July 31, 2015. Dear Dr. Biegalski:



Similar documents
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

March 27, Massachusetts Institute of Technology Research Reactor

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT /

PUBLIC MEETING. details&code APPLICATIONS FOR NUCLEAR POWER PLANTS Regulatory Guide [Revision]

Sara Brock Counsel for NRC Staff

August 15, Docket No License No Control No

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS

May 23, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

A-Ow INDIA NA MICHIGAN POW!ER. September 18, 2015 AEP-NRC CFR Docket No.:

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT / )

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, Palo Verde Nuclear Generating Station, Units 1, 2, and 3

June 8, SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report No )

May 5, Mr. Brian Almon Public Utility Commission of Texas 1701 N. Congress Avenue P.O. Box Austin, Texas

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, 2014

NRC REGULATORY ISSUE SUMMARY , REQUESTING QUALITY ASSURANCE PROGRAM APPROVAL RENEWALS ONLINE BY ELECTRONIC INFORMATION EXCHANGE

ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk Rockville Pike Rockville, MD 20852

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

October 20, 2004 LOUISIANA ENERGY SERVICES - REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING PLAN

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

MATERIALS LICENSE. Delaware City, Delaware Docket No Reference No.

Crystal River Unit 3 License Transfer Notification of Transfer Date

March 20, On Wednesday, March 7, 2012, the U.S. Nuclear Regulatory Commission s staff held a public

Risk Management GUIDE GUIDE. for PHYSICIAN. Austin, TX

June 25, FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Standard Review Plan for Renewal of Specific Licenses and Certificates of Compliance for Dry Storage of Spent Nuclear Fuel

License Application Package Overview MOX Fuel Fabrication Facility 27 September 2006

POLICY ISSUE (INFORMATION)

Security for Independent Spent Fuel Storage Installations (ISFSI)

NUCLEAR REGULATORY COMMISSION [EA ; NRC ] In the Matter of Northern States Power Company, Minnesota

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C June 1, 2005

August 24, 2009 NRC INSPECTION REPORT / AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Defense Logistics Agency; DLA Strategic Materials

NEI 06-13A [Revision 2] Template for an Industry Training Program Description

SUBCHAPTER EE. High Deductible Health Plans 28 TAC INTRODUCTION. The Texas Department of Insurance proposes new 21.

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.

May 30, Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

CHAPTER 3. LIFE, ACCIDENT, AND HEALTH INSURANCE AND ANNUITIES Subchapter QQ, Provider Network Contract Registration 28 TAC

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

May 9, 2013 SUBJECT: FINAL SAFETY EVALUATION FOR TECHNICAL REPORT NEI 11-04, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 0

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

May 7, SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH / , NOTICE OF VIOLATION, AND NOTICE OF NONCONFORMANCE

Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 37

Westinghouse. Westinghouse Electric Company

DRAFT REGULATORY BASIS TO CLARIFY 10 CFR PART 21, REPORTING OF DEFECTS AND NONCOMPLIANCE

AoDI. December 9, 2015 NOC-AE CFR U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC

DRAFT REGULATORY GUIDE

Security Requirements for Spent Fuel Storage Systems 9264

September 15, Docket No General License (10 CFR 31.5)

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC

Florida Gas Transmission Company, LLC Docket No. RP

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA

Transcription:

July 31, 2015 Dr. Steven Biegalski, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Rd, Bldg 159 Austin, Texas 78758 SUBJECT: UNIVERSITY OF TEXAS AT AUSTIN - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE RENEWAL REQUEST FOR THE NUCLEAR ENGINEERING TEACHING LABORATORY TRIGA MARK II NUCLEAR RESEARCH REACTOR (TAC NO. ME7694) Dear Dr. Biegalski: The U.S. Nuclear Regulatory Commission (NRC) is continuing its review of your application for renewal of Facility Operating License No. R-129, for the University of Texas at Austin, dated December 12, 2011, as most recently supplemented on July 15, 2015 (redacted version available on the NRC s public website, www.nrc.gov, in the Agencywide Documents Access and Management System [ADAMS], Accession Nos. ML12156A097 and ML15211A638) respectively. During our review of your recent submittal, a question has arisen for which we require additional information. Please provide responses to the enclosed request for additional information within 30 days of the date of this letter. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.30(b), Oath or affirmation, your response must be executed in a signed original under oath or affirmation. Your response must be submitted in accordance with 10 CFR 50.4, Written Communications. Information included in your response that is considered sensitive, or proprietary, that you seek to have withheld from the public, must be marked in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding. Any information related to security should be submitted in accordance with 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements. Following receipt of the additional information, we will continue our evaluation of your amendment request.

S. Biegalski -2- If you have any questions regarding this review, please contact me at (301) 415-2856 or by electronic mail at Michael.Balazik@nrc.gov. Sincerely, /RA by DHardesty for/ Docket No. 50-602 cc w/encl: See next page Michael F. Balazik, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

University of Texas at Austin Docket No. 50-602 cc: Governor s Budget and Planning Office P.O. Box 13561 Austin, TX 78711 Bureau of Radiation Control State of Texas 1100 West 49 th Street Austin, TX 78756 Dr. William Powers, Jr., President University of Texas at Austin Nuclear Engineering teaching Laboratory Austin, TX 78758 Office of the Governor P.O. Box 12428 Austin, TX 78711 P. Michael Whaley, Associate Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road Austin, TX 78758 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

S. Biegalski -2- If you have any questions regarding this review, please contact me at (301) 415-2856 or by electronic mail at Michael.Balazik@nrc.gov. Sincerely, /RA by DHardesty for/ Docket No. 50-602 cc w/encl: See next page Michael F. Balazik, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation DISTRIBUTION: Public RidsNrrDpr RidsNrrDprPrta MBalazik, NRR PBoyle, NRR RTR r/f RidsNrrDprPrtb AAdams, NRR NParker, NRR LTran, NRR ADAMS Accession No: ML15211A362 OFFICE DPR/PRLB: PM DPR/PRLB: LA DPR/PRLB: BC DPR/PRLB: PM MBalazik ELee AAdams MBalazik NAME (DHardesty for) (w/comment) (LTran for) (DHardesty for) DATE 7/31/2015 7/31/2015 7/31/2015 7/31/2015 OFFICIAL RECORD COPY

OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL REQUEST FOR THE UNIVERSITY OF TEXAS AT AUSTIN TRIGA MARK II NUCLEAR REACTOR LICENSE NO. R-129; DOCKET NO. 50-602 The U.S. Nuclear Regulatory Commission (NRC) is continuing its review of your application for renewal of Facility Operating License No. R-129, for the Nuclear Engineering Teaching Laboratory (NETL) TRIGA Mark II Nuclear Research Reactor (the facility) owned by the University of Texas at Austin (UT, the licensee), dated December 12, 2011, as most recently supplemented on July 15, 2015 (available on the NRC s public website, www.nrc.gov, in the Agencywide Documents Access and Management System (ADAMS), Accession Nos. ML12156A097 and ML15211A638). During the review of your recent submittal for license renewal of the NETL TRIGA Mark II Nuclear Research Reactor (herein referred to as UT TRIGA), the following question has arisen for which we require additional information. The guidance in NUREG-1537 Section 4.5.2, Reactor Core Physics Parameters, requests the applicant provide calculations of certain core physics parameters and compare them with applicable measurements. A request for additional information was sent to you in a letter dated July 25, 2012 (ADAMS Accession No. ML15211A638), regarding a comparison of calculated and measured values for reactivity parameters. In response, your submittal dated July 15, 2015 (ADAMS Accession No. ML121500308), provided calculations for control rod worth and excess reactivity in Tables 11 and 12, respectively. In addition, you provided comparisons of these calculations and measurements in Table 13. a. In Table 11, your calculations of excess reactivity and control rod worth on 3/16/1992, 7/24/2007, 6/4/2008, 6/11/2008, 6/14/2010, 6/23/2010, 7/25/2011, and 8/2/2012 indicate the shutdown margin for the UT TRIGA reactor would have a positive reactivity. A positive reactivity would not meet Technical Specification 3.2 Shutdown Margin. Please justify why the positive reactivity presents an acceptable level of safety regarding shutdown margin for the UT reactor. b. In Tables 11 and 12, your calculations for excess reactivity are consistently higher than the measured values. The average bias between the calculated and measured values is $2.56. Please justify why this bias presents an acceptable level of agreement in modeling the UT reactor. c. Control rod worth in Table 13 appears to be inconsistent. For example, the Regulating Rod worth varies between +12.7% and -21.2%. Specifically, the values for two separate Regulating Rod data points on 7/13/2012, changes from -10.1% to +12.7%. Similarly, Shim-2 worth varies between -23.1% and +30.1%. Please justify why these variations indicate an acceptable level of agreement in modeling the UT reactor. ENCLOSURE