Plug and Abandonment Producing Well. Slides for very basic education only!



Similar documents
The Impact Of Cementing On Proper Well Control

Plug and Abandonment Forum

Energize your mind. April Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones

Tax Executives Institute

Well Integrity Basics, Prevention, Monitoring, Red Flags & Repair Options

Drilling Problems. pull

DynaSlot System. 360 Certainty Well Abandonment

An Overview of Drill Cuttings Re-Injection Lessons Learned and Recommendations ABSTRACT

NORSOK Standard D-010 Rev. 4, August 2012

Tubular Design and Downhole Equipment

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

66 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling

Recommended Practices Associated with Hydraulic Fracturing Operations

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

DecisionSpace Well Engineering Software

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications

Guidelines For Sealing Groundwater Wells

An Introduction to Oil and Gas Well Servicing

Module No. # 02. Impact of oil and gas industry on marine environment

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Injectrol and PermSeal Sealants Repair Leaks, Restore Integrity to Casings

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

DIRECTIONAL DRILLING

OFFSHORE FIELD DEVELOPMENT

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Code of Practice for Coal Seam Gas

CHAPTER 4 WELL COMPLETION AND MAINTENANCE

Wellbore Integrity Restoration Services

number 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering

Certificate Programs in. Program Requirements

Value Addition Using Cement Evaluation by Ultra Sonic Imaging Tool In Upper Assam Oil Fields

FLUID MIGRATION MECHANISMS DUE TO FAULTY WELL DESIGN AND/OR CONSTRUCTION: AN OVERVIEW AND RECENT EXPERIENCES IN THE PENNSYLVANIA MARCELLUS PLAY

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Directive 059: Well Drilling and Completion Data Filing Requirements

Deepwater Horizon Disaster

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process

bakerhughes.com Cementing Services

PRIVATE EQUITY INSIGHTS

News Volume 1 Edition 1

Perforating Basics. How the perforating processes work. George E. King Engineering GEKEngineering.com 3/14/2009 1

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

ARPN Journal of Science and Technology All rights reserved.

Underground Injection Wells For Produced Water Disposal

1 What is the purpose of this document?

Drilling for Deepwater Data: A Forensic Analysis of the Gulf of Mexico Deepwater Horizon Disaster

Wellbore Integrity Restoration Services

Irresponsible of Statoil

Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE

Degree/ Higher Education Jobs:

HDD High Definition Data. defining a new standard for Open Hole, Cased Hole & Production Logging

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

10 Wireline operations

C O M P L E T I O N S E R V I C E S

ASX ANNOUNCEMENT 17 JUNE 2014

Meeting the Challenge of Pipeline Emergency Repair

SANTA FE COUNTY'S OIL DEVELOPMENT ZONING ORDINANCE

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

FIBER-OPTIC SENSING TECHNOLOGIES

Interpreting Uncemented Multistage Hydraulic Fracturing Completion Effectiveness Using Fiber-Optic DTS Injection Data

Reservoir Performance Monitor Formation evaluation and reservoir monitoring

Solving challenges. Drill out solutions Package

MUDSOLV NG. Integrated filter-cake removal service for optimizing performance of open-hole completions

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

WELL DEVELOPMENT COMPARING SEVERAL METHODS OF WELL

E-Line and Braided Line. E-Line Open Hole wireline

PRESIDENT ENERGY PLC. ( President or the Company ) PARAGUAY UPDATE

Guidelines for produced water injection

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

CHAPTER 13 LAND DISPOSAL

Understanding Well Construction and Surface Footprint

Stilling Well Recommendations

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July Wolfgang Zimmer, Paul Fink

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle

Petrophysical Well Log Analysis for Hydrocarbon exploration in parts of Assam Arakan Basin, India

Section 2100-Trenching and Tunneling

TECHNICAL INFORMATION

DOE Award Number: TITLE PAGE. Phase I Topical Report. Don L. Hanosh

Understanding Hydraulic Fracturing

Annular Space Grouting of Slipline Products

SECTION ABANDONMENT OF SEWER MAINS

EPRI Global Climate Change Research Seminar. Natural Gas Supply. Francis O Sullivan, Ph.D. May 25 th, 2011

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

Can You See It Coming? Examining and Mitigating the Common Causes of HDD Failures

TUBULAR Holing and Slotting Of Casing

Transcription:

Plug and Abandonment Producing Well. Slides for very basic education only! Different from drilling P&A operations. Specific regulations set by governing bodies. This presentation covers the intent of P&A: Isolate and protect all fresh and near fresh water zones; Isolate and protect all commercial producing horizons for future development; Prevent leaks from or into the well; Remove surface equipment and cut and plug pipe below ground level or fishing net level or, depending on requirements, mark the surface location so identification can be made at any time after abandonment. P&A responsibility does not usually end with the P&A activities and not even with sale of the property. If it leaks, you will likely be held responsible for damage and to repair and remediate the well and the site. Do it right the first time. 3/14/2009 1

Abandonment Types: TA and P&A TA temporarily abandoned: During a long shut-down. Waiting on a workover. Waiting on field development or redevelopment. Opinion do not delay abandonments that need to be done. In many cases, delays have increased P&A cost by 1 to 2+ orders of magnitude. Set plugs to prevent cross flow and production. Isolate all flow and protect from pressures. Test and monitor the well and keep good records. 3/14/2009 2

Abandonment Types P&A plugged and abandoned: End of current economic operations. Well problem that cannot be economically repaired. Moving the bottom hole location P&A the bottom and reuse the top part of the well. Set cement and mechanical plugs to prevent cross flow and production. Isolate all flow and protect from pressures. Follow governing body regulations. Opinion exceed the regulations and make sure it doesn t leak. Regulations change and companies might be held liable for further repairs even if the well was properly P&A d under existing laws of the time. 3/14/2009 3

P&A Costs On Shore: nothing to low expense. Well equipment recovered often offsets cost of P&A. Off-Shore: $100k to millions. Depends on whether isolated wells or whole campaign to decommission a platform. Depends on depth, pressure and potential to endanger fishing, shipping, coast line, etc. Significantly increased by platform damage from storms, ship impact or corrosion. 3/14/2009 4

Well damage increases the P&A cost sharply 100k to 10 s of millions 3/14/2009 5

Pipe damage may necessitate pulling operations not in the original plans. Cement plugs generally need to be circulated into place a functional tubing string is required. Special Conditions and considerations: 1. Collapsed or burst pipe repairs are difficult because the tubing has to be fished, often in pieces. Burst sections have to be sealed and isolated. Setting effective cement plugs is critical. 2. Channels and fractures in annulus cement or shoe areas. Setting long cement plugs requires effective sealing of fractures. 3/14/2009 6

Legislative Drivers Safe Water Drinking Acts Numbers of abandoned wells both hydrocarbon and water (>3mm in US since 1859) and reliability of the abandonment seals. Changing government regulations on fresh and near fresh waters. Protection of resources for the future (fields are often abandoned with 60 to 80% of oil and 10 to 20% of the gas still in place) waiting on technology development often for decades. 3/14/2009 7

Main targets that must be sealed Isolation: open hole, separate pay zones, perforations, liner tops and channels in cement, surface locations (3 or 1m on land to 10 to 15 or 3 to 5m, below ML offshore) damaged sections (wear points, milling, perfs, etc.), multi-laterals, corrosive zones (highly corrosive salt water?), special cases (clearing sea floor, rigs to reefs, geothermal, etc.). 3/14/2009 8

Requirements Plug thickness (height). Tag to validate plug position. Pressure tests to validate seal. Well Identification(?). Marking of lost radioactive source tools. 3/14/2009 9

Threats From Improperly Abandoned Wells Contaminated surface water entry (minerals, bacteria, waste, etc.). Surface leakage from shallow zones through well or leaking cement sheath. Leakage form an aquifer to surface. Leakage from surface to an aquifer. Danger of open well to surface egress (falling down the well). 3/14/2009 10

Materials Used in Abandonment Cement slurries. Gelled pills (bentonite and others). Spacers to protect cement slurries. Mechanical plugs (incl. cement retainers). Inflatable plugs. Sand plugs (as base for cement). 3/14/2009 11

P & A Concerns Knowledge of the well where are plugs needed? Perforations Wear areas in the casing Multilateral junctions Overlap seal stability Channels and fractures in cement sheath Fracturing far out of zone (probably rare?) Etc. Placement accuracy and seal reliability of plugs. Reliability of the cement sheath. Reliability of the overall P&A system. 3/14/2009 12

Cement Plugs Cement slurry design. Cement type and additives. API class Extenders, shrinkage, gas control, fluid loss control, formation and pipe adherence, spacers. Volumes and excesses. Placement method. Location identification, Depth control, Spotting method (bailer, circulation, etc.), Contamination control, Testing requirements. 3/14/2009 13

Cement Plug Placement Balanced method. Modified balanced method. Displacement from surface. Two plug circulation. Grouting various. Mechanical assistance. 3/14/2009 14

Setting a cement plug Not as easy as it may seem Position of the end of tubing (EOT) may not correspond to where the plug is actually set. What are the considerations of setting a cement plug in mud? Effect of fluid loss and cross flow on setting an effective cement plug? 3/14/2009 15

Setting Cement Plugs A near 100% reliable system if cross flow can be stopped. Most cement plugs fail because of cross flow, density and viscosity mismatch, or failure to break the fluid momentum. Full plug method described and field tested in SPE 11415 (published in SPE JPT Nov 1984, pp 1897-1904) and SPE 7589. 3/14/2009 16

Cement Plug Failure Many cement plugs fail for the same 4 reasons: 1. Cross flow cuts channels into the plug. 2. Cement is higher density that the mud cement falls through the mud. Mud contamination of the cement may keep it from setting. 3. The mud is much lower viscosity than the cement slurry cement falls through the mud 4. The open ended tubing produces a high momentum energy condition that the mud cannot stop thus cement falls through the mud. The result of the last three is that the cement is spread out along the hole and a plug is never formed. 3/14/2009 17

How? 1. Use a simple tubing end plug with circulation to the side and upward but not downward. 2. Spot a heavily gelled bentonite pill below the cement plug depth. Pill thickness of 500-800 ft (152-244 m). 3. Use a custom spacer to separate the pill and the cement slurry. 4. Use a viscous, thixotropic cement with setting time equal to the job time plus ½ hr. Plug thickness of 300 to 600 ft (91 to 183 m) 5. Rotate the centralized tubing (do not reciprocate) during placement and gently withdraw at the end of the pumping. 6. WOC = 4 hrs for every 1 hour of pump time. Full details and field tests in SPE 11415. 3/14/2009 18

Diverter Plug on End of Tubing A simplified diverter tool can be made by plugging the end of tubing and drilling 8 holes the bottom four straight out and the top four angled up at 45 o. Holes are 0.75 to 1 (2 to 2.5 cm) diameter. 3/14/2009 19

Laying Sand Plugs Shut-in well for several hours to prevent crossflow disruption of plug. Don t bury the BHA with dumped sand Tag frequently to avoid over-fill Use a gel spacer in front of sand to prevent sand roping or falling down the hole. Rapid sand fall out can cause bridge off inside the CT. Sand plugs are often used as a base for more stable plugs. 3/14/2009 20

Sand fall rates in various fluids 10/20 mesh sand 20/40 mesh sand Fluid ft/min m/min ft/min m/min WF220 7.5 2.3 2.2 0.67 WF240 2.05 0.62 0.49 0.15 WF260 0.49 0.15 0.11 0.03 Diesel 21.9 6.7 10.2 3.1 Water 21.9 6.7 12.6 3.8 10/20 mesh Bauxite 20/40 mesh Bauxite Fluid ft/min m/min ft/min m/min WF220 14.4 4.4 4.1 1.2 WF240 4.1 1.2 1 0.3 WF260 1 0.3 0.24 0.07 Diesel 33.7 10.3 16.9 5.2 Water 33.7 10.3 20 6.1 3/14/2009 21 Source D/S Field Book

Reasons for Cement Plug Failures Contamination of the cement slurry with drilling mud during or immediately after placement. Failure to place a viscous pill to stop downward movement of cement slurry. Inaccurate knowledge of volumes required. 3/14/2009 22

General Requirements Onshore 10 ft (3 m) plug on top of the well and casing cut 3 ft (1m) below the ground surface. Mud between plugs (9.5 lb/gal). Plug thickness minimum of 100 ft, plus 10% for each 1000 ft of zone. 3/14/2009 23

Procedures Remove salvageable equipment. NORM scale present? Leave the pipe in the well? What pipe is needed for a barrier? How effective? Set, at minimum, plugs required by regulations. Don t hesitate to go beyond requirements. Test to limits required. Cap and identify as specified. 3/14/2009 24

Isolation of Open Hole Cement Plug 100ft (30m) above and below lower-most shoe in open hole. Cement retainer 50 to 100 ft (15 to 30m) above the shoe. Cement 100 ft (30m) below shoe and 50 ft (15m) of cement on top. Tested to 15,000 lbs load or 1000 psi. 3/14/2009 25

Isolation of Perforations Cement Plug 100ft (30m) above and below perfs (or to next plug). Cement retainer 50 to 100 ft (15 to 30m) above the perfs. Cement 100 ft (30m) below shoe and 50 ft (15m) of cement on top. Permanent bridge plug within 150 ft (45m) of perfs with 50 ft (15m) of cement on top. 3/14/2009 26

Isolation of lap joints or liner tops. Cement Plug 100ft (30m) above and below liner top (or to next plug). Cement retainer or permanent bridge plug 50 ft (15m) above the liner with 50 ft (15m) of cement on top. Cement plug 200 ft (60m) long within 100 ft (30m) of liner. 3/14/2009 27

Finding and Repairing Channels in Cement Channels in cement occur from many causes: Lack of effective pipe centralization, Inadequate mud conditioning prior to cementing, Ineffective cement displacement design and/or execution, Excess free water in the cement, especially in a deviated hole (usually a cement mixing problem). Excessive fluid loss from the cement slurry (generally results in low cement top), Gas influx before the cement sets, Cement shrinkage, Etc. 3/14/2009 28

Identifying Channels in Cement Sheath Numerous logging methods: CBL and segmented CBL tools that scan around the wellbore, Borax logging, Carbon-Oxygen logs, Sonic tools, etc. Plug and packers with perforating. 3/14/2009 29

Repair of Channels - Cement Squeezes Types (some names anyway) Block squeeze Cement Packer Suicide squeeze Breakdown squeeze Running and Walking squeezes Hesitation squeeze What is used depends on both what is needed and the experience of the operator. 3/14/2009 30

Abandonment Gun Systems for Large Casing Can be designed to shoot through one very large diameter casing string without hitting the outer casing string. 11.875 13.375 16 A grouped set of perforating guns within a large casing. Key design factor: Inexpensive way to put charges near casing wall does not require single body very large guns that are difficult to find and difficult to handle. 3/14/2009 31 From Phil Snider

Surface Plug On-Shore depends on local regulations. Offshore cement plug 150 ft (45m) long within 150 ft (45m) of mud line. Placed in the smallest string of casing that extends to the mud line. 3/14/2009 32

Testing of Plugs Location of the first plug below the surface plug shall be verified. Pipe weight of 15,000 lbs on cement plug, cement retainer, or bridge plug. Pump pressure of 1,000 psi with maximum 10% drop in 15 minutes. 3/14/2009 33

Fluid Left in the Hole Fluid fill between plugs must exert a fluid density at least higher than the greatest formation pressure in the intervals between the plugs at the time of abandonment. 3/14/2009 34

Disclaimer These slides are very basic slides for educational purposes on the very basic elements of the P&A process. To meet legal guidelines, consult an expert for interpretation of the laws, design and application of the P&A jobs. 3/14/2009 35

Selected P&A References Dwight K. Smith: Handbook on Well Plugging and Abandonment, PennWell Books, Tulsa, OK, 1993. Nagelhout, A.C.G.: Laboratory and Field Validation of a Sealant System for Critical Plug and Abandon Situations, SPE 97347, 2005. Liversidge, D.: Permanent Plug and Abandonment Solution for the North Sea, SPE 100771, 2006. Tettero, F.: Optimizing Integrated Rigless Plug and Abandonment - A 60 Well Case Study, SPE 89636, 2004. Calvert, D.G., Smith, D.K.: Issues and Techniques of Plugging and Abandonment of Oil and Gas Wells, SPE 28349, 1994. Sankar, R., et.al.: Challenging the Limits: Setting Long Cement Plugs, SPE 81182, 2003. Warner, D.L., McConnell, C.L.: Assessment of Environmental Implications of Abandoned Oil and Gas Wells, SPE 20692, 1993. Idialu, P, et.al.: Restoration and Remediation of Abandoned Petroleum Drill Sites - A Nigerian Case Study, SPE 86796, 2004. 3/14/2009 36

References on Cement Channel Location Watters, L.T., Sabins, F. L.: Field Evaluation of Method to Control Gas Flow Following Cementing, SPE 9287, Dallas, Sep. 21-24, 1980. Tinsley, J.M., Miller, E.C., Sabins, F.L., Sutton, D.L.: Study of Factors Causing Annular Gas Flow Following Primary Cementing, SPE JPT, Aug 1980, p1427. Sabins, F., Wiggins, M.L.: Parametric Study of Gas Entry into Cemented Wellbores, SPE 28472, New Orleans, Sabins, F.L., Sutton, D.L.: Interrelationship Between Critical Cement Properties and Volume Charges During Cement Setting, SPE Drilling Eng, June 1991, p88. Blount, C.G., Copoulos, A.E., Myers, G.D.: A Cement Channel-Detection Technique Using the Pulsed Neutron Log, SPE Formation Evaluation, December 1991, p485. Subbas, C.D., Fox, G.A., Zebrowitz, M.J.: Time Lapse Borax Logging in a Karstified Limestone Formation of the Panna Field, Bombay Offshore, India. Harris, K., Graysion, G, Langlinais, J.: Obtaining Successful Shoe Tests in the Gulf of Mexico: Critical Cementing Factors, New Orleans, Sep 30-Oct 3, 2001. Schumacher, J.P., Bell, R.W., Morrison, S.E., Chan, A.F., Wydrinski, R.: Improved Primary Cement Jobs Through the Use of Unique Spacer Design Technology: Gulf of Mexico Case History Study, SPE 36486, Denver, 1996. Fox, P.E., Adnyiana, G., Setiadi, I.: Applications of Carbon/Oxygen Logging in Indonesian Reservoirs, SPE 54353, SPE Asia Pacific, Jakarta, April 20-22, 1999. Psotler, D.: Pressure Integrity Test Intepretation, SPE 37589, Amsterdam, March 4-6, 1997. Badruzzaman, et.al.: Progress and Future of Pulsed Neutron Technology in Oil Field Management, SPE 49228, New Orleans, Sept 27-30, 1998. Beirute, R.M., Sabins, F.L., Ravi, K.V.: Large Scale Experiments Show Proper Hole Conditioning: A Critical Requirement for Successful Cementing Operations, SPE 22774, Dallas, Oct. 6-9, 1991. Sabins, F.L.: Problems in Cementing Horizontal Wells, JPT, April 1990,, p398. Sabins, F.L., Smith, R.C., Broussard, M.D., Talbot, K.J., Olaussen, S.R.: Factors Contributing to Cement Sheath Deposition in Casing Under Highly Deviated Well Conditions, SPE 19934, SPE Drilling and Completions, Dec 1993, p 265. Wilson, M.A., Sabins, F.L.: A Laboratory Investigation of Cementing Horizontal Wells, SPE 16928, Dallas, Sep 27-30, 1987. Sabins, F.L., Sutton, D.L.: The Relationship of Thickening, Time Gel Strength, and Compressive Strength of Oilwell Cements, SPE Production Engineering, March 1986. P143. Griffith, J.E., Sabins, F.L., Harness, P.E.: Investigation of Ultrasonic and Somic Bond Tools for Detection of Gas Channels in Cements, SPE 24573, Washington D.C., Oct 4-7, 1992. 3/14/2009 37