Hong Kong Institute of Surveyors



Similar documents
Construction Claims in

Time bars in construction and global claims

Recovery of Overhead and Profit when delay occurs

Peter D Aeberli. Barrister - Arbitrator - Mediator Adjudicator. The Waiting Game: Extensions of Time

Delay, Disruption and Acceleration Costs

Hong Kong Institute of Surveyors. Seminar on Conditions of Building Contract Questions and Answers Conducted by Mr. Colin B. Lee

Who pays the Money for the Time?

Back to Basics: Professional Indemnity Construction and Engineering

PRACTICE NOTES FOR QUANTITY SURVEYORS

Scheduling Best Practices

International Accounting Standard 11 Construction Contracts

Project Control. 1. Schedule Updating

Bills of Quantity. D. Atkinson December Nature of Bills

Construction Contracts

Understanding variations a contractor's perspective Jonathan Brooks, Tim Tapper, Andrew Ash & Stuart McGee. 21 March 2011 & 23 March 2011

How To Account For Construction Contracts In Hong Kong Kongsong Accounting Standard 11

1 Supplement: IAS 11 Construction contracts

7 Contract Costing. Basic Concepts. Contract Costing

Contractors Claims for Loss and Expense under the Principle Traditional Forms of Irish Building Contract

GUIDANCE NOTE Cost Control: Price Variation Clauses

BASIC CONCEPTS AND FORMULAE

MR GREGORY YAU-MING TUNG. (Bachelor of Science in Quantity Surveying with Honours) (Date of Qualification 1987)

NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS

NEC Users Group Workshop Defined Cost

GETTING (BACK TO) BUSINESS INTERRUPTION INSURANCE. Section 1: Lost property and lost earnings are treated separately

A Guide to Small Works. A brief explanation

Service Level Commitment to Insured Employers

International Accounting Standards

Tipsheet 11 Hired-In Labour

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors

Marginal and. this chapter covers...

NZQA registered unit standard version 2 Page 1 of 5. Develop and implement a project plan to deliver on an Infrastructure works contract

Report of the Employment Status Group - PPF

NORWEGIAN SUBSEA CONTRACT NSC 05 CONDITIONS OF CONTRACT

STATEMENT OF INSOLVENCY PRACTICE 9 (SCOTLAND) REMUNERATION OF INSOLVENCY OFFICE HOLDERS

Construction Contracts

Capital Projects. Providing assurance over effective delivery of projects

Accounting for Administrative Overhead In oil and Gas Upstream Industry

CONTRACT FOR PAYROLL SERVICES. It is agreed by clicking on Acknowledge on the PayMe Australia Pty Ltd Contractors Join Online Form:

CONDITIONS FOR SUPPLY OF SKIPS AND CONTAINERS AND FOR THE DISPOSAL OF THE CONTENTS OF THE SKIPS AND CONTAINERS

Sri Lanka Accounting Standard -LKAS 11. Construction Contracts

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

Where to Begin 1. What You Need to Know Once You ve Been Injured 2. The People Playing a Role in Your Recovery 5

Impacts on the construction industry of the new revenue standard

Contractor / Self-employed Person?

The Practical Techniques on Contract Administration, Site Management, Scheduling, Budgeting, Claims & Counterclaims

CAPITAL PROJECTS IMPLEMENTATION

CLAIMS UNDER THE NEW FIDIC CONDITIONS OF CONTRACT. JOHN PAPWORTH FRICS, FCIArb, MInstCES, MACostE Managing Director, John Papworth Limited, UK

Basic Guide. General Conditions of Contract for Construction Works (GCC 2004)

GOVERNMENT OF MALAYSIA

Appendix 18 NEC3 Options

Commercial leases and insurance claims

Principles for Remedy

Schedule of Prices. Project Name Contract No. Contract Number

WELCOME Best Practices for Managing Construction Delay and Interference Claims

THIS AGREEMENT is made effective as of this day of in the year of.

CONTRACT CONDITIONS FOR LOGISTICS (2014)

RBI ASSET MANAGEMENT STANDARD CONDITIONS OF BUSINESS

Report Building Procurement Methods

Construction Contracts

Applicability / Objective

THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS $ EDITION

How To Advise The Director Of Legal Aid

NAB CONNECT MERCHANT TRANSACTION REPORTING SERVICE

International Financial Reporting. Construction Contracts IAS 11

ELECTRICITY NORTH WEST LTD GENERAL CONDITIONS OF CONTRACT (BUSINESS)

How To Write A Short Form Prime Prime Prime Contract Between A Contractor And Owner

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

Summary. Chapter Five. Cost Volume Relations & Break Even Analysis

Rehabilitation and Return to Work Policy. Overview. Purpose. Scope. Policy

Letters, Instructions, etc.

Project manager services

PPC2000 Contracts RICS East of England and CIOB - Framework and Partnering Agreements CPD 21 June 2010 Richard Cooke. Contents.

Statement of Guidance: Outsourcing All Regulated Entities

Civil Law (Wrongs) (Proportionate Liability and Professional Standards) Amendment Act 2004

What amount of damages is the plaintiff entitled to recover from the defendant? 1

Third Party Supplier Security

Liquidated and unliquidated damages

Consultation Document. Reducing the number and costs of whiplash claims. Response from:

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

ATTACHMENT 6.02 Generalist Compliance Matrix 2015

CONTRACTING HINTS AND TIPS

BMT Tax Depreciation Pty Ltd - Terms of Engagement

The South African Council for the Project and Construction Management Professions (SACPCMP)

Optimization of Clinical Engineering in Private Healthcare

Cost VOLUME RELATIONS & BREAK EVEN ANALYSIS

Technical Journal. Paper 142

Taking Action. Dispute resolution, legal action and claims for negligence

Marginal Costing and Absorption Costing

Are you covered? Coverage issues for construction professionals Part 2

Professional Development Programme on Enriching Knowledge of the Business, Accounting and Financial Studies (BAFS) Curriculum

Transcription:

Prolongation and Loss and Expense Claims For the Hong Kong Institute of Surveyors Mike Allen BSc FRICS MHKIS MCI Arb FA Cost E FAE CEDR Accredited Mediator 13 th February 2012

Contents Introduction The contract price structure Prolongation cost How to analyse such a claim Issues and methods to consider Summary How to present a prolongation claim Suggested further reading Mike Allen 13 th February 2012 2

Introduction In common practice an extension of time is usually awarded before a prolongation or a loss and expense, claim is submitted (terms are interchangeable); The intention of the contract is to allow the Contractor to recover monetary compensation if there is a compensable delay that prevents the Contractor completing the contract work; Generally express or implied in most construction contracts: The client or its representatives shall not hinder or prevent the Contractor from performing his contract obligations; Acts by a client (e.g. instruction, variation order, open-up inspection, etc.) which cause delay to a contract may cause prolonged maintenance of resources by the contractor; Mike Allen 13 th February 2012 3

Introduction (cont d) Therefore prolongation or loss and expense can be simply described as The reimbursement of costs (or rates) which are incurred as a result of delayed work activities. This generally relates to time related costs, such as supervisory staff and the associated support to maintain that supervision. Mike Allen 13 th February 2012 4

Introduction (cont d) Prolongation is found in most construction contracts, which describe it as a reimbursement to which the Contractor is entitled under the provisions of the Contract in respect of prolongation and/or delay; Prolongation cost is not a disruption cost; Prolongation costs consist of the costs of on-site overheads and off-site overheads time related cost; Mike Allen 13 th February 2012 5

The Contract Price Structure 40% 60% 70% DIRECT LABOUR DIRECT PLANT MATERIALS Direct Cost 30% O/H, O/H, PROFIT RISK GENERAL ITEMS, PRELIMS SUPERVISORY STAFF Indirect Cost 35% 65%

Prolongation Cost Check the terms of the Contract (what and how); So what is exactly a prolongation cost? Prolongation cost is generally the time (& not fixed) related cost; Time related costs normally represent the costs of the Contractor's site establishment, site overheads, general plant, etc. that are typically affected by a delay to the critical path of the construction work; So when can we claim prolongation cost? The entitlement to prolongation costs incurred as consequence of the delay greatly depends on the contract (variations and neutral events etc). Mike Allen 13 th February 2012 7

Prolongation Cost (cont d) To put it into a simple case study: Party (A) suffers a loss which he is entitled to compensation from party (B) causing the 'injury' (for example a delay), the damages are to put (A) back into the position he was nominally in before the event. The prolongation costs shall be the costs that are actually incurred at the time the delaying events impacted the progress of the Works, instead of the period of extension; What must be priced is the effect of the delay, and it boils down to a clear analysis of the effects of the delay to ascertain the additional supervisory resources which are linked to the delayed events. Mike Allen 13 th February 2012 8

Prolongation Cost (cont d) The SCL protocol says, with regards to this matter: the recoverable prolongation compensation is to be assessed by reference to the period in which the effect of the Employer Event Risk was felt It is clearly intended that, once it is established that additional payment is due for prolongation resulting from Client s delays, the evaluation should relate to the period when the effect of the delay occurs and not to the overrun period at the end of the contract. Mike Allen 13 th February 2012 9

Prolongation Cost Summary What should surveyors look for: Check the contract; Be clear on the body of cost you are valuing; Be clear on what you are considering (prelims and resources affected by the events, that are time related); Value the actual period of delay (not the overrun period); Be guided by a general principle of reimbursement as a result of an event or but for. Mike Allen 13 th February 2012 10

How to analyse such a claim Before the prolongation analysis is being considered, the maintenance of adequate records is an essential ingredient for supporting the prolongation claim; Some of the essential records that are required: Programme (initial plan working sequence and the subsequent changes due to the delaying event); Records of resources (dual if possible); Labour & Plant Schedules; Subcontract daily allocations; Site diary; Records to show any additional supervision mobilisation. Mike Allen 13 th February 2012 11

How to analyse such a claim (cont d) The Contract FIDIC (1999 Edition) Time Extension of Time (GCC 8.4) The Contractor shall be entitled to an EoT if and to the extent that completion is or will be delayed Money Variations (GCC 12 and 13) Claims (GCC 20.1) Refers back to the body of the Contract Mike Allen 13 th February 2012 12

How to analyse such a claim (cont d) The Contract Hong Kong Standard Form (Private Edition With Quantities 2005) Time Extension of Time (GCC 25) an event likely to cause delay to the completion of the Works Fixing new completion is being or is likely to be delayed Money Direct loss and/or expense (GCC27) GCC 27.1 If in the Contractor s opinion, he has incurred or likely to incur direct loss and/or expense GCC 27.2 Quantity Surveyor to ascertain the amount of any direct loss/and expense Mike Allen 13 th February 2012 13

How to analyse such a claim (cont d) Mike Allen 13 th February 2012 14

How to analyse such a claim (cont d) Identify & categorise the delaying event: Compensable delay events that entitle the contractor to an extension of time and to prolongation costs flowing from that event; Excusable delay events that entitle the contractor to an extension of time but where the contractor bears the risk of additional costs that may flow from that event; and Culpable delay events that do not entitle the contractor to either time or money Mike Allen 13 th February 2012 15

How to analyse such a claim Cause Effect Inefficiency Extra Cost Delay...Project Overrun / Extra Cost Mitigation / Acceleration. Extra Cost Three problems that concern our clients; how to 1. Apportion and demonstrate responsibility for disturbance; 2. and link money with time; 3. and maximise certainty of outcome at proportionate cost. Mike Allen 13 th February 2012 16

Issues to consider (cont d) 1 2 3 4 5 6 7 A Employer Delay 1 Employer Delay 2 Delay 1 Impact Delay 2 Impact B C D E Contractor Delay Delay Impact Core Staff Non-Core Staff Prelims Total 10 15 20 20 20 20 20 20 15 20 30 40 40 40 40 40 10 15 20 20 20 20 20 20 35 50 70 80 80 80 80 80 Delay 1 Delay 1 Linked Linked Time Time Related Related Costs Costs Site Records Site Records Audited Audited Cost Cost Data Data Variations (Overheads) Variations (Overheads) SITE WIDE STAFF ACTIVITY RELATED STAFF SUPPORT AND WELFARE ISSUE ISSUE Delay 2 and relationship with Delay 3 Delay 2 and relationship with Delay 3 CONCURRENCY CONCURRENCY DOMINANT DOMINANT CAUSE CAUSE PROXIMATE CAUSE PROXIMATE CAUSE APPORTIONMENT APPORTIONMENT Mike Allen 13 th February 2012 17

Summary Before valuing the reimbursable cost, how do we determine the level of recovery? The level of recovery of damages for breach of contract is intended, so far as is possible, to put the Contractor in the same position he would have been if he had not sustained the delay for which he is now seeking compensation; When a claim is made under the contract, the specific entitlement that the parties have agreed needs to considered in order to establish the level of costs to which the Contractor will be entitled if he can prove his losses (cost or rates); Mike Allen 13 th February 2012 18

Summary (cont d) What needs to be extracted when preparing a prolongation claim? Identify costs which are recurring and can be identified as being related to ongoing activities or commitments which are, or have been, prolonged as a consequence of the delaying event; What are recurring Site Costs? site staff, site offices, maintenance of site office, utilities, equipment, plants, insurance, etc; Some quarterly/annual costs sensibly should be averaged; Contractor s own & hired plant needs careful consideration; Head office overhead claims (typically formula calculated); Overhead duplication reviews (Variations). Mike Allen 13 th February 2012 19

How to present a Prolongation claim General considerations What the contract says; Objective and audience; Use graphics to assist the explanation; Type of disturbance; Forum for debate; Information available; Timing before or after completion; Proportionality; Clear, simple and substantiated. Mike Allen 13 th February 2012 20

Further suggested reading Prolongation claims and issues related thereto: Henry Boot Construction (UK) Ltd v Malmaison Hotel (Manchester) Ltd [1999] 70 Con LR 32 Royal Brompton Hospital NHS Trust v Hammond and Ors (No.7) [2001] 76 ConLR 148 Laing Management (Scotland) Ltd v John Doyle Construction Ltd [2004] BLR 295 City Inn v Shepherd Construction Ltd [2007] CSOH 190 Society of Construction Law (SCL) Protocol (2002) SCL Paper - Prolongation Claims in Construction Contracts Cost or Value? (2004) by J Battersby. J Molloy and M Charlton Mike Allen 13 th February 2012 21

Mike Allen 14 February 2012 22