Underground Geological Database Management System for Mapping Process Improvement, Case Study of Deep Ore Zone (DOZ) Mine, PT Freeport Indonesia



Similar documents
Certificate Programs in. Program Requirements

Data Management for Exploration and Mining Companies

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

REPORT OF WORK GUIDELINES

Executive Summary. It is considered unlikely that, in Mineral Reserve estimation, one individual will have the requisite skills or experience to

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

Establishing the feasibility of your proposed mining venture

STUDENT GUIDE GEOLOGICAL ENGINEERING University of British Columbia

How To Map A Lake In The North Of The Holland (Fiji)

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Achtung, Folientest, nicht für den Produktiveinsatz geeignet. Blötberget Iron Ore Project From Resource and Mining History to Present

Future of Minerals Exploration Helping the mining industry go deeper.

COURSE OUTLINE GEOL 204 MINING COMPUTING 45 HOURS 1.5 CREDITS

Savannah North Scoping Study Looking into the future 3 February 2016

For personal use only

4.10 Geological models

Appendix A Use of Supporting Studies in Process for NI Documentation

For personal use only

Chalcophile and Key Element Distribution in the Eastern Goldfields: seismic traverse EGF01. Aleks Kalinowski Geoscience Australia, pmdcrc Y2 project

3D Modelling & Mine Planning Software. Comprehensive tools provide a competitive advantage from exploration to rehabilitation.

The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines

Expert Knowledge. New. ArcGIS 10. Incorporating. fuzzy logic tools. By Gary L. Raines, Don L. Sawatzky, and Graeme F.

ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin

Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

Enterprise Resource Planning Analysis of Business Intelligence & Emergence of Mining Objects

DAMANG MINE: SWINGING BACK TO PROFITABILITY ALFRED BAKU EVP & Head of West Africa NG Mining Summit, Cape Town, June 2015

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Leapfrog : new software for faster and better 3D geological modelling

META DATA QUALITY CONTROL ARCHITECTURE IN DATA WAREHOUSING

MINIMUM ENGINEERING STUDY REQUIREMENTS UPDATE

STUDENT GUIDE GEOLOGICAL ENGINEERING University of British Columbia

What you can do:...3 Data Entry:...3 Drillhole Sample Data:...5 Cross Sections and Level Plans...8 3D Visualization...11

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

Second Quarter Earnings Release Conference Call. July 23, 2009

A GIS BASED GROUNDWATER MANAGEMENT TOOL FOR LONG TERM MINERAL PLANNING

Focusing on Near Term Production and Exploration in Quebec

ALCYONE REPORTS JORC SILVER RESOURCES

N O T E S. Environmental Forensics. Identification of Natural Gas Sources using Geochemical Forensic Tools. Dispute Scenarios

Minnesota Department of Natural Resources \mn_dnr \mn_dnr\spatial \mn_dnr\tabular \mn_dnr\metadata

Collecting and Analyzing Big Data for O&G Exploration and Production Applications October 15, 2013 G&G Technology Seminar

CIVL451. Soil Exploration and Characterization

EXPLORATION TONY HOUSTON Head of Exploration

SYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN

I Newsletter Q1 WELCOME TO OUR FIRST NEWSLETTER EDITION FOR 2015!

(b) How data mining is different from knowledge discovery in databases (KDD)? Explain.

Manitoba Technical-Vocational Curriculum Framework of Outcomes. Mining Engineering Technology 2015 Draft

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

CNSX: TV

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Exploration. Exploration methods

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

Basements and Deep Building Construction Policy 2014

Implementation of a Web Portal for Managing and Sharing Environmental Data

Application of Big Data Solution to Mining Analytics Sandipan Chakraborti Senior Architect ENU

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

EnerCom The Oil & Gas Conference. An Integrated Workflow for Unconventional Reservoirs

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Q CONFERENCE CALL. Q Earnings Call. Thursday, August 13, :00 am EST.

DecisionSpace. Prestack Calibration and Analysis Software. DecisionSpace Geosciences DATA SHEET

Soil behaviour type from the CPT: an update

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

Chapter 5. Rules and Policies

KYLYLAHTI RESOURCE INCREASED

Exploration Update - Corunna

Sabina Gold & Silver Corp.

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

Significant Nickel Sulphides at Killaloe JV Project

For personal use only

Drilling into Science: A Hands-on Cooperative Learning Oil Exploration Activity designed for Middle School and High School Students

Urban planning and management information systems analysis and design based on GIS

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:

2015/01/04. New SAMREC Representative. Ken Lomberg. Group. Pr.Sci.Nat. Senior Principal Consultant. with Coffey. 30 years experience in South Africa

FOCUS MINERALS LIMITED

Mining Engineering Department, Middle East Technical University, Ankara, Turcja **

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Making the right decisions with SCOR

MGT Resources Limited 1305/109 Pitt St Sydney NSW 2000 Australia. December Quarterly Report QUARTERLY REPORT

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

New Discoveries in the Relationship Between Macro and Micro Grindability

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Investing in an Underground Coal Mine in Indonesia

Iterative Database Design Challenges and Solutions for a Geomechanics Database

LEARNING OUTCOMES EVALUATION. Mining Engineering

Galahad Gold plc (Galahad)

APPLICATION OF DATA MINING TECHNIQUES FOR BUILDING SIMULATION PERFORMANCE PREDICTION ANALYSIS.

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Implementing Heuristic Miner for Different Types of Event Logs

Customer Classification And Prediction Based On Data Mining Technique

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

How To Understand The History Of The American Gold Mine

NOVEMBER January 2013

Transcription:

Available online at www.sciencedirect.com Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 International Symposium on Earth Science and Technology, CINEST 2012 Underground Geological Database Management System for Mapping Process Improvement, Case Study of Deep Ore Zone (DOZ) Mine, PT Freeport Indonesia Harman Setyadi 1, LilikEko Widodo 2, HeriSetiono 3,Lasito Soebari 4 1 Doctorate Student, Mine Engineering Program, Facultyof Mine and PetroleumEngineering, Institute Technology Bandung, Jl. Ganesa 10, Bandung 40132 1 General Superintendent Geologic Data Administration & Maintenance, PT. Freeport Indonesia, Papua E-mail: Harman.Setyadi@yahoo.co.id; Harman_Setyadi@fmi.com 2 Earth Resources Exploration Group - Facultyof Mine Engineering and Petroleum Institute Technology Bandung, Jl. Ganesa 10, Bandung 40132 E-mail: lew@gc.itb.ac.id 3 Chief Engineer System Development & Management, PT Freeport Indonesia, Tembagapura, Papua E-mail: Heri_Setiono@fmi.com 4 ManagerUG Geology Operations, PT Freeport Indonesia M72 Office, Papua E-mail: Lasito_Soebari@fmi.com Abstract The Deep Ore Zone (DOZ) is the underground (UG) mine which is located on the East ErstbergSkarn System (EESS) of Grasberg-Ertzberg Au-Cu district in Tembagapura Papua. The DOZ mine is operated by block cave mine method with average of daily production is 80 ktpd ore. Geological information is the important information required for planning, developing, and monitoring the underground mine. This project was initiated in 2007 using the commercial database management software. The objective of the project is to establish the common and centralized underground geology data as well as improve the information transparency. Geological data recording in every draw points is to collect information of rock types proportion, grade and dilution estimates, water condition, clay contents. Solid data integration would help in 3D block model versus the drawn material reconciliation as well as mine planning processes. The first phase of UG geology database management system was successfully to accelerate the creation of routine geological report and improve data and report quality. The second phase of this project was designed to integrate the geo-science data for UG operation support. The paper will be devoted to the management system of geological data collected from production in order to map the characteristics of rock. This may subsequently be used in order to improve all processes including mine planning, production scheduler, draw order, mud rush potential anticipation and mud rush mitigation. Keywords: Deep Ore Zone (DOZ), Underground Mine, Database management 1878-5220 2013 The Authors. Published by Elsevier B.V. Open access under CC BY-NC-ND license. Selection and/or peer review under responsibilty of Institut Teknologi Bandung and Kyushu University. doi:10.1016/j.proeps.2013.01.010

Harman Setyadi et al. / Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 71 1. INTRODUCTION Geological mapping commonly consists of observation of lithological, mineralogical, alteration, and structural aspect. All geological aspect should be recorded using specific techniques and may use the specific recording data sheet, which traditionally using paper sheet. Different Geological information may be collected and recorded by same geologist or different geologist, in the same time or in the different time. Finally all different data or information should be integrated on the mapping system. Geologists with their geological and or body of knowledge will evaluate and interpretto the geological information (Kenneth, 2012). In the mine operation, support geological information should be converted to the mine support requirement that is included but not limited for the lithology and/or metallurgy characteristic, grade distribution, and geotechnical support. The Geological mapping process from field data observation, recording, compiling, integration, evaluation and reporting are traditionally required a long time and prone some inconsistent data and missing data. The objective of the data management is to create the standardize data collecting and data recording procedure to establish the common and centralized underground geological data. Centralized data will avoid potential redundant data source for the different data used as well as the data versioning. Information transparency is assuming that all data was recorded properly in the timely manner. All data or information should be put and published in the integrated database system so the geologists (users) areable to access the data collected byothers geologists and/or other from different data sources related to the geological aspects as well as mine operation. 2. UNDERGROUND GEOLOGICAL SUPPORTS The main support of underground Geology to the DOZ underground mine is included but not limited for daily, weekly and quarterly support. Daily geological support consistsof: 1) face mapping for development daily observation report of lithology, structural and ore-waste mapping; and acid rock drainage (ARD) assessment from the geological mapping; 2.) daily drilling progress report as quick logging, which was reported for the general geological condition including structure estimate grade, structure, RQD and ground condition assessment for pilot hole; 3.) weekly underground geology support is mainly related to the DOZ underground mine production by means regular weekly draw point geological mapping. 3. UG GEOLOGICAL DATABASE Underground Geologistsare generally conducting several different mapping and/or data collecting for the geological propose as well as for the mine operation supports. Every mapping task may be conducted by different geologist,they should conduct single or multi-tasking works. The example of single mapping is to do the geological and structural mapping along the development drift. However, in some cases this task should be combined with the geological sampling. Different data type should be recorded in the different format as well as different data storage procedures. Geological draw point mapping is commonly combined to record the fragmentation as well as the wetness condition.

72 Harman Setyadi et al. / Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 Data Collector - A Data Collector - B Data Collector - C User for Data A+B UG Geology Database Integration User for Data B+C Multi User for Data A+B+C Figure 1: Generalized UG Geological data collecting, database storage and data users. Figure 1 present the generalized UG Geology data flow. Different data form and different data collecting with potentially have different data format suggested recorded in the single integrated database. User may use only single information or may need combined information collected from different data sources. They also potentially want to visualize several different types of data in the 2D and/or 3D GIS model to evaluate the geological and/or mining status progress. To meet this requirement database system should be developed in flexible way to meet user need. The updated status mapping should be uses for mapping plan to check potential geological change, especially for the draw point mapping, which performs a time series data. Its mean that in the same point of observation should have different information in different time observation. The static spatial data such as drift mapping should only single observation in one point observation. The updated data in the map was also used for the mapping plan as well as to generate a potential geological map revision. Data flow of the UG geology was simplified as Figure 2. This process also suggeststhat geological database is growing along mine production and development. START Field Mapping Planning Field Observation & Data Recording Data Entry Data Plot & geological outlined UG Geology Databases Data Validation External Factors 2D-3D Visualization and Interpretation Geological Reports FINISH Figure 2: Simplified UG Geology datacollection and storage.

Harman Setyadi et al. / Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 73 The geological database nature is required the historical record from the initial data collection. The requirement is uses for reviewing the initial geological condition for mine planning and to reconcile with the actual information discovered during the mining live. Data validation of UG Geological data (Figure 2) is the important task since the geological data commonly collected by the visual observation. The external factors such as the dark, dusty and noisy on the underground mine environment will impacted to the accuracy of the observation. Different observer (geologist) may have different estimation and/or interpretation in the same object. Standardization as well as observation data control should be taken to ensure the data consistency. 4. DATABASE DEVELOPMENT PROGRESS In the introduction section has been mentioned that there are three major different database uses for UG geology department PT. Freeport Indonesia. Due the different type, characteristic and database stakeholders the data has been stored in the three different databases. The first major is the UG Geology draw point database. The first phase development had successfully migrated the historical data from the MS Excel and in-house database system onto the integrated UG Cave Management database using the commercial database system platform. Data migration to the commercial database system is to reduce the use of database developer and to have support and system maintenance from the vendor. The other consideration is to use the generic best practice of exploration and mine database administration. The second type of the UG database is the Geological structure database which has specific data type. At this stage, difference data type and exclusive data type for special purpose have been stored in the independent database but using the same commercial database system. The integrated mapping system, database capturing and 3D visualization have smoothed data recorded process as well as reporting procedure (Manning, 2010). The third database is the Exploration database, which is used for drilling information data repository. Exploration database is the data source for the mineral resources modeling and calculation. Mine geology as part of the advance exploration that is responsiblefor evaluating drilling project related for geotechnical and hydrology for underground mine. Moreover it is also used for infill drilling and/or delineation drilling project. Drilling data is use for reserve resource modeling. Geotechnical drilling is regularly requested to improve mine design development and mine operation. Hydrology drilling was designed for dewatering project, which is run by Hydrology Department. Further detail exploration database model was prepared and presented in different paper of this symposium. Infill drilling is requested to ensure the resource calculation and model, which is reviewed in the regularly basis. In some cases, specific metallurgical test is required from drill core data to study and to better understand ore characteristics. Infill drilling is an additional information, which is possible to be used for revising the existing resource or reserve model. An example of infill drilling for Big Gossan mine (BG2720-40), which shows the revised ore boundary that may impact mine planning (Figure 3). Figure 3: Cross-section of DDH BG2720-40 showing the 1% mineralization boundary (purple) and the new interpretation (Mine Geology, 2012). 5. DATA TRACKING AND AGGREGATION Figure 4 shows the monthly data comparison between lithology composition trends and copper grade trend. An example of the advance data integration need: ore production grade evaluation in comparison with lithological

74 Harman Setyadi et al. / Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 composition is required to integrate two separated database systems, which are geological data and Mill production database system.data collecting itself has different time frame. Mill data production is recorded using time basis, which represents the whole mine production, while geological data is collected using weekly basis at an individual draw point. Data aggregation process of each data is required before comparison to see the general overview. Figure 4: Graph of DOZ Mine rock types distribution versus Cu grades (white line) from January 2011 to May 2012 (Mine Geology, 2012). Data tracking is other important task in the integration system, which is to ensure that all data beingstored is ready to use. The current database is a static system, which meansno warning system if any part of the process does not work properly. The manual tracking was conducted by meansof assign somebodywho was appointed as data stewardto regularly check and ensure that all process work properly. 6. FURTHER DATABASE DEVELOPMENT Data collection related to the DOZ underground operation is not only from UG geology but also from other departments, such as Cave Management, Geotechnical and Hydrology as well as UG Engineering Department. In other hand, others evaluation and/or decision require data not only from their department but also fromother parties. UG Geological data, which records every draw point informationthat consists of rock types proportion, grade and dilution estimates, water condition, clay contents. Thisinformation in turn was used for mud rush potential anticipation and mud rush mitigation. Based on the latest study by LAPI-ITB (2011), itconcludes that the mud rush or wet muck evidence is contributed from water (wetness), fine material, and draw point disturbances during mucking activity. Table 1 is thesummary of the mud rush or wet muck potential occurrence ant it indicators summarized from Butcher et all (2005), Samosir (2008), Rachmad (2011), Lasito (2011), UG Geotechnical & Hydrology (2011) in LAPI 2011. Table 1: The summary of mud rush element and it indicators for DOZ mine. 1 Total fine mater, Fine material source, clay content, lithological change and type (Geology) 2 Rain fall, water travel time, water content in draw point, water saturation, clean water occurrence, hydraulic connectivity (Water). 3 Disturbance by mining activity,mine production, non-continuously drawing productivity 4 High angel (> 45 ) of material at draw point 5 Increasing height of draw (HoD) 6 Material migration from higher level, indicated by increasing yellow garnet.

Harman Setyadi et al. / Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 75 Table 1 indicates that database development for mud rush mitigation requires several data sources. At the end, the integration data was proposed to understand the overall figure of the process or situation on the whole area interested as Knowledge Data Discovery (KDD). Figure 6was designed to be suggested for the Exploration Data Mining and Business Intelligence (KDD) for Underground mine related to geo-science information. This may subsequently be used in order to improve all processes including mine planning, production scheduler, draw order, mud rush potential anticipation and mud rush mitigation. The data collection with scattered data in different place and different format is challenging of further development. At the first phase of data collection, called as data discovery,is the process to understanding where the data source and what kind the data. During this phase is possible that there may some inconsistenciesin data gathering method as well as data readiness, for example the latest HoD data is recorded in February 2012, while the latest geological data is recorded in May 2012 for data extraction in June 2012. Figure 5 shows the data trend, which also presents the data availability. Understanding of data meaning and purpose is also important part in data validation and consolidation. Reviewing data using simple chart (Figure 5) and/or plot in the map as well as discussing with the data owner is the way to understand the data meaning in order to develop the System Management & Quality Assurance (Figure 6). Figure 5: An example data review and validation for further database development for mud rush mitigation. Decision Making Data Visualization 2D, 3D GIS Analysis and Modeling System Management & QA Validation, Consolidation, Integration, Data Warehouse, Querying, Reporting Data Source Administration Field Data Gathering: Geological Mapping-Logging, Geophysical Survey, Geochemical Sampling, Remote Sensing Figure 6: The suggested exploration data Mining and business intelligence (modified from Saptawati, 2011). 7. CONCLUSION Based on the study and development, the first phase database management system successfully established by UG geology to accelerate the creation of routine geological report and improve data and report quality.

76 Harman Setyadi et al. / Procedia Earth and Planetary Science 6 ( 2013 ) 70 76 Further development and enhancement, which involves several departments with different type of data and different method of data gathering,will create more complex database system and should require standardization. ACKNOWLEDGEMENTS Thank you for PT Freeport Indonesia Management, especially the Geo Service Division which gives an opportunity to present and publish the Underground Geological Database. References 1. Butcher, et.all, Mud Rushers and Methods of Combating them, The journal of The South African Institute of Mining and Metallurgy, Volume 105, pp 817-824 (2005). 2. Kenneth, M, In house Training of Resource Modeling, PT Freeport Indonesia, Tembagapura (2012). 3. LAPI-ITB, Identification, Characterization, Modeling of Groundwater and Management of Inflow into DOZ Underground Block Caving Operation, Prepared for PT Freeport Indonesia (2011). 4. Marjoribank, R, Geological Method in Mineral Exploration and Mining, Second Edition, Springer, Australia (e-book) (2010). 5. Manning, P, Using LAVA to increase Productivity, Maptek Users Conference, North America (2010). 6. Saptawati, P, Data Mining; Concepts and Techniques, Institute Technology Bandung (2011). 7. Underground Geotech& Hydrology, Workshop Wet Muck Assessor, Angkatan ke-1, PT. Freeport Indonesia (2011). 8. Mine Geology, Mine Geology Status Report May-2012, Internal Report PT Freeport Indonesia (2012).