PRIVATE WELL SEPARATION



Similar documents
SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

The Plumbing Pipeline

CHAPTER 11 STORM DRAINAGE

Downspout Disconnection Program FAQs

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Beacon Hill Sewer District Standard Specifications

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

CHAPTER 11 STORM DRAINAGE

SECTION STORM DRAINAGE SYSTEM

SECTION STORM DRAIN SYSTEM

SECTION FACILITY STORM DRAINAGE PIPING

SANITARY SEWER BACKUP. Causes & Prevention

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Mobile Home Pre-Inspection Checklist

SECTION STORM DRAINAGE TABLE OF CONTENTS

Sewage Compliance Form Instructions

4.3 Cisterns and Rain Barrels

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Well Records and Maintenance Guidelines

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

SEWER BACKUP PREVENTION PROGRAM

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Protect Your Home From Flooding. A guide for Lethbridge Residents

Town House Center Highway North Huntingdon, PA 15642

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

Protect your home from basement flooding

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

Jay R. Smith Mfg. Co.

The Town of Lakeshore Basement Flooding Information to Residents

Preventing water damage in the basement

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

Wastewater Capital Projects Management Standard Construction Specification

How To Install An Overhead Sewer

LS 2540 SEWER LATERALS AND INSPECTION TEES

Downspout to storm sewer. Leaky laterals

OVER-HEAD SEWER ASSISTANCE GRANT

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Top 10+ Mistakes of DWV plumbing design

Requirements for Building Application Submission

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES

a guide to PREVENTING HOME FLOODING DURING STORMS

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)


Revised April (May) 2015

SECTION SELECTIVE DEMOLITION

SECTION PRECAST CONCRETE UTILITY STRUCTURES

PLUMBING ROUGH IN INSPECTION

SECTION 3 SANITARY SEWER DESIGN

Protect your. home from. basement. have you done everything you can?

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

C. Section TESTING LABORATORY SERVICE.

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS

Fats, Oil and Grease. Best Management Practices Manual. Information, Pollution Prevention, and Compliance Information For Food Service Facilities

Plugging Home Drains to Prevent Sewage Backup

SANITARY SEWER SPECIFICATIONS

WATER SERVICE 2

Essential Water. Customer Charter

Copper and Copper Alloy Tube, Pipe and Fittings

2010 Residential Water Heater Replacement Check List

SECTION GROUND WATER STORAGE TANKS

SECTION SITE PREPARATION

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

CHAPTER 32 PLUMBING CODE

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

SEWER BACK UP PREVENTION PILOT PROGRAM

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

INTERCEPTORS TABLE OF CONTENTS S-WD-INTER

Specifications for Residential Property Owners Connection to New Public Sewer

DIVISION 4300 STORM DRAINAGE

San Joaquin County. Well Standards. (San Joaquin County Ordinance Code Section )

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

PREVENTING WET OR FLO ODED BASEMENTS

Constructing Cistern Installations

SECTION 1 GENERAL REQUIREMENTS

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

MOBILE HOME LAW. Revised November 2001

FAQ and Device/Usage Chart. What Is a Cross-Connection? What Is Backflow Prevention? What Is Backflow?

Town of Beaumont. Lot Grading Guidelines

What to Expect From the Examination. How to Study the Plumbing Codes

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

Sanitary Sewer Overflow (SSO) Incident Report Form

Chapter 7 Plumbing Connections

Additional Services Agreement. Part 3: Schedule of our requirements

CHAPTER 11 STORM DRAINAGE

See Appendix A for additional information, or contact ASTM directly.

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Why Do I Have Sewer Smells In My Home or Business?

SECTION SEWERAGE AND DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Transcription:

PRIVATE WELL SEPARATION This is an explanation to explain what you have to do with your well, and/or the other sources of water that you may have, in order to receive public water. The term well includes all private water sources on the property (cisterns, springs, etc.). To obtain service from the Town of Batavia, the private water source must be dealt with in accordance with the New York State Sanitary Code, Part V. The New York State and local Health Departments require water purveyors to operate under and enforce the State Sanitary Code. These regulations are meant to protect the public water system as well as the underground aquifer (if you would like a copy of these regulations you can request one from us). As a result, you must choose one of three options to ensure that the well and public water supply are permanently separated. The options are: (1) abandon your well, (2) separate the plumbing of the well and the public sources, or (3) install and maintain an approved backflow prevention device. Option 1 - Well Abandonment: The best long-term option for you and the Town of Batavia is to simply abandon your well in accordance with the Health Department regulations. This saves you the expense of using and maintaining the well (i.e., electricity, replacing the well s components such as the pump, bladder tank, foot valve, etc.), the inconvenience of having to abandon the well sometime in the future. In most cases, the cheapest and easiest abandonment method (for a well with a casing pipe) is to remove the casing to a depth of 18 inches below the ground and install a concrete cap. The cost of this method can be reduced further if you are the handy, do-it-yourself type that does not need to have a plumber do all the work. The abandonment must be inspected by the Town, which is done free of charge. Other requirements that must be followed and alternate methods of abandonment for the various types of wells and private sources of water (e.g. dug well or cistern) are described below. 1. Cisterns a. Disconnect all incoming source pipes from the gutters or roofs and divert this storm drainage outside. b. Drain or pump the cistern dry. c. Cut and plug all incoming source pipes either on the inside or outside of the cistern wall. d. Disconnect and remove all supply pumps and appurtenances. e. Cut and plug all supply piping (suction and discharge) either on the inside or outside of the cistern wall. 2. Springs a. Remove any pump, piping, and/or electrical conduit/cable from inside the spring. b. Cut and cap the water supply line(s) outside of the spring enclosure. c. Cap the water supply line(s) at the inside wall of the house or other structure(s). d. Provide drainage relief for the spill basin. 3. Dug Well b. Cap the water supply line(s) at the inside wall of the house or other structure(s).

c. Fill well with clean fill. 4. Drilled or Driven Well Scenario No. 1 b. Plug and cap the water supply line(s) at the inside wall of the house or other structure(s). c. Lower the well casing a minimum of 18 inches below grade and tightly cap the well casing by employing one of the following methods: Place a cover or cap over the top of the well casing. Install a concrete cap, 12 inches in thickness with a round area of twice the diameter of the casing (see Figure No. 2) or a square area with a side dimension of twice the diameter of the casing (not shown in the figure). Plastic Casing Solvent weld a plastic cap to the top of the well casing. Cast Iron/Steel Casing Completely weld (continuous bead) a ¼ steel plate to the top of the well casing. 5. Drilled or Driven Well Scenario No. 2 b. Plug and cap the water supply line(s) at the inside wall of the house or other structure(s). c. Fill well casing with puddled clay (bentonite), concrete, or neat cement (ASTM C150). Option 2 - Well Separation: Your second option is separation of the public and the private systems. The plumbing system from your well must be totally isolated from any plumbing connected to the public system. After you separate the plumbing systems, the Town must inspect them before your water service is turned on. Health Department regulations also require additional inspections, every three years and whenever the home is sold, for as long as the well exists on the property. Option 3 Backflow Prevention Device: Your third option is to install an approved backflow prevention device on your public service near the meter. This is typically the most costly option, but affords you the greatest flexibility for the use of your well. This option requires the installation of the backflow device be designed by a Licensed Professional Engineer or Architect whom you will need to contact directly. In addition, this device needs to be inspected, initially by the Town, and then every year by a tester certified by the Health Department (usually a plumber).

TOP VIEW SIDE VIEW WELL ABANDONMENT DETAIL DATE: 10/24/06 SCALE: NONE WELL ABANDONMENT DETAIL TOWN OF BATAVIA FIGURE #3 TOWN OF BATAVIA GENESEE COUNTY NEW YORK