ESTABLISHMENT AND OVERSIGHT OF A RELIABILITY PROGRAM AND MAINTENANCE PROGRAM ESCALATION



Similar documents
DEVELOPMENT OF AIRCRAFT MAINTENANCE PROGRAMS

Airworthiness and Maintenance Requirements for U.S. Registered Aircraft

ADVISORY CIRCULAR AC

TRAINING PROGRAM APPROVAL PROCESS FOR APPROVED MAINTENANCE ORGANISATIONS (AMOs)

Date: 9/30/15 AC No: Initiated by: AFS-300 Change: 0

SUMMARY AUDIT REPORT DIRECTORATE OF CIVIL AVIATION OF MOROCCO

Subject: Air Carrier Maintenance Programs Date: 11/15/12 AC No: F Initiated by: AFS-300

Limited Ratings of Airframe Maintenance

ADVISORY CIRCULAR AC

Highlights from EC2042/2003 and 2003/19/RM regarding Aircraft Type Practical Experience and On-the-Job Training- Rev. EU1149//2011 / ED2012/004/R

DRAFT. Date: DRAFT Initiated by: AFS-300

Hong Kong Aviation Requirements

CIVIL AVIATION REQUIREMENTS SECTION 2 AIRWORTHINESS SERIES F PART VIII 5 TH MARCH 1998 EFFECTIVE: 26 TH JANUARY 2007

Bermuda Advisory Circular BAC-AW-03 INSTALLED AIRCRAFT COMPONENTS REMOVED TO SERVICE ANOTHER AIRCRAFT (ROBBERY)

DRAFT Advisory Circular

EXPORT AIRWORTHINESS APPROVALS

FedEx HUD/EFVS Update Aviation New Technology Workshop June 7th, 2012, Beijing, China

Repair Station Training Program

DISMANTLING OF AIRCRAFT WITHDRAWN FROM SERVICE

DRAFT ADVISORY CIRCULAR AC Approval of modification and repair designs under Subpart 21.M

AMC Part-M Revised AMC to Annex I (Part-M) of Regulation (EC) No 2042/2003 as last amended by Regulation (EC) No 1056/2008

Maintenance Management & Engineering Training

Singapore Airworthiness Requirements

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Part-145: Approved Maintenance Organisations (Annex II (EC) 2042/2003)

BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994

MOS Part 143 Air Traffic Service Training Providers

DRAFT. Advisory Circular. AC 121A-09(0) December 2003 HUMAN FACTORS AND CREW RESOURCE MANAGEMENT TRAINING

DEFENCE INSTRUCTIONS (GENERAL)

MOS Part 171 Aeronautical Telecommunication and Radio Navigation Services

Change Notice Revision 2 adds a definition of NANDTB, and acceptance of the National Aerospace NDT Board of Australia.

Part 102 CAA Consolidation 24 September 2015 Unmanned Aircraft Operator Certification

Agreement on International Civil Aviation (Sops 11/1949), Annex 19 Safety Management) Modification details

[Docket No. FAA ; Directorate Identifier 2014-NM-194-AD; Amendment ; AD ]

COMMISSION REGULATION (EU) No 965/2012 Annex VI Part NCC

Singapore Airworthiness Requirements

DANGEROUS GOODS TRAINING FOR EMPLOYEES

Benefits of Optimizing Maintenance Intervals

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration. Date: 06/10/2013 Initiated by: AIR-110

ISO 9001:2008 Quality Management System Requirements (Third Revision)

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Background. Audit Quality and Public Interest vs. Cost

Post-accreditation monitoring report: The Chartered Institute of Personnel and Development. June 2007 QCA/07/3407

Safety Oversight Audit Section

Subject: Safety Management Systems for Date: 1/8/15 AC No: B Aviation Service Providers Initiated by: AFS-900 Change:

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

INSTALLATION OF MODE 'A' / 'C' AND MODE S TRANSPONDERS.

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/1.1-12/19 10 April 2012

Operation of Aircraft

ISLAND AVIATIONS SERVICES LTD MALE REQUEST FOR PROPOSALS ENGINEERING MANAGEMENT SOFTWARE

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OD-2017-Ed.1.5 CHECK LIST FOR TESTING AND CALIBRATION LABORATORIES

AUDIT SUMMARY REPORT OF THE DEPARTMENT OF CIVIL AVIATION MAURITIUS

COMMISSION REGULATION (EU)

SMS Tools. 4th Edition-1 January 2012

Title & Image NATIONAL CIVIL AVIATION ADMINSTRATION. Advisory Circular

Regulations and Procedures for the International Registry

Hong Kong Aviation Requirements

ADVISORY CIRCULAR AC

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

NZQA registered unit standard version 1 Page 1 of 8. Apply knowledge of aircraft radio systems to the certification of aeronautical maintenance

Page 1. Special Condition

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

[Docket No. FAA ; Directorate Identifier 2008-NM-171-AD; Amendment ; AD ]

Special Purpose Reports on the Effectiveness of Control Procedures

Foreign Part 145 approvals. Aircraft Line Maintenance UG.CAO

Safety Management Systems (SMS) guidance for organisations

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

ESTADOS UNIDOS MEXICANOS (MEXICO) -- SPECIAL REQUIREMENTS. (Revised October 5, 2007)

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION CONTENTS

Guidelines for Financial Institutions Outsourcing of Business Activities, Functions, and Processes Date: July 2004

Certification Directorate. Continuing Airworthiness of Type Design Procedure (CAP) C.P006-01

ISO 9001:2015 Internal Audit Checklist

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration

هيئة تنظيم الطيران المدني

Course Syllabus Revision Aircraft Maintenance License - AML. Part-66. Detailed Course

Part-145 Organisation

ADVISORY CIRCULAR ON SAFETY RISK ASSESSMENT AND MITIGATION

Maintenance Records and Reports

3. regulations issued on the basis of provisions included under 1 or 2,

Advisory Circular. Subject: DAMAGE TOLERANCE INSPECTIONS FOR REPAIRS AND ALTERATIONS. Date: 11/20/07 Initiated by: ANM-100.

ISO 9001:2000 AUDIT CHECKLIST

Turbo Resources International Quality Procedure

ADVISORY CIRCULAR AC

"What's being done to keep the helicopter in the air?"

Validity: until further notice Legal basis: Underlying international standards, recommendations and other documents:

Ref.: AN 13/2.5-09/45 19 June 2009

DRAFT (Public comments phase August 2006) Date: XX/XX/XX. Initiated by: ANE-110

MARITIME OPERATOR SAFETY SYSTEM: MARITIME RULE PARTS 19 AND 44

Guideline on good pharmacovigilance practices (GVP)

FLIGHT TRAINING DEVICES

Methods, techniques, and practices contained in manufacturer s Instructions for Continued Airworthiness (ICA),

CIVIL AVIATION REQUIREMENTS SECTION 2 AIRWORTHINESS SERIES F PART VIII 5 TH MARCH 1998 EFFECTIVE: 1 st SEPTEMBER 2010

Working Party on Control of Medicines and Inspections. Final Version of Annex 16 to the EU Guide to Good Manufacturing Practice

Change Notice Revision 2 updates section Drug and alcohol programme to align with CAA current practice.

Transcription:

GENERAL CIVIL AVIATION AUTHORITY OF BOTSWANA ADVISORY CIRCULAR CAAB Document GAC-011 ESTABLISHMENT AND OVERSIGHT OF A RELIABILITY PROGRAM AND MAINTENANCE PROGRAM ESCALATION GAC-011 Revision: Original November 2012 PAGE 1 of 14

Intentionally left blank GAC-011 Revision: Original November 2012 PAGE 2 of 14

TABLE OF CONTENTS Page number 1. Purpose 5 2. Status of this advisory circular 5 3. Effective Date 5 4. Applicability 5 5. Related Regulations 5 6. Related Publications 5 7. Definitions & Acronyms 5 8. Background 6 9. Small Fleet Operations 7 10. Reliability Department 7 11. Contracted Maintenance 8 12. Reliability Program Development 8 12.1 Objectives of the Reliability Program 8 12.2 Identification of Controlled Maintenance Items 9 12.3 Terms and Definitions 9 12.4 Maintenance Data Sources and Collection 9 12.5 Display of Information 9 12.6 Maintenance Data Analysis and Interpretation 10 12.7 Corrective Actions 11 12.8 Organisational Responsibilities 11 12.9 Presentation of Information to the CAAB 11 12.10 Program Evaluation and Review 12 12.11 Approval of Maintenance Program Amendment s 12 13. Pooling Arrangements 13 GAC-011 Revision: Original November 2012 PAGE 3 of 14

Intentionally left blank GAC-011 Revision: Original November 2012 PAGE 4 of 14

1. PURPOSE This General Advisory Circular (GAC) provides operators with information and guidance on establishment and on-going oversight of a reliability program, and escalation of an aircraft maintenance program. 2. STATUS OF THIS ADVISORY CIRCULAR This General Advisory Circular is an original issuance. 3. EFFECTIVE DATE This GAC becomes effective immediately. 4. APPLICABILITY The information in this GAC applies to operators required to have reliability programs as part of the aircraft maintenance programs. 5. RELATED REGULATIONS Civil Aviation (Air Operator Certification and Administration) Regulations 6. RELATED PUBLICATIONS Copies may be obtained from the Government Printer. ICAO Annex 6 Operation of Aircraft, Part 1 ICAO Doc 9760 Airworthiness Manual Copies may be obtained from Document Sales Unit, ICAO, 999 University Street, Montreal, Quebec, Canada H3C 5H7. 7. DEFINITIONS AND ACRONYMS 7.1 The following acronyms are used in this circular CAAB ETOPS FAA GAC ICAO MEL MPD MRB MRBR MSG RVSM TCDS Civil Aviation Authority of Botswana Extended Range Twin Engine Operations US Federal Aviation Administration General Advisory Circular International Civil Aviation Organization Minimum Equipment List Maintenance Planning Document Maintenance Review Board Maintenance Review Board Report Maintenance Steering Group Reduced Vertical Separation Minima Type Certificate Data Sheet Advisory Circulars (Aces) are intended to provide advice and guidance to illustrate an acceptable means, but not necessarily the only means, of complying with the regulations, or to explain certain regulatory requirements by providing informative, interpretative and explanatory material. Where a regulation contains the words prescribed by the Authority, the AC may be considered to prescribe a viable method of compliance, but status of that prescription is always guidance (never regulation). GAC-011 Revision: Original November 2012 PAGE 5 of 14

8. BACKGROUND 8.1 Regulation 70.(1) of the Civil Aviation (Air Operator Certification and Administration) Regulations requires a maintenance program to contain, when applicable, condition monitoring and reliability program descriptions for aircraft systems, components and power plants. 8.2 The purpose of a reliability program is to ensure that the aircraft maintenance program tasks are effective and their intervals are adequate. A reliability program may result in the escalation or deletion of a maintenance task, as well as the deescalation or addition of a maintenance task. 8.3 A reliability program is an integral part of an aircraft maintenance program consisting of: Data collection Data analysis Corrective action Performance standards Data display and report Maintenance program adjustment and process change, Program revision. 8.4 A reliability program is an appropriate means of monitoring the effectiveness of a maintenance program. 8.5 A reliability program should be developed in the following cases: (1) the aircraft maintenance program is based upon MSG-3 logic; (2) the aircraft maintenance program includes condition-monitored components; (3) the aircraft maintenance program does not contain overhaul time periods for all significant systems and components, and (4) when specified by the Manufacturer s maintenance planning document (MPD) or Maintenance Review Board Report (MRBR). 8.6 A reliability program need not be developed in the following cases: the maintenance program is based upon MSG-1 or 2 logic and only contains hard time and on condition items. the aircraft is not complex and it is below 5 700 kg maximum take-off mass. the aircraft maintenance program provides overhaul time periods for all significant systems and components. Note: For the purpose of this paragraph, significant system is a system the failure of which could endanger aircraft safety. 8.7 Notwithstanding paragraphs 8.5 and 8.6 above, an organization/operator may however, develop a reliability monitoring program when it is deemed beneficial from a maintenance planning point of view. GAC-011 Revision: Original November 2012 PAGE 6 of 14

9. SMALL FLEET OPERATIONS 9.1 For the purpose of this paragraph, a small fleet of aircraft is a fleet of less than six (6) aircraft of the same type. 9.2 The requirement for a reliability program is irrespective of the operator s fleet size. 9.3 Complex reliability programs could be inappropriate for a small fleet. It is recommended that such organisations tailor their reliability programs to suit the size and complexity of operation. 9.4 One difficulty with a small fleet of aircraft is the small amount of available data which can be processed. When this amount is too low, calculation of alert value is not possible. 9.5 An organisation operating a small fleet of aircraft should consider the following elements when establishing a reliability program: The program should focus on areas where a sufficient amount of data is likely to be processed. When the amount of available data is very limited, there is need for an objective assessment of the program s ability to identify negative trends. In the following examples, careful engineering analysis should be exercised before taking decisions: A 0 rate in the statistical calculation may possibly simply reveal that there is no sufficient statistical data; When alert values are used, a single event may have the figures reach the alarm level. Discretion is required to distinguish between false and real alarm. Small operators may establish contact with other organisations operating the same type of aircraft in order to share statistical data for comparison purposes. Making evaluations of data provided by the manufacturer is also another acceptable means of compliance of sharing operational experience. 9.6 In order to obtain accurate reliability data, it should be recommended to pool data or analysis with one or more other organisation(s). Section 13 of this document specifies under which conditions it is acceptable that organisations share reliability data. 9.7 Notwithstanding the above there are cases where the organisation will be unable to pool data with other organisation, e.g. at the introduction to service of a new type. In that case the CAAB will impose additional restrictions on the MRB/MPD tasks intervals (e.g. no variations or only minor evolution are possible, and with CAAB approval). 10. RELIABILITY DEPARTMENT 10.1 In approving the organization s maintenance and reliability programs, the Authority is expected to ensure that the operator has a fully equipped Reliability Department. The department should be manned by sufficiently qualified personnel with appropriate engineering experience and understanding of reliability program concepts. The reliability program document should define minimum qualification standards for a reliability officer or engineer and the assigned duties and responsibilities. GAC-011 Revision: Original November 2012 PAGE 7 of 14

10.2 Failure to provide appropriately qualified personnel for the implementation of the reliability program will undermine its effective implementation and therefore invalidates the approval. 11. CONTRACTED MAINTENANCE 11.1 If maintenance is sub-contracted, the aircraft maintenance program which includes the associated reliability program should be managed and presented by the operator to the CAAB. It is understood that the organisation may delegate certain functions to a contracted maintenance organisation provided the latter demonstrates capability to run the program. These functions are: (d) Developing the aircraft maintenance and reliability programs, Performing the collection and the analysis of the reliability data, Providing reliability reports, and Proposing corrective actions to the continuing airworthiness management organization/operator. 11.2 Notwithstanding the above, the decision to implement a corrective action (or the decision to request from the CAAB the approval to implement a corrective action) remains the organisation s prerogative and responsibility. In relation to paragraph 11.1 (d) above, a decision not to implement a corrective action should be justified and documented. 11.3 The arrangement between the organisation and the maintenance organisation should be specified in the maintenance contract and the operator s and maintenance organisation s relevant manuals and procedures. 12. RELIABILITY PROGRAM DEVELOPMENT 12.1 Objectives of the Reliability Program 12.1.1 A statement should be included summarizing the primary objectives of the program. At the minimum it should the following: Systematic identification of negative and positive trends establish what corrective action is needed, Develop a system for maintenance program adjustment and process change, and (d) Determine the effectiveness of the follow up action. 12.1.2 The extent of the objectives should be directly related to the scope of the program. This could vary from component defect monitoring system for a small organisation, to an integrated maintenance management program for a big organisation. Further guidance is provided in the manufacturer s MPD and other documents such as FAA Advisory Circular 120-17. 12.1.3 The reliability program should provide a monitoring mechanism for all MSG-3 related tasks from the maintenance program to show that they are effective and their intervals are adequate. GAC-011 Revision: Original November 2012 PAGE 8 of 14

12.2 Identification of Controlled Maintenance Items The maintenance items controlled by the program should be stated, e.g. by the ATA chapters. In all cases where some items (e.g. aircraft structure, engines, APU) are controlled by separate programs, the associated procedures (e.g. individual sampling or life development programs, constructor s structure sampling programs) should be cross-referenced in the program. 12.3 Terms and Definitions The significant terms and definitions applicable to the Program should be clearly identified. 12.4 Maintenance Data Sources and Collection 12.4.1 Sources of maintenance data should be listed and procedures for the transmission of information from the sources, together with the procedure for collecting and receiving it, should be set out in detail in the operator s and maintenance organisation s manuals. 12.4.2 The type of information to be collected should be related to the objectives of the Program and should be such that it enables both an overall broad based assessment of the information to be made and also allow for assessments to be made as to whether any adjustment is necessary. The following are examples of normal data sources: Pilots reports. Technical logs. Aircraft Maintenance Access Terminal / On-board Maintenance System readouts. (d) Maintenance worksheets. (e) Workshop reports. (f) Reports on functional checks. (g) Reports on special inspections. (h) Stores issues/reports. (i) (j) Air safety reports. Reports on technical delays and incidents. (k) Other sources: ETOPS, RVSM, CAT II/III. 12.4.3 In addition to the normal sources of information, continuing airworthiness and safety information from the manufacturer should also be considered. 12.5 Display of Information 12.5.1 Collected information may be displayed graphically or in a tabular format or a combination of both. The rules governing any discarding of information prior to incorporation into these formats should be stated. The format should be such that the identification of trends, specific highlights and related events would be readily GAC-011 Revision: Original November 2012 PAGE 9 of 14

apparent. Where standards or alert values are included in the program, the display of information should be oriented accordingly. 12.6 Maintenance Data Analysis and Interpretation The method employed for analyzing and interpreting the program information should be explained. 12.6.1 Examination Methods of examination of information may be varied according to the content and quantity of information of individual programs. These can range from examination of the initial indication of performance variations to formalized detailed procedures at specific periods, and the methods should be fully described in the program documentation. 12.6.2 Analysis and Interpretation The procedures for analysis and interpretation of information should be such as to enable the performance of the items controlled by the program to be measured; they should also facilitate recognition, diagnosis and recording of significant problems. The whole process should be designed to enable a critical assessment to be made of the effectiveness of the program. Such a process may involve: (d) (e) (f) (g) Comparisons of operational reliability with established or allocated standards (in the initial period these could be obtained from in-service experience of similar equipment of aircraft types). Analysis and interpretation of trends. The evaluation of repetitive defects. Confidence testing of expected and achieved results. Studies of life-bands and survival characteristics. Reliability predictions. Other methods of assessment. 12.6.3 The range and depth of maintenance data analysis and interpretation should be related to the particular program and to the facilities available. The following elements should be considered: (d) (e) (f) (g) (h) Operational defects and reductions in operational reliability. Defects occurring on line and at main base. Deterioration observed during routine maintenance. Workshop and overhaul facility findings. Modification evaluations. Sampling programs. Adequacy of maintenance equipment and publications. Effectiveness of maintenance procedures. GAC-011 Revision: Original November 2012 PAGE 10 of 14

(i) (j) Staff training. Service bulletins, technical instructions, etc. 12.6.4 Where the organisation relies upon contracted maintenance and/or overhaul facilities as an information input to the program, the arrangements for availability and continuity of such information should be established. 12.7 Corrective Actions 12.7.1 The procedures and time scales both for implementing corrective actions and for monitoring the effectiveness of corrective actions should be fully described. Corrective actions shall correct any reduction in the acceptable level of reliability revealed by the program and could take the form of: (d) (e) (f) (g) (h) Maintenance program adjustments and process changes. These may include alteration of inspection frequency and content, functional checks, overhaul requirements and time limits, which will require amendment of the schedules maintenance periods or tasks in the approved maintenance program. This may include escalation or de-escalation of tasks, addition, modification or deletion of tasks. Changes to operational procedures or techniques; Amendments to approved manuals (e.g. maintenance manual, crew manual); Initiation of modifications; Special inspections of fleet campaigns; Spares provisioning; Staff training; and Manpower and equipment planning. Note: Some of the above corrective actions may need CAAB approval before implementation 12.7.2 The procedures for effecting changes to the maintenance program should be described, and the associated documentation should include a planned completion date for each corrective action, where applicable. 12.8 Organisational Responsibilities The organizational structure and the reliability department responsible for the administration of the Program should be stated. The chains of responsibility for individuals and departments (Engineering, Production, Quality, Operations, etc.) in respect of the program, together with the information and functions of any program control committees (reliability board), should be defined. Participation of the CAAB should be stated. This information should be contained in the operator s and maintenance organisation manuals as appropriate. 12.9 Presentation of Information to the CAAB The following information should be submitted to the CAAB for approval as part of the reliability program: The format and content of routine reports. GAC-011 Revision: Original November 2012 PAGE 11 of 14

The time scales for the production of the reports together with their distribution. The format and content of reports supporting request for increases in periods between maintenance (escalation) and for the amendments to the approved maintenance program. These reports should contain sufficient detailed information to enable the CAAB to make its own evaluation where necessary. 12.10 Program Evaluation and Review 12.10.1 Each Program should describe the procedures and individual responsibilities in respect of continuous monitoring of the effectiveness of the program as a whole. The time periods and the procedures for both routine and non-routine reviews of maintenance control should be detailed (progressive, monthly, quarterly, or annual reviews, procedures following reliability standards or alert values being exceeded, etc.). 12.10.2 Each Program should contain procedures for monitoring and, as necessary, revising the reliability standards or alert values. The organisational responsibilities for monitoring and revising the standards should be specified together with associated time scales. 12.10.3 Although not exclusive, the following list gives guidance on the criteria to be taken into account during the review: (d) (e) (f) (g) Utilization (high/low/seasonal). Fleet commonality. Alert level adjustment criteria. Adequacy of data. Reliability procedure audit. Staff training. Operational and maintenance procedures. 12.11 Approval of Maintenance Program amendments The CAAB may authorize the organization to implement certain maintenance program changes arising from the reliability program results prior to the formal approval by the CAAB. This may take place when the organisation is satisfied that: the Reliability Program monitors the effectiveness of the maintenance program in a comprehensive manner, and the procedures associated with the functioning of the Reliability Board provide the assurance that appropriate control is exercised by the Owner/Operator over the internal validation of such changes. GAC-011 Revision: Original November 2012 PAGE 12 of 14

13. POOLING ARRANGEMENTS 13.1 In some cases, in order that sufficient data may be analyzed it may be desirable to pool data: i.e. collate data from a number of organisations operating the same type of aircraft. For the analysis to be valid, the aircraft concerned, mode of operation, and maintenance procedures applied must be substantially the same. It should be understood that variations in utilization and operating environment between two organisations may render the systems incompatible. Although not exhaustive the following list gives guidance on the primary factors which need to be taken into account to determine compatibility: Certification factors, such as: aircraft TCDS compliance (variant) / modification status, including SB compliance. Operational factors, such as operational environment / utilization, e.g. low/high/seasonal etc. / respective fleet size operating rules applicable (e.g. ETOPS/RVSM/All Weather etc.) / operating procedures / MEL and MEL utilization. Maintenance factors, such as aircraft age maintenance procedures; maintenance standards applicable; lubrication procedures and program; MPD revision or escalation applied or maintenance program applicable. 13.2 Although it may not be necessary for all of the foregoing to be completely common, it is necessary for an acceptable level of compatibility to be in place in order to effect the pooling arrangement. A decision for a pooling arrangement to take place or not will be taken by the CAAB on a case-by-case basis. 13.3 In case of a short term lease agreement (less than 6 months) more flexibility when applying paragraph 13.1 above may be exercised by the CAAB, so as to allow the owner/operator to operate the aircraft under the same program during the lease agreement effectively. 13.4 Changes by any one organisation to the above, requires assessment in order that the pooling benefits can be maintained. Where an organisation wishes to pool data in this way, CAAB approval should be sought prior to any formal agreement being signed between organizations. 13.5 Whereas this paragraph [6] is intended to address the pooling of data directly between organisations, it is acceptable that the organisation participates in a reliability program managed by the aircraft manufacturer, when the CAAB is satisfied that the manufacturer manages a reliability program which complies with the intent of this paragraph. End of Advisory Circular GAC-011 Revision: Original November 2012 PAGE 13 of 14

Intentionally left blank GAC-011 Revision: Original November 2012 PAGE 14 of 14