MEM18084A Commission and decommission split air conditioning systems

Similar documents
MEM30021A Prepare a simple production schedule

MEM11015B Manage warehouse inventory system

Release: 1. MEM25014B Perform marine slipping operations

CPCPMS3017A Install and test split system air conditioning

UEENEEJ164A Analyse the operation of HVAC air and hydronic systems

FNSRSK601A Develop and implement risk mitigation plan

CPCPFS4005A Commission fire alarm and detection systems

Release: 1. MEM07022C Program CNC wire cut machines

Elements Elements describe the essential outcomes.

LMFGN3002B Estimate and cost job

TAEDES401A Design and develop learning programs

UEGNSG708A Pressure Test Residential and Small Commercial Gas Installations

AURC465349B Prepare a vehicle repair quotation

Release: 1. MEM30019A Use resource planning software systems in manufacturing

Revision Number: 1. BSBADM307B Organise schedules

CPPSEC4016A Install networked security system

LMTCL4002A Assemble and fit commercially tailored or bespoke garments

Elements Elements describe the essential outcomes.

Release: 1. ICAICT604A Identify and implement business innovation

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

ICTSUS4183A Install and test renewable energy system for ICT networks

UEENEEJ191A Select residential air conditioning system equipment, components and accessories

Release: 1. ICADBS603A Determine suitability of database functionality and scalability

Elements Elements describe the essential outcomes. 1. Prepare to dismantle air conditioning compressor

Revision Number: 1. FNSMCA301A Collect debts

Release: 1. CPPSEC4015A Maintain networked security system

FNSCRD505A Respond to corporate insolvency situations

ICTTEN2209A Build and maintain a secure network

UEENEEJ139A Develop specifications and prepare drawings for HVAC/Refrigeration projects

LGAGOVA616A Provide property asset management services

FNSIBK605A Manage insurance brokerage service performance

CPPSEC2021A Install security equipment and systems

Release: 1. CPCCBC4026A Arrange building applications and approvals

FNSSUP301A Process superannuation fund payments

CPCPPS5014A Locate and maintain piping systems

Release: 1. FNSILF302A Process a life insurance application

Release: 1. BSBPMG503A Manage project time

FNSPIM303A Work within the personal injury management sector

FNSIBK404A Provide a claims service to an insurance broking client

FNSILF303A Issue a life insurance policy

Release: 1. BSBPMG509A Manage project procurement

Release: 1. RIIBEF602A Establish and evaluate operational performance management systems

CPPSEC4017A Determine security system configurations

FNSRTS309A Maintain main bank account

BSBMKG508A Plan direct marketing activities

LMFFDT4012A Produce ideation drawings

FNSPIM411A Manage personal injury case loads

AHCORG502A Prepare the enterprise for organic certification

Release: 1. BSBPMG510A Manage projects

Revision Number: 1. ICPPP397A Transfer digital files

FPICOT2221A Trim and cross cut felled trees

PSPCRT409B Administer court fines and debt management

BSBGOV403A Analyse financial reports and budgets

Release: 1. CPPDSM4080A Work in the real estate industry

Refrigeration, Air Conditioning and Appliance Servicing

MEM30405 Certificate III in Engineering - Electrical/Electronic Trade

Release: 1. FNSRTS302A Handle foreign currency transactions

Release: 1. AURT322666A Repair/retrofit air conditioning systems

Release: 1. ICAPMG601A Establish IT project governance

PRSSM419A Install networked security system

UEENEEF007B Set up the wireless capabilities of communications and data storage devices

Release: 1. ICADBS601A Build a data warehouse

BSBLEG515A Apply legal principles in wills and probate matters

AHCPRK201A Care for health and welfare of pigs

Release: 1. RIIOHS302A Implement traffic management plan

Revision Number: 1. BSBFIA302A Process payroll

Release: 2. UEENEEJ194A Solve problems in low voltage refrigeration circuits

BSBMKG506B Plan market research

Release: 1. ICASAS407A Conduct pre-installation audit for software installation

ICPCF406C Set up and load in-line smart card machine

Release: 1. CPPDSM5032A Market the agency

Release: 1. CPCCWP3004A Apply waterproofing remedial processes

FNSACC611A Implement an insolvency program

Revision Number: 1. CUFBRT402A Maintain broadcast equipment and facilities

How To Understand The Unit Of Competency

Release 1. BSBWHS508A Manage WHS hazards associated with plant

Release: 1. UEENEED012B Support computer hardware and software

ICAS4134C Provide first-level remote help desk support

MSACMT260A Use planning software systems in manufacturing

Release: 1. MEM234013A Plan and design engineering-related manufacturing processes

Release: 1. ICADBS412A Build a database

Release: 1. BSBSLS402A Identify sales prospects

Release 1. ICAICT814A Develop cloud computing strategies for a business

BSBINM501A Manage an information or knowledge management system

CPPCCL3020A Develop a plan to mitigate water damage and restore carpet

Release: 1. ICAICT404A Use online learning tools

Release: 1. TAEPDD501A Maintain and enhance professional practice

MEM30205 Certificate III in Engineering - Mechanical Trade

Release: 1. CPPSEC3020A Monitor security from control room

ICANWK402A Install and configure virtual machines for sustainable ICT

Refrigeration / Air Conditioning Mechanic

AURS344330A Inspect, appraise and purchase used motor vehicles to supplement stock for sale

Release: 1. ICTWOR3093A Manage spare parts

Release: 1. AHCFIR501A Manage wildfire hazard reduction programs

ICAB5071B Review developed software

TLIL4059A Implement asset management systems

PUASES013A Undertake storm and water damage operations performed at heights

Release: 1. CPPDSM4003A Appraise property

FDFRB3015A Produce and decorate gateaux and tortes

Release: 1. ICAPRG426A Prepare software development review

Transcription:

MEM18084A Commission and decommission split air conditioning systems Release: 1

MEM18084A Commission and decommission split air conditioning systems Modification History Not Applicable Unit Descriptor Unit descriptor This unit covers commissioning and decommissioning of split air conditioning systems to relevant standards, codes and local regulations. Application of the Unit Application of the unit It includes the application of safe working practices, following standard procedures to pressure test, evacuate, recover, charge and perform functional checks to test system performance. This unit refers to plug in appliances only. For hard wired installations a licensed electrical tradesperson must undertake connection and disconnection. Band: A Unit Weight: 4 Licensing/Regulatory Information Not Applicable Pre-Requisites Prerequisite units Path 1 MEM09002B Interpret technical drawing MEM12023A Perform engineering measurements Approved Page 2 of 11

Prerequisite units MEM18001C MEM18002B MEM18055B Use hand tools Use power tools/hand held operations Dismantle, replace and assemble engineering components Employability Skills Information Employability skills This unit contains employability skills. Elements and Performance Criteria Pre-Content Elements describe the essential outcomes of a unit of competency. Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. Approved Page 3 of 11

Elements and Performance Criteria ELEMENT PERFORMANCE CRITERIA 1. Determine the operating conditions of vapour compression systems 2. Recover refrigerants from split air conditioning systems 3. Pressure and leak test split air conditioning systems 1.1. Established procedures are used to determine the actual and specified range of operating conditions from measured and calculated values as they apply to particular vapour compression systems. 1.2. Established OHS procedures and risk control measures for carrying out the work are followed. 1.3. Operating conditions are established and recorded on commissioning documentation. 1.4. Tools, equipment and testing devices needed to determine the basic operating conditions are obtained and checked for correct operation and safety 1.5. The system is checked and isolated where necessary, in strict accordance OHS requirements and procedures 2.1. Circuits/appliances are isolated where necessary in strict accordance OHS requirements and procedures. 2.2. Refrigerants are removed safely into suitably labelled containers in accordance with legislative and industry requirements. 2.3. Contaminated refrigerant is dealt with in accordance with legislative and industry requirements. 3.1. Safety hazards are identified and noted and established risk control measures are implemented. 3.2. Industry codes of practice and manufacturer installation instructions are followed. 3.3. Precautions are taken to prevent damage to components while pressure testing the system. 3.4. Pressure testing is conducted at a pressure compatible with the refrigerant to be used. 3.5. Leaks are located, isolated and repaired using methods appropriate to the system type under test and in accordance with industry practices. 4. Evacuate split air 4.1. Safety hazards which have not previously Approved Page 4 of 11

ELEMENT conditioning systems 5. Charge split air conditioning systems 6. Test the operation of split air conditioning systems 7. Complete the commissioning/recommission ing of split air conditioning systems PERFORMANCE CRITERIA been identified are noted, and established risk control measures are implemented. 4.2. The system is evacuated to the required level and cleaned the system of all moisture and other containments in accordance with legislative and industry requirements. 4.3. A standing vacuum test is applied in accordance with industry codes of practice and applicable standards. 5.1. Correct refrigerant is selected for the system, in accordance with manufacturer requirements and industry practices. 5.2. The refrigerant charge is measured by weight in accordance with manufacturer specifications. 5.3. The system is charged correctly in accordance with manufacturer requirements and industry practices. 5.4. All components are checked and maintained in accordance with manufacturer requirements. 6.1. The system is started and operated in accordance with manufacturer instructions 6.2. Standard tests are carried out to confirm system performance to manufacturer specifications. 6.3. The refrigerant charge is checked and refrigerant added if required. 6.4. The system is leak checked in accordance with refrigeration procedures and practices. 6.5. Test data is recorded as required. 7.1. The worksite is cleaned and left in presentable condition in accordance with original presentation, client requirements, industry standards and organisational requirements. 7.2. Final inspections are undertaken to ensure installation conforms with industry, legislative and work order requirements. 7.3. The client is instructed on the use of the product in accordance with organisational requirements and manufacturer Approved Page 5 of 11

ELEMENT 8. Decommission split air conditioning systems PERFORMANCE CRITERIA specifications. 7.4. Certificates of compliance and other relevant commissioning documentation are completed and processed in accordance with State regulatory requirements. 8.1. Plug in appliance is electrically disconnected or arrangements made for appropriately licensed person to isolate hard-wired appliances 8.2. Refrigerants are recovered, stored and disposed of in accordance with legislative and industry requirements. 8.3. Units and components are removed and disposed of safely and in accordance with regulations, industry codes of practice and sustainable environmental practices. 8.4. The worksite is cleaned and left in presentable condition, client and organisational requirements, industry standards and sustainable environmental practices. 8.5. Decommissioning documentation is completed and processed in accordance with State regulatory requirements. Required Skills and Knowledge REQUIRED SKILLS AND KNOWLEDGE This section describes the skills and knowledge required for this unit. Required skills Look for evidence that confirms skills in: reading, interpreting and following information on written job instructions, specifications, standard operating procedures, charts, catalogues, lists, drawings and other applicable reference documents effective communication with appropriate persons planning and sequencing operations checking and clarifying task related information using tools, techniques and equipment necessary to check for correct operation Approved Page 6 of 11

REQUIRED SKILLS AND KNOWLEDGE comparing system and component performance/ operation against specification identifying faulty components and non-compliances using appropriate test equipment to identify non-compliance safely removing, containing and adding refrigerant to relevant Australian Standards or codes and regulations making required adjustments to achieve specifications applying safety procedures, standard operating procedures and legislative requirements to all work undertaken completing relevant commissioning and decommissioning documentation Required knowledge Look for evidence that confirms knowledge of: applicable legislative and regulatory requirements, standards, codes, licensing requirements and sustainable environmental practices for commissioning and decommissioning systems applicable procedures and legislative requirements for storage, handling and treatment of ozone depleting and synthetic greenhouse gas refrigerant procedures to determine the actual and specified range of operating conditions from measured and calculated values as they apply to particular vapour compression systems typical work environments, demands and considerations specifications, operational characteristics and process for identifying system components typical problems, contingencies and solutions applicable tools, equipment and testing devices and their operation procedures for evacuating system procedures for leak testing procedures for adding refrigerant requirements and procedures to isolate circuits/appliances procedures for checking air flow measuring instruments/equipment, specifications and procedures for checking temperature and system performance measuring instruments/equipment, specifications and procedures for checking components procedures for reporting non-conformances process for identifying refrigerant type types of commissiong documentation requirements and procedures for completing documentation OHS procedures and risk control measures hazards and risk control measures associated with commissioning split and domestic air conditioning systems Approved Page 7 of 11

Approved Page 8 of 11

Evidence Guide EVIDENCE GUIDE The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. Overview of assessment Critical aspects for assessment and evidence required to demonstrate competency in this unit Context of and specific resources for assessment Method of assessment A person who demonstrates competency in this unit must be able to install split air conditioning systems to manufacturer specifications, safely, to relevant Australian Standards, codes and regulations. Competency in this unit cannot be claimed until all prerequisites have been satisfied. Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts. This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate. This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with commissioning, recommissioning and decommissioning split air conditioning systems or domestic air conditioning and refrigeration appliances and other units requiring the exercise of the skills and knowledge covered by this unit. Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be Approved Page 9 of 11

EVIDENCE GUIDE permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials. Guidance information for assessment Range Statement RANGE STATEMENT The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. Tools, equipment and testing devices Legislative and industry requirements System performance Residential split air conditioning systems Refrigeration gauge manifold, Schraeder access valves; quick connect couplings, thermometer/thermocouple temperature measuring devices; analogue and digital vacuum measuring gauges; digital scales; refrigerant recovery unit; vacuum pump; electronic leak detectors, refrigerant containers/cylinders Commonwealth, State and Territory legislation, regulations, standards and industry codes of practice The Ozone Protection and Synthetic Greenhouse Gas Legislation Amendment Bill 2003; Air conditioning residential best practice guidelines (AIRAH); State and local building regulations Sustainable environmental practices for commissioning and decommissioning split air conditioning and domestic refrigeration. Pressure; temperature; sub cooling; superheating; evaporator coil to air temperature difference Single head split systems up to 18kw cooling capacity Approved Page 10 of 11

RANGE STATEMENT Domestic refrigeration and air conditioning systems Domestic refrigeration and air conditioning systems being self contained 240 volt plug in self contained appliances primarily used in domestic/residential situations Unit Sector(s) Unit sector Co-requisite units Co-requisite units Competency field Competency field Installation and commissioning Approved Page 11 of 11