provides certainty to the parties facilitates the recovery of damages by avoiding the requirement of proof of loss simplifies the dispute resolution procedure may induce performance of the contract. Liquidated damages clauses regulate the rights of parties after a contract is breached, or alternatively quantify the party s secondary obligation to pay damages (which survives termination). 2 The use of 'nil' or 'n/a' for the rate of liquidated damages Standard form construction contracts often require the insertion of a rate for liquidated damages. Parties sometimes insert 'NIL' or 'N/A' for this rate. 3 The effect of inserting 'NIL' or similar words in liquidated damages clauses has been the subject of differing opinions. 4 Australian law In the Australian case of J-Corp Pty Ltd v Mladenis 5 (J-Corp), the appellant builder entered into a lump sum building contract with the respondent Owners, under which the builder agreed to construct a house on the 1 See Boucaut Bay Co Ltd v Commonwealth (1927) 40 CLR 98. 2 Robophone Facilities Ltd v Blank [1966] 3 All ER 128. 3 Silent Vector Pty Ltd t/as Sizer Builders v Squarcini [2008] WASC 246, [98]. 4 J-Corp Pty Ltd v Mladenis (J-Corp) (2010) 26 BCL 106, [61]. 5 (2010) 26 BCL 106. PwC 3

Liquidated and unliquidated damages Owners' land for the sum of $311,484.12. 6 The contract was prepared by the builder and was a standard form of contract used by the builder. 7 The liquidated damages clause of the contract provided that if the builder failed to complete works within specified time, the builder was liable to pay liquidated damages at rate of 'NIL DOLLARS ($00.00)' per day for each day beyond the due date for practical completion, as follows: If the Builder breaches sub-clause 11.1, it shall be liable to pay the Proprietor liquidated damages at the rate of NIL DOLLARS ($00.00) per day for each day beyond the due date for practical completion until practical completion is deemed to have taken place. The builder breached the contract failing to complete the works by the due date. 8 The court had to decide whether the liquidated damages clause excluded the right to common law (unliquidated) damages for losses suffered by the Owner due to the builder's breach. The court held that the use of 'NIL' did not exclude the Owner's right to claim unliquidated damages. 9 The court took the following considerations into account: the common intention of the parties, by reference to what a reasonable person would understand the contract to mean 10 where parties enter building contracts, this purpose may include allocating risk for loss or damage 11 'NIL' can be used to limit the extent in damages of a party's liability 12 the amount for liquidated damages here was not so excessive as to constitute a penalty 13 there is a reason for keeping liquidated and unliquidated damages clauses separate, rather than assuming that 'NIL' applies to both. Liquidated damages provisions relieve the Owner of proving actual damage, so in the absence of a liquidated damages clause the Owner may only have the potentially costly and timeconsuming remedy of unliquidated damages 14 The court emphasised that 'clear words' are required to rebut the presumption that a contracting party does not intend to abandon a common law breach of contract remedy. 15 The clause here did not contain clear words to express the intention that the Owner could not claim unliquidated damages; it only provided that no liquidated damages could be claimed. 16 This case followed the reasoning of Silent Vector Pty Ltd T/as Sizer Builders v Squarcini. 17 Like in J-Corp, the issue was whether a liquidated damages clause in a contract operated to exclude unliquidated damages. In Silent Vector 'N/A' was inserted as the rate for 'liquated damages per day'. Like in J- 6 (2010) 26 BCL 106, [13]. 7 Ibid. 8 Ibid, [21]. 9 Ibid, [60]. 10 Ibid, [33]. 11 Ibid, [6]. 12 Ibid, [36]. 13 Ibid, [35]. 14 Ibid, [48-49]. 15 Gilbert-Ash (Northern) Ltd v Modern Engineering (Bristol) Ltd [1974] AC 689, 717-718; see also Concut Pty Ltd v Worrell (2000) 176 ALR 693; Waterways Authority of New South Wales v Coal And Allied (Operations) Pty Ltd [2007] NSWCA 276, [44]. 16 J-Corp Pty Ltd v Mladenis (J-Corp) (2010) 26 BCL 106, [47]. 17 Silent Vector Pty Ltd t/as Sizer Builders v Squarcini [2008] WASC 246.

Liquidated and unliquidated damages Corp, the court decided that the Principal could claim unliquidated damages for delay, because 'N/A' indicated the parties intention that only the entire liquidated damages clause would not apply. The recent cases of Andrews v Australia and New Zealand Banking Group Ltd 18 and Re Pioneer Energy Holdings Pty Ltd 19 significantly expanded the penalty doctrine in Australia, together holding that: equity may hold that a provision is a penalty even if it is not triggered by a breach of contract provisions requiring compensation to be provided by one party to another should be proportionate to the potential loss suffered express agreement between parties that compensation is reasonable will not necessarily oust the doctrine of penalties provisions that incentivise parties to meet deadlines and carry out their obligations, as opposed to compensating a party where another party does not fulfil stipulated obligations, are more likely to be enforceable as such provisions may avoid the issue of penalties altogether. English law In the leading English case of Temloc Ltd v Errill Properties Ltd, 20 unliquidated damages were excluded by the use of ' Nil' as the rate of liquidated damages. The contract outlined the following regarding damages for non-completion: Damages for non-completion If the Contractor fails to complete the Works by the Completion Date then the Architect shall issue a certificate to that effect. Subject to the issue of a certificate...the Contractor shall...pay or allow to the Employer the whole or such part as may be specified in writing by the Employer of a sum calculated at the rate stated in the Appendix as liquidated and ascertained... 21 The court decided that the liquidated damages clause was an exhaustive agreement for the treatment of damages. As the parties agreed that damages for late completion were to be liquidated damages, it could not have been intended that the Principal should also be allowed unliquidated damages. 22 Drafting liquidated damages clauses The presumption is that parties in building contracts are entitled to all remedies for breach as would arise by operation of law. There is no general rule about the use of 'NIL' in a liquidated damages clause. The effect of 'NIL' will depend on the proper construction of the contract as a whole. In Australia the courts have recommended that parties should be careful to delete, amend or add clauses to such contracts in a consistent and clear manner. 23 18 (2012) 247 CLR 205. 19 [2013] NSWSC 1134. 20 (1987) 39 BLR 30. 21 Ibid, 34. 22 Ibid, 39. 23 Silent Vector Pty Ltd t/as Sizer Builders v Squarcini [2008] WASC 246, [99].

Liquidated and unliquidated damages Parties who wish to exclude liability for unliquidated damages need to state this clearly and unequivocally in the contract. Parties should include a clear statement that the liquidated damages provided for under the contract are the sole remedy available for delays in completion of the works and the parties agree that general damages are not available to the Principal in the event of delay by the Contractor for such delay. Further reading Michael Hollingdale, Designing and enforcing liquidated damages clauses to maximise recovery (2005) 21 Building and Construction Law 412. Trevor Thomas, $Nil liquidated damages: An exhaustive remedy for delay under a construction contract (2008) 24 Building and Construction Law 82.

www.pwc.com.au 2016 PricewaterhouseCoopers. All rights reserved. PwC refers to the Australian member firm, and may sometimes refer to the PwC network. Each member firm is a separate legal entity. Please see www.pwc.com/structure for further details. At PwC Australia our purpose is to build trust in society and solve important problems. We re a network of firms in 157 countries with more than 208,000 people who are committed to delivering quality in assurance, advisory and tax services. Find out more and tell us what matters to you by visiting us at www.pwc.com.au Liability limited by a scheme approved under Professional Standards Legislation.