1) GENERAL 2) WORKING AREAS



Similar documents
Independent Contractor Policy

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.

CSA CONSTRUCTION, INC McAllister Road Houston, Texas SUBCONTRACTOR AGREEMENT

INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS

A1 Motor home Hire & Rental Terms & Conditions

Contractor Safety Management

MOTOR TRADERS- EXTERNAL- Absa Select

PUBLIC POWER CORPORATION S.A. DISTRIBUTION

GENERAL CONDITIONS FOR CONTRACTS OF SERVICES WITH TRANSPORT OPERATORS

SNOW REMOVAL CONTRACT

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

WAVELENGTH PORTS AND TERMINALS CONSORTIUM SECTION 1 - LIABILITY WORDING

INSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts:

Construction Contract

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

CARS AND CAR ALLOWANCES POLICY COMPANY CARS MSR ROUP.

ALARM SYSTEM ORDINANCE

BROOKFIELD GLOBAL INTEGRATED SOLUTIONS STANDARD PURCHASE ORDER TERMS FOR SUPPLIES

CAIRNS CRUISE LINER TERMINAL VENUE HIRE DEED

PUBLIC LIABILITY INSURANCE POLICY

416 DRUG AND ALCOHOL TESTING

Motor insurance Introduction

Part 10. Directors and Company Secretaries

Employers Liability Section

Subordinate Local Law No (Operation of Temporary Entertainment Events) 2015

Health & Safety Policy For Locations Hosting Film Production Companies

Noise Control Bylaw No. 4404, Consolidated for Convenience Only

ASOS Ethical Code of Conduct

AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between:

Bodily injury, death, disease, illness, mental injury, mental anguish or nervous shock.

LOGGING SUBCONTRACT. Recital

TERMS AND CONDITIONS

GENERAL CONDITIONS FOR CONTRACTORS

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)

Request For Price. Work Schedule The project shall commence within a reasonable time of the request.

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

Fleet Policy. Version Number: 2 Controlled Document Director of Corporate Affairs

SITE CONTRACTOR PROCEDURES

Colocation Master Services Vol.1.0

MINNESOTA STATE COLLEGES AND UNIVERSITIES General Insurance Requirements for Contractors & Vendors

THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND PURCHASE ORDER TERMS AND CONDITIONS OF PURCHASE

Public and Product Liability - General

LIABILITY INSURANCE Particular Conditions for Commercial Operations S A M P L E

Terms and Conditions for Purchase Orders for Recycling Materials

CONDITIONS FOR SUPPLY OF SKIPS AND CONTAINERS AND FOR THE DISPOSAL OF THE CONTENTS OF THE SKIPS AND CONTAINERS

NORTH CAROLINA WEATHERIZATION ASSISTANCE PROGRAM SUBCONTRACTOR AGREEMENT - PLUMBING

REGULATORY OVERVIEW. This section sets forth a summary of the major laws and regulations applicable to the Group s business in Hong Kong.

INDEPENDENT CONTRACTORS AGREEMENT

Motor Sports (World Rally Championship) Act 2009 No 55

SUPER OVERSIZE / OVERWEIGHT SINGLE TRIP

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

EXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS

General Conditions of Contract for the Provision of Design and other Professional Services

6. WARNING BY BUYER. BUYER shall give warning of any possible hazard to any person or persons to whom BUYER resells, gives or delivers the Property

Safety Training Document for contractors working at the Boehringer Ingelheim sites in Ingelheim, Biberach, Dortmund and Hannover. As at:

LEGAL PRACTITIONERS (AMENDMENT) ORDINANCE 2012 CONTENTS

Construction Site Set Up Requirements

WORKING IN CONFINED SPACES GUIDELINES

TORONTO MUNICIPAL CODE CHAPTER 880, FIRE ROUTES. Chapter 880 FIRE ROUTES

4 Guidelines on Administration Charges for Reporting of Site Accidents

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS

CSC-DIVISION 1-MASTER SECTIONS Description

Exhibit B Wharves Insurance And Indemnity Requirements of Construction Manager

Proposal Public & Products Liability

CONTRACT CONDITIONS FOR LOGISTICS (2014)

TRANSPORTATION AGREEMENT

The Passenger and Freight Elevator Act

Permit Number: Date Issued: Permit Fee: Invoice Number:

SCHEDULE 17. Insurance Requirements. Part 1 Insurance Requirements applicable to the Phase 2 Work

MOTOR TRADE INSURANCE POLICY

Film Policy Cedar Hill, Texas

CONSULTANT AGREEMENT

Of course, the same incident can give rise to an action both for breach of contract and for negligence.

ATTACHMENT A.6 INSURANCE REQUIREMENTS ROUTINE CONSTRUCTION, MAINTENANCE AND REPAIR PROJECTS

LIABILITY INSURANCE Particular Conditions for Industrial Operations S A M P L E

Exhibit B (Incorporated into Construction Purchase Order Terms and Conditions) CONSTRUCTION CONTRACT INSURANCE REQUIREMENTS

INFORMATION REQUIRED FOR EMPLOYEE HANDBOOK

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

Exhibit C-2 Insurance Terms

THE QUEEN S COLLEGE OXFORD

Contractors and Suppliers Code of Conduct. June 2013

PREQUALIFICATION APPLICATION REQUIREMENTS

FILMING & PHOTOGRAPHY AT GARDENS BY THE BAY

Garage Liability Policy

Monash University. Novated Lease Vehicle Policy

2. Permit to Establish or Alter a Memorial or Place of Interment

ABC Corporate Vehicle Policy

Right-Of-Entry Permit

Contractors Plant and Equipment Insurance Policy

2016 Shitbox Rally Terms and Conditions

Headings and marginal captions are inserted for the purpose of convenient reference only and are not to be deemed part of this Policy.

GENERAL SPECIFICATIONS REHABILITATION RESIDENTIAL CONTRACTORS HANDBOOK

TRAFFIC MANAGEMENT PLAN

Environmental Protection Department March 2010

QUEST - QBE COMPREHENSIVE MOTOR INSURANCE MASTER POLICY

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12

Work Injury Compensation Insurance (Contract)

Transcription:

THE CHINESE UNIVERSITY OF HONG KONG Estates Management Office/Campus Development Office Regulations for Contractors Working Within the University Campus (Sept 2013) 1) GENERAL 1.1 These regulations shall apply to all works being carried out within the University Campus, and to any access to work sites through the Campus. They are meant to supplement the Agreement & Schedule of Conditions of Building Contract for Use in Hong Kong Standard Form of Building Contract or other forms of General Conditions of Contract being adopted or applied to construction works conducted by contractors within the Campus, irrespective whether formal contract documents have been executed. Copies of the said Conditions are available for scrutiny and perusal at the Campus Development Office(CDO) / Estate and Management Office(EMO) of the University during regular office hours. 2) WORKING AREAS 2.1 The proposed location of any site office, workshop, storage shed and temporary storage area for material, garbage etc. in connection with the works must be agreed or approved in advance by CDO/EMO. 2.2 The storage of any material and debris must be kept within the allocated work site specified by CDO/EMO. There is no temporary storage/ waiting-to-remove area allowed outside the allocated work site. All material must be stored and labeled according to the latest local legislations. The stockpiles on dump trucks or within site area should be covered or sprayed with water. 2.3 Any debris or spoil from the works must be collected and carted off the site outside the University Campus to a legal public dump on a daily basis or, in exceptional cases, to a location in Campus directed by The EMO. The Contractor must clear, discharge or remove any kind and any form of waste and debris diligently according to the latest local legislations. Debris or rubbish left in public access or communal areas including Refuse Collection Points/Depots in the University Campus will be considered as illegal dumping. Contractors shall provide evidence/records on their legal dumping in appropriate licensed facilities. The University may arrange removal of illegal dumping and impose a minimum charge of HK$1,000 or at cost, whichever is higher, plus an administrative fee of

HK$500 for each occurrence to the contractor. 2.4 The University may also request the Contractor to provide any evidence to demonstrate the work is completed according to the latest local legislation. Should the contractor fail to do so, the University may reserve the right to suspend its work at the Contractor s cost until satisfactory recovery & precaution work is completed. Such work suspension instruction will not have any time and cost implication to the Contract. 2.5 The contractor shall be required to execute extensive care and adopt suitable alternatives in order to protect and minimize disturbance to the existing flora, fauna, wild lives and historical heritage. Any works that may not be prevented from affecting or disturbing landscaping or wild lives must be submitted with a plan for correction or compensation for CDO/EMO s approval. 3) VEHICLES & ACCESS ROADS 3.1 The contractor shall be permitted to use only those roads in the Campus to the extent prescribed by the CDO/EMO and under no circumstances shall his vehicles use any other roads. Without formal permission given by the University, the Contractor shall not close any access road, car parks, grounds or facility within the University Campus for any reason. Written consent must be obtained from relevant departments/ offices and CDO/EMO not less than 14 days in advance before any such closure. Contractor shall submit the Application for Road Enclosure and associated traffic arrangement allowing not less than 7 for CDO/EMO processing. 3.2 Vehicles for the contractor s works must be parked inside the allocated works area. Parking in University parking lots, along University roads or on side walks is not permitted. 3.3 The operation of motor cycles in the University Campus by the contractor is prohibited. 3.4 The contractor shall provide all lorries hauling material to and from the University work sites with stout covers which shall be used at all times to prevent material falling onto the roads. He shall take all necessary steps such as brooming, wheel washing, spraying thoroughly with water or a dust suppression chemical, etc. to minimize dust generated and ensure that mud and debris are not carried onto the University roads by laden vehicles entering or leaving the work sites. The contractor should provide the corresponding facilities with routine maintenance records at his own cost, such as wheel washing facilities include high pressure water jets, wheel washing bays, tyre wheel machine together with paved road in

between the facilities and the exit, if necessary. 3.5 The contractor shall ensure that any mud and debris carried onto University roads by his vehicles are removed there from as soon as possible, employing his own labour and equipment, failing which the University may arrange for their clearance at a charge to the contractor. 4) PERMITS 4.1 All motor vehicles for the contractor's works entering the university campus shall bear a valid registration certificate issued by the Hong Kong Government, and shall have valid third party insurance cover. In addition, all trucks operating in the University Campus shall exhibit a prominent sign bearing the name (in Chinese and English) of the construction firm engaging them. 4.2 The driver of any motor vehicle for the contractor's works shall be a licensed driver carrying a valid driving license issued by the Hong Kong Government. He shall observe strictly all traffic regulations, such as posted speed limits and designated stop signs, etc. currently enforced in the University Campus as well as the direction and guidance given by security guards and other authorized personnel of the University. 4.3 Trucks loaded with building material and machinery may not be permitted to leave the Campus unless issued with an exit permit by the CDO/EMO. 4.4 The University may issue entry permits to or impose such restrictions as deemed necessary from time to time on the contractor for the operation of any motor vehicle for his works in Campus. 4.5 Permit for Hot Works / Other Works affecting AFA systems 4.5.1 Contractor should apply for hot work permits and take all the necessary precautions for safety in case their works involving welding, flame cutting and grinding disc cutting which may create fire, sparks, or smokes. They should coordinate with the University fire services contractors to isolate the part of fire detection system that may initiate false alarm due to their work and reinstate the system after their hot work daily. 4.5.2 For small project taking less than or equal to 30 working days for completion, the University Fire Services Contractor shall cover free of charge to the contractor for daily isolate / reinstate the system due to the carrying out of hot works / works affecting AFA systems for 5 working days. For larger project taking more than 30 days for completion, the University F.S. Contractor shall cover free of charge to the contractor for daily isolate / reinstate the system due to the carrying out of hot works / works affecting AFA systems for 10

working days. In any case, the granted free of charges for such permit will be subject to the jurisdiction of EMO/CDO. Contractors requesting such permit period more than the above conditions will be required to pay for HK$500/day for hiring of using University Fire Service Term Contractors to carry out related inspection and isolation of related systems. 4.5.3 A contractor will be subject to an administrative charge to the University, deductible from the contract amount, of a minimum charge of HK$1,000 or at cost, whichever is higher, when false alarm occurred. There will also be other measures for warning and charge to stop the unsafe site operation as when necessary 5) RESPONSIBILITIES AND INDEMNITIES 5.1 The contractor shall ensure that vehicular entries onto or through the University are made only for duties necessary for the execution of his contractual works, and he shall be fully responsible for the behaviour of the drivers engaged in his works and the proper operation of their vehicles in Campus. 5.2 The contractor shall be solely liable for and shall indemnify the University in respect of any liabilities, loss, claim or proceedings whatsoever arising under any statute or at common law in respect of any injury or damage whatsoever to any person whomsoever or any property real or personal in so far as such injury or damage arises out of or in the course of or by reason of the operation of any motor vehicle for his works in the University Campus, whether such is due to any negligence, omission or default of the driver, his agents or vehicle, or to any circumstances beyond his control. 5.3 Any injury or damage so caused shall be made good at the cost of the contractor. The University may make good such injury or damage herself or employ others to do so at her absolute discretion; and the contractor shall, on demand, pay to the University such sums as she may certify to be the cost of such making good. 5.4 The operation of any motor vehicle by its driver for the contractor's works within the University Campus shall be entirely at his own risk and the University shall not be responsible for any loss or damage. 6) WORK SITE MANAGEMENT 6.1 All staffs/workers of Main Contractor and his sub-contractors are prohibited to use any University vehicles/shuttle buses for transportation within the University. Main Contractor and his sub-contractors shall at their own cost

to provide transportation for their staffs/workers to site. 6.2 Gambling in the University Campus is prohibited. The contractor shall be responsible for ensuring that his workmen or employees do not engage in gambling in any work site within the Campus. 6.3 The contractor shall not bring or keep any dogs in any work site for whatever purpose. 6.4 The contractor should guard against theft and pilfering of material, equipment and tools, etc. within his work sites. The University will not be responsible for any loss sustained by the contractor in this respect. 6.5 No person of the contractor shall be permitted to live in the work site. 6.6 The contractor shall keep his work site at all times in an orderly and hygienic condition and provide adequate firefighting and protective measures. 6.7 According to the Smoking (Public Health) Ordinance (Cap 371) and its amendments, the University campus has been stipulated as a DESIGNATED NO SMOKING AREA with effect from 1st January 2007. All campus users are required to observe the statutory requirements and should not smoke or carry a lighted cigarette, cigar or pipe within the campus area, indoor or outdoor. The contractor should take all necessary measures to ensure the strict compliance of his and his subcontractors workmen or employees to the above policy. The contractor will also be liable for any loss arising from or caused by such offence of his workmen or employees in this regard. Any person found smoking on campus may i) result in penalty under the law; ii) have his / her rights and privileges in the use of part or all of the facilities concerned suspended for a specified period of time or removed completely; iii) be liable to disciplinary action by the University in accordance with the established procedure. 6.8 The contractor shall be responsible for the behaviour of his workmen in and out the work site. He should ensure that no workmen loiter or rest outside the work site in University premises and grounds. If it is necessary for them to use University facilities such as canteens, they should abstain themselves from abusive languages and insolent behaviour and be decently dressed. 6.9 The contractor shall provide appropriate warning signs and adequate lights at night around openings of roads or grounds. 6.10 The Contractor and his workmen must ensure that all work sites have strictly observed statutory safety and fire regulations requirements and procedures. 6.11 Where foul water cannot be directed to foul sewer, septic tanks or chemical toilets should be employed at the contractor s cost.

7) ENVIRONMENTAL MANAGEMENT 7.1 The contractors and his workmen must observe and complete the works following the relevant local legislation regulating the environmental protection of the campus. Environmental aspects include but not limit to air emission, water pollution and conservation, waste management, resource management, noise, ecology and heritage. 7.2 The contractors and his workmen must take appropriate measures to prevent and mitigate pollution, and to follow but not limit to the measures stipulated in the Environmental Guidelines for Construction Sites published by CDO/EMO. Contractors must adopt the measures stated in the guidelines where applicable and relevant to the construction activities. 7.3 The contractors must retain the relevant environmental records for submission to CDO/EMO upon request. 8) MISCELLANEOUS 8.1 The University has the rights to deduct charges from any monies due or to become due to the Contractors in CUHK. 8.2 Blasting will not be permitted. 8.3 The contractor shall make his own arrangement with the Authorities or Utility Companies concerned prior to commencing work for adequate supplies of water and electricity. 8.4 The contractor shall identify all existing University underground services in his work site prior to commencing work and take good measures to protect them or divert them as necessary. 8.5 The contractor shall not engage illegal immigrants to work at any University site. 8.6 No opening of roads, pavement, or grounds for services installation, connection, repair, and works of any kind; nor closure of a thoroughfare, pedestrian walk, an engineering or building services installation or system; nor hot works of any kind, shall be commenced by the contractor without having obtained beforehand a requisite permit or written consent from the CDO/EMO, stipulating the scope and programme of any such work sanctioned. 8.7 The contractor shall not utilize any passenger lift for the transport of material to facilitate his work. If it is at all necessary to do so, he shall secure beforehand a permit or a written consent from the CDO/EMO, stipulating any specific and restricted utilization permitted. 8.8 In case of a commotion, brawl, accident, mishap or fire involving the contractor,

environmental incidents, he should immediately inform the Security Officer (3943 7999 or 2603 5222) and the Estates Management Office (3943 6666). The contractors should report any incident with investigation and appropriate corrective and preventive actions taken to the USO, EMO and CDO for review.