UNIVERSITY OF WISCONSIN MADISON



Similar documents
ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Spill Prevention, Control and Countermeasure (SPCC) Rule

History of the SPCC Rule

Civil Engineering Sector Labour-Management Health and Safety Committee

Spill Prevention, Control, and Countermeasures (SPCC) Course Material

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

Spill Control Prevention Plan (SCPP)

Spill Prevention, Control and Countermeasure (SPCC) Training

Spill Prevention, Control & Cleanup SC-11

ABOVE-GROUND STORAGE TANKS

TRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit

Waste Oil Collection / Storage

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN PREPARED FOR: ARKANSAS STATE UNIVERSITY JONESBORO, ARKANSAS ORIGINAL DATE OF PLAN: APRIL 2005

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN. for the PIÑON RIDGE MILL HIGHWAY 90 BEDROCK, COLORADO Prepared by:

Kurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program

SPILL RESPONSE PLAN. What is the Issue? Regulatory Requirements. General Information

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Outdoor Storage of Raw Materials SC-33

SPILL CONTAINMENT AND CONTROL PLAN

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Environmental Health & Safety

Waste Handling & Disposal

SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

FUELING AND FUEL STORAGE

How To Safely Handle A Spill

SPCC for Food Services

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

Temporary Batch Plants

Contact Person Sarah Morris-Benavides Revision 1.1 Document Plan Effective Date 07/01/2014 Review Date 03/15/2017.

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

APPENDIX G Materials Storage and Handling Guidelines

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

Susceptibility of Your Drinking Water Source to Contamination

MODULE IV Secondary Containment, Oil Spill Control & Spill Prediction

BEST MANAGEMENT PRACTICES FOR LEAK AND SPILL CONTROL

Critical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.

Fuel Storage Who to ask: tank farm owners/operators

VEHICLE SERVICE FACILITIES. Best Management Practices

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

Stormwater BMPs: Secondary Containment and Spill Control. September 2012

Spill Prevention Control and Countermeasure Plan

Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Outdoor Liquid Container Storage

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

FOOD SERVICE FACILITIES Best Management Practices Stormwater Management Program City of Bluff City P.O. Box 70, Bluff City, TN

Environmental Incident Response Plan Farm A

BASEMENT FLOODING. Prevention Guide for. Homeowners

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

Spill Response Procedures & Sorbent Materials

Cheap Spills for Spill Seekers a.k.a Spills and Thrills

FACILITY ENVIRONMENTAL COMPLIANCE

SPCC. Created by EPA in 1973 under the Clean Water Act. 10/22/2014. Spill Prevention Control & Countermeasure Plan

Draft. ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF and

New York State Department of Environmental Conservation 625 Broadway, Albany, NY Environmental Self Audit For Small Businesses

First in Service First in Safety

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

Spill Prevention, Control and Countermeasure (SPCC)

Storm Water Management Requirements for Construction Projects Less than One Acre

Spill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet


SILICON VALLEY CLEAN WATER. May 2015

Farm Fuel Tank Safety Guide

OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

How Your Business Can Prevent Stormwater Pollution

APPENDIX 7-B. Hazardous Materials Management Plan

Section 5. Secondary Containment and Impracticability. (as applicable to APSA tank facilities)

RUTGERS, THE STATE UNIVERSITY OF NEW JERSEY SPILL PREVENTION CONTROL & COUNTERMEASURE PLAN

Chapter 5: Spills Response

for Gary Hughes GARY HUGHES SELF SERVICE LLC State of Missouri ID: ST

This page left intentionally blank

The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview

SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)

RESOURCE RECYCLING SOLUTIONS LTD

Below Grade Spill Containment Manholes Gallon Gallon Gallon. Installation Instructions

Florida Department of Environmental Protection

OIL POLLUTION PREVENTION REGULATIONS

Transcription:

UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) Departments of: Environment, Health & Safety Physical Plant Table of Contents Spill Contingency Plan Most Common Contractor Spills Spill Incident Report Fuel Transfer Checklist

UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) This reference guide is written to document required compliance with US EPA, WI DNR and WI DSPS rules (40CFR112, NR706, SPS310) for spills of 5 gallons or less. However, for spills greater than 1 gallon, notify UW Madison EH&S (Environment, Health & Safety Dept.). Contractor shall reimburse the University for damage resulting from a spill and for costs incurred by the University to clean up and dispose of waste. In an emergency, please refer to the Emergency Call List as follows: Police & Fire (Emergencies): 911 UW Madison EH&S: 265 5000 Physical Plant CARS (Central Answering and Response Service): 263 3333 Your Assigned Campus Project Manager: [xxx xxxx] CONTAIN THE SPILL. Follow the spill response and notification steps, start the cleanup procedure, fill out a spill incident report and give report to the Project Manager. Basic Spill Response Steps: 1. Notify others in the area; seal off area if necessary. 2. Check the scene if you can do so safely; identify the source of the incident. 3. If there is a threat to health or the environment, dial 911 and then the numbers on the Emergency Call List. 4. Take reasonable measures to stop the source and contain the spill. 5. If you can do safely, clean up the spill. 6. If you cannot do safely and there is no threat to human health or the environment, call EH&S (265 5000). 7. Contain, seal and secure the spill cleanup material. Call EH&S (265 5000) for disposal instructions. 8. Fill out Spill Incident Report. Return report to Project Manager. A copy of the report must be sent to EH&S at 30 East Campus Mall, Madison, WI. Spill Response Equipment: Contractor shall have on hand enough equipment to control spills up to 5 gallons and for the cleanup of equipment at the construction site. Standard spill response kits should contain at a minimum the following: oil absorbents, cellulose socks, latex gloves, dust masks, disposal bags or containers and hand wipes. Contractor shall have additional clean up equipment readily available to assure containment of spill can be kept intact. Clean up materials for disposal should be accessible within 24 hours as long as spill area can be weather tight and stay contained. If spill is too large for cleanup equipment or personnel, if spill has entered storm sewer, if runoff has flowed into surface waters or wetlands, or if material is too hazardous to handle, dial 911 and then the numbers on the Emergency Call List above.

Most Common Contractor Spills: Fuel (diesel and gasoline) Petroleum (oil, hydraulic fluid, transmission fluid, brake fluid) Construction spills (form oil, sealers, cleaning acids) Use the process identified on the previous pages for the above spills. Anytime you use an absorbent on a fuel or petroleum product, or you contaminate the soil with fuel or petroleum product, you must call EH&S (265 5000), who will provide you with disposal instructions. Use the following process to cleanup all types of wash ups onto the ground/soil (e.g., concrete, mortar, plaster, tile set/grout): 1. Stay away from the outer most branches of the tree or shrub (drip line). 2. Pick or create a low spot to contain wash up into a limited area; burn if necessary. 3. After wash up has dried, clean up and dig down a minimum of 6" 8", remove soil and replace with new soil. CONTRACTOR CAN REMOVE this wash up soil and must report cleanup to the Project Manager. If in doubt of what or how to clean up, ask your Project Manager, who can obtain assistance from Environmental Services and the campus landscapers. Preserving campus green space is an important University concern.

SPILL INCIDENT REPORT This must be completed and given to the Project Manager within 24hrs of an incident 1. CONTRACTOR NAME: PROJECT NAME: FACILITY NAME: ADDRESS: CITY or TOWN: NEAREST HIGHWAY or INTERSECTION: LOCATION OF SPILL (SPECIFIC): DATE AND TIME OF INCIDENT: NAME AND TEL. NUMBER OF ON SCENE CONTACT: 4. SEVERITY OF THE INCIDENT: a. Name of Spilled Material: b. Total Amount Spilled: c. Amount Recovered: d. Fate of Recovered Materials (i.e., oil, water, soil, absorbents): 5. SIGNIFICANT AREAS AFFECTED BY THE SPILL: (Indicate location of any of the following affected areas, and estimate amount spilled in or on each area) a. Building Area: b. Surface Water: c. Floor Drains: d. Storm Drains: e. Drainage Ditches: f. Soil, Gravel or Lawn Surfaces: g. Concrete Surface: h. Asphalt Surface: 6. LOCAL TERRAIN CONDITIONS: (Check off most appropriate description) a. Flat: (no significant slope) b. Somewhat Flat: (1 5% slope) c. Gently Rolling: (5 10% slope) d. Sharply Rolling: (10 20% slope) e. Steep: (>20% slope) 7. WEATHER CONDITIONS: (Check off most appropriate condition) a. Dry b. Fog or Drizzle c. Rain d. Snow e. Other 8. CAUSE AND SOURCE OF INCIDENT: (Check off most appropriate choice and attach a brief description of the problem) a. Equipment Failure b. Accident c. Human Error d. Other 9. OFFICE NOTIFIED: (Check off the offices which were notified and list the name of the person who took the report in person or by telephone) a. Project Manager b. UW EH&S Dept. c. CARS (Physical Plant) 10. Note any equipment repairs to prevent reoccurrence:

11. Report filled out by: Date: Phone No.: [Date] NOTICE TO PETROLEUM PRODUCT VENDORS/EMPLOYEES To: From: All Bulk Petroleum Product Vendors UW Madison Department of Environment, Health & Safety (EH&S) In accordance with of the Code of Federal Regulations 40 CFR 112, all petroleum product vendors who deliver, load, unload, or pick up petroleum products or waste oil to or from UW Madison facilities are required to comply with the following requirements: 1. Exercise caution when maneuvering vehicles to avoid damage to secondary containment structures. [112.7(a)(3)(ii)] 2. Drivers are to be present and alert monitoring the transfer of petroleum product full time while product is being transferred to or from on site storage containers. [112.7(a)(3)(ii)] 3. Chock the tank truck wheels while loading or unloading tanks and do not to remove the wheel chocks until after the transfer is complete and the transfer hose is disconnected to prevent an accidental drive off without removing the transfer hose. [112.7(h)(2)] 4. Prior to filling and departure, closely inspect for discharges at the lowermost drain and all outlets of the tank truck, and if necessary, ensure that they are tightened, adjusted, or replaced to prevent liquid discharge while in transit. [112.7(h)(3)] 5. Continuously monitor for potential tank overfills while loading or unloading storage containers. Check the freeboard capacity of containers prior to filling to estimate the volume to fill the tank and visually monitor the filling process to ensure the tank does not overfill. For tanks with audible air vent alarms, continuously listen for the audible air vent overfill warning whistle. [112.8(c)(8)(i)] 6. Promptly stop and clean up any petroleum product leaks or spills that occur while loading or unloading containers. [[112.8(c)(10)] 7. Immediately report leakage or spillage requiring assistance of site personnel to clean up to the Project Manager and UW Madison EH&S. [112.7(a)(3)(ii)] 8. Prior to loading/unloading, place an empty container under the hose end to be disconnected first with enough capacity to catch the remaining liquid in the transfer hose. Verify that appropriate valves are closed before disconnecting loading/unloading lines. Prior to disconnecting the transfer hose, gravity drain remaining product in the hose to the lowest container. [112.7(a)(3)(ii)] 9. Require that facility personnel oversee all oil loading/unloading activities associated with an outside vendor. [Best Management Practice] This notice is provided for your information to make you aware of these requirements so you can maintain regulatory compliance. This notice is also made as an integral part of the UW Madison campus Spill Prevention Control and Countermeasures (SPCC) Plan maintained on site and available for your inspection in our office.