Site Recovery Manager (SRM) Proof of Concept (POC) Guide

Similar documents
VMware Site Recovery Manager Overview Q2 2008

VMware Site Recovery Manager (SRM) Lessons Learned in the First 90 Days

Disaster Recovery with EonStor DS Series &VMware Site Recovery Manager

VMware vsphere: Install, Configure, Manage [V5.0]

EMC Business Continuity for VMware View Enabled by EMC SRDF/S and VMware vcenter Site Recovery Manager

VMware Site Recovery Manager with EMC RecoverPoint

JOB ORIENTED VMWARE TRAINING INSTITUTE IN CHENNAI

Providing Self-Service, Life-cycle Management for Databases with VMware vfabric Data Director

Veritas Storage Foundation High Availability for Windows by Symantec

Site Recovery Manager Administration Guide

Site Recovery Manager Installation and Configuration

Table of Contents. vsphere 4 Suite 24. Chapter Format and Conventions 10. Why You Need Virtualization 15 Types. Why vsphere. Onward, Through the Fog!

VMware vsphere 5.1 Advanced Administration

Drobo How-To Guide. Topics Drobo and vcenter SRM Basics Configuring an SRM solution Testing and executing recovery plans

Symantec Storage Foundation High Availability for Windows

Veeam ONE What s New in v9?

EMC Business Continuity for Microsoft SQL Server 2008

Backup and Recovery of Virtual Servers. John A. Davis Senior Consulting Engineer New Age Technologies

Frequently Asked Questions: EMC UnityVSA

VMware Business Continuity & Disaster Recovery Solution VMware Inc. All rights reserved

Cookbook Disaster Recovery (DR)

VMware vsphere-6.0 Administration Training

PROTECTING THE VIRTUAL DATACENTER: DISASTER RECOVERY USING DELL EQUALLOGIC PS SERIES STORAGE AND VMWARE VCENTER SITE RECOVERY MANAGER

DR-to-the- Cloud Best Practices

VMware Site Recovery Manager and Nimble Storage

EMC Disaster Recovery with VMware SRM

What s New with VMware Virtual Infrastructure

SAP Disaster Recovery Solution with VMware Site Recovery Manager and EMC CLARiiON

Directions for VMware Ready Testing for Application Software

Installing and Administering VMware vsphere Update Manager

What the student will need:

How To Use Vcenter Site Recovery Manager 5 With Netapp Fas/Vfs Storage System On A Vcenter Vcenter 5 Vcenter 4.5 Vcenter (Vmware Vcenter) Vcenter 2.

Using EonStor FC-host Storage Systems in VMware Infrastructure 3 and vsphere 4

CA ARCserve Family r15

Play IT Safe. I love that everything just works with Unitrends. Unitrends Disaster Recovery as a Service. Backup, Archiving & Disaster Recovery

SAP Solutions on VMware Business Continuance Protecting Against Unplanned Downtime

E-SPIN's Virtualization Management, System Administration Technical Training with VMware vsphere Enterprise (7 Day)

VMware vsphere 5.0 Boot Camp

Implementing Microsoft Windows 2000 Clustering

Design Implement Troubleshoot. VMware Virtualisation Strategies Private/Public/Hybrid Cloud Computing.

Advanced VMware Training

Implementing disaster recovery solutions with IBM Storwize V7000 and VMware Site Recovery Manager

Mastering Disaster Recovery: Business Continuity and Virtualization Best Practices W H I T E P A P E R

Site Recovery Manager Installation and Configuration

Hyper-V vs ESX at the datacenter

Implementing a Holistic BC/DR Strategy with VMware

Bosch Video Management System High Availability with Hyper-V

VMware vcenter Update Manager Administration Guide

HP 3PAR Peer Persistence Software Installation and Startup Service

Khóa học dành cho các kỹ sư hệ thống, quản trị hệ thống, kỹ sư vận hành cho các hệ thống ảo hóa ESXi, ESX và vcenter Server

SonicWALL SRA Virtual Appliance Getting Started Guide

Prospect 365 CRM Installation Requirements. Technical Document

Reducing the Cost and Complexity of Business Continuity and Disaster Recovery for

VMware vsphere 4.1 with ESXi and vcenter

VMware vsphere: [V5.5] Admin Training

Oracle E-Business Suite Disaster Recovery Solution with VMware Site Recovery Manager and EMC CLARiiON

Using Emergency Restore to recover the vcenter Server has the following benefits as compared to the above methods:

Cloud Computing. Chapter 1 Introducing Cloud Computing

Microsoft SharePoint 2010 on VMware Availability and Recovery Options. Microsoft SharePoint 2010 on VMware Availability and Recovery Options

Sage 300 ERP 2014 Compatibility guide

EMC Mehrwert in virtuellen Umgebungen. VMware & CISCO & EMC - a perfect fit

Site Recovery Manager Administration Guide

Migrating Control System Servers to Virtual Machines

Use Case: Secure and Affordable SAP HANA Cloud- Based Solutions. Kevin Knuese, Symmetry SESSION CODE: SM1833

CA ARCserve Replication and High Availability Deployment Options for Hyper-V

VMware vcenter Update Manager Administration Guide

VMWARE VSPHERE 5.0 WITH ESXI AND VCENTER

EMC CLARiiON Guidelines for VMware Site Recovery Manager with EMC MirrorView and Microsoft Exchange

Infrastructure Provisioning with System Center Virtual Machine Manager

Getting the Most Out of Virtualization of Your Progress OpenEdge Environment. Libor Laubacher Principal Technical Support Engineer 8.10.

Planning and Administering Windows Server 2008 Servers

VMware vcenter Site Recovery Manager 5 Technical

Downtime, whether planned or unplanned,

R3: Windows Server 2008 Administration. Course Overview. Course Outline. Course Length: 4 Day

Patch Management. Module VMware Inc. All rights reserved

A Comparison of Oracle Performance on Physical and VMware Servers

EMC Integrated Infrastructure for VMware

Cloud Optimize Your IT

VMware vsphere 5.0 Evaluation Guide

Study Guide. Professional vsphere 4. VCP VMware Certified. (ExamVCP4IO) Robert Schmidt. IVIC GratAf Hill

docs.rackspace.com/api

Tintri Deployment and Best Practices Guide for VMware vcenter Site Recovery Manager 5.8

A Comparison of VMware and {Virtual Server}

Statement of Support on Shared File System Support for Informatica PowerCenter High Availability Service Failover and Session Recovery

EMC Plugins for VMware vcenter EMC World EMC Plugins. For VMware vcenter

"Charting the Course... MOC C Designing a Data Solution with Microsoft SQL Server Course Summary

Symantec Virtual Machine Management 7.1 User Guide

Cloud Infrastructure Licensing, Packaging and Pricing

Enterprise Java Applications on VMware: High Availability Guidelines. Enterprise Java Applications on VMware High Availability Guidelines

SolarWinds Log & Event Manager

VMware vsphere: Fast Track [V5.0]

Maximize Your Virtual Environment Investment with EMC Avamar. Rob Emsley Senior Director, Product Marketing

VMware System, Application and Data Availability With CA ARCserve High Availability

1 Download & Installation Usernames and... Passwords

QuickStart Guide vcenter Server Heartbeat 5.5 Update 2

Changing Shape of the Cloud ISACA North Texas Chapter. Michael Lee Managing Principle-Cloud

Planning and Administering Windows Server 2008 Servers

James Wenger, Network Manager, Charmer Sunbelt Group Kevin Knuese, Chief Technology Officer, Symmetry Corp.

Transcription:

Site Recovery Manager (SRM) Proof of Concept (POC) Guide Always watch for the most current version of this document. It will be updated as often as the users of it make suggestions!

Table of Contents Table of Contents... 2 Team Details... 3 Customers Business Drivers & Success Criteria... 4 Application Environment... 4 Recovery Order... 4 Site Naming... 5 Proof of Concept Configuration Information... 5 Networking... 5 Virtual Infrastructure Information... 5 Storage Array Information... 6 Customer Success Criteria... 6 Pre-Engagement Preparation... 7 Storage... 7 Application... 7 Pre-Engagement Checklist... 7 POC Tasks... 9 POC Architecture Diagram... 10 Results of this PofC from the point of view of the customer!... 11 Next Steps for the customer and local SE... 11 After Action Report... 11 Appendix... 12 PofC Outline... 12 Whiteboard Education... 12 Background info... 13 Comments / Suggestions... 13 Page 2 of 13

Team Details VMware Account Team Region Account Manager Systems Engineer/Consultant SSSE / SME Client Company Name Location Storage Vendor Company Name & Contact Partner Name & Contact Client Executive Sponsor Name Title Group POC Details Customer Project Lead Phone Number Email Address Start Date Page 3 of 13

Customers Business Drivers & Success Criteria Business Overview: What are the key business drivers and compelling reasons for this Proofof-Concept (POC)? What is the Required RPO/RTO for a production implementation? Has the customer performed a Business Impact Analysis (BIA)? Has the customer ranked applications in terms of importance and/or RPO/RTO requirements? Note: please delete this text, including this note with the business overview information. Application Environment List Applications to be protected during the Proof-of-Concept (POC) along with their components: Example: Application CRM: 6 virtual servers total, 2 for iis, 2 for weblogix, 2 for Oracle Fill in the Following Table Detailing Application Components: Component VM Name VM OS VM No CPUs VM- Amt Mem (GB) VM- Amt Storage (GB) IP addr Prod NW IP addr DR NW ESX Server Important Note: This PofC is about proving SRM can do what is needed and that is through education. It is strongly recommended that you do no more than 10 VM s due to the complexity that might entail and of course subtract from the learning and success of the PofC. Recovery Order Provide Recovery Order of All Application Components: Example: 1. Oracle Database 2. iis 3. weblogix Page 4 of 13

Site Naming What is the Protected Site name What is the Recovery Site name Proof of Concept Configuration Information Networking Fill in the Following Table Detailing Networking Components: Component Production Site IP DR Site IP Subnet Gateway DNS Virtual Infrastructure Information Fill in the Following Table Detailing VMware Infrastructure: Component Fully Qualified Host Name IP address Server Model or VM Number of CPUs Amount of Memory ESX Server in Production Site ESX Server in DR Site Virtual Center Server in Production Site Virtual Center Server in DR Site Oracle or SQL Database in Production Site Page 5 of 13

Oracle or SQL Database in DR Site Storage Array Information Fill in the Following Table Detailing Storage Array and Replication: Production Site DR Site LUNs required for replication Shadow VM LUN N/A 4 GB max Storage Array Array Firmware Replication Type Available Snapshot Type Available Array Manager Software version Storage Management Hostname and/or IP Addr) Note: extra space will be required on the recovery side for snapshots, flashcopys, remote copys, flexclones, etc. The amount of extra space will vary among the storage vendors. Customer Success Criteria Proof-of-Concept (POC) Success Criteria as Defined by Client: Examples: 1. Show Application Restarts at DR Site 2. Test Application Functionality at DR Site Page 6 of 13

Pre-Engagement Preparation Storage To be completed by the VMware SE and Storage Vendor representatives: 1. Get commitment from the storage vendor to help with POC and attend the second day of POC. 2. Get a copy of storage vendor s Storage Replication Agent (SRA) documentation and current code revision. 3. Get a copy of the release notes for the current SRA and any future SRA that is available. Identify known issues section. 4. Determine and document the customer s complete storage configuration to be used for the POC. This includes array, array firmware, array management software, replication and snapshot software, available storage, and any other management components. For example, if the customer is using EMC Clariion with ECC management software then the Solutions Enabler component is required for the POC if they are not using ECC, Solutions Enabler is not required. Each storage vendor is different on their requirements so document the environment and with the storage vendor go through the SRA document thoroughly to understand configuration requirements and components. 5. Make sure there is enough space in the array at the DR site to accommodate an array snapshot for testing the SRM Recovery Plan. Application To be completed by the VMware SE and customer application and IT team representatives: 1. Determine and document application shutdown and startup order 2. Determine application authentication requirements and dependencies (i.e. AD, hard-coded IP addresses, hostnames etc.) 3. Determine application network dependencies 4. Determine application dependencies on physical components and plan for access to these components after failover 5. Plan for the application team to be available prior to SRM implementation to test application shutdown and startup in the POC environment (this baselines the application prior to SRM) Pre-Engagement Checklist To be completed jointly with the client and the storage vendor in a pre-poc prep meeting, prior to the first day of the POC. NOTE1: The storage vendor should also attend the first day of the POC to help as the storage vendor s Storage Replication Agent (SRA) is installed and verified. NOTE2: Check with the SRM Reference Guide to note any potential issues that may impact your PofC. Also, it is useful for background information that will help you sound more knowledgeable. Page 7 of 13

Requirement Yes/No Details Facilities we will need a room with a projector and white board for the duration of the PofC. An internet connection will be required. One VMware ESX Server installed at both the Production and DR sites. Please include make\model and CPU and Memory capacity in details. Please ensure that the ESX host server hardware is certified and on our hardware compatibility list. The HCL is located at: http://www.vmware.com/resources/techresources/cat/119 The ability to install SRM on both the VC at the production site and the VC at the DR site needs to be confirmed. See the following for requirements for both VC and ESX: http://www.vmware.com/pdf/srm_compat_matrix_4_x.pdf One VMware Virtual Center Management Server 2.5 installed on either a virtual or physical Windows 2003 Server at both the Production and DR sites. The ability to access via ODBC either a SQL or Oracle database for SRM at both the Production and DR sites. Valid versions of these databases are listed here: http://www.vmware.com/pdf/srm_compat_matrix_4_x.pdf Create a database in either Oracle or SQL at both the Production and DR sites. Create an empty database, with similar naming structure as VC and VUM, and make the owner of it the same account as will be used in the ODBC connection. Obtain Valid VMware licenses to cover all components These can either be purchased licenses or evaluation keys. SRM has a built in 60 license. TCP/IP connectivity and forward, reverse, short, long DNS resolution between VC, ESX, and SRM servers in each site. Create a list of Virtual Machine(s) to be protected by SRM along with their underlying storage. As discussed earlier in this document. Identify storage vendor and array replication and snapshot software to be used. Verify storage is supported: http://www.vmware.com/pdf/srm_storage_partners.pdf With customer, contact storage vendor and make sure the storage vendor follows their Storage Replication Agent (SRA) documentation to prepare for the POC. Read through the SRA documentation to note any information that pertains to the limits or capabilities of the SRA that will or may impact the PofC. Validate VM operating systems are supported: http://www.vmware.com/pdf/srm_compat_matrix_4_x.pdf Validate VM operating systems requiring customization are supported: http://www.vmware.com/pdf/srm_compat_matrix_4_x.pdf Customization requirements discussion and list Networking Requirements for DR failover - identified Non-replicated storage at DR site for shadow VMs. This storage needs only be 4 GB MAX. Page 8 of 13

POC Tasks It is important to understand that this is not just a PofC to sell SRM, but to further a relationship with the customer. In fact sometimes it is a start to a relationship. In the three days of this PofC you will have a lot of time to impress the customer with our products, our company, and you. Take advantage of it. Bring in lunch and do product roadmaps, or tips and tricks, or demonstrate other products. I often will give demos of other things like View or vsphere. Even a demo of vsel is very effective. When installing software explain the significance and sometimes how it used to be before SRM. Use examples where possible from the customer world. Use the SRM Reference Guide for background knowledge and learning before you start! Task Completed Comments (Y/N) or MM\DD\YY Issues POC Kick Off Meeting Review key business drivers and priorities and document them in section above. Why is the client looking at SRM? This can often be part of the Education section below. This can be done as part of understanding current methods of DR. Provide cursory overview of underlying Virtual Infrastructure framework, including centralized management and high availability. Learn their naming, organization so your examples will make more sense. Education this should take roughly half of a day, and sometimes (often) longer. It can / should be done on a whiteboard. Find hints and suggestions in Appendix. Whiteboard proposed POC architecture and document. Include in POC Architecture section below. Address any client concerns and\or questions. Often this is the end of day 1. Site Recovery Manager (SRM) Installation Install Site Recovery Manager (SRM) server at both sites. Sometimes day 1 ends here. Install SRM Plug-in where required Install storage vendor SRA at both the production and DR sites Compare Site Pairings Configure Array Managers Inventory Mappings Configuration of SRM Page 9 of 13

Create Protection Group(s) SRM Recovery Plans Create Recovery Plan(s) Note: test small, failover small or big. This is more effective for the testing and availability of resources. Test Recovery Plan - simple Test A Recovery Plan(s). Do no IP customization. Make sure things work. This is a test of SRM / SRA communication. Troubleshoot as necessary Capture SRM Test Recovery Plan Report. Generally day 2 will end here. Test Recovery Plan - enhanced First teach customization in detail! Use tool to do customization Adjust RP to use VLAN Validate Successful VMs running at DR site with proper IP Capture SRM Run/Execute Recovery Plan Report Teach how to do Test Plan. This should take between 2 and 3 hours. Find more info on this and an outline in the SRM Reference Guide. Do Availability roadmap. Normally the end of day 3 here. Ideas for lunch would include roadmaps, and product demos. Even talking about best practices. The outline above should take roughly 3 days when it goes smooth. POC Architecture Diagram Page 10 of 13

Results of this PofC from the point of view of the customer! Happy and willing to buy for example. Or happy with SRM but they need something else to buy. Next Steps for the customer and local SE Pricing information to be provided to customer. After Action Report How can this guide, and the SRM Reference guide but easier to use? Did you learn anything we need to bring back to the storage partner? Did you get any comments or learn anything that needs to be shared with our engineers or product management? Please record here any comments or suggestions you have to make things better. Than email this complete report to MWhite@VMware.com. This is important so we can improve this document, reference guide, and SRM! Page 11 of 13

Appendix PofC Outline Day 1 Tour Whiteboard (see below) Maybe, install SRM, but not configure Suggest lunch activity VMware overview roadmap Day 2 Install? Configure Simple Test Suggested lunch activity View demo, or vsel demo Day 3 Ehanced test, More simple test IP customization Catch up Suggested lunch activity CARS roadmap Whiteboard Education Much of this can be found in the SRM Reference Guide. What is SRM and what is it not? Usage scenarios data center moves, test dev stocking, also talk about 1 to 1 Licensing draw it out! And talk about how to manage it during an event - meaning the licenses are needed for the failback but are in fact on the original protected side. SRA only use trusted ones, what they are for, support BIA / Run books they are key and why they are important! Design and scalability Naming, in LUN / Storage, but also resource pools / folders, for troubleshooting, but also for the purpose of understanding if something is protected or not. Or in a recovery place or not. Mention this again when doing the array manager stuff. Resource pools with low shares better than sleeping which is an option in the recovery plan. Make sure they understand. Page 12 of 13

Updates how to do patching (4 weeks after a patch is received, watch forums, talk to local SE s, make sure it is good.) Than when ready get it done quick as SRM needs exact builds on each side! Support start with us but we will not help much with SRA but will usually provide a log snippet to use with the SRA vendor. Always submit logs. Simple test vs. enhanced testing. Meaning simple uses test bubble and enhanced uses VLAN. Background info Make sure to use the SRM Reference Guide to help you with this process. Many things mentioned briefly in this document are in detailed in the Reference Guide. Scalability, design, test plans and much more including caveats about SRA s. You should have installed SRM a few times, hopefully with the help of a SME or SSSE, and have attended the SRM Troubleshooting lab at vsummit. If neither of these are true contact the local SME for a ride along and you will be good the following time on your own. The local SME can also arrange for the SSSE to attend. Comments / Suggestions Please forward any comments or suggestions to Jeff Junter, BC/DR SSSE, at jhunter@vmware.com. This is document version VMware_SRM_POCGuide_f.docx. Thanks! Page 13 of 13