CHAPTER 14. SOLAR RIGHTS.



Similar documents
City of Alva, Oklahoma Board of Adjustments Meeting Application. Property Address. Owner Address. Owner Name. Owner Phone Number

TREE CONTRACTORS LICENSE APPLICATION

Sec Certificates of use.

C. Development Permit Requirement in Flood Hazard Areas

CHAPTER 15 - BUILDING, PLUMBING, ELECTRIAL AND HOUSING CODES

Chapter 72 ALARMS. [HISTORY: Adopted by the Town Board of the Town of Summit as indicated in article histories. Amendments noted where applicable.

Chapter 5.56 EMERGENCY ALARM SYSTEMS

FRANKLIN TOWNSHIP Erie County, Pennsylvania

The Board of Supervisors of the County of Riverside ordain as follows:

1/ CHAPTER 15 MASSAGE PARLORS

ORDINANCE #44. The Town of Bolton hereby finds and declares the need to protect its

$ Vending from commercial site. $ Door-to-door vending. $75.00 All license renewals.

THE CALIFORNIA SOLAR RIGHTS ACT

ARTICLE V ADMINISTRATION AND ENFORCEMENT

Alarms. Chapter 27 ALARMS. Definitions. Police Alarm System. Alarm System Requirements Alarm System Inspections Alarm Agent Permits

ALARM SYSTEMS INFORMATION & REQUIREMENTS

ORDINANCE NO AMENDING THE SAN MATEO MUNICIPAL CODE TO ADD CHAPTER 7.46 REGARDING MEDICAL MARIJUANA COLLECTIVES REGULATIONS

The Board of Zoning Appeals shall have the duty and power to:

Chapter 5.60 BINGO. Sections:

CHAPTER XVII ALARM SYSTEMS

CHAPTER VIII. HARDSHIP RELIEF

Ordinance Number 642 AN ORDINANCE REGULATING ALARM SYSTEMS IN STEUBEN COUNTY

4-1 Architectural Design Control 4-1 ARCHITECTURAL DESIGN CONTROL 1

CHAPTER 6. Massage Establishments

MASSAGE THERAPY CERTIFICATE 2016 LICENSE APPLICATION INSTRUCTIONS City of Plymouth 3400 Plymouth Boulevard, Plymouth, MN

CHAPTER 23 Wireless Communication Facilities

A bill to be entitled

Chapter 9.42 FORTUNETELLING AND OCCULT ARTS

DATE STAMP RECEIVED BY OFFICE OF PLANNING

ARTICLE 330 Landlord and Rental

Section 801 Driveway Access Onto Public Right-of-Ways

ALARM BUSINESSES. Chapter 129 ALARM BUSINESSES

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

ORDINANCE NO. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HERCULES DOES HEREBY ORDAIN AS FOLLOWS:

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment

ORDINANCE NO. WHEREAS, Grantee shall pay the City of El Paso for this special privilege;

CITY DEVELOPMENT BOARD[263]

Chapter 3.26 CAR RENTAL OCCUPATION TAX

HOUSE BILL No page 2

Dickinson Municipal Code October 2007 PLUMBING

ARTICLE IV. DRIVEWAYS

ARTICLE III. FIRE ALARMS. Sec Purpose. Sec Definitions.

December Purpose

Section Emergency Water Shortage Regulations and Staged Water Use Reduction Plan Section Scope and Purpose

Chapter 5.58 SECURITY ALARM SYSTEMS

MOBILE HOME LAW. Revised November 2001

City of Raleigh Massage Business License Application PO Box 590 Raleigh, NC (919)

ACTS, Chap. 527.

Nebraska Loan Broker Act Chapter 45, Article 1, Section f to

(2) For production of public records or hospital medical records. Where the subpoena commands any custodian of public records or any custodian of hosp

STATE OF OKLAHOMA. 2nd Session of the 44th Legislature (1994) AS INTRODUCED An Act relating to professions and occupations;

St. Louis Park City Code of Ordinances - Chapter 8 Subdivision VI. Massage Therapy Establishments

CHAPTER 721 Peddlers and Solicitors

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

ARTICLE IV: SECURITY ALARM SYSTEMS

Court of Appeals of Ohio

Oklahoma Precious Metal and Gem Dealer Licensing Act 59 O.S

DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA

Virginia Property Owners Association Act

Chapter 8 ALARM SYSTEMS. [HISTORY: Adopted by the Annual Town Meeting, Art. 27. Amendments noted where applicable.] GENERAL REFERENCES

ORDINANCE NO. 72 THE TOWNSHIP BOARD OF TRUSTEES FOR THE CHARTER TOWNSHIP OF LANSING HEREBY ORDAINS:

SUMMIT TOWNSHIP SIGN PERMIT PROCESS

BUCKS COUNTY DEPARTMENT OF HEALTH RULES AND REGULATIONS FOR CONDUCTING AND OPERATING FOOD FACILITIES

TITLE 6. Health and Sanitation CHAPTER 1. Health and Sanitation

DEPARTMENT OF WORKFORCE SERVICES LABOR STANDARDS DIVISION CHAPTER 4

TITLE XI: BUSINESS REGULATIONS 110. CABLE TELEVISION

105 CMR : STATE SANITARY CODE CHAPTER I : GENERAL ADMINISTRATIVE PROCEDURES

This chapter shall be known and cited as the alarm systems code. The provisions of this chapter shall apply to the incorporated area of the city.

City of South Portland Office of the City Clerk P.O. Box 9422 South Portland, ME

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

NATURAL GAS ACT. (Note: All underlined material was added to the Natural Gas Act by the Energy Policy Act of 2005)

CAR DEALERS LICENSE - APPLICATION FORM

NEVADA CHAPTER 82 - NONPROFIT CORPORATIONS

TOWN OF WOODSIDE. The Town Council introduced the attached draft ordinance at its regular meeting on July 28, 2015.

Monroeville Water Works. Emergency Water Conservation Plan

Chapter 5. Code Enforcement

ALARMS. Chapter 32 ALARMS

NC General Statutes - Chapter 136 Article 2E 1

ASSEMBLY, No STATE OF NEW JERSEY. Introduced Pending Technical Review by Legislative Counsel PRE-FILED FOR INTRODUCTION IN THE 1996 SESSION

Ridgway Municipal Code Section Cable Television System Permits

RULES OF TENNESSEE DEPARTMENT OF LABOR DIVISION OF WORKER S COMPENSATION CHAPTER GENERAL RULES OF THE WORKERS COMPENSATION PROGRAM

PUBLIC SAFETY ORDINANCE. Table of Contents

LOCAL LAW BE ENACTED BY THE BOARD OF TRUSTEES OF THE VILLAGE OF MAMARONECK AS FOLLOWS:

BY-LAWS OF ECOLAB INC. (A Delaware corporation) AS AMENDED THROUGH OCTOBER 29, 2015 ARTICLE I OFFICES

Transcription:

CHAPTER 14. SOLAR RIGHTS. For state Solar Rights Act, see W.S., 1977, 34-22-101 et seq. As to authority of town relative to solar rights, see W.S., 1977, 34-22-105. As to building generally, see ch. 5 of this Code. 14-1. Purpose and intent of chapter. 14-2. Definitions. 14-3. Shading of collectors prohibited; location of collectors. 14-4. Certain structures or vegetation exempt from section 14-3. 14-5. Variances. 14-6. Solar access permits- -Generally. 14-7. Same- -Application; fee; issuance. 14-8. Same- -Notice and hearing on application; appeals. 14-9. Same- -Grounds for denial. 14-10. Same- -Waiver of notice and hearing. 14-11. Same- -Contents. 14-12. Same- -Same Recordation with county clerk. 14-13. Abandonment of solar rights- -Generally. 14-14. Same- -Application by adjacent property owners; notices; protest; declaration. 14-15. Recordation of orders of cancellation and declarations of abandonment. 14-16. Burden of proof regarding applications for permits and abandonment. 14-17. Violations and enforcement.

14-1. Purpose and intent of chapter. The purpose of this chapter is to protect the health, safety and general welfare of the community by encouraging the use of solar energy systems. The overall objective of this chapter is to provide adequate protection from interference by structures, trees or topography. It is the intent of this chapter to provide a means of protection for the use of solar collectors without causing undue hardships on the rights of adjacent property owners and to establish solar collectors as a permitted use in all zoning or land use districts. (Ord. No. 115, 1.) 14-2. Definitions. For the purposes of this chapter, the following words and phrases shall have the meanings respectively ascribed to them by this section: Solar Collector: One of the following, which is capable of collecting, storing or transmitting at least twenty-five thousand BTU s on a clear winter solstice day: (a) A wall, clerestory or skylight window designed to transmit solar energy into a structure for heating purposes; (b) A greenhouse attached to another structure and designed to provide part of all of the heating load for the structure to which it is attached; (c) A trombe wall, drum wall or other wall or structural element designed to collect and transmit solar energy into a structure; (d) A photovoltaic collector designed to convert solar energy into electric energy; (e) A plate type collector designed to use solar energy to heat air, water or other fluids for use in hot water or space heating or other applications; (f) A massive structural element designed to collect solar energy and transmit it to internal spaces for heating; or (g) Other devices or combinations of devices which rely upon sunshine as an energy source. Solar right. A property right to an unobstructed line-of-sight path from a solar collector to the sun, which permits radiation from the sun to impinge directly on the solar collector. The extent of the solar right shall be described by the illumination provided by the path of the sun on the winter solstice day which is put to a beneficial use or otherwise limited by this chapter. Winter solstice day. The solstice on or about December 21, which marks the beginning of winter in the northern hemisphere and is the time when the sun reaches its southernmost point. (Ord. No. 115, 2.) 14-3. Shading of collectors prohibited; location of collectors. (a) Except as otherwise provided by this chapter, it is unlawful for the owner

of any real property to erect any structure thereon or to allow any tree, shrub or other vegetation to grow thereon in such a manner as to cast a shadow upon a solar collector located upon the property of another, if that shadow is greater than the shadow cast by a hypothetical wall ten feet in height, located along the boundary lines of the property upon which such structure or vegetation is located, between the hours of 9:00AM and 3:00PM Mountain Standard Time, on the winter solstice day. (b) Solar collectors shall be located on the solar user s property so as not to unreasonably or unnecessarily restrict the uses of neighboring property. (Ord. No. 115, 3.) 14-4. Certain structures or vegetation exempt from section 14-3. The provisions of section 14-3 shall not apply to structures or vegetation in existence upon the effective date of this chapter, nor shall they apply to structures or vegetation in existence prior to the time of installation of a solar energy collection system upon neighboring property. (Ord. No. 115, 4.) Editor s Note- -Ordinance No. 115, from which this chapter is derived, was adopted on July, 8, 1982. 14-5. Variances. Variances from the strict application of the provisions of section 14-3 may be granted by the board of adjustment (Town Council) upon a finding that the strict enforcement of this chapter would result in unnecessary hardship. Notice and procedure shall be the same as followed by the board (Town Council) for variances from the Zoning Ordinance of the town. (Ord. No. 115, 5.) 14-6. Solar access permits- -Generally. (a) Required. No solar right may be perfected unless a solar access permit therefore has been granted and issued by the town. (b) Standards for issuance. A solar access permit shall be granted for any proposed or existing solar collector which complies with the requirements of section 14-3 and all other applicable ordinances of the town. (c) Vesting of solar rights; beneficial use requirement. A solar right vests when the solar access permit is granted and issued. The solar right pursuant to such permit shall be put to beneficial use within two years after issuance; provided, that additional time not exceeding three years may be granted for good cause. The building inspector, shall request of the permitee, provide certification upon the original permit when beneficial use of such right has been made in accordance with the provisions of this subsection. (d) Permits for existing uses. Permits for solar collectors existing on the

effective date of this chapter may be applied for and granted within five years after such date. (Ord. No. 115, 6.) 14-7. Same- -Application; fee; issuance. (a) Any person desiring to obtain a solar access permit shall first make application to the building inspector or other authorized representative of the town, on the appropriate form furnished by the town, providing all information required thereon and accompanied by a fee for such permit in the amount of ten dollars. (b) The Town Council, after review of the application, shall grant a solar access permit for any proposed or existing solar collector which complies with this chapter. 14-8. Same- -Notice and hearing on application; appeals. Upon receiving any application for a solar access permit, and prior to the issuance of any such permit, notice of such application shall be given to all adjacent property owners, by delivery in person or by certified mail. Notice delivered to any occupant over the age of fourteen years shall be deemed to be sufficient notice to all other occupants, owners or other persons claiming any interest whatsoever in such premises or property. The notice shall state the name and address of the applicant for the solar access permit, the street address of the property for which it is sought and the legal description of the property for which it is sought and shall state that written protests may be filed at a place therein designated for a period of ten days, the first day of which shall be the date such notice is delivered in person or deposited in the United States mail, postage prepaid, by certified mail as herein provided. IN the event any such protests are received, a hearing upon the application for the permit shall be conducted, with notice to all protestors and to the applicant, and conducted by the town building inspector or his designated representative. Either party may appeal from the decision of the building inspector to the board of adjustment (Town Council). (Ord. No. 115, 9.) 14-9. Same- -Grounds for denial. An application for a solar access permit may be denied upon any one or more of the following grounds: (a) Inadequacy of information provided in the application (b) Misrepresentation of information furnished in or with the application. (c) Noncompliance with any provision of this Code or other town ordinance or state law. (d) Undue hardship upon adjacent property owners. (e) Undue interference with use of adjacent properties. (Ord. No. 115, 10.)

14-10. Same- -Waiver of notice and hearing. Any applicant for a solar access permit presenting with his application waiver and consent forms properly executed by all of the owners of record of the adjacent properties may be granted a permit without the necessity of notice or hearing. Such waiver and consents shall be prepared by and obtained by the applicant. (Ord. No. 115, 11.) 14-11. Same- -Contents. Each solar access permit issued according to this chapter shall contain a legal description of the property for which the permit is issued, as well as a legal description of each of the surrounding properties, and shall further include a description of the collector surface or that portion of the collector surface for which the permit is granted. It shall further include the dimensions of the collector surface, the direction of orientation, the height above ground level, the location of the collector on the solar user s property and the date the solar access permit was granted and shall have the signature of the building inspector or other authorized representative of the town. (Ord. No. 115, 13.) 14-12. Same- -Recordation with county clerk. Each solar access permit issued in accordance with the provisions of this chapter shall be recorded with the county clerk by the applicant at the expense of the applicant, and the applicant shall return to the building inspector a copy of the permit containing the recording information. No solar right shall be deemed to have been perfected until the provisions of this section have been complied within full, and the applicant shall have sole responsibility for having such permit prepared in recordable form. (Ord. No. 115, 14.) 14-13. Abandonment of solar rights- -Generally. A solar right which is not applied to a beneficial use for a period of five years or more after the issuance of a solar access permit shall be deemed abandoned and without priority. (Ord. No. 115, 8.) 14-14. Same- -Application by adjacent property owners; notice; protest; declaration. A solar right which is not applied to a beneficial use for a period of five years or more may be declared to have been abandoned upon the application of any adjacent property owner. Notice of such application shall be given to the owner of the property or premises for which that solar access permit was granted, and such notice shall be served in the same manner as herein provide for service of notice of an application for a permit and shall inform the holder of a permit that he may protest such demand for abandonment within a period of ten days after the service thereof, in the same manner shall proceed to hearing in the manner as provided for issuance of permits. If no such protest is filed, a

declaration of abandonment shall be entered by the building inspector or other authorized representative of the town without other or further notice. (Ord. No. 115, 12.) 14-15. Recordation of orders of cancellation and declarations of abandonment. An order of cancellation entered by the town shall be recorded with the county clerk by the town at the town s expense. A declaration of abandonment shall be recorded with the county clerk by the person applying therefore, at the expense of such person, and such person shall provide the building inspector or other authorized representative of the town a copy of such declaration of abandonment, containing the recording information, before any such permit shall be deemed to have been fully terminated by declaration of abandonment. (Ord. No. 115, 115.) 14-16. Burden of proof regarding applications for permits and abandonment. In every instance the burden of proof with respect to any application for a solar access permit or any application for abandonment of a permit shall be upon the person making such application. The persons so applying shall have sole responsibility for the preparation and completion of their own forms and documents and for the preparation and delivery of all notices required. (Ord. No. 115, 16.) 14-17. Violations and enforcement. Violation of the provisions of this chapter shall be violation of the civil rights of the aggrieved party and not a violation of criminal law. Accordingly, enforcement shall be by a private civil suit by the aggrieved party. This section shall not be deemed to preclude the town from exercising any remedies it may have by reason of the fact that such violation also constitutes a violation of any other ordinance of the town. (Ord. No. 115, 17.)