The Development of the 500MW Co-firing facility at Drax Power Station



Similar documents
Identifying the sustainability of biomass - assuring stakeholders of the sustainability of their supplies

Nomura Conference. Biomass: the 4 th Energy Source. June February 2011

Preliminary pellet market country report SWEDEN

Unlocking Ireland s biomass potential converting Moneypoint coal fired power station to sustainable biomass.

Our Energy Future ANALYSIS OF THE IMPACT OF LARGE BIOMASS ON THE ENERGY MIX IN BELGIUM

Guidelines for stakeholders in bio-coal supply chain: Hypothesis based on market study in Finland and Latvia

Cofiring of biomass in coal-fired power plants European experience Dr Colin Henderson IEA Clean Coal Centre

Delivering the UK s renewable heat objectives through wood fuel

BUILDING THE BUSINESS CASE FOR LARGE-SCALE UTILIZATION OF FOREST RESIDUES AS FEEDSTOCKS FOR PRODUCTION OF ENERGY COMMODITIES:

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

Biomass in Electricity Generation. Richard Lee

Biomass Supply Chains in South Hampshire

Biomass supply chain issues for power

Biomass-to-Fuel-Cell Power For Renewable Distributed Power Generation

The importance of sustainability to a UK Generator. Richard Peberdy, VP Sustainability

Foratom event 29 April 2015

Harvesting energy with fertilizers

University of Missouri Power Plant Combined Heat and Power Upgrades Columbia, Missouri

Air quality and biomass installations. A briefing for local authorities

A Review of Biomass Boiler Technologies. Fernando Preto CanmetENERGY, Natural Resources Canada

Well Positioned for the Future

A Green Idea. Reclaiming Urban Wood Waste And Urban Forest Debris. For Fuel/Combustion & Renewable Energy

Dirtier than coal? Why Government plans to subsidise burning trees are bad news for the planet

Bioenergy in Europe: A new beginning or the end of the road?

An introduction to the Sustainable Biomass Partnership

Experience with co-combustion of biomass and waste in coal-fired power plants

Subsidising Biomass Electricity - Contracts for Difference and what they mean for dedicated and converted biomass power stations

DONG Energy. Biomass for heat and power experience and perspectives

Drax Group plc Annual report and accounts powering tomorrow

New Bio Solutions. DONG Energy. Pyroneer November May 2013

BIOMASS SOURCING STRATEGIES NON-TECHNICAL CHALLENGES OF A COMPANY INTENDING TO BUILD A DEMONSTRATION/FLAGSHIP PLANT

Supply Chain Comparison. COEE Project 1

Methodology CO 2 -tool for electricity, gas and heat from biomass

Fact sheet. Conversion factors. Energy and carbon conversions 2011 update

Use of Substitute Fuels in Large Combustion Plants (LCPs)

Electric Utilities. Introduction to the module

THE POWER TO BE DIFFERENT. An introduction to Haven Power

Biomass Energy Demonstration Grant BES Lansing Board of Water & Light

Making Coal Use Compatible with Measures to Counter Global Warming

NAWARO BioEnergie AG: a short introduction into our business for BiG>East: Biogas for Eastern Europe

An Overview of California s Cap and Trade Program

Technology Strategy Board

Biomass availability and supply for co-firing projects in Alberta. Dominik Roser, Ph.D.

Wood Pellets for Power and Heat. Gordon Murray, Executive Director

Electricity Market Reform: Proposals for Implementation

DELIVERING THE BIOENERGY TRIPLE BOTTOM LINE TO THE GLOBAL COMMUNITY

Groupwork CCS. Bio-Energy with CCS (BECCS) Platzhalter Logo/Schriftzug (Anpassung im Folienmaster: Menü «Ansicht» «Folienmaster»)

THE WOOD PELLET INDUSTRY AND ITS SUPPLY CHAIN EDWARD SONTAG DIRECTOR OF FIBER SOURCING

Country Report, SWEDEN

A Guide to Woodland Carbon for Business

THE PRACTICAL, PROVEN PATH TO GREEN ENERGY. RTP rapid thermal processing from Envergent Technologies

PRODUCTION OF WOOD-BASED BIOGAS IN JOUTSENO

Module 7 Forms of energy generation

Green Energy in Europe - Potentials and Prospects

White Rose Carbon Capture and Storage (CCS) Project Document Ref: Rev. 2 PINS Ref: EN10048

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Stora Enso Fors Ltd Sweden

Regulatory Briefing. Capital Markets Day. 17 October 2013

System Basics for the certification of sustainable biomass and bioenergy

Q UEEN S I NSTITUTE FOR E NERGY & E NVIRONMENTAL P OLICY

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

THE ADDED VALUE OF A TOTAL QUALITY- DRIVEN OPTIMAL BIOMASS SUPPLY CHAIN

Agricultural Watershed Institute. Experimental Watershed Projects as a Research Platform for Co-Production of Biomass and Ecosystem Services

RESOURCE EFFICIENCY SCOREBOARD DATA CENTRE ON NATURAL RESOURCES

of bioenergy and actions

DEVELOPMENT AND STATUS OF THE USE OF AGRICULTURAL RESIDUES FOR ENERGY IN DENMARK HISTORY AND POLICY DRIVERS

Biomass prices in the heat and electricity sectors in the UK

Public health benefits of strategies to reduce greenhouse gas emissions. Professor Sir Andy Haines

System Basics for the certification of sustainable biomass and bioenergy

Success Case of Co-firing of Biomass and Coal

White Rose Carbon Capture and Storage (CCS) Project

EBRD s Green Bond Issuance and the Procedures for Selection of the Green Project Portfolio

State of the art of solid biomass technologies in Germany

How To Model Biomass

Putting a chill on global warming

SUPPLY CHAIN ISSUES FOR BIOFUELS

Mobilizing agricultural crop residues for energy and higher value bio-products

Nottingham TreeStation

ACCOUNTING FOR ASIA S NATURAL CAPITAL

Application of the Biomass, OxyFuel, and Flameless Combustion for the utilisation of pulverised coals for electricity generation

Overview on SEA output

Making sense of renewable energy technologies

Our financing of the energy sector in 2013

Transcription:

The Development of the 500MW Co-firing facility at Drax Power Station Nigel Burdett - Head Of Environment November 2010

Drax: Unique Asset in UK Generation Mix Drax Power Station is owned by Drax Group plc, a FTSE 250 company Drax is the newest and most efficient coal-fired power station in the UK 4,000MW capacity ~ 6 units. 7-8% of total UK power production Single site operation Supply business (Haven) focusing on SME/I&C The single biggest challenge facing coal-fired generation is environmental - UK requirement to reduce CO 2 by 80% from 1990 to 2050 Major exposure is carbon Drax emits 20-22 million tonnes CO 2 per year Drax role in this transition to reduce CO 2 emissions (from full load emission rate of 850 g/kwh to 700 g/kwh by 2011) through Renewable biomass and improving thermal efficiency For Drax conversion to biomass is an economic means of transitioning to low carbon, whilst retaining security of supply through Investment in biomass co-firing infrastructure and facilities Planned conversion of one or more existing coal units to biomass Planned build of three 290MW dedicated biomass generating plant 2 Drax Power Limited

Breaking down the Supply Chain Transportation Pelletising Port Loading Planting and Harvesting UK Biomass Imported Biomass Ocean Freight Renewable Power Storage/ Site Processing Transportation Port Discharge Drax Power Limited

Drax co-firing facility Building on several years experience and >80 fuels 400MW direct injection co-firing facility commissioned 2010 100MW through the mill capacity Biomass storage - 36,000 m3 (~3 days at full load) Biomass firing rate - 16-40 tonnes per hour per boiler 1.5 million tonnes per year Mainly pre-processed fuel - complements existing on-site processing facilities Combustion unexceptional 4 Drax Power Limited

New 400MW Co-firing Facility at Drax Buffer Silos Boiler Road unloading Holding Silos Hammer Mills PF Burner Air Blowers 400MW Biomass Direct Injection Rail Unloading Holding Silos 100MW through the mill capacity 5 Drax Power Limited David Smales, Head of Biomass Co-firing Coal Mills

Biomass supply chain - logistics Dedicated unloading Dedicated Rail wagons 6 Drax Power Limited

Biomass Storage Rail storage 16,500 tonnes Road storage, 7,500 t 7 Drax Power Limited

Biomass processing Processing tower biomass pellets are processed into dust before injection into boilers for combustion 8 Drax Power Limited

Biomass project overview 9 Drax Power Limited

Biomass Supply chain Biomass is a new fuel for large scale electricity generation- supply chain undeveloped Agricultural residues (e.g. straw pellet plant at Goole) Forestry ( e.g. residues, thinnings ) Energy crops ( SRC, miscanthus) Drax aim to source substantial volumes from UK but will import Potential sources of economical and sustainable feedstock are abundant Drax confidence in long term availability of large global volumes of biomass provided that sustainability concerns overcome 10 Drax Power Limited

Supply chain Investment 100,000 tonne pa local straw pelleting 11 Drax Power Limited

Supply chain Sustainability Drax is at the forefront of the implementation of credible sustainability standards into solid biomass fuel procurement activities with clear criteria and methodologies to define sustainability and to calculate greenhouse gas emissions The Drax procurement programme incorporates Rejection of all non-sustainable biomass All supply chain stages, where applicable - cultivation and harvesting, transforming, processing, and transportation. Minimum standards on Life cycle greenhouse gas savings, Environmental/biodiversity and Social Issues Internal standards stricter than EC guidance and DECC Consultation proposals Compliance with policy through procurement contracts Extensive data gathering and assessment through a programme of information exchange and an improvement programme, backed by an independent third-party audit. 12 Drax Power Limited

Supply chain Sustainability 1. Reduce GHGs by >70% vs. Coal 2. Protect Valuable Carbon sinks 3. Avoid Food vs. Fuel concerns 4. Protect Sensitive Habitats (biodiversity) 5. Protect/Maintain Soil Quality 6. Protect/Maintain Water Quality 7. Protect/Maintain Air Quality 8. Provide Social Economic benefits within the supply chain 9. Provide Social Economic benefits for biomass communities 13 Drax Power Limited

Conclusions 1. World s largest co-firing facility 2. Co-firing facility commissioned and operational in 2010 3. Excellent operational performance but key success factor is setting up and integrating the entire supply chain - Combustion - Processing - Storage/Handling - Logistics - Pelleting - Procurement - Sustainability 14 Drax Power Limited