HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES



Similar documents
YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Aurvista Gold Plans Significant Exploration Program at Douay

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

INVESTOR PRESENTATION January 2014

AGNICO-EAGLE MINES LIMITED

FORWARD LOOKING STATEMENTS

Detour Gold Provides New Life of Mine Plan for Detour Lake

Focusing on Near Term Production and Exploration in Quebec

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

TSX-V: CDA WKN: A0M6U5

How To Mine And Treat Ore From Castle Hill Stage 1

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

Q CONFERENCE CALL. Q Earnings Call. Thursday, August 13, :00 am EST.

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

Sabina Gold & Silver Corp.

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

Corporate Presentation October 2015

NOVEMBER January 2013

(NYSE-MKT:XRA, TSX:XRC,

FIJI GOLD LION ONE METALS

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

Gold Mining Camps in the Canadian Shield

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

For personal use only

AVINO SILVER & GOLD MINES LTD.

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Acquisition of Rice Lake. December 2015

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Press Release 30 th October 2015

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

Galahad Gold plc (Galahad)

Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

ACQUISITION OF TWO QUALITY MINES IN NEVADA

Endeavour Management Presentation

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

The Point Rousse Project - An Economic Analysis

Savannah North Scoping Study Looking into the future 3 February 2016

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

How To Know If Goldcorp Is A Successful Company

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

Cannon Big Pit Given the Green Light

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Further Significant High Grade Intercepts Reported from both Resource Extension and Infill Drilling at the Hot Maden Gold Copper Project

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

Mako Project, Eastern Senegal Completion of Scoping Study

For personal use only

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

Golden Band Resources Inc.

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

The last great Canadian gold mining camp controlled by a junior mining company.

CANADA S INTERMEDIATE GOLD PRODUCER

HARTE GOLD CORP. Gold Exploration and Mine Development in White River, Ontario, Canada APRIL 2016 TSX : HRT

SAVANT LAKE GOLD PROJECT. May 24,

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

Q Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia

A Global Resource Investment Corporation and Merchant Bank

EQUITY RAISING ANNOUNCEMENT

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

September 2015 Quarterly Activities Report

COMPANY PRESENTATION. Cape Town 2016

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

FORWARD-LOOKING STATEMENTS

INVESTOR PRESENTATION JULY 2013

For personal use only. MRV Metals Launch February 2016

RED 5 Limited The next gold producer

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

Transcription:

65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INITIATES DRILL PROGRAM AT UNION REEFS PROJECT AREA TARGETING HIGHH GRADE ZONES BELOW HISTORICAL OPEN PITS ADJACENT TO THE OPERATING MILL HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES February 15, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) ( Crocodile Gold or the Company ) is pleased to announce that it has initiated a drill program at the Crosscourse and Prospect Claim historical open pit targets located within the Union Reefs project area in the Northern Territory of Australia (refer to Figure 1 below for property location map and Figure 2 below for Union Reefs project area map). The targets are adjacent to the Union Reefs Mill and are identified extensions of mineralization of the historical open pits mined in the 1990s. Crocodile Gold has ranked the Union Reefs project area as one of the Company s highest priority areas for the growth of mineral reserves and resourcess and near term production within the Company s portfolio of assets for the following reasons: The Union Reefs project area is located immediately adjacent to the Company s Union Reefs mill. Historical production in the Union Reefs area has yielded over 800,000 ounces of gold from 12 open pit operations. The potential exists for both higher grade underground targets and lower grade open pit targets. Most deposits in the Unionn Reefs area sit within an approved Mining Lease and as a result the permitting process is expedited compared with an exploration license should the decision be made to advance a deposit to production. Significant exploration upside exists as past exploration in the areaa has been limited in depth with only oxide material drilled to any extent except for the Crosscourse target. Prospect Claim Open Pit Within the Union Reefs project area, the only project currently with a mineral resource estimate Prospect Claim deposit. This mineral resource estimate is currently being reviewed and optimized. is the A number of higher grade historic intercepts over significant widths have been intersected below the pit shell at the Prospect Claim open pit. Highlights include: 19.8 g/t Au over 8.9 metres 12.2 g/t Au over 12 metres 10.6 g/t Au over 19 metres 8..4 g/t Au over 11 metres 7..4 g/t Au over 9 metres TSX:CRK OTCQX:CROCF FRANKFURT: XGC www.crocgold.com

7.1 g/t Au over 7 metres 5.4 g/t Au over 11.9 metres (Note: Widths above are not known with certainty and the intervals are intercepted widths and not true widths.) Crocodile Gold s planned drill program at Prospect Claim is to target higher grade mineralization below the existing pit shell as only limited drilling extends past 100 vertical metres below the pit. The new drilling will target the down plunge component of the higher grade zones within the drilled structure (refer to Figure 3 below). The higher grade zones within Prospect Claim are steeply dipping zones associated with quartz stockwork veining with occasional steeply plunging quartz veins. These veins are most likely associated with cross structures to the main mineralized zone; these zones are being targeted with the drilling beneath the pit. Previous mining of the Prospect Claim deposit extracted 444,000 tonnes at 1.6 g/t Au from the pit before mining ceased in 2003. Crosscourse Open Pit Over 700,000 ounces of gold have been historically mined at the Crosscourse open pit from 13.9 million tonnes at a grade of 1.63 g/t Au, which represents more than 80% of gold ounces produced from the Union Reefs project area. Crocodile Gold believes potential exists for extensions of the Crosscourse mineralization in the area between Crosscourse and Prospect Claim (refer to Figure 4 below). The mineralization at Crosscourse is contained within two lenses the E Lens and Ping Que Lens. Historic drilling indicates the orebody continues down plunge below the existing Crosscourse open pit. The E Lens is located on the Union North mineralized line which contains the Prospect Claim deposit (refer to Figure 2 below). Historic records indicated the E Lens mineralization was up to 40 metres wide at an average grade of approximately 4 g/t Au (refer to photo of pit bottom in Figure 4 below). As can be seen, the E-Lens mineralization consists of a steeply plunging zone of sheeted quartz veins. These veins were traced through grade control and made up a large portion of the ore mined at the bottom of the Crosscourse Pit. Only limited drilling exists down plunge of this zone. Highlights of historic intersections on the E Lens, which plunges north into the wall of the pit, and is a high priority target area include: 10.6 g/t Au over 19 meters 4.7 g/t Au over 15 metres 16.9 g/t Au over 13.9 metres Highlights of historic intersections on the Ping Que Lens, which cuts below the main ramp of the pit, include: 10.62 g/t Au over 19 metres 24.40 g/t Au over 9 metres 4.00 g/t Au over 9 metres (Note: Widths above are not known with certainty and the intervals are intercepted widths and not true widths.) In releasing this information, Mark Edwards, General Manager Geology and Exploration for Crocodile Gold, commented, We are encouraged by the potential for expanding higher grade target areas we have identified at Prospect Claim and Crosscourse as minimal exploration has been completed on these - 2 -

targets. This phase of drilling will be the start of an expanded exploration program in the Union Reefs project area in which we plan to add to our resource base and identify additional near term production sources in close proximity to the Union Reefs mill. About Crocodile Gold Crocodile Gold is a Canadian company with operating gold mines in the Northern Territory of Australia and a land package of over 2,500 km 2. Crocodile Gold is currently mining from the Howley, North Point and Princess Louise open pit mines and the Brocks Creek underground mine. Crocodile Gold commenced mining in November 2009 and announced its first gold pour in December 2009 at its Union Reefs Mill. The Company is currently developing the Cosmo underground mine. Ore is currently processed at the 2.4 million tonne per year Union Reefs Mill. Crocodile Gold has 3.5 million ounces of NI 43-101 compliant measured and indicated resources (57 million tonnes at an average grade of 1.9 g/t gold) and 2.2 million ounces of inferred resources (38 million tonnes at an average grade of 1.8 g/t gold) (see the Amended Annual Information Form dated November 5, 2010 and Crocodile Gold press releases dated September 8, 2009, January 25, 2010, October 14, 2010 and December 2, 2010). Qualified Person Mark Edwards, General Manager Geology and Exploration for Crocodile Gold Australia Operations is a qualified person as such term is defined in National Instrument 43-101 and has reviewed and confirmed the technical information and data included in this press release. For further information, please contact: Michael Hoffman Ashleigh Clelland President and CEO Manager, Investor Relations Crocodile Gold Corp. Crocodile Gold Corp. Tel: 416-861-2964 Tel: 416-861-5899 info@crocgold.com Cautionary Note Certain information set forth in this press release contains forward-looking statements, and forwardlooking information under applicable securities laws, including management s assessment of Crocodile Gold s targeted production, future plans, operations, weather forecasts and mineral resource estimates and are based on Crocodile Gold s current internal expectations, estimates, projections, assumptions and beliefs, which may prove to be incorrect. Some of the forward-looking statements may be identified by words such as expects anticipates, believes, projects, plans, and similar expressions. These statements are not guarantees of future performance and undue reliance should not be placed on them. Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause Crocodile Gold s actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to those risks described in the annual information form of the Company. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Crocodile Gold undertakes no obligation to update forward-looking statements if circumstances or management s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements. - 3 -

Figure 1: Crocodile Gold Northern Territory Location Map - 4 -

Figure 2: Union Reefs Project Area Map - 5 -

Figure 3: Prospect Claim Longitu udinal Sectio on (looking west) w (Image shows E-Len ns mineralizattion in o the Union Mineralized Zone Z Crosscourse which is on Figure 4:: Crosscours se Pit Minera alization (Ph hoto taken in base of pit at a Crosscoursse in 2003 lo ooking north. Min neralization is s estimated to t be around d 30m wide at a a grade of o 4g/t plunging to the no orth at around 60 0o. Red line is s showing high grade zone e and orange line is lower grade g margin (~1.5g/t).) -6-