Managing construction procurement risks



Similar documents
Appendix 18 NEC3 Options

Basic Guide. General Conditions of Contract for Construction Works (GCC 2004)

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

Project Risk Identification. IH 635 Managed Lanes Project Exhibit A to Project Development Plan 1

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts

Schedule 12 - Insurances

Risk Management Policy and Framework

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

RISK & INSURANCE IN CONSTRUCTION

C1.2 CONTRACT DATA PROVIDED BY EMPLOYER (ECC3)

Kingdom of the Netherlands

Guidance Notes for the NEC Engineering and Construction Contract

INDIA MOTOR TARIFF w.e.f Policy wording STANDARD POLICY FORM FOR MOTOR TRADE INTERNAL RISKS

Contract Works and What you need to Know

Managing Risk in Procurement Guideline

INDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242

Insurance management policy and guidelines. for general government sector, September 2007

The Lowitja Institute Risk Management Plan

REQUEST FOR QUOTATION/ PURCHASE ORDER

PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) Submission to WorkCover Western Australia. Legislative Review 2013

OPTIMA TRADE PLUS SUMMARY OF COVER

AFTRS Health and Safety Risk Management Policy

Project Risk Management. Presented by Stephen Smith

SAFETY and HEALTH MANAGEMENT STANDARDS

1.1 The contract shall be deemed to have been entered into upon receipt of supplier s written acknowledgement stating its acceptance of the order.

At minimum, Project Co will be required to ensure the following insurance coverage in relation to the D&C Phase:

SAMPLE CONSTRUCTION INSURANCE REQUIREMENTS

How To Write New Government Construction Contracts

CONTRACTOR AND SUPPLIER INSURANCE REQUIREMENTS

SECTION 3 AWARD AND EXECUTION OF CONTRACT

Occupational Health & Safety Practitioner. Reading PRINCIPLES OF ACCIDENT PREVENTION

INSURANCE AND INDEMNIFICATION REQUIREMENTS. RE: CCTV system for bus shelters at the Economy Lot PAGE 1 OF 4

An insurance package suitable for small to medium sized businesses in the construction industry with a:-

1.1 In these Terms and Conditions, the following words shall have the following meanings:

Contract Management. Brief 22. Public Procurement. September 2011

INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000

GENERAL TERMS AND CONDITIONS

Insurance and the Construction Failure

BP NEW ZEALAND PURCHASE ORDER GENERAL TERMS

Nominated Subcontractors on International Projects: Approaches to Risk Allocation

The South African Council for the Project and Construction Management Professions (SACPCMP)

Risks and uncertainties

Injury Schemes a lawyer s perspective Ian Brown Vice President and President Elect, Queensland Law Society

EXHIBIT B-1 INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $30,000

COMMERCIAL INSURANCE POLICY

HONG KONG HOUSING AUTHORITY GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS 2013 EDITION

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

Shtokman Development AG

NZIA Standard Construction Contract

General Terms of Public Procurement in service contracts JYSE 2009 SERVICES

ARIEL AIRPORT OWNERS AND OPERATORS LIABILITY INSURANCE

RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

How to get value for money from service providers on major projects

POL ENTERPRISE RISK MANAGEMENT SC51. Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT:

NATIONAL WORKERS COMPENSATION AND OCCUPATIONAL HEALTH AND SAFETY FRAMEWORKS

RBI ASSET MANAGEMENT STANDARD CONDITIONS OF BUSINESS

Integrated Risk Management Policy

Insurance of Mobile Offshore Units Construction All Risk insurance (MOU/CAR)

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

BUILDING PROFESSIONAL CONSTRUCTION INDEMNITY INSURANCE GUIDELINES. Australian Procurement and Construction Council Inc

Doral Mineral Sands Pty Ltd. Standard Terms and Conditions

Corporate Risk Management Policy

Public and Product Liability - General

Principal risks and uncertainties

PM in construction industry

Guide to Developing Risk Management Plans for Sport & Active Recreation Clubs

ATTACHMENT A.6 INSURANCE REQUIREMENTS ROUTINE CONSTRUCTION, MAINTENANCE AND REPAIR PROJECTS

CONTRACT CONDITIONS FOR LOGISTICS (2014)

Conditions of Supply of Internet Services

EXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS

Professional Indemnity Insurance Specialist Supplier Presentation

CONTRACTORS ALL RISKS INSURANCE

inform practice note SUBCONTRACTING ARRANGEMENTS Content Synopsis: Practice Note # 7 May 2007 (Version 1 - May 2007) construction industry development

Risk Management in the HSE; An Information Handbook

PRIME MINISTER A NEW MEDICAL INDEMNITY INSURANCE FRAMEWORK

PUBLIC AND PRODUCTS LIABILITY INSURANCE SCHEDULE TO THE POLICY

PUBLIC POWER CORPORATION S.A. DISTRIBUTION

Employers Liability Policy of Insurance

Australian Standard. General conditions of contract for design and construct. AS (Incorporating Amendment No. 1)

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

SAMPLE SERVICES CONTRACT

GENERAL TERMS AND CONDITIONS OF PURCHASE

INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS

Transcription:

CONSTRUCTION PROCUREMENT BEST PRACTICE GUIDELINE #A5 Construction Industry Development Board Pretoria - Head Office Tel: 012 482 7200 Fraudline: 0800 11 24 32 Call Centre: 0860 103 353 E-mail: cidb@cidb.org.za 1. Introduction Managing construction procurement risks March 2004 First Edition of CIDB document 1005 Risk cannot be eradicated, but can be managed; it is better to be proactive rather than reactive. Risks, however, need to be identified, quantified and understood if they are to be managed. Risk management is an iterative process consisting of well-defined steps which, taken in sequence, support better decision-making by contributing a greater insight into risks and their impacts. The risk management process can be applied to any situation where an undesired or unexpected outcome could be significant or where opportunities are identified. Decision makers need to know about possible outcomes and take steps to control their impact. Risk management is recognized as an integral part of good management practice. To be most effective, risk management should become part of an organization's culture. It should be integrated into the organization's philosophy, practices and business plans rather than be viewed or practiced as a separate program. When this is achieved, risk management becomes the business of everyone in the organization. Risk management enables continual improvement in decision-making. It is as much about identifying opportunities as avoiding or mitigating losses. 2. The approach to risk management advocated in AS/NZ 4360: Risk Management The Australian / New Zealand standard AS/NZ 4360 (1999): Risk Management provides a generic framework for establishing the context, identification, analysis, evaluation, treatment, monitoring and communication of risk. An understanding of this standard is essential if risk is to be managed. AS/NZ 4360 contains the following definitions: monitor: to check, supervise, observe critically, or record the progress of an activity, action or system on a regular basis in order to identify change. risk: the chance of something happening that will have an impact upon objectives. risk acceptance: an informed decision to accept the consequences and the likelihood of a particular risk. risk avoidance: an informed decision not to become involved in a risk situation. Best Practice Guideline A5: Managing construction procurement risks Page 1

risk control: the part of risk management which involves the implementation of policies, standards, procedures and physical changes to eliminate or minimise adverse risks. risk management: the logical method of establishing the context, identifying, analyzing, evaluating, treating, monitoring and communicating risk associated with any activity, function or process in a way that will enable losses to be minimised and opportunities to be maximised. risk transfer: shifting the responsibility or burden of loss to another party through legislation, contract, insurance or other means or shifting a physical risk or part thereof elsewhere. The main elements of the risk management process are as shown in Figure 1 and tabulated in Table 1. Table 1: The main elements of the risk management process Element Consideration 1 Establish the context Establish the strategic, organizational and risk management context in which the rest of the process will take place. Criteria against which risk will be evaluated should be established and the structure of the analysis defined. 2 Identify risks Identify what, why and how things can arise as the basis for further analysis. 3 Analyse risks Determine the existing controls and analyse risks in terms of consequence and likelihood in the context of those controls. The analysis should consider the range of potential consequences and how likely those consequences are to occur. Consequence and likelihood may be combined to produce an estimated level of risk. 4 Evaluate risks Compare estimated levels of risk against the pre-established criteria. This enables risks to be ranked so as to identify management priorities. If the levels of risk established are low, then risks may fall into an acceptable category and treatment may not be required. 5 Treat risks Accept and monitor low-priority risks. For other risks, develop and implement a specific management plan which includes consideration of funding. 6 Monitor and review Monitor and review the performance of the risk management system and changes which might affect it. 7 Communicate and consult Communicate and consult with internal and external stakeholders as appropriate at each stage of the risk management process and concerning the process as a whole. 3. Construction related risk 3.1 Introduction All engineering and construction projects are subject to risks which can affect their successful completion. Risks can influence the delivery of a project with respect to time, cost and quality. The generic sources of risk on such projects include commercial and legal relationships, economic circumstances, human behaviour, natural events, political circumstances, technology and technical issues, management activities and controls and individual activity. On engineering and construction projects carried out with internal resources, i.e where no work is outsourced, only the organisation requiring the project, for practical purposes, is at risk. However, where construction projects are implemented by contract, a number of parties can be at risk, the principal ones being: Best Practice Guideline A5: Managing construction procurement risks Page 2

Establish the context The strategic context The organisational context The risk management context Develop criteria Decide the structure Identify risks What can happen? How can it happen? Analyse risks Determine existing controls Determine likelihood Determine consequences Estimate level of risk Monitor and review Evaluate risk Compare against criteria Set risk profiles Treat risks Identify treatment options Evaluate treatment options Select treatment options Prepare treatment plans Implement plans Accept risk? Figure 1: The process associated with establishing and implementing a risk management plan the employer the contractor (and subcontractors) professional service providers The allocation to the various parties of responsibility for dealing with specific risks is an important aspect of risk management. 3.2 Risk allocation Ideally, responsibility for indemnifying the consequences of a risk should rest with the party which has control over that risk. In practice, however, it may be preferable that responsibility for a risk is borne by the party best able to manage it. The sharing of risks and requirements for indemnities, supporting insurance, sureties, retention money etc. should be set out in the contract data. Standard conditions of contract, supplemented by contract specific data, normally perform this function. Best Practice Guideline A5: Managing construction procurement risks Page 3

The typical allocations of total risk between the two main parties, the employer and the contractor, on the commonly encountered contracting and pricing strategies are illustrated in Figure 2. Min Lump sum Bill of Quantities Pricing strategy Employer s flexibility Schedule of rates & target cost Cost + fixed fee Cost + % fee Max Min Max Employer s risk Contractor s incentive / risk Max Min Design and build Develop and construct Contracting strategy Design by Management employer contract Construction Management Construction Management Design and Build Develop and Construct Design by Employer Management Contract Similar to a management contract, the main difference being that the trade contracts are between the Employer and the various trade contractors. The Contractor undertakes most of the design and all construction in accordance with the Employer s brief and a his detailed tender submission, usually for a lump sum price. Similar to design and build, except that the Employer issues a concept design on which tenders are based. The Contractor undertakes only construction on the basis of full designs issued by the Employer. A management contractor is appointed to engage and manage a number of trade contractors to carry out construction on the basis of designs issued by the Employer, as and when they are completed. The trade contracts are between the management contractor and the various trade contractors. Figure 2: Trade offs and trends in the allocation of risk in engineering and construction contracts It can be seen in Figure 2 that the contractor s incentive is related to his risk exposure. On the other hand, the employer s flexibility is related to his risk exposure. The greater the risk borne by the employer, the less certain is the cost of a project. However, the greater the risk borne by the contractor the greater is the probability of higher tender prices being received. Thus, the choice of contracting and pricing strategy permits the employer to pass risk onto the contractor in exchange for a cost premium, but with greater certainty of out-turns cost. Conversely, the less risk passed onto a contractor, the greater the likelihood of an economical out-turn cost. Many unforeseen conditions, or unexpected events, may cause cost increases and the employer may, also, have unrealistic expectations regarding time and cost of construction, which may force contractors into unrealistic gambles, improvident corner-cutting, or commitments that may be unrealistic. Best Practice Guideline A5: Managing construction procurement risks Page 4

The construction industry is fiercely competitive in nature. Frequently, disputes arise over the rights and obligations of the parties, particularly where unexpected risk, which results in financial loss, is experienced. In such instances, relationships become adversarial and, often, energies are directed towards objectives other than getting the project completed to the correct quality, on time and within budget. The misallocation and misperception of risks can result in the employer paying more than is necessary for projects due to, inter alia, tender contingencies and unanticipated involvement in dispute resolution. Improper risk allocation can, also, cause additional costs in the form of delay in gaining use of a facility. Accordingly, particular care needs to be taken when developing contract documents for projects to ensure that risks are carefully and comprehensively allocated to the most appropriate parties. 3.3 Insurance Most physical risks can be insured against. For example, on engineering and construction works contracts a contractor can have many risks covered by effecting insurances such as Contract Works Insurance, Public Liability Insurances, SASRIA Special Risks Insurance, Removal of Support Insurance, general insurance cover for plant owned or hired by them, and Professional Indemnity Insurance. Insurance is not a substitute for effective risk management. Insurance is only intended to deal with measurable or known risks and serves to spread the impact of loss. It cannot deal with uncertainty itself and cannot prevent loss. Most standard forms of engineering and construction contracts require the contractor to effect a range of insurances and to extend such cover to subcontractors. Some require that, in addition, contractors effect specific insurances. Historically, many organs of state, particularly at national and provincial level, have required contractors themselves to effect the relevant insurances. In contrast, many public utilities and local authorities have their own Contractor s All Risk policies and work put out to contract is automatically insured through Principal Controlled Insurance, which may include an element of self insurance. In such cases, contractors are, normally, required to effect only supplementary insurance cover, such as insurance of construction plant and equipment, tools, offices and other temporary structures and contents, insurance in terms of the provisions of the Compensation for Occupational Injuries and Diseases Act of 1993, motor vehicle liability insurance and insurance for the manufacture / fabrication of portions of the works at premises other than the contract site. There could be benefits to both the employer and emerging contractors / small and micro enterprises should the employer take out Contractors All Risks insurance under which work put out to contract would be automatically insured. In contractor development programmes, insurance excesses can, in some instances, be higher than the profits generated on labour only contracts and could result in insolvency of contractors, unless mechanisms are put in place to assist them in meeting the excesses, where claims have arisen due to unavoidable circumstances. Forward cover can be taken out to insure against currency fluctuations on imported components. Risks which are retained by the employer and are not covered by insurance should instead, be covered by reasonable budgetary provisions made in advance. 4. Guidelines for risk management 4.1 General Since risk cannot be eliminated, but should be managed, it is better to be proactive than reactive. Procurement risk should be identified and assessed on a case by case basis. As a general rule, the aim should be to allocate risks to those best able to manage them provided that the cost of transferring them to that party does not exceed the cost of retaining them. In many cases, this will be the contractor. Transferring a risk to another party might well act as an incentive to that party to improve its performance. Best Practice Guideline A5: Managing construction procurement risks Page 5

However, forcing a party to accept a risk which it has little chance of managing, is likely to be costly and counter-productive. Where there is doubt about where a risk should lie the deciding factor should be the relative costs of transferring it, or retaining it. Risk management by the employer should comprise: an identification of risks, including possible consequential risks; an analysis of risks to determine the probabilities of occurrence and the likely impacts thereof; decisions as to how risks are to be allocated and managed through the life of a project to contain them within acceptable limits; monitoring and controlling changes in risks; and gathering and analysing statistics on the determination / abandonment of contracts, time and cost overruns etc., to enable risks on future contracts to be minimised. In engineering and construction works contracts, risk management may necessitate the: identification of preventative measures to avoid a risk or to reduce its effects; proceeding with a project on a stage-by-stage basis whilst initiating further investigation to reduce uncertainty through better information; consideration of risk transfer in contracting and pricing strategies, with attention to the motivational effects, and the control of risk allocations; consideration of risk transfer to insurers; setting and management of risk allowances in cost estimates, programmes and specifications; and establishment of contingency plans to deal with risks should they occur. 4.2 Procurement documents Procurement documents are important tools for managing risks. Their purpose is to determine the consequences of particular risks which have been identified. Contracts should, accordingly, clearly define the respective responsibilities of the parties and be flexible enough to deal with probable changes. The importance of the clear allocation of risk and the management of change cannot be underestimated, particularly in contracts of developmental nature, where third party management support is involved. Some forms of contract contain procedures which are designed to manage the risk of time and cost overruns. Accordingly, the selection of the appropriate form of contract can form an integral part of the risk management strategy. (See Best Practice Guideline #C2, Choosing an appropriate form of contract for engineering and construction works) Realistic contract periods should be stipulated in contracts. Contract documents should clearly set out all available data, particularly geotechnical data, to permit the cost and time implications of the project to be assessed as accurately as possible. 4.3 Managing risk in certain types of contracting strategies The main risks to the employer where the design by employer contracting strategy is utilised in engineering and construction works contracts are set out in the Table 2 in respect of: contracts where contractors are assisted by means of third party management support (see SANS 1921-4, Third party management support in works contracts, aimed at the use of newly emergent contractors, or fledgling / aspirant contractors; and prime, contracts intended for established /conventional contractors. Best Practice Guideline A5: Managing construction procurement risks Page 6

For contracts of other types, the nature of the risks will be substantially the same, but the management of the risks will vary, depending on the particular circumstances and the contracting strategy which is adopted. Table 2: Main risks to the employer in engineering and construction contracts where the design by employer contracting strategy is utilised. Risk to the Employer Risk of delay from public inquiries, legal formalities, protests by pressure groups, changes in legislation and other third party - influenced activities. Financial hazards such as statutory wage increases and unduly high inflation Liability for death, or injury, to employees, third parties and the public at large. Property loss and damage on the works arising from theft, fire, explosion and other unnatural causes. Risk of adverse effects on, or damage to, third party-owned property and buildings resulting from construction activities. Damage and delay to the works resulting from climatic and weather conditions and incidents. Risks associated with ground conditions including variability, unforeseen difficulties, subsidence and earth movements. Hazards liable to cause damage to vehicles and plant and related death, injury, or damage to third parties and property. Liability for non-compliance with statutory obligations relating to construction work. Failure by the Contractor to adhere to the construction programme and/or late completion of the contract. Default, or abandonment of the contract by the Contractor, or insolvency of the Contractor. Is risk normally insurable? Partly Usual method of managing risk Development Prime contracts contract with third party management support (See SANS 1921-4).. and insures. and insures. and insures. and may insure. Employer transfers risk to Contractor and requires him to insure. and insures, or transfers risk to Contractor and requires him to insure. and insures, or transfers risk to Contractor and requires him to insure. Employer transfers risk to Contractor.. Employer retains some risk and transfers the balance to the Contractor. and insures. Employer transfers risk to Contractor. but may require some penalty from the Contractor. Employer transfers risk to Contractor and requires him to insure. but requires a realistic penalty from the Contractor.., but requires Contractor to furnish surety for part of the contract value to be invoked in the event of default. Best Practice Guideline A5: Managing construction procurement risks Page 7

Poor workmanship by the Contractor resulting in the necessity for repairs and unduly high maintenance, or the presence of latent defects. Negligence of Professionals resulting in faulty design and contract documentation, or poor contract supervision and administration., but but withholds withholds retention money retention money for for maintenance over a maintenance over a limited period. The limited period. Risk possibility of action against can be reduced by requiring the Contractor at a later stage in respect of latent professionals to defects is not precluded. oversee construction works. Employer transfers risk to Professionals and requires them to insure. Best Practice Guideline A5: Managing construction procurement risks Page 8